Permit GraphShortlistSan Francisco building permits since 2000

Jin Park

License
C41013
Look the license up with the state
Listed as
architect
Firm
Revel
Based in
Sf
On San Francisco permits
Aug 2024 to Aug 2026

35 permits since 2000 (architect on 35 permits): 23 completed, 12 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 19, 2026In progress
issued Aug 2026
580 California StSkyline Construction13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixtures
Details
Permit
202608196811
Status
issued
Filed
Aug 19, 2026
Permit issued
Aug 31, 2026
Declared cost
$966,322
Address
580 California St

13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixtures

Open the permit page

$966,322
Aug 12, 2026In progress
issued Sep 2026
500 Beach StRdl Construction, Inc.ground floor- revision 202607024493- relocate of 2nd exit door, stair and alcove. structrual work included
Details
Permit
202608126453
Status
issued
Filed
Aug 12, 2026
Permit issued
Sep 11, 2026
Address
500 Beach St

ground floor- revision 202607024493- relocate of 2nd exit door, stair and alcove. structrual work included

Open the permit page

Aug 6, 2026In progress
issued Aug 2026
750 Battery StField Construction Inc.4th floor:interior demo & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the commen area restrooms within the e envelope.demo/install of nw finishes & fixtures mech/electrical defer
Details
Permit
202608066202
Status
issued
Filed
Aug 6, 2026
Permit issued
Aug 21, 2026
Declared cost
$2,509,029
Address
750 Battery St

4th floor:interior demo & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the commen area restrooms within the e envelope.demo/install of nw finishes & fixtures mech/electrical defer

Open the permit page

$2,509,029
Jul 2, 2026In progress
issued Jul 2026
500 Beach StRdl Construction, Inc.new demising wall, new entry door & glazing w/exterior canopy, new shared exit vestbulew/new stairs exisitng stairs, ramp and railing will be upgraded to full compliance, inlcuding structrual for new header at entry doors, ceiling ramp and stair w/landing. sprinkler deferred.
Details
Permit
202607024493
Status
issued
Filed
Jul 2, 2026
Permit issued
Jul 30, 2026
Declared cost
$190,000
Address
500 Beach St

new demising wall, new entry door & glazing w/exterior canopy, new shared exit vestbulew/new stairs exisitng stairs, ramp and railing will be upgraded to full compliance, inlcuding structrual for new header at entry doors, ceiling ramp and stair w/landing. sprinkler deferred.

Open the permit page

$190,000
Jun 25, 2026In progress
issued Aug 2026
101 California St10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491
Details
Permit
202606253884
Status
issued
Filed
Jun 25, 2026
Permit issued
Aug 12, 2026
Declared cost
$58,220
Address
101 California St

10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491

Open the permit page

$58,220
Jun 24, 2026In progress
issued Aug 2026
201 Mission StRichlen Construction14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.
Details
Permit
202606243869
Status
issued
Filed
Jun 24, 2026
Permit issued
Aug 21, 2026
Declared cost
$285,000
Address
201 Mission St

14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.

Open the permit page

$285,000
Jun 18, 2026In progress
issued Jun 2026
101 California StSource Planning And Construction Inc46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes
Details
Permit
202606183494
Status
issued
Filed
Jun 18, 2026
Permit issued
Jun 23, 2026
Declared cost
$250,000
Address
101 California St

46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes

Open the permit page

$250,000
Jun 17, 2026Completed
final sign-off Jul 2026
201 Mission StRichlen Construction23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.
Details
Permit
202606173393
Status
complete
Filed
Jun 17, 2026
Permit issued
Jun 30, 2026
Final sign-off
Jul 24, 2026
Declared cost
$56,543
Address
201 Mission St

23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.

Open the permit page

$56,543
Jun 4, 2026Completed
final sign-off Aug 2026
201 Mission StRichlen Construction22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.
Details
Permit
202606042522
Status
complete
Filed
Jun 4, 2026
Permit issued
Jun 4, 2026
Final sign-off
Aug 27, 2026
Declared cost
$190,288
Address
201 Mission St

22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.

