Phil Carlevaris Jorge Gorils
- Listed as
- architect, authorized agent-others, contractor, engineer
- Firm
- Dpw Inc.
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2000 to Jun 2009
350 permits since 2000 (contractor on 348 permits, authorized agent-others on 5 permits, engineer on 2 permits, architect on 1 permit): 211 completed, 33 never finaled, 106 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 350.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2009 | Completed final sign-off Jul 2009 | 152 Geary St | Dpw Inc. | renew pa# 2008/04/23/0401 to obtain final inspection. all work has been completed.Details
renew pa# 2008/04/23/0401 to obtain final inspection. all work has been completed. | |
| Jun 3, 2009 | Never finaled issued Jun 2009, no final | 999 California St | Dpw Inc. | to obtain final inspection for work approved under pa#200704269725. all work has been complete.Details
to obtain final inspection for work approved under pa#200704269725. all work has been complete. | |
| May 11, 2009 | Completed final sign-off Jan 2010 | 230 California St | Dpw Inc. | to obtain final inspection for work approved under pa#2006/02/22/5089. all work completed. reference pa#2007/09/13/2543.Details
to obtain final inspection for work approved under pa#2006/02/22/5089. all work completed. reference pa#2007/09/13/2543. | |
| May 11, 2009 | Completed final sign-off Jan 2010 | 230 California St | Dpw Inc. | to obtain final inspection for work approved under pa#2007/06/21/4652. all work complete.Details
to obtain final inspection for work approved under pa#2007/06/21/4652. all work complete. | |
| May 1, 2009 | Completed final sign-off Jul 2009 | 152 Geary St | Dpw Inc. | to obtain final inspection for work approved under pa#2008/04/07/8978.Details
to obtain final inspection for work approved under pa#2008/04/07/8978. | |
| Apr 24, 2009 | Completed final sign-off Apr 2009 | 55 Stockton St | Dpw Inc. | renew pa# 2007/06/05/3018 to obtain final inspection. all work has been completed.Details
renew pa# 2007/06/05/3018 to obtain final inspection. all work has been completed. | |
| Feb 24, 2009 | Completed final sign-off Feb 2009 | 100 Bush St | Dpw Inc. | renew pa# 2006/01/05/1505 to obtain final inspection. all work has been completed.Details
renew pa# 2006/01/05/1505 to obtain final inspection. all work has been completed. | |
| Feb 24, 2009 | Completed final sign-off Feb 2009 | 100 Bush St | Dpw Inc. | renew pa# 2006/01/19/2508 to obtain final inspection. all work has been completed.Details
renew pa# 2006/01/19/2508 to obtain final inspection. all work has been completed. | |
| Feb 5, 2009 | Completed final sign-off Feb 2009 | 160 Sansome St | Dpw Inc. | renewal of existing fire appl#200601051503. all work has been completed.Details
renewal of existing fire appl#200601051503. all work has been completed. | |
| Jan 2, 2009 | Completed final sign-off Mar 2009 | 580 California St | Dpw Inc. | ground floor modify existing sprinkler heads for new layout. relcoate 10 & add 7.Details
ground floor modify existing sprinkler heads for new layout. relcoate 10 & add 7. | $6,500 |
| Dec 4, 2008 | Completed final sign-off Jan 2009 | 71 Stevenson St | Dpw Inc. | #750- modify sprinklers for new wall and light layout. relocate 13, add 3 and plug 4Details
#750- modify sprinklers for new wall and light layout. relocate 13, add 3 and plug 4 | $3,200 |
| Nov 10, 2008 | Completed final sign-off Nov 2008 | 170 Columbus Av | Dpw Inc. | modify (e) sprinkler system in suite #300 for new walls and light layoutDetails
modify (e) sprinkler system in suite #300 for new walls and light layout | $2,500 |
