Block 4991, lot 007

501 Tunnel Av

City’s use
Industrial
Built
2003
Building
44,890 sq ft
Lot
64,399 sq ft
Zoning
M1
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

27 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 11, 2018Completed
final sign-off Dec 2018
501 Tunnel AvAmerican Solar Corporationrooftop- install a 544.3 kw solar electric array. slush mounted metal roof pge grid connected. maher n/a
Details
Permit
201806111544
Permit issued
Sep 25, 2018
Final sign-off
Dec 7, 2018

rooftop- install a 544.3 kw solar electric array. slush mounted metal roof pge grid connected. maher n/a

Open the permit page

$450,000
May 2, 2018Completed
final sign-off Jan 2019
501 Tunnel AvWestates Mechanical Corporation Incinstallation of 192 fire spinkler in new west wing addition. ref pa# 201605268444
Details
Permit
201805028021
Permit issued
May 7, 2018
Final sign-off
Jan 9, 2019

installation of 192 fire spinkler in new west wing addition. ref pa# 201605268444

Open the permit page

$57,000
Feb 15, 2018Completed
final sign-off Oct 2018
501 Tunnel AvWestates Mechanical Corporation Increlocation of 6"underground on private hydrant system..ef pa 2016-0526-8444
Details
Permit
201802151443
Permit issued
Feb 15, 2018
Final sign-off
Oct 31, 2018

relocation of 6"underground on private hydrant system..ef pa 2016-0526-8444

Open the permit page

$8,000
Aug 8, 2017Completed
final sign-off Nov 2018
501 Tunnel AvNibbi Bros Assoc Inc.work under permit #201605268444-s3 extends over property line. retaining wall to extend over property line. all property owned by same owner
Details
Permit
201708084243
Permit issued
Sep 12, 2017
Final sign-off
Nov 8, 2018

work under permit #201605268444-s3 extends over property line. retaining wall to extend over property line. all property owned by same owner

Open the permit page

Mar 1, 2016Completed
final sign-off Jun 2016
501 Tunnel AvOccidental Expressinstall new waste processing equipment inside the existing waste transfer facility ; fully sprinklered building; maher n/a
Details
Permit
201603010870
Permit issued
May 6, 2016
Final sign-off
Jun 1, 2016

install new waste processing equipment inside the existing waste transfer facility ; fully sprinklered building; maher n/a

Open the permit page

$285,000
Jul 23, 2015Never finaled
issued Jul 2015, no final
501 Tunnel AvWalschon Fire Protection Incinstall (6) new pendent sprinklers into office, breakroom, & restroom that are currently without coverage. n/a maher ordinance
Details
Permit
201507232270
Permit issued
Jul 23, 2015

install (6) new pendent sprinklers into office, breakroom, & restroom that are currently without coverage. n/a maher ordinance

Open the permit page

$6,000
Jul 23, 2010Expired or cancelled
expired Dec 2017
501 Tunnel AvCensource Incerect an electric single faced indirect non-illuminated replacement sign
Details
Permit
201007237337
Permit issued
Jul 23, 2010

erect an electric single faced indirect non-illuminated replacement sign

Open the permit page

$60,000
May 7, 2010Completed
final sign-off Jun 2010
501 Tunnel AvAccutite Technology Engineeringreplace spill bucket on underground storage tanl storing diesel- out door
Details
Permit
201005071962
Permit issued
May 10, 2010
Final sign-off
Jun 22, 2010

replace spill bucket on underground storage tanl storing diesel- out door

Open the permit page

$1,500
Nov 6, 2009Completed
final sign-off Nov 2010
501 Tunnel AvCritical Path Steel Buildingsconstruct a shade canopy 20'x108' over existing conveyor belt lien. steel frame work, translucent hdpe membrane cover.
Details
Permit
200911060737
Permit issued
Nov 10, 2009
Final sign-off
Nov 15, 2010

construct a shade canopy 20'x108' over existing conveyor belt lien. steel frame work, translucent hdpe membrane cover.

Open the permit page

$74,200
Mar 26, 2008Completed
final sign-off Oct 2008
501 Tunnel AvDpw Inc.extend existing sprinkler system for new canopy and lab/storage. total of 24 new heads.
Details
Permit
200803268006
Permit issued
Mar 26, 2008
Final sign-off
Oct 31, 2008

extend existing sprinkler system for new canopy and lab/storage. total of 24 new heads.

Open the permit page

$11,000
Dec 3, 2007Completed
final sign-off Jul 2008
501 Tunnel Avinstall pre-owned conveyor system and construct contaiment wall to store material such as wood, metal & sheet rock, prior to processing. change internal configuration to accept conveyor system. to comply with n.o.v. 2007729722.
Details
Permit
200712039431
Permit issued
Dec 12, 2007
Final sign-off
Jul 3, 2008

install pre-owned conveyor system and construct contaiment wall to store material such as wood, metal & sheet rock, prior to processing. change internal configuration to accept conveyor system. to comply with n.o.v. 2007729722.

Open the permit page

$10,000
Mar 30, 2006Completed
final sign-off Nov 2006
501 Tunnel AvCosco Fire Protection Inc.add three new sprinklers under mezzanine.
Details
Permit
200603307935
Permit issued
Mar 30, 2006
Final sign-off
Nov 17, 2006

add three new sprinklers under mezzanine.

