Alan Robinson
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Tuan + Robison
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jun 2026
73 permits since 2000 (engineer on 66 permits, architect on 4 permits, authorized agent-others on 2 permits, pmt consultant/expediter on 1 permit): 42 completed, 10 in progress, 11 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | 17th fl structural for high density files. ref 202606032446Details
17th fl structural for high density files. ref 202606032446 | |
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 706 Sansome St | M C S Construction Services | !/fl- ref 202505216975- add structrual engineered drawingsDetails
!/fl- ref 202505216975- add structrual engineered drawings | |
| Jun 3, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | 18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry.Details
18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry. | $3,279,000 |
| Jan 21, 2026 | In progress issued Aug 2026 | 1055 Ellis St | Guzman Construction Group Inc. | revision to pa 202510248084 underpinning method to replace shoring previously approved associated (n) elevator shoring & foundation. ref pa 202312212924.Details
revision to pa 202510248084 underpinning method to replace shoring previously approved associated (n) elevator shoring & foundation. ref pa 202312212924. | |
| Nov 14, 2025 | Completed final sign-off Jan 2026 | 1900 Fillmore St | post repair: replace and restore the damages. to comply with nov 202545129. structural work only.Details
post repair: replace and restore the damages. to comply with nov 202545129. structural work only. | $33,505 | |
| Nov 4, 2025 | Completed final sign-off Mar 2026 | 111 Taylor St | Ayala's Color & Concepts***See Note*** | 1st/f storage room: floor repairs, 16 ft by 18 ft, remove e) floor, reinforce & replace plywood base & lino flooringDetails
1st/f storage room: floor repairs, 16 ft by 18 ft, remove e) floor, reinforce & replace plywood base & lino flooring | $27,000 |
| Oct 17, 2025 | In progress issued Dec 2025 | 2970 16th St | Guzman Construction Group Inc. | reference bpa#202508253788.temporary bracing of neighboring shared wall.structural onlyDetails
reference bpa#202508253788.temporary bracing of neighboring shared wall.structural only | $500,000 |
| Sep 11, 2025 | Completed final sign-off Apr 2026 | 2970 16th St | Cahill Guzman Construction Group Jv | priority housing project - demolish a 2-story, type v, commercial building.Details
priority housing project - demolish a 2-story, type v, commercial building. | $500,000 |
| Sep 2, 2025 | In progress issued Dec 2025 | 345 California St | Skyline Construction | floor 5, new exterior pedestral deck over (e) roof structure. extension of interior corridor to new exteriorDetails
floor 5, new exterior pedestral deck over (e) roof structure. extension of interior corridor to new exterior | $2,450,000 |
| Sep 2, 2025 | In progress issued Nov 2025 | 345 California St | Skyline Construction | floor 5: common amenity suite for use by building tenants, includes two conference rooms, pantry, storage, lounge with break area and golf simulator. upgrades to existing mens/womens restroom, new womens restroom, wellness room, two vacant tenant suites & rated corridor.Details
floor 5: common amenity suite for use by building tenants, includes two conference rooms, pantry, storage, lounge with break area and golf simulator. upgrades to existing mens/womens restroom, new womens restroom, wellness room, two vacant tenant suites & rated corridor. | $3,500,000 |
| Aug 18, 2025 | Completed final sign-off Dec 2025 | 1 Front St | Skyline Construction | 35/f: revision to bpa#: 202504164571. to include (e) fire rated walls at 3525 and 3526. were not previously shown on as-built-plans. hatch has been added to depict (e) fair rated walls.Details
35/f: revision to bpa#: 202504164571. to include (e) fire rated walls at 3525 and 3526. were not previously shown on as-built-plans. hatch has been added to depict (e) fair rated walls. | |
| Aug 14, 2025 | In progress issued Aug 2025 | 101 California St | Source Planning And Construction Inc | the beam strengthening is no longer needed for the scope of work in kind to permit: 202412126710.Details
the beam strengthening is no longer needed for the scope of work in kind to permit: 202412126710. | |