| Sep 24, 2008 | Never finaled issued Sep 2008, no final | 3251 20th Av | Dpw Inc. | modify (e) sprinkler system for new ceilings in space 152 onlyDetails
modify (e) sprinkler system for new ceilings in space 152 only | $3,000 |
| Sep 12, 2008 | Never finaled issued Sep 2008, no final | 170 Columbus Av | Dpw Inc. | #240- relocate 7 fire sprinkler heads for new walls and ceilings.Details
#240- relocate 7 fire sprinkler heads for new walls and ceilings. | $3,800 |
| Jun 27, 2008 | Completed final sign-off Jun 2009 | 200 Powell St | Dpw Inc. | all floors-modify (e) sprinkler system for new tenant work on 71 sprinkler headsDetails
all floors-modify (e) sprinkler system for new tenant work on 71 sprinkler heads | $15,000 |
| Jun 18, 2008 | Completed final sign-off Aug 2008 | 50 Maiden Ln | Dpw Inc. | 1st floor-modify 20 (e) sprinkler to accomodate new wall layout. 17 sprinklers plugged.Details
1st floor-modify 20 (e) sprinkler to accomodate new wall layout. 17 sprinklers plugged. | $6,000 |
| Jun 2, 2008 | Never finaled issued Jun 2008, no final | 3251 20th Av | Dpw Inc. | space 123 -relocate 21 (e) sprinkler heads for new ceiling & walls.Details
space 123 -relocate 21 (e) sprinkler heads for new ceiling & walls. | $8,500 |
| May 16, 2008 | Completed final sign-off Jul 2008 | 160 Sansome St | Dpw Inc. | revise sprinklers to comply with high rise sprinkler ordinance. (umbrella permit) total 14 heads.Details
revise sprinklers to comply with high rise sprinkler ordinance. (umbrella permit) total 14 heads. | $20,000 |
| May 1, 2008 | Completed final sign-off Nov 2008 | 300 Brannan St | Dpw Inc. | renew expired pa# 2007/04/20/9337 for final inspection only.Details
renew expired pa# 2007/04/20/9337 for final inspection only. | |
| Apr 30, 2008 | Completed final sign-off Jul 2008 | 449 Powell St | Dpw Inc. | 2nd, 3rd, 4th floor: install a new sprinkler system, new sprinkler system to be ocnnected to existing fire pump and floor control risers.Details
2nd, 3rd, 4th floor: install a new sprinkler system, new sprinkler system to be ocnnected to existing fire pump and floor control risers. | $95,000 |
| Apr 23, 2008 | Expired or cancelled expired Jul 2009 | 152 Geary St | Dpw Inc. | remove existing 1" plugs and extend new sprinklers where new hard lids ceiling will be instalaled first and second floors. total of 11 sprinkler heads.Details
remove existing 1" plugs and extend new sprinklers where new hard lids ceiling will be instalaled first and second floors. total of 11 sprinkler heads. | $6,000 |
| Apr 14, 2008 | Never finaled issued Apr 2008, no final | 3251 20th Av | Dpw Inc. | modify existing fire sprinkler system for new ceiling system throughout space on the 2nd flo. total 43 heads. 10 add, 11 plugs, 30 relocates.Details
modify existing fire sprinkler system for new ceiling system throughout space on the 2nd flo. total 43 heads. 10 add, 11 plugs, 30 relocates. | $15,000 |
| Apr 7, 2008 | Never finaled issued Apr 2008, no final | 152 Geary St | Dpw Inc. | install new sprinkler system in the whole bldg. construct under ground piping to connect city watermain on the sidewalk on mainden ln.Details
install new sprinkler system in the whole bldg. construct under ground piping to connect city watermain on the sidewalk on mainden ln. | $45,000 |
| Mar 26, 2008 | Completed final sign-off Oct 2008 | 501 Tunnel Av | Dpw Inc. | extend existing sprinkler system for new canopy and lab/storage. total of 24 new heads.Details
extend existing sprinkler system for new canopy and lab/storage. total of 24 new heads. | $11,000 |
