Permit GraphShortlistSan Francisco building permits since 2000

Douglas Zucker

License
C012821
Look the license up with the state
Listed as
architect, authorized agent-others, designer, engineer, lessee
Firm
Gensler
Based in
San Francisco
On San Francisco permits
Jul 2001 to Jul 2025

568 permits since 2000 (architect on 535 permits, designer on 16 permits, engineer on 11 permits, authorized agent-others on 5 permits, lessee on 1 permit): 457 completed, 5 in progress, 74 never finaled, 32 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 568.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 3, 2025Completed
final sign-off Oct 2025
181 Fremont StLevel 10 Construction Lp17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures.
Details
Permit
202507030191
Status
complete
Filed
Jul 3, 2025
Permit issued
Jul 11, 2025
Final sign-off
Oct 28, 2025
Declared cost
$250,000
Address
181 Fremont St

17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures.

Open the permit page

$250,000
Jan 14, 2025In progress
issued Jun 2025
1 Market StField Construction Inc.level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate.
Details
Permit
202501148331
Status
issued
Filed
Jan 14, 2025
Permit issued
Jun 6, 2025
Declared cost
$8,000,000
Address
1 Market St

level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate.

Open the permit page

$8,000,000
Dec 11, 2024In progress
issued Dec 2024
3 Embarcadero CenterHathaway Dinwiddie Co.lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work.
Details
Permit
202412116604
Status
issued
Filed
Dec 11, 2024
Permit issued
Dec 20, 2024
Address
3 Embarcadero Center

lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work.

Open the permit page

Oct 16, 2024In progress
issued Feb 2025
150 04th Ti StCahill Contractors Llc.mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space.
Details
Permit
202403258532
Status
issued
Filed
Oct 16, 2024
Permit issued
Feb 14, 2025
Declared cost
$40,000,000
Address
150 04th Ti St

mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space.

Open the permit page

$40,000,000
Jul 25, 2024Completed
final sign-off Apr 2025
1515 03rd StPrincipal Builders Inc.mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting.
Details
Permit
202407257306
Status
complete
Filed
Jul 25, 2024
Permit issued
Sep 16, 2024
Final sign-off
Apr 4, 2025
Declared cost
$3,999,516
Address
1515 03rd St

mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting.

Open the permit page

$3,999,516
Jun 24, 2024Completed
final sign-off Nov 2024
475 Sansome StPrincipal Builders Inc.revision to bpa# 202405021310: to update millwork detail and depth per plans.
Details
Permit
202406245067
Status
complete
Filed
Jun 24, 2024
Permit issued
Jun 27, 2024
Final sign-off
Nov 21, 2024
Address
475 Sansome St

revision to bpa# 202405021310: to update millwork detail and depth per plans.

Open the permit page

Dec 13, 2023Completed
final sign-off Apr 2024
1 Maritime PzNovo Construction Inc21/f- minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit
Details
Permit
202312132478
Status
complete
Filed
Dec 13, 2023
Permit issued
Dec 14, 2023
Final sign-off
Apr 12, 2024
Declared cost
$190,000
Address
1 Maritime Pz

21/f- minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit

Open the permit page

$190,000
Dec 13, 2023Completed
final sign-off Apr 2024
1 Maritime PzNovo Construction Inc20th fl - minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit
Details
Permit
202312132475
Status
complete
Filed
Dec 13, 2023
Permit issued
Dec 14, 2023
Final sign-off
Apr 12, 2024
Declared cost
$289,000
Address
1 Maritime Pz

20th fl - minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit

Open the permit page

$289,000
Dec 4, 2023In progress
issued Feb 2024
170 Valencia StThomas Swan Sign Co Incinstall 1 non-illuminated single face door sign " chan national queer arts center"
Details
Permit
202312041890
Status
issued
Filed
Dec 4, 2023
Permit issued
Feb 20, 2024
Declared cost
$2,000
Address
170 Valencia St

install 1 non-illuminated single face door sign " chan national queer arts center"

Open the permit page

$2,000
Aug 28, 2023In progress
issued Nov 2023
560 Mission StTurner Construction Co27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work
Details
Permit
202308285394
Status
issued
Filed
Aug 28, 2023
Permit issued
Nov 20, 2023
Declared cost
$115,000
Address
560 Mission St

27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work

Open the permit page

$115,000
Jun 30, 2023Completed
final sign-off Mar 2024
170 Valencia StSkyline Constructionremoval/replacement of exterior entry gate, replacement of exterior window security grills & light fixtures on valencia st, addition of a new exterior door on the elgin park elevation, the demo of an interior restroom & door
Details
Permit
202306301346
Status
complete
Filed
Jun 30, 2023
Permit issued
Aug 7, 2023
Final sign-off
Mar 15, 2024
Declared cost
$105,000
Address
170 Valencia St

removal/replacement of exterior entry gate, replacement of exterior window security grills & light fixtures on valencia st, addition of a new exterior door on the elgin park elevation, the demo of an interior restroom & door

Open the permit page

$105,000
Oct 26, 2022Completed
final sign-off Oct 2023
170 Valencia StSkyline Constructionnew accessible restrooms, new accesible path of travel ramps; new lift to access performance stage and new acceisble pantry @ prefunction room. deferred mep
Details
Permit
202210265195
Status
complete
Filed
Oct 26, 2022
Permit issued
Jan 10, 2023
Final sign-off
Oct 27, 2023
Declared cost
$250,000
Address
170 Valencia St

new accessible restrooms, new accesible path of travel ramps; new lift to access performance stage and new acceisble pantry @ prefunction room. deferred mep

Open the permit page

$250,000
Oct 25, 2022Completed
final sign-off Oct 2023
170 Valencia StSkyline Capital Builders Llcdemolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17.
Details
Permit
202210255081
Status
complete
Filed
Oct 25, 2022
Permit issued
Oct 26, 2022
Final sign-off
Oct 27, 2023
Declared cost
$10,000
Address
170 Valencia St

demolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17.

Open the permit page

$10,000
Oct 25, 2022Never finaled
issued Dec 2022, no final
657 Mission Stnew slab opening in level 1 slab of 657 portion of building. new 2-hr rated partition w/90 minute rated door will be installed @ lobby perimeter for exit separation.
Details
Permit
202210255097
Status
issued
Filed
Oct 25, 2022
Permit issued
Dec 7, 2022
Declared cost
$100,000
Address
657 Mission St

new slab opening in level 1 slab of 657 portion of building. new 2-hr rated partition w/90 minute rated door will be installed @ lobby perimeter for exit separation.

