Permit GraphShortlistSan Francisco building permits since 2000

Bcci Construction Company

Contractor license
492944
State license record
Based in
San Francisco
On San Francisco permits
Jan 2000 to Nov 2026
Last 24 months
219 permits filed

4,291 permits since 2000: 3,343 completed, 134 in progress, 333 never finaled, 481 expired or cancelled.

Of the 333 never-finaled permits, 32 are 3 to 5 years old, 161 are 5 to 10 years old, 140 are over 10 years old. 7 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits (among their 100 most recent)

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Stairs permits

AllRoof deck 14Pergola or trellis 3Deck 13Stairs 115Kitchen remodel 30Bathroom remodel 18

115 stairs permits: 89 completed, 6 in progress, 13 never finaled, 7 expired or cancelled. Typically 14 days from filing to permit and 349 days from permit to final inspection.

Showing the 100 most recent of 115.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 20, 2026In progress
filed Nov 2026, not yet issued
353 Sacramento St3/f: guardrail relocation structural scope to support architectural permit pa# 202604149358. ramp and stairs lead to private terrace 309.
Details
Permit
202611201051

3/f: guardrail relocation structural scope to support architectural permit pa# 202604149358. ramp and stairs lead to private terrace 309.

Open the permit page

$25,000
Sep 16, 2026In progress
issued Oct 2026
1455 Market Stfloor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric
Details
Permit
202609168183
Permit issued
Oct 14, 2026

floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric

Open the permit page

$85,000
Sep 16, 2026In progress
issued Oct 2026
1455 Market Stfloor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed.
Details
Permit
202609168178
Permit issued
Oct 14, 2026

floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed.

Open the permit page

$225,000
Jul 21, 2026In progress
issued Jul 2026
555 California St46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening.
Details
Permit
202607215354
Permit issued
Jul 29, 2026

46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening.

Open the permit page

Jul 14, 2026In progress
issued Jul 2026
555 California St50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.
Details
Permit
202607144994
Permit issued
Jul 31, 2026

50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.

Open the permit page

$3,800,000
Feb 2, 2026Expired or cancelled
cancelled Apr 2026
50 Hawthorne Ststair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings.
Details
Permit
202602025014
Permit issued
Feb 3, 2026

stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings.

Open the permit page

$350,000
Dec 22, 2025In progress
issued Mar 2026
555 California Stl45-46 interconnecting stair. new finishes & banquette platform landing
Details
Permit
202512222446
Permit issued
Mar 10, 2026

l45-46 interconnecting stair. new finishes & banquette platform landing

Open the permit page

$125,000
Aug 14, 2025Completed
final sign-off May 2026
650 California St30th & 31st/f: structural deferred permit for guardrail for interior staircase. ref 202412166915
Details
Permit
202508143097
Permit issued
Sep 26, 2025
Final sign-off
May 7, 2026

30th & 31st/f: structural deferred permit for guardrail for interior staircase. ref 202412166915

Open the permit page

Jul 31, 2025Completed
final sign-off Nov 2026
4 Embarcadero Center13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred.
Details
Permit
202507312035
Permit issued
Sep 10, 2025
Final sign-off
Nov 9, 2026

13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred.

Open the permit page

$300,000
Jul 23, 2025Completed
final sign-off Jul 2026
1455 Market Stnewly added scope of work on the 4th and 5th floor consist of enclosing the (e) conveniecne internal stair with non-structural interior partitions. newly added mechanical and electrical modifications will be made to accommodate the in kind stair enclose.
Details
Permit
202507231374
Permit issued
Aug 6, 2025
Final sign-off
Jul 21, 2026

newly added scope of work on the 4th and 5th floor consist of enclosing the (e) conveniecne internal stair with non-structural interior partitions. newly added mechanical and electrical modifications will be made to accommodate the in kind stair enclose.

Open the permit page

Apr 21, 2025Completed
final sign-off Oct 2026
201 Mission St1st fl - remove concrete stair #9, remove column supporting landing @ floor 2; 2nd fl - remove portion of stair #9 landing, infill guardrail wall @ stair landing removal area; refinish guardrail wall and add drink (floor 2)
Details
Permit
202504214865
Permit issued
Oct 27, 2025
Final sign-off
Oct 13, 2026

1st fl - remove concrete stair #9, remove column supporting landing @ floor 2; 2nd fl - remove portion of stair #9 landing, infill guardrail wall @ stair landing removal area; refinish guardrail wall and add drink (floor 2)

Open the permit page

$120,000
Dec 16, 2024Completed
final sign-off May 2026
650 California St30th & 31st fl ti: non structural partitions, ceilings, finishes & asccioated mep. work includes (n) convenience stair
Details
Permit
202412166915
Permit issued
Mar 14, 2025
Final sign-off
May 7, 2026

30th & 31st fl ti: non structural partitions, ceilings, finishes & asccioated mep. work includes (n) convenience stair

Open the permit page

$2,200,000
Jun 28, 2024Completed
final sign-off Aug 2024
505 Howard Stfloors 4 and 5- removal of communicating stairs and slab infill between floors
Details
Permit
202406285521
Permit issued
Jul 1, 2024
Final sign-off
Aug 23, 2024

floors 4 and 5- removal of communicating stairs and slab infill between floors

Open the permit page

$120,000
Nov 6, 2023Completed
final sign-off Jul 2024
345 Spear St4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only.
Details
Permit
202311060260
Permit issued
Nov 7, 2023
Final sign-off
Jul 9, 2024

4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only.