| Jul 1, 2025 | In progress filed Jul 2025, not yet issued | 1 Zoo Rd | renovate(e)animal holding spaces & add new interior rooms for animal indoor playrooms,animal handles preparation stations,storage & trash room.renovate(e)mech,lighting & electrical systems for new animal holding space.renovate(e)outdoor exhibit spaces.Details
renovate(e)animal holding spaces & add new interior rooms for animal indoor playrooms,animal handles preparation stations,storage & trash room.renovate(e)mech,lighting & electrical systems for new animal holding space.renovate(e)outdoor exhibit spaces. | $4,000,000 | |
| Jun 2, 2025 | Completed final sign-off Mar 2026 | 39 Baldwin Ct | Regency General Contractors Inc | minor foundation repairs.Details
minor foundation repairs. | $200,000 |
| Jun 2, 2025 | Completed final sign-off Mar 2026 | 15 Baldwin Ct | Regency General Contractors Inc | minor foundation repairs.Details
minor foundation repairs. | $200,000 |
| May 1, 2025 | In progress filed May 2025, not yet issued | 3300 Mission St | Guzman Construction Group Inc. | priority - temporary shoring of the elevator pit including driven piles and horizontal braces.Details
priority - temporary shoring of the elevator pit including driven piles and horizontal braces. | $10,000 |
| Jul 23, 2024 | Completed final sign-off Dec 2024 | 1515 South Van Ness Av | Guzman Construction Group Inc. | priority mohcd. 100% affordable project ed 13-01. - to demolish a 1-story, type ii-b, commercial building.Details
priority mohcd. 100% affordable project ed 13-01. - to demolish a 1-story, type ii-b, commercial building. | |
| Apr 10, 2024 | Completed final sign-off May 2025 | 221 Main St | Gci, Inc | work on ground fl,consists of interior demo of non-structrural elements indlcuding but not necessarily limited to,interior partitions,doors,finishes,ceilings,lighting,mech & elec outlets & switches.addition of(n)gender neutral restrooms.Details
work on ground fl,consists of interior demo of non-structrural elements indlcuding but not necessarily limited to,interior partitions,doors,finishes,ceilings,lighting,mech & elec outlets & switches.addition of(n)gender neutral restrooms. | $1,375,798 |
| Nov 28, 2023 | Completed final sign-off Jun 2025 | 68 Haight St | Guzman - Suffolk Jv Llc | emergency temporary shoring required to support building for emergency structural repair per nov 202302977Details
emergency temporary shoring required to support building for emergency structural repair per nov 202302977 | $100,000 |
| Jul 13, 2023 | Never finaled filed Jul 2023, never issued | 1103 Page St | Bai Construction | shoring permit. excavate for 2 new adu units. ref adu permit 201908279922.Details
shoring permit. excavate for 2 new adu units. ref adu permit 201908279922. | $10,000 |
| Apr 10, 2023 | Never finaled issued Apr 2023, no final | 4567 19th St | Upcycle Builders Inc. | voluntary soils shoring for project. orig permit 202002043484 s1. install 7 soldier piles per soils engineer planDetails
voluntary soils shoring for project. orig permit 202002043484 s1. install 7 soldier piles per soils engineer plan | $15,000 |
| Dec 16, 2022 | Expired or cancelled cancelled Jan 2026 | 1174 Folsom St | ground floor first tenant improvement of (e) commercial space (tenant a) to accommodate a new restaurant. fire sprinkler & protection is a deffered submission. minor alterations to (e) common corridor interior partitions at tenant c entrance.Details
ground floor first tenant improvement of (e) commercial space (tenant a) to accommodate a new restaurant. fire sprinkler & protection is a deffered submission. minor alterations to (e) common corridor interior partitions at tenant c entrance. | $150,000 | |
| Sep 29, 2022 | Expired or cancelled withdrawn May 2023 | 851 California St | configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf.Details
configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf. | $7,500,000 | |
| Jul 27, 2022 | Completed final sign-off Aug 2025 | 828 Brannan St | Skyline Construction | temporary shoring using steel members and concrete reaction blocks. all work within property line with no encroachments into public right of way.Details
temporary shoring using steel members and concrete reaction blocks. all work within property line with no encroachments into public right of way. | $185,000 |
| Jun 9, 2022 | Completed final sign-off Aug 2025 | 22 Johnson St | Suffolk-Guzman A Joint Venture Iii | c3.4. grading associated with new building under pa# 202011199306 & 202203109674.Details
