Willard Decker
- License
- 45625
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Criterium Decker Engineers
- Based in
- San Jose
- On San Francisco permits
- Jan 2005 to Aug 2013
7 permits since 2000 (engineer on 6 permits, architect on 1 permit): 2 completed, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Calcatcar Enterprise Dba 3 C's Ornamenta, Jin Construction & Elec, Keystone Construction
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 3
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 7, 2013 | Never finaled issued Aug 2013, no final | 40 29th St | Calcatcar Enterprise Dba 3 C's Ornamenta | rail guard for stair (gate & barrier)Details
rail guard for stair (gate & barrier) | $4,600 |
| Oct 4, 2010 | Never finaled issued Jun 2011, no final | 900 07th St | demo (e) parking lot & landscaping. increase off street parking capacity, install ada ramp into office. add new lighting & landscape. lighting and landscape under separate permit.Details
demo (e) parking lot & landscaping. increase off street parking capacity, install ada ramp into office. add new lighting & landscape. lighting and landscape under separate permit. | $400,000 | |
| Dec 4, 2008 | Expired or cancelled cancelled Jan 2026 | 1652 Sunnydale Av | revision to 200809262705: relocate pad for recycling centerDetails
revision to 200809262705: relocate pad for recycling center | ||
| Sep 26, 2008 | Expired or cancelled expired Mar 2010 | 1652 Sunnydale Av | Jin Construction & Elec | remove existing a-c surface & door, new concrete pad, remove & replace existing concrete walkways install new electric svc.Details
remove existing a-c surface & door, new concrete pad, remove & replace existing concrete walkways install new electric svc. | $100,000 |
| Feb 13, 2008 | Never finaled issued Feb 2008, no final | 943 Clayton St | Keystone Construction | install a support post with a concrete footing in the carport, under a transverse beam, to prevent that beam from further sagging or settlingDetails
install a support post with a concrete footing in the carport, under a transverse beam, to prevent that beam from further sagging or settling | $5,000 |
| Jun 13, 2007 | Completed final sign-off Oct 2008 | 501 Tunnel Av | storage room addition and adjacent free standing canopy for h-2 occupancy- recyle house hold hazardous waste. sprinklers under separate permit. sffd permit required. sprinklers separte permit. explosion proof electrical system being installed and mech.Details
storage room addition and adjacent free standing canopy for h-2 occupancy- recyle house hold hazardous waste. sprinklers under separate permit. sffd permit required. sprinklers separte permit. explosion proof electrical system being installed and mech. | $345,600 | |
| Jan 28, 2005 | Completed final sign-off Apr 2006 | 501 Tunnel Av | installation of ventilation equip to fitter exhaust hood air prior to discharge to atmosphere.Details
installation of ventilation equip to fitter exhaust hood air prior to discharge to atmosphere. | $40,000 |