145 permits since 2000 (architect on 141 permits, engineer on 5 permits, designer on 1 permit): 110 completed, 8 in progress, 17 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 145.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 1450 Owens St | deferred mech and bulletin 1 wall location and ceiling updates for office ara nd support space at lvl 1,5-7. amend to (e) pa 202512232555 & 202603278446Details
deferred mech and bulletin 1 wall location and ceiling updates for office ara nd support space at lvl 1,5-7. amend to (e) pa 202512232555 & 202603278446 | ||
| Sep 2, 2026 | In progress issued Sep 2026 | 1800 Owens St | Hathaway Dinwiddie Co. | roof-revision 202406255203 to mount roof top equipmentDetails
roof-revision 202406255203 to mount roof top equipment | |
| Feb 27, 2026 | In progress issued Mar 2026 | 1800 Owens St | Hathaway Dinwiddie Co. | revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnoval of sector 2 shaft and roof top equipment scopeDetails
revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnoval of sector 2 shaft and roof top equipment scope | |
| Sep 12, 2025 | In progress issued Jan 2026 | 1800 Owens St | Hathaway Dinwiddie Co. | deferred submittal to pa# 202406255203 for frp structural only.Details
deferred submittal to pa# 202406255203 for frp structural only. | |
| Jun 12, 2025 | In progress issued Jul 2025 | 1800 Owens St | Xl Construction, Corporation | level 8 and level 9, 2 new privacy pods on level 8. 3 new privacy pods on level 9. the installation of these pods include associated structural, electrical & sprinkler installation defered.Details
level 8 and level 9, 2 new privacy pods on level 8. 3 new privacy pods on level 9. the installation of these pods include associated structural, electrical & sprinkler installation defered. | $50,000 |
| May 14, 2025 | Completed final sign-off Dec 2025 | 1500 Owens St | B N Builders Inc | l6: ti new interior partitions, doors, windows, ceilings, casework, flooring, finishes, and mep. work isolated to office area only.Details
l6: ti new interior partitions, doors, windows, ceilings, casework, flooring, finishes, and mep. work isolated to office area only. | $1,385,390 |
| Apr 24, 2025 | Completed final sign-off Feb 2026 | 449 Avenue H | Ferma Corporation | demolition of building 258 - type v-b, 2 story commercial structure.Details
demolition of building 258 - type v-b, 2 story commercial structure. | $75,000 |
| Feb 25, 2025 | In progress issued Aug 2025 | 1800 Owens St | Hathaway Dinwiddie Co. | revision to pa # 202406255203: revisions include removal of sector 4 from scope & other revisions to sectors 2 & 3.Details
revision to pa # 202406255203: revisions include removal of sector 4 from scope & other revisions to sectors 2 & 3. | |
| Feb 7, 2025 | In progress issued May 2025 | 601 Van Ness Av | Corporate Interior Solutions | suite 2090 on 2/f: anchoring one single occupant privacy pod manufactured by framery in an (e) office space. there will be no demolition or mep work.Details
suite 2090 on 2/f: anchoring one single occupant privacy pod manufactured by framery in an (e) office space. there will be no demolition or mep work. | $1,000 |
| Nov 6, 2024 | Completed final sign-off Feb 2025 | 1800 Owens St | Dome Construction Corp | evacuation map signage for the 6th and 7th flDetails
evacuation map signage for the 6th and 7th fl | |
| Oct 25, 2024 | Completed final sign-off Feb 2025 | 1800 Owens St | Dome Construction Corp | rev 202212128137- clarify lab sink counter heightDetails
rev 202212128137- clarify lab sink counter height | |
| Aug 30, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | Truebeck Construction | 2-4/fl-rev 202406184792- removal of raised access floor at north portion of buliding level 2,3,4Details
2-4/fl-rev 202406184792- removal of raised access floor at north portion of buliding level 2,3,4 | $294,845 |
| Aug 30, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | Truebeck Construction | 5/fl-rev 202406215017- removal of raised access floor at north portion of buliding level 5Details
5/fl-rev 202406215017- removal of raised access floor at north portion of buliding level 5 | $98,282 |
| Jul 17, 2024 | In progress issued Jan 2025 | 1800 Owens St | Hathaway Dinwiddie Co. | scope consists of infrastructure upgrades to(e)bldg systems to support future life science tenants.sector 2:(n)rooftop mech equpment & the addition of(2)(n)shafts from the roof(level 7 to level 2)demo & in-fill for accessory stairs added by previous tenant on level 4.Details
scope consists of infrastructure upgrades to(e)bldg systems to support future life science tenants.sector 2:(n)rooftop mech equpment & the addition of(2)(n)shafts from the roof(level 7 to level 2)demo & in-fill for accessory stairs added by previous tenant on level 4. | $3,091,676 |
| Jul 10, 2024 | Completed final sign-off Jul 2025 | 1800 Owens St | Dome Construction Corp | rev 202212128137- layout in sec 1 changes from 1 to 2 tenants. no change in use or occupancyDetails
rev 202212128137- layout in sec 1 changes from 1 to 2 tenants. no change in use or occupancy | |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | Truebeck Construction | 5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permitDetails
5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permit | $50,000 |
| Jun 18, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | Truebeck Construction | floors 2,3, & 4th floors: non structural, interior demolition per ab-017. including interior non-bearing walls, doors, cabinetry, plumbing fixtures, floor finishes, ceiling hvac diffusers, and lighting fixtures. sprinkler ref pa #2024-0613-4429Details