Open the permit page

Sep 15, 2023Never finaled
issued Sep 2023, no final
415 Mission St31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33.
Details
Permit
202309156665
Permit issued
Sep 15, 2023

31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33.

Open the permit page

$200,000
Sep 15, 2023Never finaled
issued Sep 2023, no final
415 Mission St33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736.
Details
Permit
202309156685
Permit issued
Sep 15, 2023

33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736.

Open the permit page

$200,000
Aug 16, 2023Completed
final sign-off Jul 2024
345 Spear St4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes.
Details
Permit
202308164561
Permit issued
Aug 31, 2023
Final sign-off
Jul 9, 2024

4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes.

Open the permit page

Jun 23, 2023Never finaled
issued Jul 2023, no final
415 Mission St31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included.
Details
Permit
202306230736
Permit issued
Jul 5, 2023

31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included.

Open the permit page

$200,000
Mar 6, 2023Never finaled
issued Mar 2023, no final
510 Townsend St6/f: rev to pa# 2022-0801-9661: build a security vestiblule at entance/exit of (e) convenience stair
Details
Permit
202303063092
Permit issued
Mar 23, 2023

6/f: rev to pa# 2022-0801-9661: build a security vestiblule at entance/exit of (e) convenience stair

Open the permit page

$95,000
Feb 14, 2023Expired or cancelled
cancelled Jan 2026
345 Spear St4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinkler
Details
Permit
202302141975

4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinkler

Open the permit page

$185,000
Jun 9, 2022Completed
final sign-off Sep 2023
121 Spear St1st fl: revision to pa# 202203180339. changes to handrail at staircase
Details
Permit
202206096007
Permit issued
Jul 6, 2022
Final sign-off
Sep 21, 2023

1st fl: revision to pa# 202203180339. changes to handrail at staircase

Open the permit page

Mar 18, 2022Completed
final sign-off Sep 2023
121 Spear St1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.
Details
Permit
202203180339
Permit issued
Mar 21, 2022
Final sign-off
Sep 21, 2023

1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.

Open the permit page

$450,000
Aug 17, 2021Completed
final sign-off Oct 2021
1 Market St18/f: revise draft stop at convenience stair on 18th fl. ref 2019 1219 0043. work is at 27 story steuart tower.
Details
Permit
202108176520
Permit issued
Aug 17, 2021
Final sign-off
Oct 26, 2021

18/f: revise draft stop at convenience stair on 18th fl. ref 2019 1219 0043. work is at 27 story steuart tower.

Open the permit page

$5,000
Mar 10, 2021Never finaled
issued Apr 2021, no final
555 Mission Stflrs 8,9: new convenience stair connecting floors 8 and 9. ti work under separate permit. structural drawings and calculation included.
Details
Permit
202103106230
Permit issued
Apr 29, 2021

flrs 8,9: new convenience stair connecting floors 8 and 9. ti work under separate permit. structural drawings and calculation included.

Open the permit page

$700,000
Oct 2, 2020Completed
final sign-off Jun 2023
1045 Sansome Stadd a roof terrace with outdoor seating, 42"tall guardrails set back 5' from (e) bldg parapets & new stair vestibule. demolition (e) partitions & assosciated power/data & floor finishes. construct new partitions, doors, power & tele/data, lighting, millwork & finish. 2 new restrooms.
Details
Permit
202010025777
Permit issued
Apr 12, 2022
Final sign-off
Jun 26, 2023

add a roof terrace with outdoor seating, 42"tall guardrails set back 5' from (e) bldg parapets & new stair vestibule. demolition (e) partitions & assosciated power/data & floor finishes. construct new partitions, doors, power & tele/data, lighting, millwork & finish. 2 new restrooms.

Open the permit page

$1,400,000
Aug 8, 2020Completed
final sign-off Apr 2021
300 Mission Stadded a stair entrance enclosure guardrail on levels 21 thru 23 with access control swing gate at each level. level 23: guardrail height has increased to 6'-0" h, added top cap to the guardrail, increased the guardrail glass thickness.revision to bpa#2019/0924/2474.
Details
Permit
202008081410
Permit issued
Nov 6, 2020
Final sign-off
Apr 28, 2021

added a stair entrance enclosure guardrail on levels 21 thru 23 with access control swing gate at each level. level 23: guardrail height has increased to 6'-0" h, added top cap to the guardrail, increased the guardrail glass thickness.revision to bpa#2019/0924/2474.

Open the permit page

Jul 24, 2020Completed
final sign-off Apr 2021
300 Mission St22nd fl - revision to pa 2019-1121-7838, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added
Details
Permit
202007240758
Permit issued
Oct 9, 2020
Final sign-off
Apr 16, 2021

22nd fl - revision to pa 2019-1121-7838, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added

Open the permit page

Jul 24, 2020Completed
final sign-off Apr 2021
300 Mission St21st fl - revision to pa 2019-1121-7840, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added
Details
Permit
202007240757
Permit issued
Nov 6, 2020
Final sign-off
Apr 16, 2021

21st fl - revision to pa 2019-1121-7840, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added

Open the permit page

Jul 24, 2020Completed
final sign-off Apr 2021
300 Mission St20th fl - revision to pa 2019-1121-7836, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added
Details
Permit
202007240756
Permit issued
Oct 9, 2020
Final sign-off
Apr 16, 2021

20th fl - revision to pa 2019-1121-7836, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added

Open the permit page

Jul 24, 2020Completed
final sign-off Apr 2021
300 Mission St23rd fl - revision to pa 2019-1114-7260, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added
Details
Permit
202007240759
Permit issued
Nov 6, 2020
Final sign-off
Apr 14, 2021

23rd fl - revision to pa 2019-1114-7260, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added

Open the permit page

Dec 23, 2019Completed
final sign-off Sep 2022
555 California Stpartial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.
Details
Permit
201912230291
Permit issued
Mar 5, 2020
Final sign-off
Sep 8, 2022

partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.

