Permit GraphShortlistSan Francisco building permits since 2000

Willard Decker

License
45625
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, engineer
Firm
Criterium Decker Engineers
Based in
San Jose
On San Francisco permits
Jan 2005 to Aug 2013

7 permits since 2000 (engineer on 6 permits, architect on 1 permit): 2 completed, 3 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Calcatcar Enterprise Dba 3 C's Ornamenta, Jin Construction & Elec, Keystone Construction

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 7, 2013Never finaled
issued Aug 2013, no final
40 29th StCalcatcar Enterprise Dba 3 C's Ornamentarail guard for stair (gate & barrier)
Details
Permit
201308073737
Permit issued
Aug 15, 2013

rail guard for stair (gate & barrier)

Open the permit page

$4,600
Oct 4, 2010Never finaled
issued Jun 2011, no final
900 07th Stdemo (e) parking lot & landscaping. increase off street parking capacity, install ada ramp into office. add new lighting & landscape. lighting and landscape under separate permit.
Details
Permit
201010042150
Permit issued
Jun 17, 2011

demo (e) parking lot & landscaping. increase off street parking capacity, install ada ramp into office. add new lighting & landscape. lighting and landscape under separate permit.

Open the permit page

$400,000
Dec 4, 2008Expired or cancelled
cancelled Jan 2026
1652 Sunnydale Avrevision to 200809262705: relocate pad for recycling center
Details
Permit
200812047779

revision to 200809262705: relocate pad for recycling center

Open the permit page

Sep 26, 2008Expired or cancelled
expired Mar 2010
1652 Sunnydale AvJin Construction & Elecremove existing a-c surface & door, new concrete pad, remove & replace existing concrete walkways install new electric svc.
Details
Permit
200809262705
Permit issued
Sep 26, 2008

remove existing a-c surface & door, new concrete pad, remove & replace existing concrete walkways install new electric svc.

Open the permit page

$100,000
Feb 13, 2008Never finaled
issued Feb 2008, no final
943 Clayton StKeystone Constructioninstall a support post with a concrete footing in the carport, under a transverse beam, to prevent that beam from further sagging or settling
Details
Permit
200802134668
Permit issued
Feb 13, 2008

install a support post with a concrete footing in the carport, under a transverse beam, to prevent that beam from further sagging or settling

Open the permit page

$5,000
Jun 13, 2007Completed
final sign-off Oct 2008
501 Tunnel Avstorage room addition and adjacent free standing canopy for h-2 occupancy- recyle house hold hazardous waste. sprinklers under separate permit. sffd permit required. sprinklers separte permit. explosion proof electrical system being installed and mech.
Details
Permit
200706133743
Permit issued
Feb 15, 2008
Final sign-off
Oct 31, 2008

storage room addition and adjacent free standing canopy for h-2 occupancy- recyle house hold hazardous waste. sprinklers under separate permit. sffd permit required. sprinklers separte permit. explosion proof electrical system being installed and mech.

Open the permit page

$345,600
Jan 28, 2005Completed
final sign-off Apr 2006
501 Tunnel Avinstallation of ventilation equip to fitter exhaust hood air prior to discharge to atmosphere.
Details
Permit
200501284228
Permit issued
Mar 8, 2005
Final sign-off
Apr 3, 2006

installation of ventilation equip to fitter exhaust hood air prior to discharge to atmosphere.

Open the permit page

$40,000