Open the permit page

$190,288
May 22, 2026In progress
issued Jun 2026
750 Battery StField Construction Inc.revision to pa 202602266563 drinking fountain alcove changes to accommodate (e) conditions - after exploratory demo. revision of deferred submittals, accesory specifications, rcp layout & light fixture quantities
Details
Permit
202605221763
Status
issued
Filed
May 22, 2026
Permit issued
Jun 5, 2026
Address
750 Battery St

revision to pa 202602266563 drinking fountain alcove changes to accommodate (e) conditions - after exploratory demo. revision of deferred submittals, accesory specifications, rcp layout & light fixture quantities

Open the permit page

May 21, 2026Completed
final sign-off Jun 2026
750 Battery StField Construction Inc.revision to pa 202601234385 permit set consists od drinking fountation alcove changes to accomoodate existing condition after exploratory demo. revisions to deferred submittals & accessory specs. original permit 202601234385
Details
Permit
202605211692
Status
complete
Filed
May 21, 2026
Permit issued
Jun 5, 2026
Final sign-off
Jun 22, 2026
Address
750 Battery St

revision to pa 202601234385 permit set consists od drinking fountation alcove changes to accomoodate existing condition after exploratory demo. revisions to deferred submittals & accessory specs. original permit 202601234385

Open the permit page

May 20, 2026Completed
final sign-off Sep 2026
201 Mission StRichlen Construction21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved
Details
Permit
202605201639
Status
complete
Filed
May 20, 2026
Permit issued
Jun 3, 2026
Final sign-off
Sep 10, 2026
Declared cost
$218,435
Address
201 Mission St

21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved

Open the permit page

$218,435
Apr 23, 2026Completed
final sign-off Jul 2026
595 Market StDome Construction Corp22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844
Details
Permit
202604239969
Status
complete
Filed
Apr 23, 2026
Permit issued
May 8, 2026
Final sign-off
Jul 22, 2026
Address
595 Market St

22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844

Open the permit page

Apr 23, 2026Completed
final sign-off Aug 2026
201 Mission StRichlen Constructionfloor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.
Details
Permit
202604239932
Status
complete
Filed
Apr 23, 2026
Permit issued
Apr 28, 2026
Final sign-off
Aug 27, 2026
Declared cost
$341,000
Address
201 Mission St

floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.

Open the permit page

$341,000
Apr 23, 2026Completed
final sign-off Jul 2026
595 Market StDome Construction Corp20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850
Details
Permit
202604239966
Status
complete
Filed
Apr 23, 2026
Permit issued
May 8, 2026
Final sign-off
Jul 17, 2026
Address
595 Market St

20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850

Open the permit page

Feb 26, 2026In progress
issued Mar 2026
750 Battery StField Construction Inc.6/fl- soft demo of non sturtcrual partitions, finishes and fixtures. install (n) lighting and remodel of restrooms. ti permit will be on separte permit as well as fire and mep deffered.
Details
Permit
202602266563
Status
issued
Filed
Feb 26, 2026
Permit issued
Mar 11, 2026
Declared cost
$199,000
Address
750 Battery St

6/fl- soft demo of non sturtcrual partitions, finishes and fixtures. install (n) lighting and remodel of restrooms. ti permit will be on separte permit as well as fire and mep deffered.

Open the permit page

$199,000
Feb 26, 2026Completed
final sign-off Jul 2026
595 Market StDome Construction Corp22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing
Details
Permit
202602266610
Status
complete
Filed
Feb 26, 2026
Permit issued
Mar 4, 2026
Final sign-off
Jul 22, 2026
Declared cost
$1,097,019
Address
595 Market St

22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing

Open the permit page

$1,097,019
Feb 2, 2026Completed
final sign-off Aug 2026
101 California StHp Build25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitions
Details
Permit
202602025031
Status
complete
Filed
Feb 2, 2026
Permit issued
Feb 23, 2026
Final sign-off
Aug 17, 2026
Declared cost
$120,000
Address
101 California St

25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitions

Open the permit page

$120,000
Dec 17, 2025Completed
final sign-off Sep 2026
450 Sansome StM C S Construction Servicesscope of work on the 7/f ste 700. shall consist of interior demo of non structural elements including but not necessary limited to interior partions, doors, finishes, ceiling, lighting, mech and elec outlets and switches. mep life, safety and sprinkler system on sep permit. no exterior work.
Details
Permit
202512172060
Status
complete
Filed
Dec 17, 2025
Permit issued
Jan 27, 2026
Final sign-off
Sep 25, 2026
Declared cost
$1,100,000
Address
450 Sansome St

scope of work on the 7/f ste 700. shall consist of interior demo of non structural elements including but not necessary limited to interior partions, doors, finishes, ceiling, lighting, mech and elec outlets and switches. mep life, safety and sprinkler system on sep permit. no exterior work.