floors 2,3, & 4th floors: non structural, interior demolition per ab-017. including interior non-bearing walls, doors, cabinetry, plumbing fixtures, floor finishes, ceiling hvac diffusers, and lighting fixtures. sprinkler ref pa #2024-0613-4429 | $180,000 |
| May 30, 2024 | Completed final sign-off Jan 2025 | 1450 Owens St | Truebeck Construction | deferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation.Details
deferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation. | $10,000 |
| Mar 18, 2024 | Completed final sign-off Feb 2025 | 2525 03rd St | Dome Construction Corp | construction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external workDetails
construction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external work | $75,000 |
| Mar 15, 2024 | Completed final sign-off May 2024 | 1450 Owens St | Truebeck Construction | revision to pid pa# 202307263056, pa# 202204202594, & pa# 202210043668. to incorporate final scp revisions required by landscape & public art coordination.Details
revision to pid pa# 202307263056, pa# 202204202594, & pa# 202210043668. to incorporate final scp revisions required by landscape & public art coordination. | |
| Feb 21, 2024 | Completed final sign-off Jul 2025 | 499 Illinois St | Dpr Construction A | 2nd floor: interior t.i. includes new non-load bearing partitions, doors, ceiling and finishes. mep included.Details
2nd floor: interior t.i. includes new non-load bearing partitions, doors, ceiling and finishes. mep included. | $500,000 |
| Oct 3, 2023 | Never finaled filed Oct 2023, never issued | 1800 Owens St | new condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural.Details
new condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural. | $200,000 | |
| Sep 14, 2023 | Completed final sign-off Aug 2024 | 1800 Owens St | Dome Construction Corp | revision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5Details
revision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5 | |
| Aug 18, 2023 | Completed final sign-off Dec 2025 | 1800 Owens St | Hathaway Dinwiddie Co. | mechanical & electrical work only to convert sector 1 & 3 service elevator to transport hazardous materials.Details
mechanical & electrical work only to convert sector 1 & 3 service elevator to transport hazardous materials. | $300,000 |
| Jun 9, 2023 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | Dome Construction Corp | revision to pa# 202205023388. interior only. installation of pre-fabricated metal platform structure approximately 170 s.f. for equipment within (e) with building envelope. deferred mep.Details
revision to pa# 202205023388. interior only. installation of pre-fabricated metal platform structure approximately 170 s.f. for equipment within (e) with building envelope. deferred mep. | $150,000 |
| May 24, 2023 | Never finaled issued May 2023, no final | 450 Shotwell St | Rossi Builders Inc. | deferred pre fabricated cold rooms from 202303173904Details
deferred pre fabricated cold rooms from 202303173904 | $10,000 |
| May 4, 2023 | Expired or cancelled cancelled Jan 2026 | 1800 Owens St | 6/f & 7/f: revision to bpa#202207259239, isolate scope of demo on 6/7-f under one demo permit. no change to scopeDetails
6/f & 7/f: revision to bpa#202207259239, isolate scope of demo on 6/7-f under one demo permit. no change to scope | ||
| May 4, 2023 | Expired or cancelled cancelled Jan 2026 | 1800 Owens St | 4/f & 5/f: revision to bpa#202207259239, isolate scope of demo on 4/5-f under one demo permit. no change to scopeDetails
4/f & 5/f: revision to bpa#202207259239, isolate scope of demo on 4/5-f under one demo permit. no change to scope | ||
| Apr 19, 2023 | Completed final sign-off May 2025 | 1450 Owens St | Truebeck Construction | main lobby improvements at the main entrance to a 7-story warm shell and core lab/office buildingDetails
main lobby improvements at the main entrance to a 7-story warm shell and core lab/office building | $800,000 |
| Mar 17, 2023 | Completed final sign-off Oct 2023 | 450 Shotwell St | Rossi Builders Inc. | t.i. of (e) building for food based pdr space w/accessory office use, nonstructural partitions, no exterior work to occur. ref 20208101499/r1 and 202009234840/r1.Details
t.i. of (e) building for food based pdr space w/accessory office use, nonstructural partitions, no exterior work to occur. ref 20208101499/r1 and 202009234840/r1. | $950,000 |
| Dec 12, 2022 | Completed final sign-off Jul 2025 | 1800 Owens St | Dome Construction Corp | sector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.Details
sector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements. | $5,750,000 |
| Aug 1, 2022 | Completed final sign-off Aug 2024 | 1800 Owens St | Dome Construction Corp, Xl Construction, Corporation | tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.Details
tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements. | $6,000,000 |
| Jul 18, 2022 | Completed final sign-off Aug 2024 | 1800 Owens St | Dome Construction Corp, Xl Construction, Corporation | level 6-7: addition of shafts and duct riser only in sector 1 of building.Details
level 6-7: addition of shafts and duct riser only in sector 1 of building. | $250,000 |
| Jul 18, 2022 | Completed final sign-off Aug 2024 | 1800 Owens St | Dome Construction Corp, Xl Construction, Corporation | level 4-5: addition of shafts and duct riser only in sector 1 of building.Details
level 4-5: addition of shafts and duct riser only in sector 1 of building. | $240,000 |
| Jul 1, 2022 | Completed final sign-off May 2023 | 2525 03rd St | