William Loftis
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Smith Group
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Dec 2025
123 permits since 2000 (architect on 118 permits, authorized agent-others on 4 permits, engineer on 1 permit): 97 completed, 3 in progress, 10 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 123.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2025 | In progress issued Feb 2026 | 1 Sansome St | ground fl: new security turnstiles to lobby of existing hi-rise downtown building. work to include new partitions (electrical deferred)Details
ground fl: new security turnstiles to lobby of existing hi-rise downtown building. work to include new partitions (electrical deferred) | $332,090 | |
| Oct 6, 2025 | Completed final sign-off Nov 2025 | 465 California St | Aquamatic Fire Protection | 14/fl-fire sprinker only ti 202508253785- no underground work, relocate & replace(add) 51 fire sprinklers for t.i.Details
14/fl-fire sprinker only ti 202508253785- no underground work, relocate & replace(add) 51 fire sprinklers for t.i. | $11,400 |
| Aug 25, 2025 | Completed final sign-off Jan 2026 | 465 California St | Rossi Builders Inc. | 14th flr t.i. in (e) hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceiling, new finishes. associcatd mep as deferred submiittal.Details
14th flr t.i. in (e) hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceiling, new finishes. associcatd mep as deferred submiittal. | $890,150 |
| May 8, 2025 | In progress issued May 2025 | 1 Sansome St | Stockham Construction | 22nd floor speculative office suite t.i. in an existing hi-rise downtown building. work to include new partitions, millwork, doors, glazing, ceiling and finishes.Details
22nd floor speculative office suite t.i. in an existing hi-rise downtown building. work to include new partitions, millwork, doors, glazing, ceiling and finishes. | $296,540 |
| Mar 26, 2025 | Completed final sign-off May 2026 | 1 Sansome St | Stockham Construction | 14/f: tenant improvement in an existing hight-rise downtown building. work to include new partitions, millowrk,doors, glazing, ceilings, new finishes. mep, fire life safety deferred permit. no exterior work.Details
14/f: tenant improvement in an existing hight-rise downtown building. work to include new partitions, millowrk,doors, glazing, ceilings, new finishes. mep, fire life safety deferred permit. no exterior work. | $735,550 |
| Mar 18, 2025 | Completed final sign-off Jul 2026 | 1 Sansome St | Stockham Construction | 22nd/fl, ste 2200: tenant improvement in existing hi-rise downtown building. work to include, new partitions, millwork, doors, glazing, ceilings, light fixtures, and new finishes. mep deferred.Details
22nd/fl, ste 2200: tenant improvement in existing hi-rise downtown building. work to include, new partitions, millwork, doors, glazing, ceilings, light fixtures, and new finishes. mep deferred. | $484,750 |
| Feb 7, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Stockham Construction | 15th fl - ti in an existing hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures, new finishes. electrical, lighting, plumbing and hvac deferred.Details
15th fl - ti in an existing hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures, new finishes. electrical, lighting, plumbing and hvac deferred. | $197,500 |
| Jan 28, 2025 | Completed final sign-off May 2026 | 1 Sansome St | Stockham Construction | 17th fl- interior remodel of (e) suite in an (e) hi rise downtown building. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures. new finishes, electrical lighting, plumbing & hvacDetails
17th fl- interior remodel of (e) suite in an (e) hi rise downtown building. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures. new finishes, electrical lighting, plumbing & hvac | $723,450 |
| Apr 8, 2024 | In progress issued May 2024 | 1 Sansome St | Stockham Construction | 19/f: interior remodel of common areas in an (e) hi-rise downtown building. work to include new partitions, doors, glazing. new suspended ceiling with new light fixtures, new finishes, (electrical, lighting, and hvac deferred submittal).Details
19/f: interior remodel of common areas in an (e) hi-rise downtown building. work to include new partitions, doors, glazing. new suspended ceiling with new light fixtures, new finishes, (electrical, lighting, and hvac deferred submittal). | $135,300 |
| Jul 27, 2023 | Completed final sign-off May 2025 | 1 Sansome St | Stockham Construction | suite# 3150 - interior remodel of (e) suite in an (e) hi-rise downtown bldg. include: (n) partitions, millwork, doors, glazing, (n) suspended ceiling w/ (n) light fixtures, (n) finishes, electrical, lighting & havc. mech & elect are deferred.Details
suite# 3150 - interior remodel of (e) suite in an (e) hi-rise downtown bldg. include: (n) partitions, millwork, doors, glazing, (n) suspended ceiling w/ (n) light fixtures, (n) finishes, electrical, lighting & havc. mech & elect are deferred. | $443,220 |
| Jul 27, 2023 | Completed final sign-off May 2025 | 1 Sansome St | Stockham Construction | interior remodel (#3110) of e suite in an existing hi rise downtown building. work to include new partitions, millwork, doors, glazing, new suspended ceiling with new light fixtures, new finishes, elec, lighinting, hvac.Details
interior remodel (#3110) of e suite in an existing hi rise downtown building. work to include new partitions, millwork, doors, glazing, new suspended ceiling with new light fixtures, new finishes, elec, lighinting, hvac. | $422,300 |
| Jul 27, 2023 | Completed final sign-off Feb 2025 | 1 Sansome St | Stockham Construction | suite 3210: remodel of (e) suite, new partitions, millwork, doors, glazing, new suspended ceiling w/new light fixtures/finishes/electrical/lighting/hvacDetails