Open the permit page

$100,000
Oct 14, 2022Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Increvision 201804136335 s3 to document the revised area with the mechanical room at roof level
Details
Permit
202210144426
Status
complete
Filed
Oct 14, 2022
Permit issued
Nov 17, 2022
Final sign-off
May 16, 2023
Address
145 Leavenworth St

revision 201804136335 s3 to document the revised area with the mechanical room at roof level

Open the permit page

Jun 15, 2022Completed
final sign-off Jun 2023
3 Embarcadero CenterPeacock Construction3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.
Details
Permit
202206156376
Status
complete
Filed
Jun 15, 2022
Permit issued
Jul 8, 2022
Final sign-off
Jun 29, 2023
Declared cost
$1,025,089
Address
3 Embarcadero Center

3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.

Open the permit page

$1,025,089
Jun 15, 2022Completed
final sign-off Jul 2023
3 Embarcadero CenterPeacock Construction2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.
Details
Permit
202206156401
Status
complete
Filed
Jun 15, 2022
Permit issued
Jul 12, 2022
Final sign-off
Jul 11, 2023
Declared cost
$856,324
Address
3 Embarcadero Center

2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.

Open the permit page

$856,324
May 2, 2022Completed
final sign-off May 2023
465 California StRossi Builders Inc.g/f:interior demo of ground floor space. demo non-structural partitions, ceiling, finishes. ti under separate permit requird. sprinkler under separate permits.
Details
Permit
202205023396
Status
complete
Filed
May 2, 2022
Permit issued
Jun 21, 2022
Final sign-off
May 4, 2023
Declared cost
$32,000
Address
465 California St

g/f:interior demo of ground floor space. demo non-structural partitions, ceiling, finishes. ti under separate permit requird. sprinkler under separate permits.

Open the permit page

$32,000
Mar 31, 2022Completed
final sign-off Apr 2023
361 Turk StCentric Construction Increvision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
Details
Permit
202203311289
Status
complete
Filed
Mar 31, 2022
Permit issued
Apr 25, 2023
Final sign-off
Apr 26, 2023
Address
361 Turk St

revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.

Open the permit page

Mar 31, 2022Completed
final sign-off Apr 2023
145 Leavenworth StCentric Construction Increvision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
Details
Permit
202203311305
Status
complete
Filed
Mar 31, 2022
Permit issued
Apr 7, 2023
Final sign-off
Apr 24, 2023
Address
145 Leavenworth St

revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.

Open the permit page

Jan 26, 2022Never finaled
issued Jan 2022, no final
3 Embarcadero CenterDome Construction Corpadministrative permit. obtaining a fire assemble permit. no work to be done on this permit
Details
Permit
202201266689
Status
issued
Filed
Jan 26, 2022
Permit issued
Jan 26, 2022
Address
3 Embarcadero Center

administrative permit. obtaining a fire assemble permit. no work to be done on this permit

Open the permit page

Dec 20, 2021Completed
final sign-off Jan 2023
465 California StSkyline Capital Builders Llcrevision to bpa# 2020.0903.3366. adjustment of new curb cut location off california st,due to structrual constraits.
Details
Permit
202112204712
Status
complete
Filed
Dec 20, 2021
Permit issued
Feb 16, 2022
Final sign-off
Jan 11, 2023
Address
465 California St

revision to bpa# 2020.0903.3366. adjustment of new curb cut location off california st,due to structrual constraits.

Open the permit page

Nov 23, 2021Expired or cancelled
cancelled Jan 2026
1 Market St#1800: add security doors, localized patch and repari as req. for floor finishes and ceilings. no change to use, exit stair, egress path, elevator, fire sprinklers and life safety systems to remain operational.
Details
Permit
202111232987
Status
cancelled
Filed
Nov 23, 2021
Declared cost
$10,000
Address
1 Market St

#1800: add security doors, localized patch and repari as req. for floor finishes and ceilings. no change to use, exit stair, egress path, elevator, fire sprinklers and life safety systems to remain operational.

Open the permit page

$10,000
Oct 14, 2021Completed
final sign-off Dec 2021
1 Sansome StClune Construction Company L P23rd fl - remove mechanical scope from 2018-0926-1516
Details
Permit
202110140481
Status
complete
Filed
Oct 14, 2021
Permit issued
Oct 22, 2021
Final sign-off
Dec 9, 2021
Address
1 Sansome St

23rd fl - remove mechanical scope from 2018-0926-1516

Open the permit page

Sep 22, 2021Never finaled
issued Nov 2021, no final
560 Mission StTurner Construction Coti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.
Details
Permit
202109228950
Status
issued
Filed
Sep 22, 2021
Permit issued
Nov 9, 2021
Declared cost
$1,500,000
Address
560 Mission St

ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.

Open the permit page

$1,500,000
May 18, 2021Never finaled
filed May 2021, never issued
495 Geary StHathaway Dinwiddie Co.renovations to the existing clift hotel (type 1, article 11 bldg) to include a new main entry marquee. 1. add an open building marquee over the existing sidewalk along geary street
Details
Permit
202105180539
Status
filed
Filed
May 18, 2021
Declared cost
$1,100,000
Address
495 Geary St

renovations to the existing clift hotel (type 1, article 11 bldg) to include a new main entry marquee. 1. add an open building marquee over the existing sidewalk along geary street

Open the permit page

$1,100,000
Apr 28, 2021Completed
final sign-off Jun 2022
45 Fremont StRichlen Constructionrevision to app#201904117722 to add location of epo switch for previosly approved fire pit. update in sheet ie3.01
Details
Permit
202104289498
Status
complete
Filed
Apr 28, 2021
Permit issued
May 17, 2021
Final sign-off
Jun 7, 2022
Declared cost
$1,000
Address
45 Fremont St

revision to app#201904117722 to add location of epo switch for previosly approved fire pit. update in sheet ie3.01

Open the permit page

$1,000
Apr 26, 2021Completed
final sign-off Sep 2021
427 Brannan StSource Planning And Construction Inclevel 2 interior tenant improvement include demolition of non-load bearing partitions & acoustical ceiling tile modification for a single tenant on 2nd floor. existing structure & exit stairs to remain. no facade/fenestration work.
Details
Permit
202104269362
Status
complete
Filed
Apr 26, 2021
Permit issued
Jun 3, 2021
Final sign-off
Sep 17, 2021
Declared cost
$48,000
Address
427 Brannan St

level 2 interior tenant improvement include demolition of non-load bearing partitions & acoustical ceiling tile modification for a single tenant on 2nd floor. existing structure & exit stairs to remain. no facade/fenestration work.