Open the permit page

$210,000
Dec 23, 2019Completed
final sign-off Oct 2020
1 California Stunit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.
Details
Permit
201912230407
Permit issued
Jan 7, 2020
Final sign-off
Oct 1, 2020

unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.

Open the permit page

$580,000
Nov 26, 2019Completed
final sign-off Mar 2022
1 Market Strevision to approved stair pa# 2019-0829-0178: structural calcs for stair included.
Details
Permit
201911268217
Permit issued
Dec 4, 2019
Final sign-off
Mar 11, 2022

revision to approved stair pa# 2019-0829-0178: structural calcs for stair included.

Open the permit page

Nov 18, 2019Completed
final sign-off Jan 2023
1 Maritime Pz(3) new sets of convenience stairs. new stairs #3 & #4 connect floors 2-4. new stairs #5, #6 & #7 connect floors 10-13. new stairs #8, #9 & #10 connect floors 13-16.
Details
Permit
201911187518
Permit issued
Sep 12, 2020
Final sign-off
Jan 12, 2023

(3) new sets of convenience stairs. new stairs #3 & #4 connect floors 2-4. new stairs #5, #6 & #7 connect floors 10-13. new stairs #8, #9 & #10 connect floors 13-16.

Open the permit page

$4,000,000
Nov 13, 2019Completed
final sign-off May 2021
650 California Stdemo of (e) communicating stair between floors 32-33 and floor slab infill on 33rd fl. fire and life safety system to remain in tact n/a maher
Details
Permit
201911137146
Permit issued
Nov 21, 2019
Final sign-off
May 20, 2021

demo of (e) communicating stair between floors 32-33 and floor slab infill on 33rd fl. fire and life safety system to remain in tact n/a maher

Open the permit page

$10,000
Nov 13, 2019Completed
final sign-off Jul 2021
650 California Stdemo of (e) stair between floors 31-32 and adjacent finishes and floor, elevations to match (e) floor elevations, fire and life safety system to remain intact n/a maher
Details
Permit
201911137147
Permit issued
Nov 21, 2019
Final sign-off
Jul 28, 2021

demo of (e) stair between floors 31-32 and adjacent finishes and floor, elevations to match (e) floor elevations, fire and life safety system to remain intact n/a maher

Open the permit page

$10,000
Oct 29, 2019Completed
final sign-off Feb 2021
300 Clay Ststructural framing of (e) stair opening. t.i. and stair permit will be submitted in the future seperately n/a maher
Details
Permit
201910295893
Permit issued
Nov 4, 2019
Final sign-off
Feb 25, 2021

structural framing of (e) stair opening. t.i. and stair permit will be submitted in the future seperately n/a maher

Open the permit page

$150,000
Sep 24, 2019Completed
final sign-off Apr 2021
300 Mission Stdeferred mep, fire protection & fire alarm. 20th - 23rd interior remodel of four unoccupied single tenant floors including demo of non structural partitions and construction of a (n) communication stair within floors 21-23. structural work included selective demo of existing concrete floor slab and
Details
Permit
201909242474
Permit issued
Nov 6, 2019
Final sign-off
Apr 28, 2021

deferred mep, fire protection & fire alarm. 20th - 23rd interior remodel of four unoccupied single tenant floors including demo of non structural partitions and construction of a (n) communication stair within floors 21-23. structural work included selective demo of existing concrete floor slab and

Open the permit page

$1,110,270
Aug 29, 2019Completed
final sign-off Mar 2022
1 Market St18-22 modification to (e) tenant interior convenicence stair between 18-21 with an extension to level 22. stair work include demo new handrails, finshes & construction of rated enclosure on 22. also upgrade to base bld restrooms
Details
Permit
201908290178
Permit issued
Aug 30, 2019
Final sign-off
Mar 11, 2022

18-22 modification to (e) tenant interior convenicence stair between 18-21 with an extension to level 22. stair work include demo new handrails, finshes & construction of rated enclosure on 22. also upgrade to base bld restrooms

Open the permit page

$750,000
Jul 29, 2019Completed
final sign-off Dec 2020
4 Embarcadero Centerconstruction of interconnecting stairs between 2,3 &4.
Details
Permit
201907297166
Permit issued
Nov 14, 2019
Final sign-off
Dec 21, 2020

construction of interconnecting stairs between 2,3 &4.

Open the permit page

$4,500,000
May 23, 2019Completed
final sign-off Dec 2019
1 Market Stdemo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher.
Details
Permit
201905231553
Permit issued
May 30, 2019
Final sign-off
Dec 16, 2019

demo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher.