suite 3210: remodel of (e) suite, new partitions, millwork, doors, glazing, new suspended ceiling w/new light fixtures/finishes/electrical/lighting/hvac | $751,122 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1 Sansome St | Peacock Construction | 36/f: addition of (2) new phone booths in (e) office spaceDetails
36/f: addition of (2) new phone booths in (e) office space | $17,250 |
| Dec 5, 2022 | Never finaled issued Feb 2023, no final | 1 Sansome St | Peacock Construction | 36/f: interior renovation, demo, new walls, doors, ceilings, finishes, millwork, hvac, electrical work, plumbing. mech/fire alarm/sprinklers under sep permits.Details
36/f: interior renovation, demo, new walls, doors, ceilings, finishes, millwork, hvac, electrical work, plumbing. mech/fire alarm/sprinklers under sep permits. | $872,351 |
| Jul 18, 2022 | Completed final sign-off Feb 2024 | 1 Sansome St | Bevilacqua & Sons | bar and retail t.i. basement: walk in cooler, storage room, upgrade to staff restrooms. 1/f renovation: new bar/retail, existing kitchen upgrades.Details
bar and retail t.i. basement: walk in cooler, storage room, upgrade to staff restrooms. 1/f renovation: new bar/retail, existing kitchen upgrades. | $800,000 |
| Jul 12, 2022 | Completed final sign-off Feb 2023 | 1 Sansome St | Stockham Construction | 16th fl spec suite interior renovation to include demo, new walls, doors, ceilings, finishes, millwork, hvac, elec work and plumbing. mep and sprinklers under separate permit.Details
16th fl spec suite interior renovation to include demo, new walls, doors, ceilings, finishes, millwork, hvac, elec work and plumbing. mep and sprinklers under separate permit. | $780,000 |
| Jun 17, 2022 | Completed final sign-off Jan 2023 | 44 Montgomery St | Marchetti Group | 42nd fl: commercial tenant improvement of part of existing offices to include partial height walls, doors, millwork, minor electrical work, and potential reconfigure of sprinklers + hvac diffusers if required.Details
42nd fl: commercial tenant improvement of part of existing offices to include partial height walls, doors, millwork, minor electrical work, and potential reconfigure of sprinklers + hvac diffusers if required. | $152,469 |
| Apr 18, 2022 | Completed final sign-off Feb 2024 | 1 Sansome St | Peacock Construction | main entry lobby new reception / security desk. sinage wall panel & ceiling panel, assiciated electrical work.Details
main entry lobby new reception / security desk. sinage wall panel & ceiling panel, assiciated electrical work. | $324,000 |
| Feb 18, 2022 | Completed final sign-off Jul 2022 | 650 California St | Marchetti Group | commercial tenant imrovment of e office space. adding new rooms to include new doors, walls, ceiling reconfiguration, relocation of e light fixtures, addition of new light fixtures, minor reconfiguration of hvac, addition of vanity sink to mothers roomDetails
commercial tenant imrovment of e office space. adding new rooms to include new doors, walls, ceiling reconfiguration, relocation of e light fixtures, addition of new light fixtures, minor reconfiguration of hvac, addition of vanity sink to mothers room | $398,926 |
| Sep 13, 2021 | Never finaled issued Oct 2021, no final | 1 Sansome St | Stockham Construction | 39/f -t.i improvement of existing t.i space. interior non rated partitions, finishes, mech, elec and plumbing to include private office, open plan office area, new gender neutral restroom, new mothers rooms, finish upgrade to existing rooms to remain.Details
39/f -t.i improvement of existing t.i space. interior non rated partitions, finishes, mech, elec and plumbing to include private office, open plan office area, new gender neutral restroom, new mothers rooms, finish upgrade to existing rooms to remain. | $643,000 |
| Dec 18, 2015 | Completed final sign-off Apr 2018 | 555 California St | Gci, Inc | lighting & power - connecting power to new or relocated light fixtures, power outlets & tenant equipment. maher n/aDetails
lighting & power - connecting power to new or relocated light fixtures, power outlets & tenant equipment. maher n/a | $950,000 |
| Aug 20, 2015 | Completed final sign-off Aug 2016 | 101 California St | Skyline Construction | 9/f: removal of (e) ceiling tiles, doors, light fixtures & finishes. new construction to include new partitions, doors, ceiling tiles & finishes. fire sprinkler & life safety and abate, if any, under separate permit.Details
9/f: removal of (e) ceiling tiles, doors, light fixtures & finishes. new construction to include new partitions, doors, ceiling tiles & finishes. fire sprinkler & life safety and abate, if any, under separate permit. | $318,955 |
| Jul 22, 2011 | Completed final sign-off Feb 2013 | 1160 Battery St | Gci, Inc | revision to permit application 2011 0301-1123 to reflect changes to the tenant entry door now shown as existing.Details
revision to permit application 2011 0301-1123 to reflect changes to the tenant entry door now shown as existing. | $1,574 |
| Nov 10, 2009 | Completed final sign-off Dec 2009 | 188 The Embarcadero | Mayta & Jensen | office ti on 4th floor. minor alteration incl partitions w/ doors, side loghts, new offices. no plbg, no clg, no case work. add 1 strobe to exit signs. life safety (sprinkler/fa) under seperate permit.Details
office ti on 4th floor. minor alteration incl partitions w/ doors, side loghts, new offices. no plbg, no clg, no case work. add 1 strobe to exit signs. life safety (sprinkler/fa) under seperate permit. | $12,644 |