| Feb 21, 2008 | Never finaled issued Feb 2008, no final | 461 Baker St | Dpw Inc. | install a new 4" fin service with backflow prevention. we will also fully sprinkler the 1st and 2nd floorsDetails
install a new 4" fin service with backflow prevention. we will also fully sprinkler the 1st and 2nd floors | $50,000 |
| Feb 11, 2008 | Expired or cancelled expired Nov 2009 | 222 Mason St | Dpw Inc. | modify existing sprinkler system for new walls and ceilings. we will relocate and use existing outlets for new ti work. 4 new, 3 relocates. building appl#200802042937Details
modify existing sprinkler system for new walls and ceilings. we will relocate and use existing outlets for new ti work. 4 new, 3 relocates. building appl#200802042937 | $5,000 |
| Jan 30, 2008 | Never finaled issued Jan 2008, no final | 101 02nd St | Dpw Inc. | modify (e) sprinkler system for new tenant improvement work. relocate 32, add 4, plug-off 2Details
modify (e) sprinkler system for new tenant improvement work. relocate 32, add 4, plug-off 2 | $8,500 |
| Jan 23, 2008 | Completed final sign-off Feb 2009 | 925 Market St | Dpw Inc. | fully sprinkler building @ basement, 1st floor, 2nd floor. a new fire service will also be installed. total 110 heads.Details
fully sprinkler building @ basement, 1st floor, 2nd floor. a new fire service will also be installed. total 110 heads. | $48,000 |
| Nov 14, 2007 | Completed final sign-off Jul 2008 | 757 Market St | Dpw Inc. | fire sprinkler system on level b1 and 1st floor. relocate & add 84 heads for new walls & ceilings 34 heads and relocate 50 heads. no work in guest rooms.Details
fire sprinkler system on level b1 and 1st floor. relocate & add 84 heads for new walls & ceilings 34 heads and relocate 50 heads. no work in guest rooms. | $16,800 |
| Nov 13, 2007 | Completed final sign-off Feb 2008 | 601 California St | Dpw Inc. | fire sprinkler system. relocate 13 (e) sprinkler heada, and add 3 new headsDetails
fire sprinkler system. relocate 13 (e) sprinkler heada, and add 3 new heads | $5,000 |
| Nov 13, 2007 | Expired or cancelled expired Oct 2011 | 90 New Montgomery St | Dpw Inc. | fire sprinkler system. relocate 30 existing heads, plug off 12 heads on 2nd floorDetails
fire sprinkler system. relocate 30 existing heads, plug off 12 heads on 2nd floor | $9,000 |
| Nov 8, 2007 | Expired or cancelled expired Jun 2009 | 580 California St | Dpw Inc. | 19th floor: relocate 4 existing sprinkler heads and add 2 new heads.Details
19th floor: relocate 4 existing sprinkler heads and add 2 new heads. | $4,000 |
| Nov 6, 2007 | Completed final sign-off Apr 2008 | 384 Post St | Dpw Inc. | 3rd floor - relocate (30) existing sprinkler heads and add (1) for new tenant improvement. ref. appl. #2007.10.30.6812.Details
3rd floor - relocate (30) existing sprinkler heads and add (1) for new tenant improvement. ref. appl. #2007.10.30.6812. | $11,000 |
| Nov 5, 2007 | Expired or cancelled expired Jun 2009 | 201 Post St | Dpw Inc. | modify (e)sprinkler system at basement and ground levels including relocation and installation of new sprinkler heads. 25 heads in basement and 101 heads in ground floor.Details
modify (e)sprinkler system at basement and ground levels including relocation and installation of new sprinkler heads. 25 heads in basement and 101 heads in ground floor. | $35,000 |
| Nov 5, 2007 | Completed final sign-off Jan 2008 | 55 Cyril Magnin St | Dpw Inc. | 5th floor - relocate (11) existing head and plug-off (11) for new ceiling and wall layouts. no work to be done on residential units. ref arch appl. #2007.0712.6549.Details