c3.4. grading associated with new building under pa# 202011199306 & 202203109674. | |
| Mar 10, 2022 | Completed final sign-off Aug 2025 | 22 Johnson St | Suffolk-Guzman A Joint Venture Iii | parcel c3.4 - shoring associated with new building under pa# 202011199306.Details
parcel c3.4 - shoring associated with new building under pa# 202011199306. | $350,000 |
| Jan 8, 2021 | Completed final sign-off Jan 2024 | 2055 Bryant St | Skyline Capital Builders Llc | underpinning for new construction at 2750 - 19th st/ reference bpa# 201712156665-sDetails
underpinning for new construction at 2750 - 19th st/ reference bpa# 201712156665-s | $300,000 |
| Jan 8, 2021 | Completed final sign-off Sep 2023 | 2700 19th St | Skyline Capital Builders Llc | underpinning for new construction at 2750 - 19th st/ reference bpa# 201712156665-sDetails
underpinning for new construction at 2750 - 19th st/ reference bpa# 201712156665-s | $300,000 |
| Nov 5, 2020 | Never finaled issued Jan 2021, no final | 302 Silver Av | Cahill Contractors Llc. | replace existing security kiosk with new prefab security booth. install slab on grade & prefab kiosk.Details
replace existing security kiosk with new prefab security booth. install slab on grade & prefab kiosk. | $40,000 |
| Jul 30, 2020 | Completed final sign-off Nov 2024 | 52 Kirkwood Av | Azul Works, Inc., G E C M S Inc | temporary shoring and excavation for future construction on site. see pa# 2019/10/03/3486 and 2020/02/13/4438.Details
temporary shoring and excavation for future construction on site. see pa# 2019/10/03/3486 and 2020/02/13/4438. | $400,000 |
| May 14, 2020 | Never finaled issued May 2022, no final | 3 Signal Rd | Plant Construction Co, Lp | shoring for new yerba buena island construction, reference pa #2019-0517-0923 and pa #2019-0517-0926.Details
shoring for new yerba buena island construction, reference pa #2019-0517-0923 and pa #2019-0517-0926. | $775,000 |
| May 14, 2020 | Never finaled issued May 2022, no final | 3 Signal Rd | Plant Construction Co, Lp | grading & excavation for new yerba buena island construction, reference pa #2019-0517-0923 and pa #2019-0517-0926.Details
grading & excavation for new yerba buena island construction, reference pa #2019-0517-0923 and pa #2019-0517-0926. | $985,000 |
| Mar 3, 2020 | Completed final sign-off Jun 2020 | 35 Rosemont Pl | Sol Builders | bathroom remodel. mech and ele in a separate permit.Details
bathroom remodel. mech and ele in a separate permit. | $20,000 |
| Dec 16, 2019 | Completed final sign-off Jun 2023 | 2750 19th St | Skyline Capital Builders Llc | shoring & brick facade retention for the fitzgerald project at 2750 19th st. ref pa #2017-1215-6665 (s).Details
shoring & brick facade retention for the fitzgerald project at 2750 19th st. ref pa #2017-1215-6665 (s). | $450,000 |
| Nov 26, 2019 | Completed final sign-off Jan 2020 | 2222 Market St | Fisher Development Inc | achorage of stucco to east wall to secure stucco during work related to 201811166151 and 201803194011Details
achorage of stucco to east wall to secure stucco during work related to 201811166151 and 201803194011 | $2,000 |
| Jul 26, 2019 | Completed final sign-off Jan 2020 | 190 Amber Dr | Sol Builders | revision to pa 2018-1011-2976 - widening opening between kitchen & dining roomDetails
revision to pa 2018-1011-2976 - widening opening between kitchen & dining room | $2,000 |
| Jul 24, 2019 | Never finaled issued Jul 2019, no final | 421 Turk St | Kin Wo Construction Inc. | revision to app#201607081936:all demo areas replaced and repair like kind and must be waterproofed. revision to app#201809211048 to add additional support.Details
revision to app#201607081936:all demo areas replaced and repair like kind and must be waterproofed. revision to app#201809211048 to add additional support. | $30,000 |
| Dec 11, 2018 | Never finaled issued Feb 2019, no final | 633 Folsom St | Plant Construction Co, Lp | structural shoring associated with the rmoval & replacement of the ground level column at the intersection of gridlines b & 3. (ref pa# 2017/06/01/8184-s)Details
structural shoring associated with the rmoval & replacement of the ground level column at the intersection of gridlines b & 3. (ref pa# 2017/06/01/8184-s) | |
| Oct 19, 2018 | Never finaled issued Nov 2018, no final | 65 Scott St | revision to 201803143642 replacing mechanically fastened moment frame with a welded moment frame. no exterior work.Details
