- Sep 2016 to Sep 2026
61 permits since 2000 (engineer on 55 permits, architect on 7 permits): 44 completed, 8 in progress, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 315 Montgomery St | Sc Builders, Inc | 9th and 10th floor:submittal of differed mechanical, electrical and structural drawings related to building pa #202607295731 (anchrage of phone boothDetails
9th and 10th floor:submittal of differed mechanical, electrical and structural drawings related to building pa #202607295731 (anchrage of phone booth | $60,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 2 Henry Adams St | Sc Builders, Inc | ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered)Details
ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered) | $139,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 555 California St | Sc Builders, Inc | revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl openingDetails
revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening | $100,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 130 Sutter St | 3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately.Details
3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately. | $25,000 | |
| May 15, 2026 | In progress filed May 2026, not yet issued | 85 02nd St | 2nd and 3rd floor: - revision to bpa: 202604219805. adding structural for the phone booths.Details
2nd and 3rd floor: - revision to bpa: 202604219805. adding structural for the phone booths. | ||
| Apr 13, 2026 | In progress issued Apr 2026 | 555 California St | Skyline Construction | 30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office spaceDetails
30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office space | $1,250,000 |
| Dec 16, 2025 | Completed final sign-off Apr 2026 | 600 Townsend St | Novo Construction Inc | 2/f: revision to permits 202507221305 and 202510298361 to add (11) phone rooms. structural details included.Details
2/f: revision to permits 202507221305 and 202510298361 to add (11) phone rooms. structural details included. | $20,000 |
| Dec 4, 2025 | Expired or cancelled withdrawn Feb 2026 | 300 Howard St | 2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms.Details
2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms. | $2,959,620 | |
| Oct 27, 2025 | Completed final sign-off Apr 2026 | 295 Bay St | B N Builders Inc | interior only work. new communicating stair, new millwork, slab infill at l1 & l2.Details
interior only work. new communicating stair, new millwork, slab infill at l1 & l2. | $200,000 |
| Sep 15, 2025 | Completed final sign-off Oct 2026 | 1650 Owens St | Rossi Builders Inc. | rev to pa# 2023-1221-2902: improvements include selective demo walls and installing new autoclave with minor mep upgrades the new layoutDetails
rev to pa# 2023-1221-2902: improvements include selective demo walls and installing new autoclave with minor mep upgrades the new layout | $1,097,966 |
| Aug 19, 2025 | Completed final sign-off Mar 2026 | 3565 California St | Skyline Construction | exterior building shell renovation of north and south facades. scope includes new exterior walls, storefronts, and trash enclosure and new interior structural columns, beams, and foundations.Details
exterior building shell renovation of north and south facades. scope includes new exterior walls, storefronts, and trash enclosure and new interior structural columns, beams, and foundations. | $712,000 |
| Aug 5, 2025 | Completed final sign-off Mar 2026 | 1825 Post St | Innovative Mechanical Inc | replace: 6 rooftop air handling units, 6 condensing units, 1 boiler and 4 exhaust fans.Details
replace: 6 rooftop air handling units, 6 condensing units, 1 boiler and 4 exhaust fans. | $700,000 |
| Jan 21, 2025 | In progress issued Jun 2025 | 1060 Key Av | Cbre Gws Licential Llc. | voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building.Details
voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building. | $4,260,000 |
| Dec 16, 2024 | Completed final sign-off Nov 2025 | 615 Battery St | Hathaway Dinwiddie Co. | new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountainDetails
new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain | $38,500 |
| Dec 16, 2024 | Completed final sign-off Nov 2025 | 633 Battery St | Hathaway Dinwiddie Co. | new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861Details
new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861 | |