5th floor - relocate (11) existing head and plug-off (11) for new ceiling and wall layouts. no work to be done on residential units. ref arch appl. #2007.0712.6549. | $5,000 |
| Oct 26, 2007 | Completed final sign-off Jan 2008 | 160 Sansome St | Dpw Inc. | fully sprinkle per nfpa 13 floors 7 and 14, on exisiting srinkler system. floors have now been abated. tie into existing 6" riser and install new sectional control valves for both floors.Details
fully sprinkle per nfpa 13 floors 7 and 14, on exisiting srinkler system. floors have now been abated. tie into existing 6" riser and install new sectional control valves for both floors. | $40,000 |
| Oct 19, 2007 | Completed final sign-off Jan 2008 | 500 Howard St | Dpw Inc. | modify existing sprinkler system on 4th floor only for new tenant improvements within 2000 sq.ft. area. new calc's, 21 add, 6 relocate.Details
modify existing sprinkler system on 4th floor only for new tenant improvements within 2000 sq.ft. area. new calc's, 21 add, 6 relocate. | $10,000 |
| Oct 17, 2007 | Completed final sign-off Nov 2007 | 150 Post St | Dpw Inc. | renew pa#200703156308 for final inspection.(3rd/ fl)Details
renew pa#200703156308 for final inspection.(3rd/ fl) | |
| Oct 17, 2007 | Completed final sign-off Oct 2007 | 150 Post St | Dpw Inc. | renew pa#200703156309 for final inspection. (5th fl)Details
renew pa#200703156309 for final inspection. (5th fl) | |
| Oct 15, 2007 | Expired or cancelled expired May 2009 | 170 Columbus Av | Dpw Inc. | tenant improvement sprinkler work. relocate 9 existing sprinkler head and add 1 sprinkler head on first floor.Details
tenant improvement sprinkler work. relocate 9 existing sprinkler head and add 1 sprinkler head on first floor. | $4,000 |
| Oct 11, 2007 | Completed final sign-off Apr 2008 | 1075 California St | Dpw Inc. | add 9 new sprinklers at 1st floor, add 8 new sprinklers in sub bsmt garbage areaDetails
add 9 new sprinklers at 1st floor, add 8 new sprinklers in sub bsmt garbage area | $8,500 |
| Oct 1, 2007 | Completed final sign-off Nov 2007 | 3251 20th Av | Dpw Inc. | fire sprinkler system on 1st fl. relocate 11 sprinkler heads and plug 1 head.Details
fire sprinkler system on 1st fl. relocate 11 sprinkler heads and plug 1 head. | $2,500 |
| Oct 1, 2007 | Completed final sign-off Nov 2007 | 100 Spear St | Dpw Inc. | fire sprinkler system on 18th floor. relocate 4 and add 1 new sprinkler head.Details
fire sprinkler system on 18th floor. relocate 4 and add 1 new sprinkler head. | $1,500 |
| Sep 24, 2007 | Completed final sign-off Mar 2008 | 1 Market St | Dpw Inc. | suite #420- modification of existing sprinkler system, 7 relcoates, 1 add.Details
suite #420- modification of existing sprinkler system, 7 relcoates, 1 add. | $4,500 |
| Sep 5, 2007 | Completed final sign-off Mar 2008 | 550 California St | Dpw Inc. | 1st floor - modification of existing sprinkler system. relocate 31 heads, add 1 and plug 2.Details
1st floor - modification of existing sprinkler system. relocate 31 heads, add 1 and plug 2. | $7,000 |
| Sep 4, 2007 | Completed final sign-off Oct 2007 | 3251 20th Av | Dpw Inc. | 2nd floor-sprinkler system modification- add 6, relocate19, delete 2.Details
2nd floor-sprinkler system modification- add 6, relocate19, delete 2. | $9,000 |
| Aug 28, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Dpw Inc. | relocate 41, add 16, remove 2 sprinkler heads, 18th floorDetails
relocate 41, add 16, remove 2 sprinkler heads, 18th floor | $11,780 |
| Aug 28, 2007 | Completed final sign-off Jul 2008 | 7070 California St | Dpw Inc. | install a new wet fire sprinkler system for new classroom. new fire service by other.Details