Open the permit page

$5,000
Mar 15, 2019Never finaled
issued Mar 2019, no final
1 Embarcadero Centerdemo of (e) stair between 15 & 16, convenience stair not exit stair. in-fill floor slab on 16th fl. no change in occupancy use or area. mep, like safety, sprinklers under separate permit
Details
Permit
201903155297
Permit issued
Mar 21, 2019

demo of (e) stair between 15 & 16, convenience stair not exit stair. in-fill floor slab on 16th fl. no change in occupancy use or area. mep, like safety, sprinklers under separate permit

Open the permit page

$175,000
Feb 13, 2019Never finaled
issued Dec 2019, no final
799 Van Ness Avbasement, 1st, 2nd & roof. new renovation of (e) building. change of use. new provide fitness center. pool, beauty spa, ancillary, restaurant etc. (mep, life safety, sprinklers, skylights, stairs, structural, guards, demo under separate permit).structural pa# 2019/02/01/1918 under review.
Details
Permit
201902132846
Permit issued
Dec 6, 2019

basement, 1st, 2nd & roof. new renovation of (e) building. change of use. new provide fitness center. pool, beauty spa, ancillary, restaurant etc. (mep, life safety, sprinklers, skylights, stairs, structural, guards, demo under separate permit).structural pa# 2019/02/01/1918 under review.

Open the permit page

$3,080,000
Jan 29, 2019Completed
final sign-off Aug 2019
1 Embarcadero Centerdemo of (e) inte-connecting stair between fls. 16 & 17, infill of floor slab on 17, no change in occupancy, use, or area, mep life safety & sprinklers on sep permit
Details
Permit
201901291463
Permit issued
Mar 19, 2019
Final sign-off
Aug 16, 2019

demo of (e) inte-connecting stair between fls. 16 & 17, infill of floor slab on 17, no change in occupancy, use, or area, mep life safety & sprinklers on sep permit

Open the permit page

$100,000
Sep 25, 2018Completed
final sign-off Aug 2019
50 California Stremove extg interior stairs between 2nd and 3rd floor. infill stair opening at 3rd floor. infill interior stair opening at 3rd floor.
Details
Permit
201809251352
Permit issued
Oct 9, 2018
Final sign-off
Aug 6, 2019

remove extg interior stairs between 2nd and 3rd floor. infill stair opening at 3rd floor. infill interior stair opening at 3rd floor.

Open the permit page

$50,000
Jul 31, 2018Completed
final sign-off Aug 2019
345 California St7th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress)
Details
Permit
201807316020
Permit issued
Aug 8, 2018
Final sign-off
Aug 6, 2019

7th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress)

Open the permit page

$1,200,000
Jul 31, 2018Completed
final sign-off Aug 2019
345 California St6th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress)
Details
Permit
201807316022
Permit issued
Aug 8, 2018
Final sign-off
Aug 6, 2019

6th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress)

Open the permit page

$1,200,000
Jul 20, 2018Completed
final sign-off Aug 2019
345 California Stremoval of floor slab and new stair connecting 6th and 7thf fls. ref#201710181527 & 201802232072. n/a for maher
Details
Permit
201807205159
Permit issued
Jul 31, 2018
Final sign-off
Aug 6, 2019

removal of floor slab and new stair connecting 6th and 7thf fls. ref#201710181527 & 201802232072. n/a for maher

Open the permit page

$400,000
May 22, 2018Completed
final sign-off Jan 2020
123 Mission St4th & 5th flr - revision to approved stair permit btw 4th & 5th flr change finishes replace glass panels with steel cable. ref 201801199016 maher na
Details
Permit
201805229739
Permit issued
May 22, 2018
Final sign-off
Jan 14, 2020

4th & 5th flr - revision to approved stair permit btw 4th & 5th flr change finishes replace glass panels with steel cable. ref 201801199016 maher na

Open the permit page

$20,000
Apr 26, 2018Completed
final sign-off Aug 2019
100 California St14th flr - revision to stair permit and approve arch. ref 201801319972 & 201802211831 maher na
Details
Permit
201804267451
Permit issued
May 2, 2018
Final sign-off
Aug 22, 2019

14th flr - revision to stair permit and approve arch. ref 201801319972 & 201802211831 maher na

Open the permit page

Mar 16, 2018Completed
final sign-off Jan 2019
300 California St7th flr - limited demo, enclosure of (e) communicating stair. maher n/a
Details
Permit
201803163854
Permit issued
Apr 2, 2018
Final sign-off
Jan 9, 2019

7th flr - limited demo, enclosure of (e) communicating stair. maher n/a

Open the permit page

$106,337
Feb 21, 2018Completed
final sign-off Aug 2019
100 California St14th flr - new stair connecting 14th floor to roof. ref 201801319972 maher na
Details
Permit
201802211831
Permit issued
Feb 27, 2018
Final sign-off
Aug 22, 2019

14th flr - new stair connecting 14th floor to roof. ref 201801319972 maher na

Open the permit page

$125,000
Jan 19, 2018Completed
final sign-off Jul 2019
123 Mission St5th flr: demo of (e) structural slab and structural support beams. new communicating stair and new structural support beams maher na
Details
Permit
201801199016
Permit issued
Feb 8, 2018
Final sign-off
Jul 25, 2019

5th flr: demo of (e) structural slab and structural support beams. new communicating stair and new structural support beams maher na

Open the permit page

$300,000
Dec 21, 2017Never finaled
issued Mar 2018, no final
415 Mission Stnew communicating stair between 45th and 46th floors
Details
Permit
201712217072
Permit issued
Mar 15, 2018

new communicating stair between 45th and 46th floors

Open the permit page

$310,000
Nov 20, 2017Completed
final sign-off Jun 2019
121 Spear Ston 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a **
Details
Permit
201711204399
Permit issued
Feb 5, 2018
Final sign-off
Jun 21, 2019

on 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a **

Open the permit page

$1,100,000
Nov 15, 2017Completed
final sign-off Jun 2019
121 Spear St4/f- partial floor t.i. includes wellness center & 2 hr. rated enclosure of stairs that will be under seperate permit. mep. included. n/a ordinance #155-13
Details
Permit
201711154071
Permit issued
Nov 28, 2017
Final sign-off
Jun 25, 2019