Open the permit page

$48,000
Feb 26, 2021Completed
final sign-off Jun 2021
1 Market StBcci Construction Company20th fl: arch revision to construct new non-structural partition, ceiling, light fixtures and finishes. ref pa# 201909252656. revision reflecting conversion of reception area by elevators to two conference rooms.
Details
Permit
202102265433
Status
complete
Filed
Feb 26, 2021
Permit issued
Apr 23, 2021
Final sign-off
Jun 3, 2021
Declared cost
$40,000
Address
1 Market St

20th fl: arch revision to construct new non-structural partition, ceiling, light fixtures and finishes. ref pa# 201909252656. revision reflecting conversion of reception area by elevators to two conference rooms.

Open the permit page

$40,000
Feb 23, 2021Never finaled
filed Feb 2021, never issued
201 California StBcci Construction Companyexterior work to demo & construct ground level & level 2 storefronts and facade finishes. exterior lighting upgrade, sidewalks & new building signage. interior work includes replacement of non-structual partitions, doors, ceiling, millwork & lighting. mep deferred.
Details
Permit
202102235152
Status
filed
Filed
Feb 23, 2021
Declared cost
$5,000,000
Address
201 California St

exterior work to demo & construct ground level & level 2 storefronts and facade finishes. exterior lighting upgrade, sidewalks & new building signage. interior work includes replacement of non-structual partitions, doors, ceiling, millwork & lighting. mep deferred.

Open the permit page

$5,000,000
Dec 18, 2020Completed
final sign-off Dec 2022
2 Embarcadero CenterHathaway Dinwiddie Co.deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033419.
Details
Permit
202012181301
Status
complete
Filed
Dec 18, 2020
Permit issued
Apr 9, 2021
Final sign-off
Dec 30, 2022
Address
2 Embarcadero Center

deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033419.

Open the permit page

Dec 18, 2020Completed
final sign-off Dec 2022
3 Embarcadero CenterHathaway Dinwiddie Co.deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033420.
Details
Permit
202012181300
Status
complete
Filed
Dec 18, 2020
Permit issued
Apr 9, 2021
Final sign-off
Dec 30, 2022
Address
3 Embarcadero Center

deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033420.

Open the permit page

Nov 18, 2020Completed
final sign-off Jan 2023
72 Ellis StWebcor Construction Lpfor health review only in relationship to pa #201508033157
Details
Permit
202011189224
Status
complete
Filed
Nov 18, 2020
Permit issued
Feb 5, 2021
Final sign-off
Jan 13, 2023
Address
72 Ellis St

for health review only in relationship to pa #201508033157

Open the permit page

Nov 6, 2020Completed
final sign-off Mar 2021
333 Bush StDome Construction Corp4/f: deffered mep for 202002144567. maher n/a.
Details
Permit
202011068432
Status
complete
Filed
Nov 6, 2020
Permit issued
Dec 17, 2020
Final sign-off
Mar 23, 2021
Address
333 Bush St

4/f: deffered mep for 202002144567. maher n/a.

Open the permit page

Sep 3, 2020Completed
final sign-off Jan 2023
465 California StSkyline Capital Builders Llcwork on 1st floor to update storefront at main entry and leidesdorff st. entry, sidewalk replacement, lighting along leidesdorff st. hallway ceiling and lighting, art niche in central lobby, glazing and elecrical.
Details
Permit
202009033366
Status
complete
Filed
Sep 3, 2020
Permit issued
Aug 18, 2021
Final sign-off
Jan 11, 2023
Declared cost
$1,500,000
Address
465 California St

work on 1st floor to update storefront at main entry and leidesdorff st. entry, sidewalk replacement, lighting along leidesdorff st. hallway ceiling and lighting, art niche in central lobby, glazing and elecrical.

Open the permit page

$1,500,000
Feb 14, 2020Completed
final sign-off Mar 2021
333 Bush StDome Construction Corp4th floor: interior t.i. including non load bearing walls, new ceilings, finishes mep, life safety, fire sprinkler modification will be under seperate permit.
Details
Permit
202002144567
Status
complete
Filed
Feb 14, 2020
Permit issued
Feb 24, 2020
Final sign-off
Mar 23, 2021
Declared cost
$2,500,000
Address
333 Bush St

4th floor: interior t.i. including non load bearing walls, new ceilings, finishes mep, life safety, fire sprinkler modification will be under seperate permit.

Open the permit page

$2,500,000
Dec 30, 2019Never finaled
filed Dec 2019, never issued
150 Minna StSkyline Constructiontenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permit
Details
Permit
201912300883
Status
filed
Filed
Dec 30, 2019
Declared cost
$1,500,000
Address
150 Minna St

tenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permit

Open the permit page

$1,500,000
Dec 19, 2019Completed
final sign-off Oct 2021
1 Market StBcci Construction Company18th fl - office ti. new partitions, millwork & finishes. mep deferred.
Details
Permit
201912190043
Status
complete
Filed
Dec 19, 2019
Permit issued
Jan 7, 2020
Final sign-off
Oct 26, 2021
Declared cost
$990,000
Address
1 Market St

18th fl - office ti. new partitions, millwork & finishes. mep deferred.

Open the permit page

$990,000
Dec 19, 2019Completed
final sign-off Oct 2021
1 Market StBcci Construction Company19th fl - office ti. new partitions, millwork & finishes. mep deferred.
Details
Permit
201912190040
Status
complete
Filed
Dec 19, 2019
Permit issued
Jan 7, 2020
Final sign-off
Oct 26, 2021
Declared cost
$980,000
Address
1 Market St

19th fl - office ti. new partitions, millwork & finishes. mep deferred.

Open the permit page

$980,000
Dec 9, 2019Completed
final sign-off Jul 2020
555 California StPrincipal Builders Inc.16/f: tenant improvement: work to include new non-structural partitions, doors, ceilings, finishes, casework, and furniture. new mep ductwork & lighting systems. fully sprinklered building. no plumbing.
Details
Permit
201912099031
Status
complete
Filed
Dec 9, 2019
Permit issued
Dec 23, 2019
Final sign-off
Jul 30, 2020
Declared cost
$1,104,564
Address
555 California St

16/f: tenant improvement: work to include new non-structural partitions, doors, ceilings, finishes, casework, and furniture. new mep ductwork & lighting systems. fully sprinklered building. no plumbing.