install a new wet fire sprinkler system for new classroom. new fire service by other. | $37,000 |
| Aug 23, 2007 | Expired or cancelled expired Mar 2009 | 900 North Point St | Dpw Inc. | modify (e) sprinler system for new walls & ceilings . remove (e) 1" plugs for 22 new pendent heads.Details
modify (e) sprinler system for new walls & ceilings . remove (e) 1" plugs for 22 new pendent heads. | $14,000 |
| Jun 21, 2007 | Expired or cancelled expired Jan 2010 | 230 California St | Dpw Inc. | raise existing piping in lobby and restrooms per new handlid ceilings. ceiling hght 8'foot above finish floor. work permformed on floors 3,4, & 6Details
raise existing piping in lobby and restrooms per new handlid ceilings. ceiling hght 8'foot above finish floor. work permformed on floors 3,4, & 6 | $15,000 |
| Jun 6, 2007 | Completed final sign-off Jan 2009 | 200 Powell St | Dpw Inc. | install a new fire sprinkler system in basement, 1st and 2nd floors. total 0f 29 heads.Details
install a new fire sprinkler system in basement, 1st and 2nd floors. total 0f 29 heads. | $38,000 |
| Jun 5, 2007 | Expired or cancelled expired Apr 2009 | 55 Stockton St | Dpw Inc. | 1st floor: relocate 22 (e) sprinkler heads, add (7) new and plug off (6) heads.Details
1st floor: relocate 22 (e) sprinkler heads, add (7) new and plug off (6) heads. | $9,000 |
| Jun 1, 2007 | Completed final sign-off Jul 2007 | 640 Bryant St | Dpw Inc. | relocate 6 (e) heads and add 8 new heads from 1" outlet left at the 1x 1/2 x1 tees for buildoutDetails
relocate 6 (e) heads and add 8 new heads from 1" outlet left at the 1x 1/2 x1 tees for buildout | $6,500 |
| May 24, 2007 | Completed final sign-off Nov 2007 | 450 Mission St | Dpw Inc. | 1st & 2nd floor: install a new wet type sprinkler system on 1st & 2nd floor sales office only.Details
1st & 2nd floor: install a new wet type sprinkler system on 1st & 2nd floor sales office only. | $25,000 |
| May 24, 2007 | Completed final sign-off Nov 2007 | 150 Post St | Dpw Inc. | suite 650: relocate 21 (e) sprinkler heads for new ceiling and walls.Details
suite 650: relocate 21 (e) sprinkler heads for new ceiling and walls. | $8,500 |
| May 16, 2007 | Completed final sign-off Oct 2007 | 1199 Bush St | Dpw Inc. | relocate (50) existing sprinkler heads, add (6) new and plug-off (4) for new walls & ceilingsDetails
relocate (50) existing sprinkler heads, add (6) new and plug-off (4) for new walls & ceilings | $12,000 |
| May 15, 2007 | Expired or cancelled expired Oct 2013 | 50 03rd St | Dpw Inc. | relocate 3 sprinkler heads for new guestrooms only on 4th floorDetails
relocate 3 sprinkler heads for new guestrooms only on 4th floor | $6,000 |
| May 10, 2007 | Completed final sign-off Jul 2007 | 999 California St | Dpw Inc. | modify existing sprinkler system for new executive suite expansion, 4 relocates, 2 new, 1 plug offDetails
modify existing sprinkler system for new executive suite expansion, 4 relocates, 2 new, 1 plug off | $3,000 |
| May 4, 2007 | Completed final sign-off Jun 2007 | 221 Main St | Dpw Inc. | relocate (e) existing sprinkler heads and add (1) to existing closet. work on 12th floor only.Details
relocate (e) existing sprinkler heads and add (1) to existing closet. work on 12th floor only. | $3,500 |
| Apr 26, 2007 | Expired or cancelled expired May 2009 | 999 California St | Dpw Inc. | ground floor-bring a new sprinkler supply line to new garage canopy and install a new fire sprinkler system in canopy area. 18 heads total.Details
ground floor-bring a new sprinkler supply line to new garage canopy and install a new fire sprinkler system in canopy area. 18 heads total. | $18,000 |