Open the permit page

$1,100,000
Nov 13, 2025Completed
final sign-off Jun 2026
185 Berry StHathaway Dinwiddie Co.1/f: tenant suite demising wall. ste #150, resulting in creating suite #140 and #150.
Details
Permit
202511139547
Status
complete
Filed
Nov 13, 2025
Permit issued
Feb 6, 2026
Final sign-off
Jun 9, 2026
Declared cost
$15,000
Address
185 Berry St

1/f: tenant suite demising wall. ste #150, resulting in creating suite #140 and #150.

Open the permit page

$15,000
Nov 5, 2025Completed
final sign-off Sep 2026
450 Sansome StM C S Construction Services13th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.
Details
Permit
202511058944
Status
complete
Filed
Nov 5, 2025
Permit issued
Jan 28, 2026
Final sign-off
Sep 25, 2026
Declared cost
$834,400
Address
450 Sansome St

13th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.

Open the permit page

$834,400
Nov 5, 2025Completed
final sign-off Sep 2026
450 Sansome StM C S Construction Services12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.
Details
Permit
202511058940
Status
complete
Filed
Nov 5, 2025
Permit issued
Jan 20, 2026
Final sign-off
Sep 25, 2026
Declared cost
$347,351
Address
450 Sansome St

12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.

Open the permit page

$347,351
Nov 5, 2025In progress
issued Jan 2026
450 Sansome StM C S Construction Services14th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.
Details
Permit
202511058945
Status
issued
Filed
Nov 5, 2025
Permit issued
Jan 20, 2026
Declared cost
$426,957
Address
450 Sansome St

14th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.

Open the permit page

$426,957
Oct 23, 2025Completed
final sign-off Sep 2026
450 Sansome StM C S Construction Servicesscope of work 7th fl (ste 750) shall consist of interior demo of non structural elements including interior partitoins, doors, finishes, ceilings, lighting,mech and elec outlets/switches. restroom ada upgrades, drinking fountains. mep life safety,sprinkler sys sep permit. no exterior work.
Details
Permit
202510237987
Status
complete
Filed
Oct 23, 2025
Permit issued
Jan 20, 2026
Final sign-off
Sep 25, 2026
Declared cost
$351,066
Address
450 Sansome St

scope of work 7th fl (ste 750) shall consist of interior demo of non structural elements including interior partitoins, doors, finishes, ceilings, lighting,mech and elec outlets/switches. restroom ada upgrades, drinking fountains. mep life safety,sprinkler sys sep permit. no exterior work.

Open the permit page

$351,066
Oct 23, 2025In progress
issued Jan 2026
450 Sansome StM C S Construction Services11/f suite 1100 - demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting, mech electrical outlets and switches. restroom ada access. upgrade and new ada hi/lo drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.
Details
Permit
202510238040
Status
issued
Filed
Oct 23, 2025
Permit issued
Jan 27, 2026
Declared cost
$1,043,000
Address
450 Sansome St

11/f suite 1100 - demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting, mech electrical outlets and switches. restroom ada access. upgrade and new ada hi/lo drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.

Open the permit page

$1,043,000
Sep 5, 2025Completed
final sign-off Apr 2026
201 Spear StHathaway Dinwiddie Co.17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.
Details
Permit
202509054642
Status
complete
Filed
Sep 5, 2025
Permit issued
Oct 31, 2025
Final sign-off
Apr 6, 2026
Declared cost
$800,000
Address
201 Spear St

17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.

Open the permit page

$800,000
Aug 21, 2025Completed
final sign-off Apr 2026
222 02nd StNovo Construction Inc13/f -revision to pa #202502130273. revision to smoke control narrative only.
Details
Permit
202508213655
Status
complete
Filed
Aug 21, 2025
Permit issued
Sep 2, 2025
Final sign-off
Apr 10, 2026
Address
222 02nd St

13/f -revision to pa #202502130273. revision to smoke control narrative only.

Open the permit page

Aug 14, 2025Completed
final sign-off Oct 2025
88 Stevenson Stscope of work on 3rd floor shall consist of limited interior construction of non structural elements including but not neccasary limited to partitions, doors finishes, and electrical outlets.
Details
Permit
202508143106
Status
complete
Filed
Aug 14, 2025
Permit issued
Aug 15, 2025
Final sign-off
Oct 29, 2025
Declared cost
$82,705
Address
88 Stevenson St

scope of work on 3rd floor shall consist of limited interior construction of non structural elements including but not neccasary limited to partitions, doors finishes, and electrical outlets.