| Sep 23, 2009 | Completed final sign-off Jan 2010 | 1 Market St | Bcci Construction Company | code upgrade to existing idf roomDetails
code upgrade to existing idf room | $15,000 |
| Sep 14, 2009 | Completed final sign-off Oct 2009 | 580 California St | Ward Alan Emery Construction Inc. | offife ti on 13th floor. minor non struc interior demo, new finishes, repair drywall and acoustic ceiling. life saftey, fire sprinlers and mep under separate permit.Details
offife ti on 13th floor. minor non struc interior demo, new finishes, repair drywall and acoustic ceiling. life saftey, fire sprinlers and mep under separate permit. | $25,000 |
| May 27, 2009 | Completed final sign-off Aug 2009 | 425 Market St | Hathaway Dinwiddie Co. | t.i. at 32nd fl: provide 1 hour rating to existing idf room, replace existing non-rated door w/ new rated dor, add cooling heat pumps to existing idf rooms.Details
t.i. at 32nd fl: provide 1 hour rating to existing idf room, replace existing non-rated door w/ new rated dor, add cooling heat pumps to existing idf rooms. | $45,000 |
| May 11, 2009 | Completed final sign-off May 2009 | 580 California St | Hathaway Dinwiddie Co. | revision to appl #200812027633 - door swing corections at men's & women's restrooms. new braille signage updated unresonable harship request.Details
revision to appl #200812027633 - door swing corections at men's & women's restrooms. new braille signage updated unresonable harship request. | $500 |
| May 1, 2009 | Completed final sign-off Sep 2009 | 1 Market St | Gci, Inc | 17th floor removal of existing ceiling grid, light fixtures, wall & floor finishes, install new ceiling grid new gyp bd ceiling & soffits, new light fixtures wall & floor finishes in elevator lobby & corridor. elect, mech, life safety under separate permit.Details
17th floor removal of existing ceiling grid, light fixtures, wall & floor finishes, install new ceiling grid new gyp bd ceiling & soffits, new light fixtures wall & floor finishes in elevator lobby & corridor. elect, mech, life safety under separate permit. | $110,000 |
| Apr 27, 2009 | Never finaled issued Apr 2011, no final | 1 Market St | Dpr Construction Inc | remodel of 2 office tower lobbies, (e) atrium & concourse, demo exterior decorative metal grilles, new exterior doors to match e storefront, remodel of existing and addition of new retail spaces, new mechanical system for retail tenant improvement. all work at ground floor.Details
remodel of 2 office tower lobbies, (e) atrium & concourse, demo exterior decorative metal grilles, new exterior doors to match e storefront, remodel of existing and addition of new retail spaces, new mechanical system for retail tenant improvement. all work at ground floor. | $13,125,000 |
| Apr 8, 2009 | Completed final sign-off Aug 2009 | 1 Market St | change in occupancy from b to a-2 restaurant on the 42nd floor.temporary assembly space. curtain and rail system to define boundaries of assembly spaceDetails
change in occupancy from b to a-2 restaurant on the 42nd floor.temporary assembly space. curtain and rail system to define boundaries of assembly space | $3,000 | |
| Apr 8, 2009 | Never finaled issued Apr 2009, no final | 1 Market St | change in occupancy from b to a-2 resturant on the 41st floor. temporary assemby space, installing curtain and rail system to define boundaries of assembly spaceDetails
change in occupancy from b to a-2 resturant on the 41st floor. temporary assemby space, installing curtain and rail system to define boundaries of assembly space | $3,000 | |
| Apr 6, 2009 | Completed final sign-off Jan 2010 | 1 Market St | Bcci Construction Company | demolition of concrete curb at ramp, construction of new curb at basement level b-1Details
demolition of concrete curb at ramp, construction of new curb at basement level b-1 | $3,000 |
| Apr 1, 2009 | Completed final sign-off May 2009 | 225 Bush St | Rudolph Commercial Interiors Inc, Rci | at 18th fl: t.i. construction includs new interior partitions, new doors & new flooring throughout, mechanical, electrical under seperate permits. bathroom work per app#200811257292.Details
at 18th fl: t.i. construction includs new interior partitions, new doors & new flooring throughout, mechanical, electrical under seperate permits. bathroom work per app#200811257292. | $123,000 |
| Mar 4, 2009 | Completed final sign-off Jan 2010 | 1 Market St | Bcci Construction Company | project scope consists of barrier removal within b1 level parking garage and includes installation of new handrails at existing ramp, installation of precast concrete wheel stops, new signage, repainting of intl symbol of accessibility at accessible parking stalls and restriping.Details
project scope consists of barrier removal within b1 level parking garage and includes installation of new handrails at existing ramp, installation of precast concrete wheel stops, new signage, repainting of intl symbol of accessibility at accessible parking stalls and restriping. | $6,500 |
| Jan 29, 2009 | Completed final sign-off Apr 2009 | 188 The Embarcadero | Ward Alan Emery Construction Inc. | ti minor non structural demo, drywall partitions, acoustic ceiling and finishes. no mech this permit, no sprinkler & life safety.Details
ti minor non structural demo, drywall partitions, acoustic ceiling and finishes. no mech this permit, no sprinkler & life safety. | $38,000 |
| Jan 7, 2009 | Never finaled issued Jan 2009, no final | 188 The Embarcadero | D A Pope Inc | 7th floor revision to appl #200810073577 - alteration of previously submitted plans to reflect deletion of tenant space build out, new plans show area demo's to a shell. reduced scope of work: no new partitions, plumbing or electrical work at t.i. space.Details