| Apr 20, 2007 | Completed final sign-off Jun 2007 | 3251 20th Av | Dpw Inc. | 1st floor; space #109-modify (e) sprinkler system for new walls & ceiling on 1st floor only. relocate 36, plug 6, add 6.Details
1st floor; space #109-modify (e) sprinkler system for new walls & ceiling on 1st floor only. relocate 36, plug 6, add 6. | $13,000 |
| Apr 20, 2007 | Completed final sign-off Nov 2008 | 300 Brannan St | Dpw Inc. | remove (e) sprinkler riser and install a new 6" riser with floor. isolation risers. we will also install a new fire pump.Details
remove (e) sprinkler riser and install a new 6" riser with floor. isolation risers. we will also install a new fire pump. | $95,000 |
| Apr 19, 2007 | Expired or cancelled expired Apr 2009 | 250 Post St | Dpw Inc. | modify extg basement and ground floor for new walls and ceilingsDetails
modify extg basement and ground floor for new walls and ceilings | $20,000 |
| Apr 3, 2007 | Completed final sign-off Oct 2007 | 475 Sansome St | Dpw Inc. | modify existing sprinkler system on 1st & mezzanine floor for new walls and ceilings. 30 relocates, sprinkler work only.Details
modify existing sprinkler system on 1st & mezzanine floor for new walls and ceilings. 30 relocates, sprinkler work only. | $11,500 |
| Mar 30, 2007 | Completed final sign-off Sep 2007 | 199 Fremont St | Dpw Inc. | relocate 9 existing sprinkler heads for new officesDetails
relocate 9 existing sprinkler heads for new offices | $4,500 |
| Mar 15, 2007 | Expired or cancelled expired Nov 2007 | 150 Post St | Dpw Inc. | relocate 9 existing sprinkler heads for new suite expansion.Details
relocate 9 existing sprinkler heads for new suite expansion. | $5,000 |
| Mar 15, 2007 | Completed final sign-off Oct 2007 | 150 Post St | Dpw Inc. | modify existing sprinkler system for 3 ajoining suites, 4 relcoate, 1 new.Details
modify existing sprinkler system for 3 ajoining suites, 4 relcoate, 1 new. | $4,800 |
| Mar 15, 2007 | Completed final sign-off Jan 2008 | 160 Sansome St | Dpw Inc. | install a new wet type sprinkler system in the roof mech. room. 53 new sprinkler heads.Details
install a new wet type sprinkler system in the roof mech. room. 53 new sprinkler heads. | $40,000 |
| Mar 9, 2007 | Never finaled issued Mar 2007, no final | 50 03rd St | Dpw Inc. | relocate 57 existing heads, add 3 new and plug off 1 existing head for new ceilings in meeting roomsDetails
relocate 57 existing heads, add 3 new and plug off 1 existing head for new ceilings in meeting rooms | $20,000 |
| Feb 21, 2007 | Completed final sign-off Nov 2008 | 1300 Fillmore St | Dpw Inc. | modify existing sprinkler system for new wall, ceiling and light layout, existing sytem in core condition. 1st floor. 1st time tenant. 6 adds, 56 relocatesDetails
modify existing sprinkler system for new wall, ceiling and light layout, existing sytem in core condition. 1st floor. 1st time tenant. 6 adds, 56 relocates | $16,000 |
| Feb 8, 2007 | Completed final sign-off Mar 2007 | 101 California St | Dpw Inc. | modify existing sprinkler system for new wall layout 2 new heads, 11 relocatesd, all work on 15th floorDetails
modify existing sprinkler system for new wall layout 2 new heads, 11 relocatesd, all work on 15th floor | $4,500 |
| Nov 10, 2006 | Completed final sign-off Nov 2006 | 1805 Broadway | Dpw Inc. | renew pa# 9723472 for final inspection.Details
renew pa# 9723472 for final inspection. | |
| Nov 2, 2006 | Completed final sign-off Apr 2007 | 211 Main St | Dpw Inc. | 1st floor-relocate 30 (e) head, add 10 new & plug-off 1 for new tenant improvement on ground floor only.Details