| May 23, 2024 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | revision to pa # 2022-1222-9044 & 2022-1222-9047 structural revisions. ref permits 202305198219, 202305238412, 202304145800, 202304145798Details
revision to pa # 2022-1222-9044 & 2022-1222-9047 structural revisions. ref permits 202305198219, 202305238412, 202304145800, 202304145798 | |
| Apr 23, 2024 | Completed final sign-off Aug 2025 | 1940 Broadway | Blue Bay Painting Contractor | installation of new steel fall protection guardrails at the (e) parapet locations w/height of less than 42" above walking surface of roof (90 lineal feet guardrail. not visible streetDetails
installation of new steel fall protection guardrails at the (e) parapet locations w/height of less than 42" above walking surface of roof (90 lineal feet guardrail. not visible street | $25,000 |
| Apr 4, 2024 | In progress issued Apr 2024 | 1000 Van Ness Av | Sullivan / Thompson Masonry & Restoratio | pinning terra cotta on exterior of bldg as identified location by civil engineer. all three sides of bldg.Details
pinning terra cotta on exterior of bldg as identified location by civil engineer. all three sides of bldg. | $948,000 |
| Feb 9, 2024 | Completed final sign-off Sep 2025 | 1940 Broadway | Tom Lewis Restoration And Consulting | at front south elevation, remove and replace (e) water table/cornice at 4th floor, to match (e) at north and east and west rear elevation repair concrete parapet wall.Details
at front south elevation, remove and replace (e) water table/cornice at 4th floor, to match (e) at north and east and west rear elevation repair concrete parapet wall. | $500,000 |
| Feb 7, 2024 | Completed final sign-off Sep 2025 | 548 Delta St | Truebeck Construction | to accommodate a "0-5yr" childcare center. will serve approximately 60 children in 4 classrooms: 1 infant, 1 toddler, & 2 pre-k. will contain a family resource center & teacher/staff lounge. interior demolition as req. non-bearing partitions, mep, replace (e) windows & doors. (n) lula elevator,Details
to accommodate a "0-5yr" childcare center. will serve approximately 60 children in 4 classrooms: 1 infant, 1 toddler, & 2 pre-k. will contain a family resource center & teacher/staff lounge. interior demolition as req. non-bearing partitions, mep, replace (e) windows & doors. (n) lula elevator, | $4,700,674 |
| Dec 21, 2023 | Completed final sign-off Oct 2026 | 1650 Owens St | Rossi Builders Inc. | 5/f lab improvements. selective demo of non-structural walls, doors, ceilings, finishes, mep work to suppor the new bsl3 lab layout. mep layout in mostly existing.Details
5/f lab improvements. selective demo of non-structural walls, doors, ceilings, finishes, mep work to suppor the new bsl3 lab layout. mep layout in mostly existing. | $1,800,000 |
| Jul 3, 2023 | Completed final sign-off Jan 2024 | 615 Battery St | Hathaway Dinwiddie Co. | 3rd fl - interior ti including (n) partitions, millwork, finishes, lighting and concrete ramp; demo includes removal of portion of (e) wall to create a new commicating opening between the adjacent buildingDetails
3rd fl - interior ti including (n) partitions, millwork, finishes, lighting and concrete ramp; demo includes removal of portion of (e) wall to create a new commicating opening between the adjacent building | $1,184,500 |
| Jun 13, 2023 | Completed final sign-off Sep 2023 | 2101 Mission St | A M Rocca Inc. | unit 200: change of n demising wall separating ste 200 & 201. change in use from design prof (5964 sf) to type b tutoring/mentoring personal service (8714 sf). construct new full hght partitions, partial hght partitions, door frams, glazing, accordian style door. reconfigure interior layout.Details
unit 200: change of n demising wall separating ste 200 & 201. change in use from design prof (5964 sf) to type b tutoring/mentoring personal service (8714 sf). construct new full hght partitions, partial hght partitions, door frams, glazing, accordian style door. reconfigure interior layout. | $551,000 |
| Mar 30, 2023 | Completed final sign-off Jan 2024 | 5285 Diamond Heights Bl | G J Chavez Inc | structural revision to pa 2022-1129-7300 adding beam at wall already proposed on 1st floor.Details
structural revision to pa 2022-1129-7300 adding beam at wall already proposed on 1st floor. | $5,000 |
| Mar 28, 2023 | Completed final sign-off Sep 2023 | 2750 Jackson St | Plant Construction Co, Lp | interior renovation. work includes re-configuration of 2nd fl vocational room & teacher office & minor partition, door, fixture work on floors 1 & 2. associated electrical. deferred mechanical only.Details