Open the permit page

$82,705
Aug 13, 2025Completed
final sign-off Oct 2025
88 Stevenson Stsuite 200 -minor interior demo and construction of non structural elements including but not limited to partitions finishes, electrial outlets
Details
Permit
202508132982
Status
complete
Filed
Aug 13, 2025
Permit issued
Aug 15, 2025
Final sign-off
Oct 29, 2025
Declared cost
$79,745
Address
88 Stevenson St

suite 200 -minor interior demo and construction of non structural elements including but not limited to partitions finishes, electrial outlets

Open the permit page

$79,745
Jul 18, 2025Completed
final sign-off Oct 2025
1455 Market StBcci Construction Company8th/fl:shall consist of demolition of finishes, and minimal new millwork, plumbing, power data receptacles, paint and flooring finish. no change to ceiling, lighting, life safety scope of work does not affect the path of travel.
Details
Permit
202507181150
Status
complete
Filed
Jul 18, 2025
Permit issued
Aug 6, 2025
Final sign-off
Oct 6, 2025
Declared cost
$106,000
Address
1455 Market St

8th/fl:shall consist of demolition of finishes, and minimal new millwork, plumbing, power data receptacles, paint and flooring finish. no change to ceiling, lighting, life safety scope of work does not affect the path of travel.

Open the permit page

$106,000
Apr 3, 2025Completed
final sign-off Apr 2026
222 02nd StNovo Construction Inc13th fl revision to pa 2025-0213-0273: demo of (e) rated elevator lobby doors to be replaced with new rated doors and associated finishes. 5 sheets
Details
Permit
202504033654
Status
complete
Filed
Apr 3, 2025
Permit issued
Apr 14, 2025
Final sign-off
Apr 10, 2026
Address
222 02nd St

13th fl revision to pa 2025-0213-0273: demo of (e) rated elevator lobby doors to be replaced with new rated doors and associated finishes. 5 sheets

Open the permit page

Feb 13, 2025Completed
final sign-off Apr 2026
222 02nd StNovo Construction Inc13/fl- -ti work includes (n) interior partitions, doors, finishes, ceilings and associated mep
Details
Permit
202502130273
Status
complete
Filed
Feb 13, 2025
Permit issued
Mar 12, 2025
Final sign-off
Apr 10, 2026
Declared cost
$5,000,000
Address
222 02nd St

13/fl- -ti work includes (n) interior partitions, doors, finishes, ceilings and associated mep

Open the permit page

$5,000,000
Jan 27, 2025Completed
final sign-off May 2025
747 Front StSan Francisco Commercial Builders Increvision 202408057928- changing the pass thru window within the same opening
Details
Permit
202501279163
Status
complete
Filed
Jan 27, 2025
Permit issued
Feb 3, 2025
Final sign-off
May 16, 2025
Declared cost
$1,000
Address
747 Front St

revision 202408057928- changing the pass thru window within the same opening

Open the permit page

$1,000
Jan 17, 2025Completed
final sign-off Apr 2026
222 02nd StNovo Construction Incinterior demolition on 13th floor:demolition scope includes but not limitted to interior partitions, doors, ceiling, lighting and finishes. no structural, site, building exterior, landscape, parking change are proposed.
Details
Permit
202501178557
Status
complete
Filed
Jan 17, 2025
Permit issued
Feb 6, 2025
Final sign-off
Apr 10, 2026
Declared cost
$184,172
Address
222 02nd St

interior demolition on 13th floor:demolition scope includes but not limitted to interior partitions, doors, ceiling, lighting and finishes. no structural, site, building exterior, landscape, parking change are proposed.

Open the permit page

$184,172
Aug 15, 2024In progress
issued Aug 2024
550 California St8th fl-interior ti demo & (n) construction of elements including but not limitied to interior partitions,doors,finishes, ceiling, lighting, (n) studio pipe grid, mech & elec outlets & switches. ref to mep & structural drawings. scope does not affect fixture quantities, occ load or path of travel.
Details
Permit
202408158724
Status
issued
Filed
Aug 15, 2024
Permit issued
Aug 20, 2024
Declared cost
$60,000
Address
550 California St

8th fl-interior ti demo & (n) construction of elements including but not limitied to interior partitions,doors,finishes, ceiling, lighting, (n) studio pipe grid, mech & elec outlets & switches. ref to mep & structural drawings. scope does not affect fixture quantities, occ load or path of travel.

Open the permit page

$60,000