4/f- partial floor t.i. includes wellness center & 2 hr. rated enclosure of stairs that will be under seperate permit. mep. included. n/a ordinance #155-13

Open the permit page

$1,700,000
Nov 2, 2017Completed
final sign-off Jun 2025
415 Mission Stinterior stair opening connecting level 31-35 floor, revision to #201709087307 existing permit
Details
Permit
201711022979
Permit issued
Apr 4, 2018
Final sign-off
Jun 20, 2025

interior stair opening connecting level 31-35 floor, revision to #201709087307 existing permit

Open the permit page

$450,000
Sep 8, 2017Completed
final sign-off Jun 2025
415 Mission Stnon rated stair connecting floors 34 and 35. ref . 2017-09-08-7306
Details
Permit
201709087307
Permit issued
Sep 11, 2017
Final sign-off
Jun 20, 2025

non rated stair connecting floors 34 and 35. ref . 2017-09-08-7306

Open the permit page

$120,000
Mar 10, 2017Never finaled
issued Mar 2017, no final
315 Montgomery Stper approved pre-app 02/15/2017 with bldg and sffd, accessibility sign project to renumber (e) floors l,m,2 through 16 to (n) floors 1 through 17 & partial concourse-elevator & stair signs, no new construction. no mep, fa and evac sign under separate permit. maher na
Details
Permit
201703101161
Permit issued
Mar 23, 2017

per approved pre-app 02/15/2017 with bldg and sffd, accessibility sign project to renumber (e) floors l,m,2 through 16 to (n) floors 1 through 17 & partial concourse-elevator & stair signs, no new construction. no mep, fa and evac sign under separate permit. maher na

Open the permit page

$54,000
Mar 6, 2017Completed
final sign-off May 2017
315 Montgomery St15th and 16th floor:provide power/lighting of approximately 375 sq ft if stair case. work associated with approved app#201610059555. n/a for maher
Details
Permit
201703060780
Permit issued
Mar 7, 2017
Final sign-off
May 26, 2017

15th and 16th floor:provide power/lighting of approximately 375 sq ft if stair case. work associated with approved app#201610059555. n/a for maher

Open the permit page

$6,500
Dec 5, 2016Completed
final sign-off Sep 2017
350 California St4th and 5th floor. this t.i. project involves modification of extg tenant suite to include selective demolition and construction of non-load bearing partitions, new ceiling tiles and grid, new gyp board ceiling , light fixtures, doors and frames, millwork and new finishes. extg stair to remain.
Details
Permit
201612054179
Permit issued
Feb 2, 2017
Final sign-off
Sep 22, 2017

4th and 5th floor. this t.i. project involves modification of extg tenant suite to include selective demolition and construction of non-load bearing partitions, new ceiling tiles and grid, new gyp board ceiling , light fixtures, doors and frames, millwork and new finishes. extg stair to remain.

Open the permit page

$2,500,000
Oct 5, 2016Completed
final sign-off May 2017
315 Montgomery Stnew metal stair extension at 15/f & 16/f, structural & non-structural demo, new interior partitions, doors and wall finishes. n/a ordinance #155-13
Details
Permit
201610059555
Permit issued
Oct 6, 2016
Final sign-off
May 26, 2017

new metal stair extension at 15/f & 16/f, structural & non-structural demo, new interior partitions, doors and wall finishes. n/a ordinance #155-13

Open the permit page

$110,000
Jan 19, 2016Completed
final sign-off Nov 2019
601 Townsend St(exterior entry) -approved pa# 2015/11/23/3300 for exterior work including the replacement of 2 stair egress doors. ** maher: n/a **
Details
Permit
201601197316
Permit issued
Jun 6, 2016
Final sign-off
Nov 21, 2019

(exterior entry) -approved pa# 2015/11/23/3300 for exterior work including the replacement of 2 stair egress doors. ** maher: n/a **

Open the permit page

$7,500
Sep 22, 2015Completed
final sign-off Mar 2017
436 Bryant Stinterior renovations to floors 1,2,3 including new partitions, code complaint egress stairs, structural reinforcement. mep and ls under sep permit. n/a for maher.
Details
Permit
201509227705
Permit issued
Oct 26, 2015
Final sign-off
Mar 14, 2017

interior renovations to floors 1,2,3 including new partitions, code complaint egress stairs, structural reinforcement. mep and ls under sep permit. n/a for maher.

Open the permit page

$365,000
Aug 10, 2015Completed
final sign-off Jul 2016
201 03rd Stnew steel stair between 6th and 7th flr including structural work and associated mechanical.
Details
Permit
201508103765
Permit issued
Aug 10, 2015
Final sign-off
Jul 6, 2016

new steel stair between 6th and 7th flr including structural work and associated mechanical.

Open the permit page

$519,000
Jul 7, 2015Completed
final sign-off Jul 2016
201 03rd Stdemolition under ab-017 on the 7th floor. construct opening in floor for new stair. arch, mep, sprinkler, and fire alarm revisions under separate applications.
Details
Permit
201507070766
Permit issued
Jul 7, 2015
Final sign-off
Jul 6, 2016

demolition under ab-017 on the 7th floor. construct opening in floor for new stair. arch, mep, sprinkler, and fire alarm revisions under separate applications.