Open the permit page

$1,104,564
Nov 26, 2019Completed
final sign-off Mar 2022
1 Market StBcci Construction Companyrevision to approved stair pa# 2019-0829-0178: structural calcs for stair included.
Details
Permit
201911268217
Status
complete
Filed
Nov 26, 2019
Permit issued
Dec 4, 2019
Final sign-off
Mar 11, 2022
Address
1 Market St

revision to approved stair pa# 2019-0829-0178: structural calcs for stair included.

Open the permit page

Oct 24, 2019Completed
final sign-off Oct 2020
1 Market StBcci Construction Company21st & 22nd floor: revised drawings to show rated exit passageways changes to reflect approved exit passageways on the 20th floor. ref app#201909252656 and 201909242582 and 201909242584 mep dererred. n/a for maher
Details
Permit
201910245516
Status
complete
Filed
Oct 24, 2019
Permit issued
Oct 31, 2019
Final sign-off
Oct 28, 2020
Address
1 Market St

21st & 22nd floor: revised drawings to show rated exit passageways changes to reflect approved exit passageways on the 20th floor. ref app#201909252656 and 201909242582 and 201909242584 mep dererred. n/a for maher

Open the permit page

Oct 10, 2019Completed
final sign-off Feb 2021
495 Geary StHathaway Dinwiddie Co.tenant improvement for gr fl cafe in existing hotel with occupant load
Details
Permit
201910104132
Status
complete
Filed
Oct 10, 2019
Permit issued
Jul 6, 2020
Final sign-off
Feb 22, 2021
Declared cost
$700,000
Address
495 Geary St

tenant improvement for gr fl cafe in existing hotel with occupant load

Open the permit page

$700,000
Oct 3, 2019Completed
final sign-off Dec 2022
3 Embarcadero CenterHathaway Dinwiddie Co.lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a**
Details
Permit
201910033420
Status
complete
Filed
Oct 3, 2019
Permit issued
Jul 28, 2020
Final sign-off
Dec 30, 2022
Declared cost
$2,250,000
Address
3 Embarcadero Center

lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a**

Open the permit page

$2,250,000
Oct 3, 2019Completed
final sign-off Dec 2022
2 Embarcadero CenterHathaway Dinwiddie Co.lobby improvement includes new curtain wall, minor slab infill, ceilings, partitions & associated steel structure fl wall, elevator cab finishes & mep. replacement of glass canopy @ podium courtyard & addition of (n) stair from lobby to promenade level.**maher n/a**
Details
Permit
201910033419
Status
complete
Filed
Oct 3, 2019
Permit issued
Jul 28, 2020
Final sign-off
Dec 30, 2022
Declared cost
$2,250,000
Address
2 Embarcadero Center

lobby improvement includes new curtain wall, minor slab infill, ceilings, partitions & associated steel structure fl wall, elevator cab finishes & mep. replacement of glass canopy @ podium courtyard & addition of (n) stair from lobby to promenade level.**maher n/a**

Open the permit page

$2,250,000
Sep 25, 2019Never finaled
issued Oct 2019, no final
1 Market StBcci Construction Company20th flr. new non-structural partitions, ceilings, light fixtures, millwork and finishes
Details
Permit
201909252656
Status
issued
Filed
Sep 25, 2019
Permit issued
Oct 9, 2019
Declared cost
$1,000,000
Address
1 Market St

20th flr. new non-structural partitions, ceilings, light fixtures, millwork and finishes

Open the permit page

$1,000,000
Sep 19, 2019Never finaled
issued Oct 2019, no final
555 California StTurner Construction Co30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety system
Details
Permit
201909192166
Status
issued
Filed
Sep 19, 2019
Permit issued
Oct 9, 2019
Declared cost
$100,000
Address
555 California St

30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety system

Open the permit page

$100,000
Sep 3, 2019Completed
final sign-off Jun 2025
415 Mission StBcci Construction Company34th fl - revision to remove maker lab and all product conveying exhaust equipment. new room shall be used as display space. ref pa 2017-0913-7868, 2017-1011-0893, 2018-0508-8484 and 2018-0118-8890
Details
Permit
201909030441
Status
complete
Filed
Sep 3, 2019
Permit issued
Sep 24, 2019
Final sign-off
Jun 20, 2025
Declared cost
$40,000
Address
415 Mission St

34th fl - revision to remove maker lab and all product conveying exhaust equipment. new room shall be used as display space. ref pa 2017-0913-7868, 2017-1011-0893, 2018-0508-8484 and 2018-0118-8890

Open the permit page

$40,000
Aug 15, 2019Never finaled
issued Aug 2019, no final
400 California StBana Construction Incscope of work is to record e historic interior stone wall panels, remove and reinstall in place with e or new as necessary during the seismic retrofit voluntary work. revision to 201804247160. structutral and mep work work on a separate permit
Details
Permit
201908158866
Status
issued
Filed
Aug 15, 2019
Permit issued
Aug 23, 2019
Declared cost
$13,200
Address
400 California St

scope of work is to record e historic interior stone wall panels, remove and reinstall in place with e or new as necessary during the seismic retrofit voluntary work. revision to 201804247160. structutral and mep work work on a separate permit

Open the permit page

$13,200
Aug 8, 2019Completed
final sign-off Nov 2019
495 Geary StHathaway Dinwiddie Co.14, 15, 16 and 17th floors - ab-017 soft demo
Details
Permit
201908088255
Status
complete
Filed
Aug 8, 2019
Permit issued
Aug 9, 2019
Final sign-off
Nov 27, 2019
Declared cost
$20,000
Address
495 Geary St

14, 15, 16 and 17th floors - ab-017 soft demo

Open the permit page

$20,000
Aug 6, 2019Completed
final sign-off Sep 2019
1 Market StBcci Construction Company20th, 21st, 22nd flrs. demo of (e) non-structural partitions, ceilings, fixtures, millwork and finishes. mep demo also included. will comply with ab-017.
Details
Permit
201908068009
Status
complete
Filed
Aug 6, 2019
Permit issued
Aug 6, 2019
Final sign-off
Sep 6, 2019
Declared cost
$150,000
Address
1 Market St

20th, 21st, 22nd flrs. demo of (e) non-structural partitions, ceilings, fixtures, millwork and finishes. mep demo also included. will comply with ab-017.