1st floor-relocate 30 (e) head, add 10 new & plug-off 1 for new tenant improvement on ground floor only. | $20,000 |
| Oct 26, 2006 | Completed final sign-off Nov 2006 | 3251 20th Av | Dpw Inc. | modification of existing sprinkler system. add 6 (n) heads.Details
modification of existing sprinkler system. add 6 (n) heads. | $5,000 |
| Oct 17, 2006 | Never finaled issued Oct 2006, no final | 1525 Silver Av | Dpw Inc. | re-route existing piping in basement for extension of elevator. we will also drop head in elevator room and elevator mech. room. 2 heads & pipe.Details
re-route existing piping in basement for extension of elevator. we will also drop head in elevator room and elevator mech. room. 2 heads & pipe. | $8,000 |
| Oct 12, 2006 | Completed final sign-off Nov 2006 | 201 03rd St | Dpw Inc. | install a new total pac pre-action system for new server room and replace all existing standard response heads in space to new tyco ty-frb heads per landlords request.Details
install a new total pac pre-action system for new server room and replace all existing standard response heads in space to new tyco ty-frb heads per landlords request. | $25,000 |
| Sep 15, 2006 | Completed final sign-off Oct 2006 | 100 01st St | Dpw Inc. | add 1 asprinkler head and relocate 1 existing head for new door location - door under separate permit this permit : sprinkler workDetails
add 1 asprinkler head and relocate 1 existing head for new door location - door under separate permit this permit : sprinkler work | $2,500 |
| Sep 12, 2006 | Completed final sign-off Mar 2007 | 315 Montgomery St | Dpw Inc. | reocate 10 existing sprinkler heads and add 2 new head on 10th floor onlyDetails
reocate 10 existing sprinkler heads and add 2 new head on 10th floor only | $5,500 |
| Sep 7, 2006 | Expired or cancelled expired Aug 2007 | 228 Grant Av | Dpw Inc. | relocate 3 existing heads in lobby for new ceiling systemDetails
relocate 3 existing heads in lobby for new ceiling system | $2,700 |
| Sep 7, 2006 | Completed final sign-off Nov 2006 | 153 Townsend St | Dpw Inc. | modify existing core sprinkler system for new tenant expansion on 6th floor onlyDetails
modify existing core sprinkler system for new tenant expansion on 6th floor only | $5,000 |
| Aug 30, 2006 | Completed final sign-off Nov 2006 | 845 Market St | Dpw Inc. | pasta moto, space# fe 6. cti-4, bart level, sp.Details
pasta moto, space# fe 6. cti-4, bart level, sp. | $10,000 |
| Aug 18, 2006 | Expired or cancelled expired Mar 2009 | 595 Market St | Dpw Inc. | to renew pa#2005/12/20/0732 for fire sprinkler finalDetails
to renew pa#2005/12/20/0732 for fire sprinkler final | |
| Aug 9, 2006 | Expired or cancelled expired Oct 2008 | 3251 20th Av | Dpw Inc. | relocate (10) existing sprinkler heads in space 260 for new ceiling & walls. plugging 2 headsDetails
relocate (10) existing sprinkler heads in space 260 for new ceiling & walls. plugging 2 heads | $4,000 |
| Aug 9, 2006 | Completed final sign-off Sep 2006 | 180 Montgomery St | Dpw Inc. | 18th floor-relocate 4 (e) fire sprinkler heads.Details
18th floor-relocate 4 (e) fire sprinkler heads. | $3,000 |
| Aug 1, 2006 | Completed final sign-off Oct 2006 | 845 Market St | Dpw Inc. | zazil,space# 400. cti-4, 4th floor, sp.Details
zazil,space# 400. cti-4, 4th floor, sp. | $20,000 |
| Jul 28, 2006 | Expired or cancelled expired Feb 2009 | 845 Market St | Dpw Inc. | cti-4, 4th & towne, 3rd floor, space# 345, sp.Details
cti-4, 4th & towne, 3rd floor, space# 345, sp. | $30,000 |