Open the permit page

$68,000
Jun 9, 2015Completed
final sign-off Jan 2016
1 Montgomery Ststructural work associated with stair included in approved app#201503312401 and 2015040125511
Details
Permit
201506098541
Permit issued
Jun 9, 2015
Final sign-off
Jan 28, 2016

structural work associated with stair included in approved app#201503312401 and 2015040125511

Open the permit page

$3,650
Apr 6, 2015Never finaled
issued Apr 2015, no final
1455 Market Strevision to app#201412194140 to change guard rail design at stairs.n/a for maher.
Details
Permit
201504062873
Permit issued
Apr 6, 2015

revision to app#201412194140 to change guard rail design at stairs.n/a for maher.

Open the permit page

Mar 13, 2015Completed
final sign-off Nov 2015
555 California Stwork associated w/approved permit # 2015 0312 0645. provide new concrete slab over metal deck infill at the 26th flr. tenant & stairs btw 25th & 26th flrs is to be removed & remaining infill opening is to be infilled. maher - not req'd
Details
Permit
201503130794
Permit issued
Mar 13, 2015
Final sign-off
Nov 16, 2015

work associated w/approved permit # 2015 0312 0645. provide new concrete slab over metal deck infill at the 26th flr. tenant & stairs btw 25th & 26th flrs is to be removed & remaining infill opening is to be infilled. maher - not req'd

Open the permit page

$62,000
Feb 17, 2015Completed
final sign-off Jul 2016
201 03rd Stnew steel stair between 5th and 6th fl including new floor opening on 6th fl, ceiling, finishes, structural work, elec modifications. life safety under separate permit
Details
Permit
201502178521
Permit issued
Apr 13, 2015
Final sign-off
Jul 6, 2016

new steel stair between 5th and 6th fl including new floor opening on 6th fl, ceiling, finishes, structural work, elec modifications. life safety under separate permit

Open the permit page

$619,000
Jan 21, 2015Completed
final sign-off Jun 2016
345 Spear Ststructural work associated with 201411191892 for staircase detail and framing details for a shaft 5,6, and 7
Details
Permit
201501216291
Permit issued
Feb 6, 2015
Final sign-off
Jun 16, 2016

structural work associated with 201411191892 for staircase detail and framing details for a shaft 5,6, and 7

Open the permit page

$125,000
Dec 19, 2014Never finaled
issued Mar 2015, no final
1455 Market Sttenant improvement on a portion of the 6th,7th,8th,9th floors to include (n) floor opening & auditorium stair between levels 6,7 & 8 and an interconnecting stair between level 8 & level 9.
Details
Permit
201412194140
Permit issued
Mar 19, 2015

tenant improvement on a portion of the 6th,7th,8th,9th floors to include (n) floor opening & auditorium stair between levels 6,7 & 8 and an interconnecting stair between level 8 & level 9.

Open the permit page

$435,000
Dec 18, 2014Completed
final sign-off Jul 2016
1455 Market St7th floor:tenant improvement on a portion of the 7th fl to include new drywall, ceiling work, doors, glazing, finishes. mep, sprinkler, fire alarm, standpipe removal & stairs under sep permit. n/a maher
Details
Permit
201412184072
Permit issued
Jan 5, 2015
Final sign-off
Jul 13, 2016

7th floor:tenant improvement on a portion of the 7th fl to include new drywall, ceiling work, doors, glazing, finishes. mep, sprinkler, fire alarm, standpipe removal & stairs under sep permit. n/a maher

Open the permit page

$2,881,130
Nov 19, 2014Completed
final sign-off Jun 2016
345 Spear St3rd floor - revision to appl #2014.0818.4059 to reconfigure work spaces & to eliminate the demolitoin of the interconnecting staircase. mechanical & electrical work under separate permit.
Details
Permit
201411191892
Permit issued
Nov 19, 2014
Final sign-off
Jun 6, 2016

3rd floor - revision to appl #2014.0818.4059 to reconfigure work spaces & to eliminate the demolitoin of the interconnecting staircase. mechanical & electrical work under separate permit.

Open the permit page

Aug 18, 2014Expired or cancelled
cancelled Jul 2016
345 Spear Stinterior demolition of convenient stair connecting levels 2 to 3 floor & 3 to 4 floor. demolition of associated partitions. structural infill of openings on levels 3 to 4 floor. n/a ordinance #155-13
Details
Permit
201408184050
Permit issued
Aug 28, 2014

interior demolition of convenient stair connecting levels 2 to 3 floor & 3 to 4 floor. demolition of associated partitions. structural infill of openings on levels 3 to 4 floor. n/a ordinance #155-13

Open the permit page

$250,000
Jun 11, 2014Completed
final sign-off Dec 2014
345 Spear Stcafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load.
Details
Permit
201406118144
Permit issued
Jul 31, 2014
Final sign-off
Dec 22, 2014

cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load.

Open the permit page

$1,400,000
Apr 21, 2014Completed
final sign-off Jan 2015
50 Hawthorne Stnew roof deck on existing roof, extension of existing stairs & new elevator from 3rd floor to roof, structural work under seperate permit.
Details
Permit
201404213718
Permit issued
Apr 21, 2014
Final sign-off
Jan 27, 2015

new roof deck on existing roof, extension of existing stairs & new elevator from 3rd floor to roof, structural work under seperate permit.