Open the permit page

$150,000
Jul 23, 2019Completed
final sign-off Mar 2021
3 Embarcadero CenterHathaway Dinwiddie Co.new bridge walkways at lobby level w/ glass guardrails.
Details
Permit
201907236725
Status
complete
Filed
Jul 23, 2019
Permit issued
Jan 3, 2020
Final sign-off
Mar 29, 2021
Declared cost
$200,000
Address
3 Embarcadero Center

new bridge walkways at lobby level w/ glass guardrails.

Open the permit page

$200,000
Jul 23, 2019Completed
final sign-off Mar 2021
2 Embarcadero CenterHathaway Dinwiddie Co.new bridge walkways at lobby level w/ glass guardrails.
Details
Permit
201907236731
Status
complete
Filed
Jul 23, 2019
Permit issued
Jan 3, 2020
Final sign-off
Mar 29, 2021
Declared cost
$400,000
Address
2 Embarcadero Center

new bridge walkways at lobby level w/ glass guardrails.

Open the permit page

$400,000
Jul 8, 2019Completed
final sign-off Sep 2021
657 Mission StSkyline Constructionrevision to appln #201802272374. scope is to modify the use & separation (non-structural) of the ground fl according to the approved conditional use appln. work includes additional exterior lighting on minna st
Details
Permit
201907085316
Status
complete
Filed
Jul 8, 2019
Permit issued
Sep 3, 2019
Final sign-off
Sep 1, 2021
Declared cost
$1,000
Address
657 Mission St

revision to appln #201802272374. scope is to modify the use & separation (non-structural) of the ground fl according to the approved conditional use appln. work includes additional exterior lighting on minna st

Open the permit page

$1,000
Jun 24, 2019Completed
final sign-off Feb 2021
505 Howard StSkanska Usa Building Increvision to pa #201710231998. structural revision to support plate b. not visible from exterior.
Details
Permit
201906244204
Status
complete
Filed
Jun 24, 2019
Permit issued
Sep 25, 2019
Final sign-off
Feb 3, 2021
Address
505 Howard St

revision to pa #201710231998. structural revision to support plate b. not visible from exterior.

Open the permit page

Jun 7, 2019Never finaled
issued Jun 2019, no final
400 California StBana Construction Increv to pa# 201810112890; as noted, lighting, finishes, elecrical, mechanical distriution
Details
Permit
201906072807
Status
issued
Filed
Jun 7, 2019
Permit issued
Jun 13, 2019
Address
400 California St

rev to pa# 201810112890; as noted, lighting, finishes, elecrical, mechanical distriution

Open the permit page

Jun 3, 2019Completed
final sign-off Jul 2019
555 Mission StBcci Construction Company34th fl - demo per ab-017 only permit to remove non-structural partitions, acoustical ceilings grid and tile, and lighting. mep demo included. sprinkler demo/turn up pa#201906143450. n/a for maher.
Details
Permit
201906032283
Status
complete
Filed
Jun 3, 2019
Permit issued
Jun 18, 2019
Final sign-off
Jul 24, 2019
Declared cost
$60,000
Address
555 Mission St

34th fl - demo per ab-017 only permit to remove non-structural partitions, acoustical ceilings grid and tile, and lighting. mep demo included. sprinkler demo/turn up pa#201906143450. n/a for maher.

Open the permit page

$60,000
May 31, 2019Expired or cancelled
cancelled Jan 2026
415 Mission StBcci Construction Company34th - revision to pa 2018-0710-4088 new equipment for clean space, create space and shape space. revised smoke control report to reflect changes to equipment
Details
Permit
201905312144
Status
cancelled
Filed
May 31, 2019
Declared cost
$100,000
Address
415 Mission St

34th - revision to pa 2018-0710-4088 new equipment for clean space, create space and shape space. revised smoke control report to reflect changes to equipment

Open the permit page

$100,000
May 23, 2019Completed
final sign-off Dec 2019
1 Market StBcci Construction Companydemo only. remove an (e) partition
Details
Permit
201905231552
Status
complete
Filed
May 23, 2019
Permit issued
May 28, 2019
Final sign-off
Dec 16, 2019
Declared cost
$2,000
Address
1 Market St

demo only. remove an (e) partition

Open the permit page

$2,000
May 23, 2019Completed
final sign-off Oct 2019
1 Market StBcci Construction Companydemo of (e) partition and light fixtures. new construction of room and upgrade lighting in area
Details
Permit
201905231554
Status
complete
Filed
May 23, 2019
Permit issued
Jun 6, 2019
Final sign-off
Oct 24, 2019
Declared cost
$25,000
Address
1 Market St

demo of (e) partition and light fixtures. new construction of room and upgrade lighting in area

Open the permit page

$25,000
May 23, 2019Completed
final sign-off Dec 2019
1 Market StBcci Construction Companydemo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher.
Details
Permit
201905231553
Status
complete
Filed
May 23, 2019
Permit issued
May 30, 2019
Final sign-off
Dec 16, 2019
Declared cost
$5,000
Address
1 Market St

demo of (e) glass partitions and construction of new non load bearing partitions around convenience staircase. n/a for maher.

Open the permit page

$5,000
May 20, 2019Expired or cancelled
cancelled Oct 2020
420 Montgomery StT C B Builders Inc12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a.
Details
Permit
201905201046
Status
cancelled
Filed
May 20, 2019
Permit issued
Jun 17, 2019
Declared cost
$9,000
Address
420 Montgomery St

12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a.