revision to 201803143642 replacing mechanically fastened moment frame with a welded moment frame. no exterior work. | ||
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 1030 Golden Gate Av | D.F.P.F Corp Dba Fine Line Construction | revision to pa #201804105921. move frame locations.Details
revision to pa #201804105921. move frame locations. | |
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 1139 Turk St | D.F.P.F Corp Dba Fine Line Construction | revision to pa #201804105922. move frame locations.Details
revision to pa #201804105922. move frame locations. | |
| Apr 10, 2018 | Completed final sign-off Jan 2019 | 1030 Golden Gate Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of (e) shear walls at 1st flr only. all work for lateral force resistance. no new vertical load carrying elements includedDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of (e) shear walls at 1st flr only. all work for lateral force resistance. no new vertical load carrying elements included | $300,000 | |
| Apr 10, 2018 | Completed final sign-off Jan 2019 | 1139 Turk St | to comply with #201715451. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of (e) shear walls at 1st flr only. all work for lateral force resistance. no new vertical load carrying elements includedDetails
to comply with #201715451. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of (e) shear walls at 1st flr only. all work for lateral force resistance. no new vertical load carrying elements included | $300,000 | |
| Mar 14, 2018 | Completed final sign-off Jun 2021 | 65 Scott St | comply w/ soft story retrofit per sfebc chapter 4d, engineering design 2016 cebc a4. comply w/ nov# 201719651.Details
comply w/ soft story retrofit per sfebc chapter 4d, engineering design 2016 cebc a4. comply w/ nov# 201719651. | $120,000 | |
| Jan 18, 2018 | Expired or cancelled cancelled Jan 2026 | 399 Geary St | new pg&e vault. maher n/a.Details
new pg&e vault. maher n/a. | $30,000 | |
| Jun 19, 2017 | Completed final sign-off Apr 2021 | 1500 Mission St | Charles Pankow Builders Ltd | temp exc shoring support for new construction by means of soldier beams, cement soil mix panels & tie backs. ref pa# 2016/06/20/0387-s. ** maher: exempted - see approval from dph attached with the plan. **Details
temp exc shoring support for new construction by means of soldier beams, cement soil mix panels & tie backs. ref pa# 2016/06/20/0387-s. ** maher: exempted - see approval from dph attached with the plan. ** | $3,746,570 |
| Jun 19, 2017 | Completed final sign-off Sep 2018 | 1 South Van Ness Av | Charles Pankow Builders Ltd | tiebacks installed under boa building during excavation shoreing of adjacent property - 1500 mission street for new construction under pa#2016/06/20/0387-s. ** maher: exempted - see approval from dph attached with the plan **Details
tiebacks installed under boa building during excavation shoreing of adjacent property - 1500 mission street for new construction under pa#2016/06/20/0387-s. ** maher: exempted - see approval from dph attached with the plan ** | $478,430 |
| Jun 19, 2017 | Completed final sign-off Jul 2018 | 1500 Mission St | Charles Pankow Builders Ltd | mass & structural excavation. ref pa# 2016/06/20/0387-s. ** maher: exempted - see approval from dph on the plan **Details
mass & structural excavation. ref pa# 2016/06/20/0387-s. ** maher: exempted - see approval from dph on the plan ** | $3,529,710 |
| May 16, 2017 | Completed final sign-off Aug 2023 | 405 Taylor St | Cw Horton General Contractor | project scope consists of the select demolition & renovation of public space areas. hotel lobby, work includes demolition & construction of walls, ceilings, floors, fixtures & finishes. no exterior work. no change in egress. no plumbing work perform on this permit.Details
project scope consists of the select demolition & renovation of public space areas. hotel lobby, work includes demolition & construction of walls, ceilings, floors, fixtures & finishes. no exterior work. no change in egress. no plumbing work perform on this permit. | $260,500 |
| Apr 28, 2017 | Completed final sign-off Jun 2019 | 1960 California St | soft story strenthening. to comply with sf soft story ordinance & 2016 cebc appendix a-4Details
soft story strenthening. to comply with sf soft story ordinance & 2016 cebc appendix a-4 | $60,000 | |