7th floor revision to appl #200810073577 - alteration of previously submitted plans to reflect deletion of tenant space build out, new plans show area demo's to a shell. reduced scope of work: no new partitions, plumbing or electrical work at t.i. space. | $64,000 |
| Dec 5, 2008 | Completed final sign-off May 2009 | 580 California St | Hathaway Dinwiddie Co. | 14th fl: revision #200812027633, to remove note requiring sprinkler, life safety and mech. under seperate permit. no modification to existing mep systems.Details
14th fl: revision #200812027633, to remove note requiring sprinkler, life safety and mech. under seperate permit. no modification to existing mep systems. | $600 |
| Dec 2, 2008 | Never finaled filed Dec 2008, never issued | 1 Market St | demolition of lobby finishes - in conpliance with ab-017.Details
demolition of lobby finishes - in conpliance with ab-017. | $1,000,000 | |
| Dec 2, 2008 | Completed final sign-off May 2009 | 580 California St | Hathaway Dinwiddie Co. | interior alteration to the 14th floor: minor demolition, build partitions, ceilings and finishes. electrical under seperate permit.Details
interior alteration to the 14th floor: minor demolition, build partitions, ceilings and finishes. electrical under seperate permit. | $60,000 |
| Nov 25, 2008 | Completed final sign-off May 2009 | 225 Bush St | Rudolph Commercial Interiors Inc, Rci | #1850 -tenant improvement-construction of new non bearing walls, construct new offices. electrical, fire, life safety, sprinkler under seperateDetails
#1850 -tenant improvement-construction of new non bearing walls, construct new offices. electrical, fire, life safety, sprinkler under seperate | $95,880 |
| Oct 30, 2008 | Completed final sign-off Feb 2010 | 225 Bush St | Novo Construction Inc | remove at ground fl east & west lobbies: selected doors & selected storefront. construction: install at ground floor selected exterior address sign, selected doors & selected storefront. interior scope of work to be permitted seperately. m.e.p. under seperate permit.Details
remove at ground fl east & west lobbies: selected doors & selected storefront. construction: install at ground floor selected exterior address sign, selected doors & selected storefront. interior scope of work to be permitted seperately. m.e.p. under seperate permit. | $250,000 |
| Oct 30, 2008 | Completed final sign-off Feb 2010 | 225 Bush St | demolition: remove @ grd fl east & west lobbies, selected flr finishes, wall finishes, selected ceiling finishes, selected doors, security deck & interior lighting. construction: provide & install at grd flr, selected flr finishes, wall finishes, ceiling finishes, doors, security desk & interior ligDetails
demolition: remove @ grd fl east & west lobbies, selected flr finishes, wall finishes, selected ceiling finishes, selected doors, security deck & interior lighting. construction: provide & install at grd flr, selected flr finishes, wall finishes, ceiling finishes, doors, security desk & interior lig | $650,000 | |
| Oct 29, 2008 | Completed final sign-off Jan 2010 | 60 Spear St | revision to 200805061396 to clarify envelope compliance title 24 report from presciptive method to performance basedDetails
revision to 200805061396 to clarify envelope compliance title 24 report from presciptive method to performance based | $1,000 | |
| Sep 11, 2008 | Completed final sign-off Feb 2010 | 500 Terry A. Francois Bl | Turner Construction Co | 2nd floor: 2 spec suites, non bearing partition, suspended ceiling/lights, new electrical, data outlets, casework, plumbing, finishes. common corridor work.Details
2nd floor: 2 spec suites, non bearing partition, suspended ceiling/lights, new electrical, data outlets, casework, plumbing, finishes. common corridor work. | $625,000 |
| Sep 4, 2008 | Never finaled issued Sep 2008, no final | 201 California St | R.M.R. Construction Company | 6th floor-tenant improvement-4 spec suites, non-structural interior demo, acoustic ceiling, drywall partitions, mill work, re-configure toilet partitions & finishes. structural deck patch. m.e.p, life safety, sprinklers on seperate permitsDetails
6th floor-tenant improvement-4 spec suites, non-structural interior demo, acoustic ceiling, drywall partitions, mill work, re-configure toilet partitions & finishes. structural deck patch. m.e.p, life safety, sprinklers on seperate permits | $150,000 |
| Aug 25, 2008 | Completed final sign-off Feb 2010 | 500 Terry A. Francois Bl | Turner Construction Co | 1st fl-new building tenant fitness center consisting of new locker rms, under flr mechanical, electrical, plumbing systems. partitions, suspended accoustic ceiling, lighting, casework, interior finishes. 2nd fl-new tenant conferece center, new partitions, suspended gypsum, accoustic ceiling, lightinDetails
1st fl-new building tenant fitness center consisting of new locker rms, under flr mechanical, electrical, plumbing systems. partitions, suspended accoustic ceiling, lighting, casework, interior finishes. 2nd fl-new tenant conferece center, new partitions, suspended gypsum, accoustic ceiling, lightin | $1,819,000 |
| Aug 15, 2008 | Completed final sign-off Dec 2008 | 201 California St | Ayoob & Peery Plumbing Co Inc | relocate & move fire sprinkler heads per t.i. (relocate 123 & removed 44)Details
relocate & move fire sprinkler heads per t.i. (relocate 123 & removed 44) | $23,370 |
| Aug 5, 2008 | Completed final sign-off Feb 2009 | 120 Montgomery St | C B 2 Builders Incorporated | revision to permit# 200803207573 for men's and women's bathroom.Details
revision to permit# 200803207573 for men's and women's bathroom. | |