Open the permit page

$9,000
Apr 24, 2019Completed
final sign-off Aug 2021
495 Geary StHathaway Dinwiddie Co.floors 2-17; renovation of (e) guestroom & floor corridors.**maher n/a**
Details
Permit
201904248784
Status
complete
Filed
Apr 24, 2019
Permit issued
Sep 23, 2019
Final sign-off
Aug 13, 2021
Declared cost
$22,000,000
Address
495 Geary St

floors 2-17; renovation of (e) guestroom & floor corridors.**maher n/a**

Open the permit page

$22,000,000
Apr 4, 2019Completed
final sign-off Apr 2019
1 Market StBcci Construction Company31st flr - demo of (e) partitions & removal of high density tile system per ab17
Details
Permit
201904047104
Status
complete
Filed
Apr 4, 2019
Permit issued
Apr 4, 2019
Final sign-off
Apr 25, 2019
Declared cost
$5,000
Address
1 Market St

31st flr - demo of (e) partitions & removal of high density tile system per ab17

Open the permit page

$5,000
Mar 28, 2019Completed
final sign-off Sep 2021
657 Mission StSkyline Constructionrevision to 201802272374, revise toilets rooms on level 1-6 to a gender
Details
Permit
201903286514
Status
complete
Filed
Mar 28, 2019
Permit issued
Aug 15, 2019
Final sign-off
Sep 1, 2021
Declared cost
$6,000
Address
657 Mission St

revision to 201802272374, revise toilets rooms on level 1-6 to a gender

Open the permit page

$6,000
Mar 26, 2019Completed
final sign-off Mar 2021
601 Townsend StBcci Construction Companypatio ground floor replacement of existing awning panels and demolition at patio; all the (n)works shown are for reference only, light fixtures, patio work and are under separate permit
Details
Permit
201903266194
Status
complete
Filed
Mar 26, 2019
Permit issued
Feb 13, 2020
Final sign-off
Mar 18, 2021
Declared cost
$350,000
Address
601 Townsend St

patio ground floor replacement of existing awning panels and demolition at patio; all the (n)works shown are for reference only, light fixtures, patio work and are under separate permit

Open the permit page

$350,000
Mar 18, 2019Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 6 revision to 201808298666. provide 2 hour rated wall for mech. level 4 exterior decorative fins to remain - new fire suppression system to be installed in exterior grease duct under sep system
Details
Permit
201903185531
Status
complete
Filed
Mar 18, 2019
Permit issued
Mar 19, 2019
Final sign-off
May 18, 2021
Declared cost
$8,000
Address
181 Fremont St

level 6 revision to 201808298666. provide 2 hour rated wall for mech. level 4 exterior decorative fins to remain - new fire suppression system to be installed in exterior grease duct under sep system

Open the permit page

$8,000
Mar 6, 2019Completed
final sign-off Dec 2019
333 Bush StSkyline Constructionrevision to pa . 27th flr revision to unrate the idf room
Details
Permit
201903064487
Status
complete
Filed
Mar 6, 2019
Permit issued
Mar 11, 2019
Final sign-off
Dec 31, 2019
Address
333 Bush St

revision to pa . 27th flr revision to unrate the idf room

Open the permit page

Mar 6, 2019Completed
final sign-off Dec 2019
333 Bush StSkyline Constructionrevision to pa 201812208894. 30th flr revision to unrate the idf room
Details
Permit
201903064488
Status
complete
Filed
Mar 6, 2019
Permit issued
Mar 11, 2019
Final sign-off
Dec 31, 2019
Address
333 Bush St

revision to pa 201812208894. 30th flr revision to unrate the idf room

Open the permit page

Mar 4, 2019Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp5th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicatton
Details
Permit
201903044264
Status
complete
Filed
Mar 4, 2019
Permit issued
Mar 5, 2019
Final sign-off
May 18, 2021
Declared cost
$15,000
Address
181 Fremont St

5th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicatton

Open the permit page

$15,000
Mar 4, 2019Never finaled
issued Mar 2019, no final
181 Fremont StLevel 10 Construction Lp6th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate application
Details
Permit
201903044266
Status
issued
Filed
Mar 4, 2019
Permit issued
Mar 5, 2019
Declared cost
$15,000
Address
181 Fremont St

6th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate application

Open the permit page

$15,000
Feb 20, 2019Completed
final sign-off May 2019
560 Mission StParadigm General Contractorsrevision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall.
Details
Permit
201902203323
Status
complete
Filed
Feb 20, 2019
Permit issued
Feb 21, 2019
Final sign-off
May 23, 2019
Declared cost
$30,500
Address
560 Mission St

revision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall.

Open the permit page

$30,500
Feb 6, 2019Completed
final sign-off Aug 2019
555 Mission StBcci Construction Company6th fl t.i. add new service hallwaly to (e) training room area. mep deferred.
Details
Permit
201902062211
Status
complete
Filed
Feb 6, 2019
Permit issued
Feb 6, 2019
Final sign-off
Aug 13, 2019
Declared cost
$195,000
Address
555 Mission St

6th fl t.i. add new service hallwaly to (e) training room area. mep deferred.

Open the permit page

$195,000
Feb 1, 2019Completed
final sign-off Aug 2019
555 Mission StBcci Construction Company14th fl: partial floor demo & ti build back. new partitions, conference rooms & pantry. n/a for maher.
Details
Permit
201902011881
Status
complete
Filed
Feb 1, 2019
Permit issued
Feb 4, 2019
Final sign-off
Aug 13, 2019
Declared cost
$550,000
Address
555 Mission St

14th fl: partial floor demo & ti build back. new partitions, conference rooms & pantry. n/a for maher.

Open the permit page

$550,000
Jan 24, 2019Completed
final sign-off Feb 2019
988 Market StPrincipal Builders Inc.7/f: construction of new non-load bearing partitions and glazing and new doors. mech/elec/sprinklers/alarm on sep permit. maher n/a.
Details
Permit
201901241157
Status
complete
Filed
Jan 24, 2019
Permit issued
Jan 24, 2019
Final sign-off
Feb 11, 2019
Declared cost
$25,000
Address
988 Market St

7/f: construction of new non-load bearing partitions and glazing and new doors. mech/elec/sprinklers/alarm on sep permit. maher n/a.

Open the permit page

$25,000
Jan 14, 2019Completed
final sign-off Jun 2019
2 Embarcadero CenterBcci Construction Company16th flr - partial floor ti construction of non structural walls, ceiling lightinf and finishes mep deferred maher na.
Details
Permit
201901140263
Status
complete
Filed
Jan 14, 2019
Permit issued
Feb 6, 2019
Final sign-off
Jun 24, 2019
Declared cost
$1,077,796
Address
2 Embarcadero Center

16th flr - partial floor ti construction of non structural walls, ceiling lightinf and finishes mep deferred maher na.