interior renovation. work includes re-configuration of 2nd fl vocational room & teacher office & minor partition, door, fixture work on floors 1 & 2. associated electrical. deferred mechanical only. | $425,000 |
| Feb 28, 2023 | Completed final sign-off Jul 2023 | 645 Harrison St | Bcci Construction Company | 1st fl - 5189 ti interior ti with associated mepDetails
1st fl - 5189 ti interior ti with associated mep | $1,000,000 |
| Dec 23, 2022 | Expired or cancelled withdrawn Apr 2023 | 2750 Jackson St | Plant Construction Co, Lp | 1st fl hallway lighting replacement. restroom renovation. voluntary accessibility upgrade. 2nd fl engineering studio & adjacent offices. (n) fixtures, finishes, & equipment. (n) build-in casework & workstations. (n) m.e.p.. minor structural work at (n) opening at concrete wall.Details
1st fl hallway lighting replacement. restroom renovation. voluntary accessibility upgrade. 2nd fl engineering studio & adjacent offices. (n) fixtures, finishes, & equipment. (n) build-in casework & workstations. (n) m.e.p.. minor structural work at (n) opening at concrete wall. | $800,000 |
| Sep 29, 2022 | Completed final sign-off Jan 2023 | 1 Lombard St | Richlen Construction | supply and install wood support membranes for mechanical unitsDetails
supply and install wood support membranes for mechanical units | $350,000 |
| Jun 10, 2022 | Never finaled issued Jun 2023, no final | 3250 19th Av | Thompson Builders Corp, Plant Construction Co, Lp | barrier removal project of (e) mercy high school building include: new accessible elevator. renovations for new accessible gender neutral student and staff restrooms. misc improvements to make path of travel to areas of work accessible (contrasting striping, handrails, guardril. sitework toDetails
barrier removal project of (e) mercy high school building include: new accessible elevator. renovations for new accessible gender neutral student and staff restrooms. misc improvements to make path of travel to areas of work accessible (contrasting striping, handrails, guardril. sitework to | $600,000 |
| Apr 20, 2022 | Completed final sign-off Mar 2023 | 2545 16th St | Brennan Strong Hold Construction Inc | rev to pa# 2021-0917-8700: a communicative stair is to be added between two (e) floors of previously permitted office space, as well windows will be installed into a 1 hr rated wll between the office space and a garage areaDetails
rev to pa# 2021-0917-8700: a communicative stair is to be added between two (e) floors of previously permitted office space, as well windows will be installed into a 1 hr rated wll between the office space and a garage area | $69,000 |
| Mar 9, 2022 | Completed final sign-off Aug 2024 | 140 Sutter St | Bcci Construction Company | revision bpa#202103226995 - 1/f: reivision to ductwork, floor construction, elevations & minor workDetails
revision bpa#202103226995 - 1/f: reivision to ductwork, floor construction, elevations & minor work | |
| Feb 15, 2022 | Completed final sign-off Oct 2022 | 1300 Stockton St | S F Garage Company Inc. | revision to bpa 202107094066 and bpa 202107094070. relocation of moment frames and extended shearwall due to field conditions. (residential)Details
revision to bpa 202107094066 and bpa 202107094070. relocation of moment frames and extended shearwall due to field conditions. (residential) | |
| Feb 15, 2022 | Completed final sign-off Oct 2022 | 1300 Stockton St | S F Garage Company Inc. | revision to bpa 202107094066 and bpa 202107094070. relocation of moment frames and extended shearwall due to field conditions. (commercial)Details
revision to bpa 202107094066 and bpa 202107094070. relocation of moment frames and extended shearwall due to field conditions. (commercial) | |
| Dec 13, 2021 | Expired or cancelled expired Jan 2026 | 3715 California St | The G B Group Inc. | revision to permit 201607202863. existing shear wall nailing adequate per engineer 7 s3.1 on plan.Details
revision to permit 201607202863. existing shear wall nailing adequate per engineer 7 s3.1 on plan. | |
| Sep 17, 2021 | Completed final sign-off Mar 2023 | 2545 16th St | Brennan Strong Hold Construction Inc | vacant gr floor space to be built out for a tenant. work includes truck bay garage area, work rooms, lab areas, meeting and office areas, storage and new restrooms and showers. mezz area will be be added to space. no work on exterior.Details