| Jul 28, 2006 | Completed final sign-off May 2007 | 845 Market St | Dpw Inc. | "wichcraft", space# 199. cti-4, 1st floor, sp.Details
"wichcraft", space# 199. cti-4, 1st floor, sp. | $30,000 |
| Jul 24, 2006 | Never finaled issued Jul 2006, no final | 2100 Webster St | Dpw Inc. | relocate 21 existing sprinkler heads and plug off 151 for new ceilings & walls in suite 105 onlyDetails
relocate 21 existing sprinkler heads and plug off 151 for new ceilings & walls in suite 105 only | $7,500 |
| Jul 6, 2006 | Expired or cancelled expired May 2008 | 123 Townsend St | Dpw Inc. | renew of pa#200504190366.Details
renew of pa#200504190366. | |
| Jul 6, 2006 | Completed final sign-off Sep 2006 | 160 Spear St | Dpw Inc. | modfy existingsprinklersystem, relocate1firesprinkler headDetails
modfy existingsprinklersystem, relocate1firesprinkler head | $2,000 |
| Jul 6, 2006 | Expired or cancelled expired Feb 2009 | 1100 California St | Dpw Inc. | modification of existin sprinkler system for 1st floor corrodorDetails
modification of existin sprinkler system for 1st floor corrodor | $8,000 |
| Jun 26, 2006 | Completed final sign-off Jul 2006 | 3251 20th Av | Dpw Inc. | modifyl existing sprinkler system for new walls and ceilings. 12 relocates, 4 plug offDetails
modifyl existing sprinkler system for new walls and ceilings. 12 relocates, 4 plug off | $5,000 |
| Jun 19, 2006 | Never finaled issued Jun 2006, no final | 1 Daniel Burnham Ct | Dpw Inc. | modify (e) sprinkler system on suite 250 only.Details
modify (e) sprinkler system on suite 250 only. | $6,000 |
| Jun 19, 2006 | Completed final sign-off May 2007 | 747 Market St | Dpw Inc. | modify existing cone sprinkler system for new walls & ceilings @ 2nd floorDetails
modify existing cone sprinkler system for new walls & ceilings @ 2nd floor | $50,000 |
| Jun 15, 2006 | Completed final sign-off May 2007 | 845 Market St | Dpw Inc. | derco fine jewelers, space# 495. cti-4, 4th floor, ls.Details
derco fine jewelers, space# 495. cti-4, 4th floor, ls. | $10,000 |
| Jun 1, 2006 | Completed final sign-off Mar 2010 | 635 Sacramento St | Dpw Inc. | modify extg sprinkler system on 1st and 2nd floor per approved plans/relocate 4/new 3/eliminate 4Details
modify extg sprinkler system on 1st and 2nd floor per approved plans/relocate 4/new 3/eliminate 4 | $25,000 |
| May 4, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | Dpw Inc. | modify (e) sprinkler systems on 3rd, 4th and 5th floor for new walls and ceiling configurations. install a pre-action system on the 3rd floorDetails
modify (e) sprinkler systems on 3rd, 4th and 5th floor for new walls and ceiling configurations. install a pre-action system on the 3rd floor | $90,000 |
| Mar 14, 2006 | Completed final sign-off Oct 2006 | 1660 Bush St | Dpw Inc. | install new sprinkler risers on each floor, relocate 25 (e) head which were removed at demo and reinstalled when steel was installedDetails
install new sprinkler risers on each floor, relocate 25 (e) head which were removed at demo and reinstalled when steel was installed | $20,000 |
| Jan 23, 2006 | Expired or cancelled expired Dec 2007 | 235 02nd St | Dpw Inc. | modify existing sprinkler system in basement for new walls, offices & ceilings in basement only.Details
modify existing sprinkler system in basement for new walls, offices & ceilings in basement only. | $20,000 |
| Jan 23, 2006 | Completed final sign-off Feb 2006 | 5260 Diamond Heights Bl | Dpw Inc. | modify existing sprinkler system for new walls & new ceilings in basement and ground floor onlyDetails
modify existing sprinkler system for new walls & new ceilings in basement and ground floor only | $30,000 |