Open the permit page

$1,077,796
Dec 20, 2018Completed
final sign-off Dec 2019
333 Bush StSkyline Constructionfull floor ti on 30th fl to include new non-load bearing partitions ceiling and floor finishes. mep, fire sprinkler and life safety under sep. permit.
Details
Permit
201812208894
Status
complete
Filed
Dec 20, 2018
Permit issued
Feb 5, 2019
Final sign-off
Dec 31, 2019
Declared cost
$70,000
Address
333 Bush St

full floor ti on 30th fl to include new non-load bearing partitions ceiling and floor finishes. mep, fire sprinkler and life safety under sep. permit.

Open the permit page

$70,000
Dec 5, 2018Completed
final sign-off Feb 2020
333 Bush StSkyline Construction28th fl - full floor ti. new non-load bearing partitions, ceiing and floor finishes. mep, life safety under separate permit.
Details
Permit
201812057508
Status
complete
Filed
Dec 5, 2018
Permit issued
Jan 24, 2019
Final sign-off
Feb 7, 2020
Declared cost
$820,000
Address
333 Bush St

28th fl - full floor ti. new non-load bearing partitions, ceiing and floor finishes. mep, life safety under separate permit.

Open the permit page

$820,000
Nov 30, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp7/f: rev to pa# 201808107073; to revise occupant load in 7th fl. cafe area per sffd field inspection. reduce occupancy from 66pp to 48pp
Details
Permit
201811307170
Status
complete
Filed
Nov 30, 2018
Permit issued
Dec 18, 2018
Final sign-off
May 18, 2021
Address
181 Fremont St

7/f: rev to pa# 201808107073; to revise occupant load in 7th fl. cafe area per sffd field inspection. reduce occupancy from 66pp to 48pp

Open the permit page

Nov 30, 2018Completed
final sign-off Apr 2021
495 Geary Strenovations to the (e) clift hotel. to include enclosure of the roof level & spanish suite terrace per city legislation file no 161068 determine occupant load for assembly space.
Details
Permit
201811307127
Status
complete
Filed
Nov 30, 2018
Permit issued
Jan 10, 2019
Final sign-off
Apr 27, 2021
Declared cost
$750,000
Address
495 Geary St

renovations to the (e) clift hotel. to include enclosure of the roof level & spanish suite terrace per city legislation file no 161068 determine occupant load for assembly space.

Open the permit page

$750,000
Nov 27, 2018Expired or cancelled
cancelled Jan 2026
560 Mission StParadigm General Contractorsrevision to da checklist for pa #201710060625
Details
Permit
201811276791
Status
cancelled
Filed
Nov 27, 2018
Address
560 Mission St

revision to da checklist for pa #201710060625

Open the permit page

Nov 21, 2018Completed
final sign-off Jun 2019
2 Embarcadero CenterBcci Construction Company16th fl - demo of partitions, ceiling system, power/data, and flooring. demo of existing ductwork. per ab-017 ada deferred. relocation of sprinklers from pendent to upright because of removal of lower ceiling under pa 2018-1130-7087
Details
Permit
201811216543
Status
complete
Filed
Nov 21, 2018
Permit issued
Dec 4, 2018
Final sign-off
Jun 24, 2019
Declared cost
$35,000
Address
2 Embarcadero Center

16th fl - demo of partitions, ceiling system, power/data, and flooring. demo of existing ductwork. per ab-017 ada deferred. relocation of sprinklers from pendent to upright because of removal of lower ceiling under pa 2018-1130-7087

Open the permit page

$35,000
Oct 31, 2018Expired or cancelled
cancelled Mar 2019
101 Mission StSkender Construction Llcste 320 - partial floor ti existing non-rated demising wall to remain. demo of existing interior partitions, ceiling/wall/floor finishes construction of new non-load bearing partitions and interior finishes. mep deferred
Details
Permit
201810314650
Status
cancelled
Filed
Oct 31, 2018
Permit issued
Nov 2, 2018
Declared cost
$550,000
Address
101 Mission St

ste 320 - partial floor ti existing non-rated demising wall to remain. demo of existing interior partitions, ceiling/wall/floor finishes construction of new non-load bearing partitions and interior finishes. mep deferred

Open the permit page

$550,000
Oct 29, 2018Completed
final sign-off Aug 2019
525 Market Stfull tenant improvment to include demo, new partitions, new ceiling and finishes. mep, ls and fire sprinkler under sep permit
Details
Permit
201810294351
Status
complete
Filed
Oct 29, 2018
Permit issued
Dec 17, 2018
Final sign-off
Aug 12, 2019
Declared cost
$1,500,000
Address
525 Market St

full tenant improvment to include demo, new partitions, new ceiling and finishes. mep, ls and fire sprinkler under sep permit

Open the permit page

$1,500,000
Oct 15, 2018Completed
final sign-off Apr 2019
1 Montgomery StBcci Construction Company32nd fl - partial floor demo of partitions & ceiling ref: 201810032082
Details
Permit
201810153158
Status
complete
Filed
Oct 15, 2018
Permit issued
Oct 15, 2018
Final sign-off
Apr 4, 2019
Declared cost
$60,000
Address
1 Montgomery St

32nd fl - partial floor demo of partitions & ceiling ref: 201810032082

Open the permit page

$60,000
Oct 11, 2018Never finaled
issued Oct 2018, no final
400 California StBana Construction Incmechanical, electrical and plumbing removal and replacement of mechanical and electrical distribution and lighting as required to accommodate voluntary seismic stregthening under sep permit 201804242160
Details
Permit
201810112890
Status
issued
Filed
Oct 11, 2018
Permit issued
Oct 31, 2018
Declared cost
$300,000
Address
400 California St

mechanical, electrical and plumbing removal and replacement of mechanical and electrical distribution and lighting as required to accommodate voluntary seismic stregthening under sep permit 201804242160

Open the permit page

$300,000
Oct 10, 2018Completed
final sign-off Jul 2019
222 02nd StDome Construction Corp1st fl - ti of 1st floor mercantile space; includes (n) concrete topper slab, all gender restroom and pantry as well as acoustic mitigation at the ceiling.
Details
Permit
201810102865
Status
complete
Filed
Oct 10, 2018
Permit issued
Nov 28, 2018
Final sign-off
Jul 12, 2019
Declared cost
$400,000
Address
222 02nd St

1st fl - ti of 1st floor mercantile space; includes (n) concrete topper slab, all gender restroom and pantry as well as acoustic mitigation at the ceiling.