| Mar 8, 2017 | Completed final sign-off Jun 2020 | 2921 Washington St | De Brus Construction Inc | soft story retrofit per sfebc chapter 4d, engineering criteria fema-p807.Details
soft story retrofit per sfebc chapter 4d, engineering criteria fema-p807. | $70,000 |
| Jan 30, 2017 | Expired or cancelled withdrawn Aug 2017 | 3315 Steiner St | Strong Builders Construction Inc. | underpinning at existing foundation of adjacent foundation pa#201701308194. n/a ordinance #155-13Details
underpinning at existing foundation of adjacent foundation pa#201701308194. n/a ordinance #155-13 | $3,000 |
| Nov 28, 2016 | Never finaled issued Dec 2016, no final | 188 Hooper St | Dpr Construction | temporary shoring and excavation along property line at 150 hooper to accomodate future new construction at 150 hooperDetails
temporary shoring and excavation along property line at 150 hooper to accomodate future new construction at 150 hooper | $50,000 |
| Nov 23, 2016 | Expired or cancelled cancelled Aug 2017 | 3321 Steiner St | Strong Builders Construction Inc. | revision to pa 2014-0801-2841, additional work replacement of section of grade beam foundationDetails
revision to pa 2014-0801-2841, additional work replacement of section of grade beam foundation | |
| Oct 17, 2016 | Completed final sign-off May 2018 | 2000 Oakdale Av | Huey Const Mngmt Co Inc - Dba M H Const. | interior t.i. for d.p.w. materials testing lab relocation.Details
interior t.i. for d.p.w. materials testing lab relocation. | $1,300,000 |
| Sep 16, 2016 | Expired or cancelled expired Mar 2020 | 3325 Steiner St | Strong Builders Construction Inc. | rev (e) 201408012841: replace (e) posts from left side of the bld maher naDetails
rev (e) 201408012841: replace (e) posts from left side of the bld maher na | $6,000 |
| May 27, 2016 | Expired or cancelled cancelled May 2024 | 1059 Leavenworth St | Artista Technologies | soft story per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story per sfbc chapter 34b, 2012 iebc appendix a-4 | $80,000 |
| Sep 28, 2015 | Completed final sign-off Nov 2018 | 1100 Van Ness Av | Charles Pankow Builders Ltd | installation of temp trestle for a crane. shoring and excavation under 201507101184 and site permit for mod under 201112090400sDetails
installation of temp trestle for a crane. shoring and excavation under 201507101184 and site permit for mod under 201112090400s | $20,000 |
| Dec 29, 2014 | Completed final sign-off May 2017 | 350 Bush St | Hathaway Dinwiddie Co. | temporary lateral support of the (e) front facade & east & west walls for removal of (e) roof & floors. temporary gravity support of east walls between grid f-1. ** maher: comliance with ordinance no# 155-13 not required **Details
temporary lateral support of the (e) front facade & east & west walls for removal of (e) roof & floors. temporary gravity support of east walls between grid f-1. ** maher: comliance with ordinance no# 155-13 not required ** | $100,000 |
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 673 04th Av | R M Construction | remodel extg kitchen: replace cabinets, stove, refridge, hood, sink.partial wall removal between kitchen and dining room. moving washer and dryer. drywall patching and painting. bathroom vanity sink sink replacement/installing fan & heated floors. new electrical & plumbing.Details
remodel extg kitchen: replace cabinets, stove, refridge, hood, sink.partial wall removal between kitchen and dining room. moving washer and dryer. drywall patching and painting. bathroom vanity sink sink replacement/installing fan & heated floors. new electrical & plumbing. | $16,000 |
| Oct 10, 2013 | Completed final sign-off Sep 2016 | 835 Jackson St | Dpr Construction Inc | the tower crane will be used for the construction of the new chinese hospital. the cranes use will be for loading and unloading of material and equipment.Details
the tower crane will be used for the construction of the new chinese hospital. the cranes use will be for loading and unloading of material and equipment. | $450,000 |
| May 2, 2012 | Completed final sign-off Sep 2014 | 121 Golden Gate Av | Nibbi Bros Assoc Inc. | excavation shoring for construction of 121 golden gate ave 10 story & basement type i bldg under separate appl 2010-1215-6753.this shoring permit to be reviewed by tom le-the plan checker for 2010-1215-6753.Details