| Jul 31, 2008 | Completed final sign-off Jan 2009 | 580 California St | Richlen Construction | at 20th fl: t.i. remove and const three non-bearing interior partitions, add one private office door, patch/printing wall, ceiling & flooring. no additional light fixtures, plumbings or life safety work. any mep work disconnect during const will be under separate permiDetails
at 20th fl: t.i. remove and const three non-bearing interior partitions, add one private office door, patch/printing wall, ceiling & flooring. no additional light fixtures, plumbings or life safety work. any mep work disconnect during const will be under separate permi | $33,000 |
| Jul 22, 2008 | Completed final sign-off Nov 2008 | 201 Mission St | 14th floor, suite 1450 - expansion of suite 1450 by minor demolition and relocation of corridor door. required mep/modifications are to be performed on a design-build basis. (seperate permit) accessibility upgrades to drinking fountain. construct demising wall.Details
14th floor, suite 1450 - expansion of suite 1450 by minor demolition and relocation of corridor door. required mep/modifications are to be performed on a design-build basis. (seperate permit) accessibility upgrades to drinking fountain. construct demising wall. | $33,960 | |
| Jul 22, 2008 | Completed final sign-off Feb 2009 | 201 Mission St | tenant improvement on 23rd fllor, suite 2375. demo of partitions, (e) millwork, removal of (e) floor finishes back to slab conditions, relocation of (e) door and (n) entry location (interior). mep and fire safety under separate permitDetails
tenant improvement on 23rd fllor, suite 2375. demo of partitions, (e) millwork, removal of (e) floor finishes back to slab conditions, relocation of (e) door and (n) entry location (interior). mep and fire safety under separate permit | $134,782 | |
| Jul 22, 2008 | Completed final sign-off Dec 2008 | 201 California St | Richlen Construction | t.i. on 5th floor. demolition limited to ceiling and grid. all partitions, electrical data to remain. new millwork, carpet, paint, lighting fixtures, plumbing, hvac, fire, life safety upgrades as noted on mep drawings.Details
t.i. on 5th floor. demolition limited to ceiling and grid. all partitions, electrical data to remain. new millwork, carpet, paint, lighting fixtures, plumbing, hvac, fire, life safety upgrades as noted on mep drawings. | $446,464 |
| Jul 22, 2008 | Never finaled issued Jul 2008, no final | 201 Mission St | tenant improvement on 18th floor, suite 1850 including (n) partitions, (n) doors, relocation of (e) 2 x 4 light fixtures, (n) carpet throughout. mep and fire safety to be under separate permitDetails
tenant improvement on 18th floor, suite 1850 including (n) partitions, (n) doors, relocation of (e) 2 x 4 light fixtures, (n) carpet throughout. mep and fire safety to be under separate permit | $150,000 | |
| Jul 9, 2008 | Completed final sign-off Nov 2008 | 201 Mission St | 21st floor: selective demolition of (e) office space. tenant improvement +/- 10,000 sf elevator lobby and common corridor, restroom + drinking fountain accessibility upgrades. fire sprinkler/fire protectio systems under separate permit.Details
21st floor: selective demolition of (e) office space. tenant improvement +/- 10,000 sf elevator lobby and common corridor, restroom + drinking fountain accessibility upgrades. fire sprinkler/fire protectio systems under separate permit. | $1,154,443 | |
| Jul 1, 2008 | Completed final sign-off Apr 2009 | 1 Market St | Novo Construction Inc | tenant improvment including demolition of existing interior partitions, glazing, doors, millwork, plumbing, and flooring finishes. construction to include new interior partitions, new doors, new glazing, lighting layout,finishes. mep separate permitDetails
tenant improvment including demolition of existing interior partitions, glazing, doors, millwork, plumbing, and flooring finishes. construction to include new interior partitions, new doors, new glazing, lighting layout,finishes. mep separate permit | $210,200 |
| Jun 18, 2008 | Completed final sign-off Jul 2008 | 2 Harrison St | Principal Builders Inc. | construction of a 2-hr rated enclosure at ex. convenience stair to separate 6th and 7th floor tenants. required mep and fire protection modifications will be design-built and under a separate permitDetails
construction of a 2-hr rated enclosure at ex. convenience stair to separate 6th and 7th floor tenants. required mep and fire protection modifications will be design-built and under a separate permit | $60,000 |
| May 29, 2008 | Completed final sign-off Oct 2008 | 425 Market St | 27th fl, full fl tenant improvement, consisting of limited demo partition, new trainging rm, storage rm and open office areas w/ new finishes in limited areas, no work to existing corredor, demising wall w/ minor upgrades to existing toilet fms, no structural work or change to building envelope.Details
27th fl, full fl tenant improvement, consisting of limited demo partition, new trainging rm, storage rm and open office areas w/ new finishes in limited areas, no work to existing corredor, demising wall w/ minor upgrades to existing toilet fms, no structural work or change to building envelope. | $100,000 | |
| May 22, 2008 | Completed final sign-off Apr 2009 | 1 Market St | Novo Construction Inc | tenant improvement including demolition of existing exterior partitions, doors, plumbing, vct flooring. construction to include new interior partitions, relocated doors, flooring in it room and breakroom. mep drawings under separate permit. no increase in office space.Details