Open the permit page

$696,300
Apr 18, 2014Completed
final sign-off Jan 2015
50 Hawthorne Ststructural work associated with approved app#201404082673 and 201404082675 including stair and platform.
Details
Permit
201404183653
Permit issued
Apr 18, 2014
Final sign-off
Jan 20, 2015

structural work associated with approved app#201404082673 and 201404082675 including stair and platform.

Open the permit page

$625,000
Sep 4, 2013Completed
final sign-off Oct 2014
1045 Bryant Ststructural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17
Details
Permit
201309045883
Permit issued
Sep 6, 2013
Final sign-off
Oct 31, 2014

structural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17

Open the permit page

$125,000
Aug 9, 2013Completed
final sign-off Feb 2015
101 Post Stinter connecting stair between 2 & 3 floors. 2nd floor t.i. conference and break room build out. new lighting and electrical. demo restroom finishes, partial removal of slab above to 3rd floor for new stair. construct non-structural partitions, doors. mep
Details
Permit
201308093986
Permit issued
Oct 2, 2013
Final sign-off
Feb 19, 2015

inter connecting stair between 2 & 3 floors. 2nd floor t.i. conference and break room build out. new lighting and electrical. demo restroom finishes, partial removal of slab above to 3rd floor for new stair. construct non-structural partitions, doors. mep

Open the permit page

$500,000
Apr 16, 2013Completed
final sign-off Aug 2015
145 Jefferson Stcore & shell improv incl:2 elevators fr 1st to 3rd, wheel chair lift fr bsmt to 1st, stair & enclosures from bsmt to 1st & 2nd from 1st to 2nd. opening in 1/fl slab for future amusement ride. related structure work. doing demo on all floor nad three tenants will remain in opertaion
Details
Permit
201304164673
Permit issued
Aug 7, 2013
Final sign-off
Aug 24, 2015

core & shell improv incl:2 elevators fr 1st to 3rd, wheel chair lift fr bsmt to 1st, stair & enclosures from bsmt to 1st & 2nd from 1st to 2nd. opening in 1/fl slab for future amusement ride. related structure work. doing demo on all floor nad three tenants will remain in opertaion

Open the permit page

$500,000
Mar 26, 2013Completed
final sign-off Mar 2014
564 06th Stdemo rear stairs, demo ramp, install folding partition supports, infill one opening, install framing and support for skylights and ac units. this structural only work associcated with approved app#201303182441
Details
Permit
201303263029
Permit issued
Mar 26, 2013
Final sign-off
Mar 12, 2014

demo rear stairs, demo ramp, install folding partition supports, infill one opening, install framing and support for skylights and ac units. this structural only work associcated with approved app#201303182441

Open the permit page

$100,000
Aug 19, 2011Completed
final sign-off Jul 2012
555 California St50th & 51st floors-work associated with approved pa# 2011-0721-0717 & 2011-0728-1223 including a communicating stair between 50th & 51st floors & structural support for av wall & platform on rooftop
Details
Permit
201108192853
Permit issued
Aug 22, 2011
Final sign-off
Jul 13, 2012

50th & 51st floors-work associated with approved pa# 2011-0721-0717 & 2011-0728-1223 including a communicating stair between 50th & 51st floors & structural support for av wall & platform on rooftop

Open the permit page

$10,000
Jun 1, 2011Completed
final sign-off Oct 2011
2 Harrison Stpreconstruction demo of interior non-exit stair btn floors 6 and 7 and struc in fill of stairway
Details
Permit
201106017188
Permit issued
Jun 1, 2011
Final sign-off
Oct 25, 2011

preconstruction demo of interior non-exit stair btn floors 6 and 7 and struc in fill of stairway

Open the permit page

$35,000
May 20, 2011Completed
final sign-off Jul 2012
2 Harrison Ststructural work to remove columns and reinforce the structure to compensate and add structural for stair and support for operable partition.(accessibility for the area of work to be addressed under separate architecture permit application before occupancy.)
Details
Permit
201105206465
Permit issued
Jun 30, 2011
Final sign-off
Jul 18, 2012

structural work to remove columns and reinforce the structure to compensate and add structural for stair and support for operable partition.(accessibility for the area of work to be addressed under separate architecture permit application before occupancy.)

Open the permit page

$220,000
Sep 20, 2010Completed
final sign-off Feb 2011
160 Pacific Avcreation of common corridor on 2nd floor. new ada compliant stair hand and guard rails
Details
Permit
201009201178
Permit issued
Nov 9, 2010
Final sign-off
Feb 8, 2011

creation of common corridor on 2nd floor. new ada compliant stair hand and guard rails

Open the permit page

$80,000
Mar 15, 2010Never finaled
issued Mar 2010, no final
650 California St28th floor-fire evacuation interior signage consisting of emergency evacuation information sign plaques to be located at elevator lobbyand stairs.
Details
Permit
201003158186
Permit issued
Mar 18, 2010

28th floor-fire evacuation interior signage consisting of emergency evacuation information sign plaques to be located at elevator lobbyand stairs.

Open the permit page

$3,000
Jul 30, 2009Completed
final sign-off Jul 2010
575 Market Stmaintain 2-existing stair vestibule assemblies; new rated elevator lobby doors the rest of elevator lobby to remain as existing. all access control devices & doors along hallway have been removed from scope of work-mechanical & work included addendum to pa#200906301693
Details
Permit
200907303779
Permit issued
Aug 3, 2009
Final sign-off
Jul 27, 2010

maintain 2-existing stair vestibule assemblies; new rated elevator lobby doors the rest of elevator lobby to remain as existing. all access control devices & doors along hallway have been removed from scope of work-mechanical & work included addendum to pa#200906301693

Open the permit page

Aug 21, 2008Completed
final sign-off Nov 2009
211 Main Strevision to application 200807187030 & 200807187032 for intervening stairs.
Details
Permit
200808219755
Permit issued
Aug 22, 2008
Final sign-off
Nov 20, 2009

revision to application 200807187030 & 200807187032 for intervening stairs.

