Permit GraphShortlistSan Francisco building permits since 2000

Block 4991, lot 008

501 Tunnel Av

City’s use
Industrial
Built
1971
Stories
2
Units
1
Rooms
1 bathroom
Building
125,589 sq ft
Lot
93,998 sq ft
Zoning
M2
Construction type
S

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

8 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 17, 2018Completed
final sign-off Oct 2018
501 Tunnel AvSiemens Industry, Inc.fire alarm work for the "recology" west wing addition. added devices: 15 smoke detectors, 3 pull stations, 1 horn / strobe power supply, 1 horn, 5 horn / strobes and 9 strobes. reference pa # 201605268444. n/a for maher.
Details
Permit
201804176510
Status
complete
Filed
Apr 17, 2018
Permit issued
Apr 18, 2018
Final sign-off
Oct 30, 2018
Declared cost
$19,785
Address
501 Tunnel Av

fire alarm work for the "recology" west wing addition. added devices: 15 smoke detectors, 3 pull stations, 1 horn / strobe power supply, 1 horn, 5 horn / strobes and 9 strobes. reference pa # 201605268444. n/a for maher.

Open the permit page

$19,785
May 26, 2016Completed
final sign-off Jan 2019
501 Tunnel AvNibbi Bros Assoc Inc.horizontal & vertical addition. (n) metal framed 2-story industrial bldg addition to (e) municipl solid waste transfer station. the addition includes storage on the lower level & a concrete loading area. bldg to be used for transferring resource recovery of compost material.* maher: n/a *
Details
Permit
201605268444
Status
complete
Filed
May 26, 2016
Permit issued
Dec 23, 2016
Final sign-off
Jan 15, 2019
Declared cost
$2,114,970
Address
501 Tunnel Av

horizontal & vertical addition. (n) metal framed 2-story industrial bldg addition to (e) municipl solid waste transfer station. the addition includes storage on the lower level & a concrete loading area. bldg to be used for transferring resource recovery of compost material.* maher: n/a *

Open the permit page

$2,114,970
Mar 18, 2014Expired or cancelled
cancelled Mar 2017
501 Tunnel Av(n) addition to the (e) transfer station to allow for continued resource recovery & waste processing activities, 1 (n) restroom. ** maher: compliance with ordinance no# 155-13 is required **
Details
Permit
201403180994
Status
cancelled
Filed
Mar 18, 2014
Declared cost
$3,500,000
Address
501 Tunnel Av

(n) addition to the (e) transfer station to allow for continued resource recovery & waste processing activities, 1 (n) restroom. ** maher: compliance with ordinance no# 155-13 is required **

Open the permit page

$3,500,000
Mar 4, 2008Completed
final sign-off Jul 2008
501 Tunnel Avpour engineered concrete pad for 2000 gallon oil tank- convault const. replace ex. tank in kind.
Details
Permit
200803046174
Status
complete
Filed
Mar 4, 2008
Permit issued
Mar 6, 2008
Final sign-off
Jul 3, 2008
Declared cost
$13,000
Address
501 Tunnel Av

pour engineered concrete pad for 2000 gallon oil tank- convault const. replace ex. tank in kind.

Open the permit page

$13,000
Jun 15, 2007Expired or cancelled
cancelled Sep 2007
501 Tunnel Avgrading
Details
Permit
9610734
Status
cancelled
Filed
Jun 15, 2007
Declared cost
$850,000
Address
501 Tunnel Av

grading

Open the permit page

$850,000
Jun 13, 2007Completed
final sign-off Oct 2008
501 Tunnel Avstorage room addition and adjacent free standing canopy for h-2 occupancy- recyle house hold hazardous waste. sprinklers under separate permit. sffd permit required. sprinklers separte permit. explosion proof electrical system being installed and mech.
Details
Permit
200706133743
Status
complete
Filed
Jun 13, 2007
Permit issued
Feb 15, 2008
Final sign-off
Oct 31, 2008
Declared cost
$345,600
Address
501 Tunnel Av

storage room addition and adjacent free standing canopy for h-2 occupancy- recyle house hold hazardous waste. sprinklers under separate permit. sffd permit required. sprinklers separte permit. explosion proof electrical system being installed and mech.

Open the permit page

$345,600
Jun 9, 2003Completed
final sign-off Aug 2003
501 Tunnel AvBarri Electric Companyalterations to (e) fire alarm system to include signaling devices: horns, strobes in occupied areas
Details
Permit
200306096635
Status
complete
Filed
Jun 9, 2003
Permit issued
Jun 9, 2003
Final sign-off
Aug 1, 2003
Declared cost
$13,000
Address
501 Tunnel Av

alterations to (e) fire alarm system to include signaling devices: horns, strobes in occupied areas

Open the permit page

$13,000
May 14, 2003Expired or cancelled
withdrawn Feb 2004
501 Tunnel Avinstall explosion proof ventilation fans, methane detectors, methane alarm, automatic garage door op
Details
Permit
200305144615
Status
withdrawn
Filed
May 14, 2003
Declared cost
$165,000
Address
501 Tunnel Av

install explosion proof ventilation fans, methane detectors, methane alarm, automatic garage door op

Open the permit page

$165,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Barri Electric Company, Nibbi Bros Assoc Inc., Siemens Industry, Inc.
Engineers
Willard Daniel Decker

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.