Open the permit page

$400,000
Oct 1, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp21st fl: construction of non-structural partitions, acoustical grid & tile & gyp. board ceilings, millwork, finishes, mech, electrical & plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na
Details
Permit
201810011839
Status
complete
Filed
Oct 1, 2018
Permit issued
Oct 25, 2018
Final sign-off
May 26, 2021
Declared cost
$1,365,000
Address
181 Fremont St

21st fl: construction of non-structural partitions, acoustical grid & tile & gyp. board ceilings, millwork, finishes, mech, electrical & plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na

Open the permit page

$1,365,000
Oct 1, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp19th fl: construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork, finishes, mechanical work, electrical, plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na
Details
Permit
201810011844
Status
complete
Filed
Oct 1, 2018
Permit issued
Oct 30, 2018
Final sign-off
May 24, 2021
Declared cost
$1,365,000
Address
181 Fremont St

19th fl: construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork, finishes, mechanical work, electrical, plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na

Open the permit page

$1,365,000
Sep 26, 2018Completed
final sign-off Oct 2020
1 Sansome StClune Construction Company L P22nd flr. interior tenant improvement work entails demo of select walls in (e) tenant suite and construction of non-load bearing partitions, ceiling, pain and carpet touch-ups. (e) base infrastructure to remain in place. mep deferred. maher n/a
Details
Permit
201809261517
Status
complete
Filed
Sep 26, 2018
Permit issued
Oct 19, 2018
Final sign-off
Oct 20, 2020
Declared cost
$250,000
Address
1 Sansome St

22nd flr. interior tenant improvement work entails demo of select walls in (e) tenant suite and construction of non-load bearing partitions, ceiling, pain and carpet touch-ups. (e) base infrastructure to remain in place. mep deferred. maher n/a

Open the permit page

$250,000
Sep 26, 2018Never finaled
issued Oct 2018, no final
1 Sansome StClune Construction Company L P23rd flr - partial renovation of (e) office space. ti work includes constructio of non bearing partitions, ceiling system with new lighting, doors and frames, carpet and paint finishes. mep deferred maher na
Details
Permit
201809261516
Status
issued
Filed
Sep 26, 2018
Permit issued
Oct 19, 2018
Declared cost
$250,000
Address
1 Sansome St

23rd flr - partial renovation of (e) office space. ti work includes constructio of non bearing partitions, ceiling system with new lighting, doors and frames, carpet and paint finishes. mep deferred maher na

Open the permit page

$250,000
Sep 24, 2018Completed
final sign-off Oct 2019
185 Berry StDfi Construction Companyinterior ti - include demo, drywall, glass and new finishes
Details
Permit
201809241150
Status
complete
Filed
Sep 24, 2018
Permit issued
Dec 17, 2018
Final sign-off
Oct 1, 2019
Declared cost
$314,600
Address
185 Berry St

interior ti - include demo, drywall, glass and new finishes

Open the permit page

$314,600
Sep 24, 2018Completed
final sign-off Oct 2019
185 Berry StDfi Construction Company4th fl - partial interior ti. including glass partitions, lighting & mec
Details
Permit
201809241153
Status
complete
Filed
Sep 24, 2018
Permit issued
Dec 17, 2018
Final sign-off
Oct 1, 2019
Declared cost
$60,500
Address
185 Berry St

4th fl - partial interior ti. including glass partitions, lighting & mec

Open the permit page

$60,500
Sep 17, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp16th floor - construction of new non-structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes. mep included - sprinklers & f/a under separate permit. convenience stair under separate permit
Details
Permit
201809170487
Status
complete
Filed
Sep 17, 2018
Permit issued
Oct 24, 2018
Final sign-off
May 24, 2021
Declared cost
$1,365,000
Address
181 Fremont St

16th floor - construction of new non-structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes. mep included - sprinklers & f/a under separate permit. convenience stair under separate permit

Open the permit page

$1,365,000
Sep 17, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp17th fl tenant improvement, non bearing partition new ceiling, finishes, pantry
Details
Permit
201809170501
Status
complete
Filed
Sep 17, 2018
Permit issued
Oct 25, 2018
Final sign-off
May 24, 2021
Declared cost
$1,365,000
Address
181 Fremont St

17th fl tenant improvement, non bearing partition new ceiling, finishes, pantry

Open the permit page

$1,365,000
Sep 13, 2018Completed
final sign-off Nov 2018
420 Montgomery StT C B Builders Inc12th fl - revision to pa 2018-0531-0545 elevator vestibule lobby
Details
Permit
201809139928
Status
complete
Filed
Sep 13, 2018
Permit issued
Sep 17, 2018
Final sign-off
Nov 9, 2018
Declared cost
$1,000
Address
420 Montgomery St

12th fl - revision to pa 2018-0531-0545 elevator vestibule lobby

Open the permit page

$1,000
Aug 29, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp5th flr - arch ti - non bearing walls, office millwork, finishes, kitchen and servery. mep under separate permit
Details
Permit
201808298664
Status
complete
Filed
Aug 29, 2018
Permit issued
Nov 5, 2018
Final sign-off
May 14, 2021
Declared cost
$1,575,000
Address
181 Fremont St

5th flr - arch ti - non bearing walls, office millwork, finishes, kitchen and servery. mep under separate permit

Open the permit page

$1,575,000
Aug 29, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp6th flr - arch ti - non structural walls, office millwork, finishes, kitchen and servery. mep under separate permit
Details
Permit
201808298666
Status
complete
Filed
Aug 29, 2018
Permit issued
Nov 5, 2018
Final sign-off
May 14, 2021
Declared cost
$1,593,930
Address
181 Fremont St

6th flr - arch ti - non structural walls, office millwork, finishes, kitchen and servery. mep under separate permit

Open the permit page

$1,593,930
Aug 16, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp14th - ti with no bearing partitions. kitchen with back of house support areas. offices & conference rooms
Details
Permit
201808167576
Status
complete
Filed
Aug 16, 2018
Permit issued
Nov 13, 2018
Final sign-off
May 14, 2021
Declared cost
$1,300,000
Address
181 Fremont St

14th - ti with no bearing partitions. kitchen with back of house support areas. offices & conference rooms

Open the permit page

$1,300,000
Aug 16, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp15th - ti with no bearing partitions for open office
Details
Permit
201808167574
Status
complete
Filed
Aug 16, 2018
Permit issued
Sep 19, 2018
Final sign-off
May 24, 2021
Declared cost
$1,300,000
Address
181 Fremont St

15th - ti with no bearing partitions for open office

Open the permit page

$1,300,000