tenant improvement including demolition of existing exterior partitions, doors, plumbing, vct flooring. construction to include new interior partitions, relocated doors, flooring in it room and breakroom. mep drawings under separate permit. no increase in office space. | $49,100 |
| May 22, 2008 | Completed final sign-off Aug 2008 | 1 Market St | Field Construction Inc. | 16th floor ti: demo existing office space and build out 7 new offices, approx 2100 sf. sprinkler, life safety, electrical, mechanical on separate permits. no increase in office spaceDetails
16th floor ti: demo existing office space and build out 7 new offices, approx 2100 sf. sprinkler, life safety, electrical, mechanical on separate permits. no increase in office space | $115,000 |
| May 2, 2008 | Completed final sign-off Oct 2008 | 1 Market St | Richlen Construction | ti for 14th floor. demo and relocate hvac duct and vav box, add new exhaust fans and relocate induction units. demo plumbing for shower and kitchen. relocate and add new lights. sprinkler and fire alarm on seperate permit ref. pa# 2008/03/31/8393Details
ti for 14th floor. demo and relocate hvac duct and vav box, add new exhaust fans and relocate induction units. demo plumbing for shower and kitchen. relocate and add new lights. sprinkler and fire alarm on seperate permit ref. pa# 2008/03/31/8393 | $175,000 |
| Apr 9, 2008 | Expired or cancelled expired Jul 2009 | 120 Montgomery St | tenant improvement consisting of new offices, reception area, break room w/ new finishes throughout. no work to corridor or demising walls w/ minor upgrades to existing toilet rooms. no structural work or changes to building envelope. mep. seperate permit.Details
tenant improvement consisting of new offices, reception area, break room w/ new finishes throughout. no work to corridor or demising walls w/ minor upgrades to existing toilet rooms. no structural work or changes to building envelope. mep. seperate permit. | $131,000 | |
| Apr 9, 2008 | Never finaled issued Apr 2008, no final | 1 Market St | Bcci Construction Company | ti for suite# 700 to create new suite 780 new space will remain an open office area. minor acoustic ceiling demo, new demising partition walls, patch and repair of ex finishes. restroom signage upgradeDetails
ti for suite# 700 to create new suite 780 new space will remain an open office area. minor acoustic ceiling demo, new demising partition walls, patch and repair of ex finishes. restroom signage upgrade | $10,000 |
| Apr 4, 2008 | Expired or cancelled expired Nov 2013 | 575 Market St | ti on the 12th floor to add 1 non rated partition to ex. room. cut in a new opening in a 1hr rated wall and a 20 min door and frame. upgrade accessible toilet stalls in the existing men's and women's toilet rooms. mep under separate permit.Details
ti on the 12th floor to add 1 non rated partition to ex. room. cut in a new opening in a 1hr rated wall and a 20 min door and frame. upgrade accessible toilet stalls in the existing men's and women's toilet rooms. mep under separate permit. | $8,000 | |
| Mar 12, 2008 | Completed final sign-off Oct 2008 | 1 Market St | tenant improvement: including demolition, new tempered glazing, n doors, finishes, cabinetry. new ceiling tile, grid to remain. relocation/replacement of old fixtures with new. sprinklers, electrical, plumbing, hvac. mep separate permit.Details
tenant improvement: including demolition, new tempered glazing, n doors, finishes, cabinetry. new ceiling tile, grid to remain. relocation/replacement of old fixtures with new. sprinklers, electrical, plumbing, hvac. mep separate permit. | $246,000 | |
| Feb 26, 2008 | Completed final sign-off Jun 2008 | 101 California St | 10th floor: minor selective demolition of (e) office and conference room. construction of 5 offices, ceiling tile patch, addition of convenience outlets, new paint, carpet to match existing. mep separate permit.Details
10th floor: minor selective demolition of (e) office and conference room. construction of 5 offices, ceiling tile patch, addition of convenience outlets, new paint, carpet to match existing. mep separate permit. | $33,000 | |
| Jan 29, 2008 | Expired or cancelled expired Jun 2009 | 580 California St | combine (e) suite 1330 w/ adjacent 1325. demolition, interior glazing, cap plumbing, paint, carpet. no ceiling work, no lighting work. m/e/p, life safety under separate permit.Details
combine (e) suite 1330 w/ adjacent 1325. demolition, interior glazing, cap plumbing, paint, carpet. no ceiling work, no lighting work. m/e/p, life safety under separate permit. | $44,008 | |
| Jan 8, 2008 | Expired or cancelled expired Jun 2009 | 120 Montgomery St | 10th floor, suite 1055 - t.i. incl new partitions,doors& sideligts,new ceiling grid &tile, casework w/sink, convenience outletd &new finishes. presently shell condition. demolition of (e) tenant space permitted previously. mep & fire life safety under separate permit 200707116496.nov 200670636.Details
10th floor, suite 1055 - t.i. incl new partitions,doors& sideligts,new ceiling grid &tile, casework w/sink, convenience outletd &new finishes. presently shell condition. demolition of (e) tenant space permitted previously. mep & fire life safety under separate permit 200707116496.nov 200670636. | $97,300 | |
| Dec 12, 2007 | Completed final sign-off Apr 2008 | 301 Howard St | Field Construction Inc. | revision to pa# 2007/11/07/7479 to add 4 new 2x4 light fixtures, 2 new power outlets, add 2 new tele/data outlets, relocate 1 strobeDetails
revision to pa# 2007/11/07/7479 to add 4 new 2x4 light fixtures, 2 new power outlets, add 2 new tele/data outlets, relocate 1 strobe | $2,000 |