Open the permit page

$3,000
Oct 12, 2005Completed
final sign-off Oct 2005
501 Tunnel AvThe Lawson Roofing Co Inc.reroofing
Details
Permit
200510125319
Permit issued
Oct 12, 2005
Final sign-off
Oct 20, 2005

reroofing

Open the permit page

$22,283
Jun 9, 2005Completed
final sign-off Nov 2006
501 Tunnel AvTransbay Fire Protectionrev. to pa#2004/03/16/8726: adding a new containment tank 1' high to orig. work
Details
Permit
200506094693
Permit issued
Sep 28, 2005
Final sign-off
Nov 17, 2006

rev. to pa#2004/03/16/8726: adding a new containment tank 1' high to orig. work

Open the permit page

Jan 28, 2005Completed
final sign-off Apr 2006
501 Tunnel Avinstallation of ventilation equip to fitter exhaust hood air prior to discharge to atmosphere.
Details
Permit
200501284228
Permit issued
Mar 8, 2005
Final sign-off
Apr 3, 2006

installation of ventilation equip to fitter exhaust hood air prior to discharge to atmosphere.

Open the permit page

$40,000
Dec 22, 2004Completed
final sign-off Apr 2006
501 Tunnel Avenclose end of exist bld space, add ventilation and lighting to create area appropriate for paint
Details
Permit
200412222028
Permit issued
May 12, 2005
Final sign-off
Apr 12, 2006

enclose end of exist bld space, add ventilation and lighting to create area appropriate for paint

Open the permit page

$114,800
Jul 23, 2004Expired or cancelled
expired Oct 2005
501 Tunnel Avnew vehicle weigh scale pit.
Details
Permit
200407239702
Permit issued
Jul 23, 2004

new vehicle weigh scale pit.

Open the permit page

$26,000
Mar 16, 2004Completed
final sign-off Jan 2006
501 Tunnel AvTransbay Fire Protectionrevision to pa 200306308368 adding diesel gas tank; install 185 gal gas tank, for fire pump system.
Details
Permit
200403168726
Permit issued
Aug 11, 2004
Final sign-off
Jan 25, 2006

revision to pa 200306308368 adding diesel gas tank; install 185 gal gas tank, for fire pump system.

Open the permit page

$1,000
Sep 26, 2003Expired or cancelled
expired Oct 2005
501 Tunnel AvBroughton Fire Protection Inc.installation of fire sprinkler underground service, permit required for crossing city lines
Details
Permit
200309265900
Permit issued
Sep 26, 2003

installation of fire sprinkler underground service, permit required for crossing city lines

Open the permit page

$1,300
Jul 7, 2003Completed
final sign-off Aug 2003
501 Tunnel AvBarri Electric Companyalterations to e fire alarm system to include signaling devices. revision to 2s00304091858/2003/06/0
Details
Permit
200307078833
Permit issued
Jul 24, 2003
Final sign-off
Aug 1, 2003

alterations to e fire alarm system to include signaling devices. revision to 2s00304091858/2003/06/0

Open the permit page

$13,000
Jun 30, 2003Completed
final sign-off Nov 2006
501 Tunnel AvTransbay Fire Protectionfire pump installation - sprinklers under pa200303109168
Details
Permit
200306308368
Permit issued
Aug 20, 2003
Final sign-off
Nov 17, 2006

fire pump installation - sprinklers under pa200303109168

Open the permit page

May 27, 2003Expired or cancelled
withdrawn Aug 2003
501 Tunnel AvTransbay Fire Protectioninstall new diesel fire pump to replace old pump
Details
Permit
200305275554

install new diesel fire pump to replace old pump

Open the permit page

$120,600
Apr 9, 2003Expired or cancelled
cancelled Dec 2003
501 Tunnel AvNibbi Bros Inc.fire alarm plans complete integrated system to new building
Details
Permit
200304091858

fire alarm plans complete integrated system to new building

Open the permit page

$8,980
Mar 10, 2003Completed
final sign-off Aug 2003
501 Tunnel AvTransbay Fire Protectioninstall new fire sprinkler system per nfpa 13-extra harzad design with fire pump-for waste transfer
Details
Permit
200303109168
Permit issued
May 15, 2003
Final sign-off
Aug 1, 2003

install new fire sprinkler system per nfpa 13-extra harzad design with fire pump-for waste transfer

Open the permit page

$120,600
May 14, 2002Completed
final sign-off Jun 2006
38 Le Conte CrJoyce Construction, Inc.existing unfinished basement to be made into a studio apartment
Details
Permit
200205146489
Permit issued
Oct 17, 2002
Final sign-off
Jun 19, 2006

existing unfinished basement to be made into a studio apartment

Open the permit page

$25,000
Oct 10, 2001Completed
final sign-off Aug 2003
501 Tunnel AvNibbi Brothers Constructionerect a two story recycling/processing structure
Details
Permit
200110100283
Permit issued
Apr 4, 2002
Final sign-off
Aug 1, 2003

erect a two story recycling/processing structure

Open the permit page

$5,000,000
Mar 14, 2000Completed
final sign-off Feb 2001
501 Tunnel Avconstruct a sort line within an existing structure
Details
Permit
200003144251
Permit issued
Dec 26, 2000
Final sign-off
Feb 8, 2001

construct a sort line within an existing structure

Open the permit page

$47,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Transbay Fire Protection (5), Westates Mechanical Corporation Inc (2), Accutite Technology Engineering, American Solar Corporation, Barri Electric Company, Broughton Fire Protection Inc., Censource Inc, Cosco Fire Protection Inc., Critical Path Steel Buildings, Dpw Inc., Joyce Construction, Inc., Nibbi Bros Assoc Inc., Nibbi Bros Inc., Nibbi Brothers Construction, Occidental Express, The Lawson Roofing Co Inc., Walschon Fire Protection Inc
Architects
Jack Munson (2)
Engineers
Willard Decker
Authorized agents
Dpw Inc

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.