excavation shoring for construction of 121 golden gate ave 10 story & basement type i bldg under separate appl 2010-1215-6753.this shoring permit to be reviewed by tom le-the plan checker for 2010-1215-6753. | $50,000 |
| May 2, 2012 | Completed final sign-off Sep 2014 | 121 Golden Gate Av | Nibbi Bros Assoc Inc. | temporary shoring for city streets frontages corner of jones& golden gate-necessary for construction of new 10 story & basement type i bldg under separate appl 2010-1215-6753s.this shoring permit to be reviewed by tom le-the plan checker for 2010-1215-6753s.Details
temporary shoring for city streets frontages corner of jones& golden gate-necessary for construction of new 10 story & basement type i bldg under separate appl 2010-1215-6753s.this shoring permit to be reviewed by tom le-the plan checker for 2010-1215-6753s. | $50,000 |
| Jul 27, 2011 | Completed final sign-off Mar 2012 | 18 Lansing St | Andrew Chekene Enterprises/ Dba Ac Enter | unit #402 - addition of a 24" high wood framed platform in living room.Details
unit #402 - addition of a 24" high wood framed platform in living room. | $3,200 |
| Apr 24, 2008 | Expired or cancelled expired Sep 2009 | 44 Nevada St | Alexander Builders Inc | interior remodel: remodeled kitchen & 2 remodeled bathrooms (less than 30% of load bearing walls; no seismic upgrade) , remove and add new wood windows and doors @ rear & sides; add patio/deck @ rear; new rear conc. stairs and (n) gate, to comply w/housing violation #200118749. add 2 (n) skylights.Details
interior remodel: remodeled kitchen & 2 remodeled bathrooms (less than 30% of load bearing walls; no seismic upgrade) , remove and add new wood windows and doors @ rear & sides; add patio/deck @ rear; new rear conc. stairs and (n) gate, to comply w/housing violation #200118749. add 2 (n) skylights. | $128,000 |
| Dec 18, 2007 | Never finaled issued Dec 2007, no final | 262 29th Av | underpinning of foundation along portion of south wall in response to south neighbor's excavation project.Details
underpinning of foundation along portion of south wall in response to south neighbor's excavation project. | $5,000 | |
| Sep 27, 2005 | Completed final sign-off Jun 2009 | 345 California St | Peacock Construction Inc | demolition aspects only. removal of an interior communication staircase between 30th & 31st floor.Details
demolition aspects only. removal of an interior communication staircase between 30th & 31st floor. | $80,000 |
| Sep 16, 2005 | Expired or cancelled expired Jul 2011 | 345 California St | demolition of a interior communication staircase between 13th & 14th fl infilling slab on 14th fl. add floor area on 13/f to usable office space. new non-structural partition & ceiling mechanical,electrical & plumbing,finixhes & fixtures.sprinklers under seperate permitDetails
demolition of a interior communication staircase between 13th & 14th fl infilling slab on 14th fl. add floor area on 13/f to usable office space. new non-structural partition & ceiling mechanical,electrical & plumbing,finixhes & fixtures.sprinklers under seperate permit | $80,000 | |
| Dec 1, 2004 | Completed final sign-off Jan 2006 | 41 Dedman Ct | D & H Construction | voluntary seismic upgrade at (3) existing tuck under garages.Details
voluntary seismic upgrade at (3) existing tuck under garages. | $40,500 |
| Dec 1, 2004 | Completed final sign-off Jan 2006 | 1 Dedman Ct | D & H Construction | bldg h-7-voluntary seismic upgrade at (8) existing tuck under garages.replace of garage doors.Details
bldg h-7-voluntary seismic upgrade at (8) existing tuck under garages.replace of garage doors. | $108,000 |
| Nov 19, 2004 | Completed final sign-off Oct 2006 | 203 Acadia St | replace interior bearing wall with new beam and columns.install new bar cabinet in kitchenDetails
replace interior bearing wall with new beam and columns.install new bar cabinet in kitchen | $10,500 | |
| May 13, 2004 | Expired or cancelled cancelled May 2005 | 90 Natoma St | provide the backs per plan to shore bldg adjacent to new constr'n under pa#9904253 & 200312162431.Details
provide the backs per plan to shore bldg adjacent to new constr'n under pa#9904253 & 200312162431. | $9,000 | |
| Sep 9, 2003 | Never finaled issued Jan 2004, no final | 628 Divisadero St | relocate bar/upgrade extg toilet to ada compl/upgrade extg ticket counter t ada comp./extend extgDetails
relocate bar/upgrade extg toilet to ada compl/upgrade extg ticket counter t ada comp./extend extg | $30,000 |