| Dec 7, 2007 | Completed final sign-off Feb 2009 | 580 California St | Bcci Construction Company | removal of (e) stairwells (abandoned -communication stairs) at 22nd - 23rd floor & 21st - 22nd floor. infill of slabs at same. barrier removal at restrooms on 22nd + 23rd floor.Details
removal of (e) stairwells (abandoned -communication stairs) at 22nd - 23rd floor & 21st - 22nd floor. infill of slabs at same. barrier removal at restrooms on 22nd + 23rd floor. | $60,000 |
| Dec 6, 2007 | Completed final sign-off Aug 2008 | 555 California St | Turner Construction Co | 18th floor: full floor t.i. for minor demolition, construction (n) partitions, acoustic ceiling, mep, millwork & finishes. (life safety & sprinklers under separate permit.)Details
18th floor: full floor t.i. for minor demolition, construction (n) partitions, acoustic ceiling, mep, millwork & finishes. (life safety & sprinklers under separate permit.) | $5,250,000 |
| Nov 29, 2007 | Completed final sign-off Oct 2008 | 1 Embarcadero Center | Turner Construction Co | architectural: cosmetic upgrade to existing spaces including carpet, paint, millwork, new partitions, relocation of existing light fixtures. installation of 2 new single use toilets (1 accessible and 1 non accessible) new breakroom, training room. relocation of existing copy equipment/work room.Details
architectural: cosmetic upgrade to existing spaces including carpet, paint, millwork, new partitions, relocation of existing light fixtures. installation of 2 new single use toilets (1 accessible and 1 non accessible) new breakroom, training room. relocation of existing copy equipment/work room. | $190,000 |
| Nov 20, 2007 | Completed final sign-off Jul 2008 | 333 Bush St | Dome Construction Corp | 22nd floor - (n) partitions, (n) sidelites, (n) carpet, (n) doors, (n) base, (n) paint, (n) vct. mep under separate permit. fire sprinkler and fire life safety under separate permit.Details
22nd floor - (n) partitions, (n) sidelites, (n) carpet, (n) doors, (n) base, (n) paint, (n) vct. mep under separate permit. fire sprinkler and fire life safety under separate permit. | $275,000 |
| Oct 30, 2007 | Expired or cancelled expired May 2011 | 120 Montgomery St | Pankow Special Projects Lp | 17th floor-work on suite #1700. ref. application # 200708079004. this application is for mechanical/electrical only. cost for this work is already included in the above mentioned project.Details
17th floor-work on suite #1700. ref. application # 200708079004. this application is for mechanical/electrical only. cost for this work is already included in the above mentioned project. | |
| Sep 14, 2007 | Completed final sign-off Feb 2008 | 101 California St | 10/f- expansion of existing offices, new partitions, power & signal, new finishes, reuse existing ceiling. minor demolition. mep.& fire life safety under seperate permit.Details
10/f- expansion of existing offices, new partitions, power & signal, new finishes, reuse existing ceiling. minor demolition. mep.& fire life safety under seperate permit. | $87,500 | |
| Aug 29, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | revision to previously approved p.a. 2007-08-03-8687: reduction of permannet landscaping and inclusion of planter boxes as shown on drwg sheet 7a/6.0.Details
revision to previously approved p.a. 2007-08-03-8687: reduction of permannet landscaping and inclusion of planter boxes as shown on drwg sheet 7a/6.0. | |
| Aug 23, 2007 | Completed final sign-off Dec 2007 | 150 California St | Skyline Construction | office t.i. on the 14th floor. four new partitions, ceiling grid adjustment, new outlet and tele data. remove rails on door and add magnetic door hold. mep under separate permitDetails
office t.i. on the 14th floor. four new partitions, ceiling grid adjustment, new outlet and tele data. remove rails on door and add magnetic door hold. mep under separate permit | $38,060 |
| Aug 7, 2007 | Completed final sign-off Feb 2008 | 120 Montgomery St | 12th floor-(n) partitions for office & conference space, (n) carpet & stone flooring, (n)doors, frames & sidelites, (n0 millwork, (n) paint & wall covering, (n) & relocated outlets & teledata. mep & title 24 separate permitDetails
12th floor-(n) partitions for office & conference space, (n) carpet & stone flooring, (n)doors, frames & sidelites, (n0 millwork, (n) paint & wall covering, (n) & relocated outlets & teledata. mep & title 24 separate permit | $214,500 | |
| Aug 7, 2007 | Expired or cancelled expired May 2011 | 120 Montgomery St | suite #1700- (n) partitions, (n) doors, frames & sidelites, (n) carpet & flooring (n) millwork, (n) paint & wall finish, (n) & relocate outlets & tele.data. mep & title 24 seperate permit. all work on 17/f, (n)carpet, int.-partitions, side lites, (n) ceiling tile, (n) paint.Details
suite #1700- (n) partitions, (n) doors, frames & sidelites, (n) carpet & flooring (n) millwork, (n) paint & wall finish, (n) & relocate outlets & tele.data. mep & title 24 seperate permit. all work on 17/f, (n)carpet, int.-partitions, side lites, (n) ceiling tile, (n) paint. | $81,000 | |
| Aug 7, 2007 | Completed final sign-off Jan 2008 | 120 Montgomery St | 25/f- new partitions, new doors, frames & sidelite, new carpeting & vct flooring, new millwork, new paint and new relocated outlets & teledata. mep & title 24 separate permit.Details
25/f- new partitions, new doors, frames & sidelite, new carpeting & vct flooring, new millwork, new paint and new relocated outlets & teledata. mep & title 24 separate permit. | $96,000 | |
| Aug 7, 2007 | Expired or cancelled expired May 2011 | 120 Montgomery St | 14th floor-new partitions, new doors, frames, sidelites, new carpet & vct flooring. new paint, new millwork, new window treatment.Details