Open the permit page

$38,000
May 22, 2008Completed
final sign-off Dec 2008
1 Embarcadero Center33rd & 34th floor: structural work associated with approved pa #200805192359, work includes a tenant stair between floors.
Details
Permit
200805222690
Permit issued
May 22, 2008
Final sign-off
Dec 10, 2008

33rd & 34th floor: structural work associated with approved pa #200805192359, work includes a tenant stair between floors.

Open the permit page

$30,000
May 19, 2008Completed
final sign-off Dec 2008
1 Embarcadero Centerinterior tenant improvement on the 33rd fl. including demo, new walls,ceiling work,doors,millwork and finishes; mech,elec,new and relocated ducting,power,signal, new lighting, stair for tenant convinience to be under separate permit.
Details
Permit
200805192359
Permit issued
May 19, 2008
Final sign-off
Dec 10, 2008

interior tenant improvement on the 33rd fl. including demo, new walls,ceiling work,doors,millwork and finishes; mech,elec,new and relocated ducting,power,signal, new lighting, stair for tenant convinience to be under separate permit.

Open the permit page

$1,026,000
May 14, 2008Completed
final sign-off Aug 2009
50 Fremont Strevision to pa# 2008-0208-4345 to include (shop drawings) stair edge detail
Details
Permit
200805142078
Permit issued
May 16, 2008
Final sign-off
Aug 13, 2009

revision to pa# 2008-0208-4345 to include (shop drawings) stair edge detail

Open the permit page

$500
Dec 7, 2007Completed
final sign-off Feb 2009
580 California Stremoval of (e) stairwells (abandoned -communication stairs) at 22nd - 23rd floor & 21st - 22nd floor. infill of slabs at same. barrier removal at restrooms on 22nd + 23rd floor.
Details
Permit
200712079938
Permit issued
Dec 21, 2007
Final sign-off
Feb 19, 2009

removal of (e) stairwells (abandoned -communication stairs) at 22nd - 23rd floor & 21st - 22nd floor. infill of slabs at same. barrier removal at restrooms on 22nd + 23rd floor.

Open the permit page

$60,000
Sep 24, 2007Never finaled
issued Sep 2007, no final
3 Embarcadero Center24th floor ti- add partition at convience stair to 25th floor- change hardware on 1 door
Details
Permit
200709243472
Permit issued
Sep 24, 2007

24th floor ti- add partition at convience stair to 25th floor- change hardware on 1 door

Open the permit page

$1,500
Sep 18, 2007Completed
final sign-off Jul 2008
600 Montgomery Stinterior tenant improvement on 22nd floor including demo, new drywall. ceiling work. doors, finishes, new tenant stair connecting with floor 23. hvac. lighting. sprinklers & life safety under seperate permit.
Details
Permit
200709182942
Permit issued
Sep 18, 2007
Final sign-off
Jul 9, 2008

interior tenant improvement on 22nd floor including demo, new drywall. ceiling work. doors, finishes, new tenant stair connecting with floor 23. hvac. lighting. sprinklers & life safety under seperate permit.

Open the permit page

$1,030,000
Aug 7, 2007Completed
final sign-off Dec 2007
4 Embarcadero Centerrevision to approved appl. 2007 0731 8264: infill stair opening at the 22nd floor.
Details
Permit
200708078945
Permit issued
Aug 7, 2007
Final sign-off
Dec 12, 2007

revision to approved appl. 2007 0731 8264: infill stair opening at the 22nd floor.

Open the permit page

$32,000
Apr 17, 2007Completed
final sign-off Nov 2007
301 Battery Ststructural revision to app #200612280699. alterate stair detail.
Details
Permit
200704179006
Permit issued
Jun 26, 2007
Final sign-off
Nov 28, 2007

structural revision to app #200612280699. alterate stair detail.

Open the permit page

$1,500
Dec 28, 2006Completed
final sign-off Nov 2007
301 Battery Ststructural work stairs on floors 6 & 7 ( creating communicating stairs between floors 6 & 7)
Details
Permit
200612280699
Permit issued
Mar 6, 2007
Final sign-off
Nov 28, 2007

structural work stairs on floors 6 & 7 ( creating communicating stairs between floors 6 & 7)

Open the permit page

$30,000
Oct 24, 2006Expired or cancelled
expired Oct 2007
1 Embarcadero Centerreplace door locks tied to life safety system on the exit stairs on floors 2,9,15,16,17,18,19,25,26,29,30,31,40,41,&42
Details
Permit
200610245907
Permit issued
Oct 24, 2006

replace door locks tied to life safety system on the exit stairs on floors 2,9,15,16,17,18,19,25,26,29,30,31,40,41,&42

Open the permit page

$500
Jun 23, 2006Expired or cancelled
expired Jan 2008
333 Market Ststructural revision to pa#2006/05/11/1422: infill (e) floor opening near previous floor/stair opening infill on 33rd floor
Details
Permit
200606234945
Permit issued
Jun 23, 2006

structural revision to pa#2006/05/11/1422: infill (e) floor opening near previous floor/stair opening infill on 33rd floor

Open the permit page

$25,000