vacant gr floor space to be built out for a tenant. work includes truck bay garage area, work rooms, lab areas, meeting and office areas, storage and new restrooms and showers. mezz area will be be added to space. no work on exterior. | $1,400,000 |
| Jul 9, 2021 | Completed final sign-off Oct 2022 | 1300 Stockton St | S F Garage Company Inc. | seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit iebc a4 2016 (residential)Details
seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit iebc a4 2016 (residential) | $70,000 |
| Jul 9, 2021 | Completed final sign-off Oct 2022 | 1300 Stockton St | S F Garage Company Inc. | seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit iebc a4 2016 (commercial)Details
seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit iebc a4 2016 (commercial) | $70,000 |
| May 21, 2021 | Completed final sign-off Mar 2023 | 2525 16th St | Brennan Strong Hold Construction Inc | new roof deck addition to an (e) building. new structural steel framing & concrete deck. elevator & stair extention including penthouse enclosure & (n) skylightsDetails
new roof deck addition to an (e) building. new structural steel framing & concrete deck. elevator & stair extention including penthouse enclosure & (n) skylights | $1,000,000 |
| May 5, 2021 | Completed final sign-off May 2023 | 608 Clarendon Av | Freestone Reconstruction Inc | replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings.Details
replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings. | $10,000 |
| Apr 29, 2021 | Completed final sign-off Oct 2021 | 2101 Mission St | A M Rocca Inc. | construct hvac platform on roof per plans.Details
construct hvac platform on roof per plans. | |
| Apr 22, 2021 | Completed final sign-off May 2023 | 666 Clarendon Av | Freestone Reconstruction Inc | replace (e) cantilevered exterior wood deck that has been structurally compromised by dryrot, install new wood support beam and posts with concrete footingsDetails
replace (e) cantilevered exterior wood deck that has been structurally compromised by dryrot, install new wood support beam and posts with concrete footings | $15,000 |
| Mar 22, 2021 | Completed final sign-off Sep 2024 | 140 Sutter St | Bcci Construction Company | 1st fl: scope to include gallery display, lecture hall, meeting rooms and cafe/retail on ground level. office work space in upper level. change in occupancy from m to a-3.Details
1st fl: scope to include gallery display, lecture hall, meeting rooms and cafe/retail on ground level. office work space in upper level. change in occupancy from m to a-3. | $1,400,000 |
| Feb 16, 2021 | Completed final sign-off May 2021 | 2101 Mission St | A M Rocca Inc. | structural only framing improvement of existing rooftop billboard. non-electrical. fully sprinklered building.Details
structural only framing improvement of existing rooftop billboard. non-electrical. fully sprinklered building. | $10,000 |
| Jan 29, 2021 | Completed final sign-off May 2021 | 3101 Clay St | Everest Waterproofing & Restoration Inc. | repairs to existing steel fire escape framing at the exterior of the extg 3 story building.Details
repairs to existing steel fire escape framing at the exterior of the extg 3 story building. | $12,000 |
| Dec 23, 2020 | Completed final sign-off May 2023 | 658 Clarendon Av | Freestone Reconstruction Inc | install (n) wood support beam, posts, diagonal bracing and concrete footings at exterior wood deckDetails
install (n) wood support beam, posts, diagonal bracing and concrete footings at exterior wood deck | $29,250 |
| Dec 10, 2020 | Completed final sign-off Aug 2021 | 1355 Market St | Hathaway Dinwiddie Construct Co | interior ti to existing convenience stair connecting floors 9 & 10. work includes demo of existing stair, new stair, structural design, stair finishes, & bench below stair. no change in use, occupancy, or egress. no change to floor area. stair is not an egress stair.Details
interior ti to existing convenience stair connecting floors 9 & 10. work includes demo of existing stair, new stair, structural design, stair finishes, & bench below stair. no change in use, occupancy, or egress. no change to floor area. stair is not an egress stair. | $594,000 |
| Nov 9, 2020 | Completed final sign-off May 2023 | 654 Clarendon Av | Freestone Reconstruction Inc | install new wood support beam and posts at exterior wood deck.Details