14th floor-new partitions, new doors, frames, sidelites, new carpet & vct flooring. new paint, new millwork, new window treatment. | $94,320 | |
| Jul 11, 2007 | Completed final sign-off Apr 2008 | 120 Montgomery St | demolish ceiling ht. partitions, doors,sidelites, carpet & padding. remove outlets, cables, jacks to their soure. remove extg plmg fixure/piping & cap to slab core wall. demolish floor finish back to slab condition. area of work 3rd flr, 10th flr, 14th flr, 22nd flr. use ab-17 sfbc for vacant spaceDetails
demolish ceiling ht. partitions, doors,sidelites, carpet & padding. remove outlets, cables, jacks to their soure. remove extg plmg fixure/piping & cap to slab core wall. demolish floor finish back to slab condition. area of work 3rd flr, 10th flr, 14th flr, 22nd flr. use ab-17 sfbc for vacant space | $300,000 | |
| Jun 11, 2007 | Completed final sign-off Jun 2009 | 333 Bush St | no structural demolition, demolish (e) partitions/walls, demolish (e) millwork, demloish (e) carpet, finish flooring, base, demolition to occur on floors 14, 16,17, 18, 19, 21, 24. disable accessibility compliance exempt for demolition permit per sfbc ab-017Details
no structural demolition, demolish (e) partitions/walls, demolish (e) millwork, demloish (e) carpet, finish flooring, base, demolition to occur on floors 14, 16,17, 18, 19, 21, 24. disable accessibility compliance exempt for demolition permit per sfbc ab-017 | $310,000 | |
| Apr 12, 2007 | Completed final sign-off Feb 2008 | 301 Howard St | Skyline Construction | oti-2, equity office properties, 16th floor, el, me, sp, ls.Details
oti-2, equity office properties, 16th floor, el, me, sp, ls. | $57,000 |
| Apr 3, 2007 | Completed final sign-off Feb 2008 | 301 Howard St | Skyline Construction | ssa/odar: oti-1 16th floor el, me, ls, spDetails
ssa/odar: oti-1 16th floor el, me, ls, sp | $575,000 |
| Apr 2, 2007 | Completed final sign-off Apr 2007 | 580 California St | scotia capital - oti-1 (revision) 21st floor, rev. to appl#200611308819Details
scotia capital - oti-1 (revision) 21st floor, rev. to appl#200611308819 | ||
| Feb 21, 2007 | Completed final sign-off May 2007 | 580 California St | Pankow Special Projects Lp | oti-1, revision, 4th floor.Details
oti-1, revision, 4th floor. | |
| Dec 27, 2006 | Expired or cancelled expired Oct 2009 | 580 California St | Pankow Special Projects Lp | oti-2, corporate executive board, 4th floor, el, me.Details
oti-2, corporate executive board, 4th floor, el, me. | $150,000 |
| Dec 19, 2006 | Expired or cancelled expired Jan 2009 | 45 Castro St | D Kelly Construction Inc. | t.i. for office space, demo, new partitions/finishes. no street space or debris box on public street. accessibile restrooms approved for appl#200309225357.Details
t.i. for office space, demo, new partitions/finishes. no street space or debris box on public street. accessibile restrooms approved for appl#200309225357. | $175,000 |
| Sep 29, 2006 | Completed final sign-off Oct 2006 | 1 Market St | Pankow Special Projects Lp | (n) flooring, carpet. remove (e) case, carpet & low walls, remove (e) partition wall, new accoustic ceiling, new lights, upgrade (e) resroom.Details
(n) flooring, carpet. remove (e) case, carpet & low walls, remove (e) partition wall, new accoustic ceiling, new lights, upgrade (e) resroom. | $25,000 |
| Sep 8, 2006 | Never finaled issued Feb 2007, no final | 201 Mission St | Turner Construction Co | demolish (e) finishes, communicating stair, portion of storefront, selected lighting, etc. build back new finishes, portion of storefront, sanitary facilities, water features, sidewalk, lighting. re-work hvac, lifesafety, fire sprinklers as required. scope of work limited to basemnt, 1st & 2nd floorDetails
demolish (e) finishes, communicating stair, portion of storefront, selected lighting, etc. build back new finishes, portion of storefront, sanitary facilities, water features, sidewalk, lighting. re-work hvac, lifesafety, fire sprinklers as required. scope of work limited to basemnt, 1st & 2nd floor | $4,000,000 |
| Sep 7, 2006 | Completed final sign-off Feb 2007 | 580 California St | Wcp Svcs, Dba: Venture Builders | oti-1, 19th floor, el, me, ls, sp.Details
oti-1, 19th floor, el, me, ls, sp. | $154,000 |
| Aug 4, 2006 | Completed final sign-off May 2007 | 201 Mission St | Wcp Svcs, Dba: Venture Builders | oti-1 22/fl el, me, ls, spDetails
oti-1 22/fl el, me, ls, sp | $475,000 |
| Jul 13, 2006 | Completed final sign-off Jan 2007 | 201 Mission St | oti-1 15th floor el me ls spDetails
oti-1 15th floor el me ls sp | $190,000 | |
| Apr 11, 2006 | Completed final sign-off May 2006 | 120 Montgomery St | oti-1, 19th floor, el, me, ls, sp.Details
oti-1, 19th floor, el, me, ls, sp. | $20,000 | |
| Apr 4, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | amend to pa 200512069638 at 15th fl, add ceiling lighting fixture at elevator lobby.Details
amend to pa 200512069638 at 15th fl, add ceiling lighting fixture at elevator lobby. | ||
| Mar 30, 2006 | Completed final sign-off Jan 2007 | 120 Montgomery St | Wcp Svcs, Dba: Venture Builders | oti 2, 8th floor, el, me, ls.Details
oti 2, 8th floor, el, me, ls. | $307,040 |
| Mar 30, 2006 | Completed final sign-off Jan 2007 | 120 Montgomery St | Wcp Svcs, Dba: Venture Builders | oti-1, 8th floor, el, me, ls, sp.Details
oti-1, 8th floor, el, me, ls, sp. | $460,560 |
| Mar 30, 2006 | Completed final sign-off Jan 2007 | 120 Montgomery St | Wcp Svcs, Dba: Venture Builders | oti-1 7th floor, el, me, ls, spDetails
oti-1 7th floor, el, me, ls, sp | $213,438 |
| Mar 30, 2006 | Completed final sign-off Jan 2007 | 120 Montgomery St | Wcp Svcs, Dba: Venture Builders | oti-1, 9th floor, el, me, ls, sp.Details
oti-1, 9th floor, el, me, ls, sp. | $460,560 |