install new wood support beam and posts at exterior wood deck. | $15,000 |
| Oct 30, 2020 | Never finaled issued Aug 2021, no final | 2101 Mission St | A M Rocca Inc. | revision to bpa# 202002245209. base building improvements by property owner, including finishes, lighting & deferred electrical & plumbing. no longer ab-017; t.i. for spaces to be occupied.Details
revision to bpa# 202002245209. base building improvements by property owner, including finishes, lighting & deferred electrical & plumbing. no longer ab-017; t.i. for spaces to be occupied. | $125,000 |
| Oct 14, 2020 | Completed final sign-off May 2023 | 668 Clarendon Av | Freestone Reconstruction Inc | replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings.Details
replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings. | $15,000 |
| Oct 13, 2020 | Completed final sign-off May 2023 | 656 Clarendon Av | Freestone Reconstruction Inc | install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts.Details
install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts. | $5,000 |
| Sep 19, 2020 | Completed final sign-off Jun 2024 | 2525 16th St | Brennan Strong Hold Construction Inc | structural work only on "ground floor" for future electrical vault room. install concrete footings & walls between gridlines 1-3 a-d1. installn ew shearwalls between gridlines 1-3 a-d1. no exterior work, all work is on ground fl.Details
structural work only on "ground floor" for future electrical vault room. install concrete footings & walls between gridlines 1-3 a-d1. installn ew shearwalls between gridlines 1-3 a-d1. no exterior work, all work is on ground fl. | $60,000 |
| Sep 10, 2020 | Completed final sign-off May 2023 | 660 Clarendon Av | Freestone Reconstruction Inc | install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck.Details
install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck. | $26,980 |
| Sep 9, 2020 | Expired or cancelled cancelled Nov 2022 | 658 Clarendon Av | Sequoia Construction Services Inc | install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck.Details
install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck. | $3,000 |
| Dec 9, 2019 | Completed final sign-off Jul 2020 | 4540 California St | West Coast Premier Construction Inc | seismic strengthing per sfbc mandatory seismic program ord# 66-13. (n) shear walls, (n) moment frame, (n) grade beams. using fema p-807.Details
seismic strengthing per sfbc mandatory seismic program ord# 66-13. (n) shear walls, (n) moment frame, (n) grade beams. using fema p-807. | $85,000 |
| Nov 27, 2019 | Completed final sign-off Oct 2020 | 325 09th Av | West Coast Premier Construction Inc | mandatory soft story retrofit per sfebc chapter 4d engineering criteria feng p-807 compliance w/ n.o.v 201991501Details
mandatory soft story retrofit per sfebc chapter 4d engineering criteria feng p-807 compliance w/ n.o.v 201991501 | $125,000 |
| May 24, 2019 | Expired or cancelled cancelled Jan 2026 | 2101 Mission St | A M Rocca Inc. | rooftop mechanical unit supportDetails
rooftop mechanical unit support | $7,500 |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 953 Union St | J L M Construction Inc. | install car lift in the existing garageDetails
install car lift in the existing garage | $16,000 |
| Feb 21, 2019 | Completed final sign-off Mar 2021 | 3060 Fillmore St | Build Group Inc. | core & shell- minor exterior work. new wall access opening. new elec and gas room, new restrooms, exit corridor & finishes. roof top mech platform. building remain vacant & future tenants requires ti permits.Details
core & shell- minor exterior work. new wall access opening. new elec and gas room, new restrooms, exit corridor & finishes. roof top mech platform. building remain vacant & future tenants requires ti permits. | $750,000 |
| Jan 25, 2017 | Expired or cancelled withdrawn Dec 2019 | 4540 California St | soft story retrofitDetails
soft story retrofit | $200,000 | |
| Oct 3, 2016 | Completed final sign-off May 2017 | 555 California St | Bcci Construction Company | concourse- revision to pa#201609016557 to revise structural detail.Details
concourse- revision to pa#201609016557 to revise structural detail. | $1,500 |
| Sep 1, 2016 | Completed final sign-off May 2017 | 555 California St | Bcci Construction Company | concourse- structural portal detail associated with pa#201606139733Details
concourse- structural portal detail associated with pa#201606139733 | $12,500 |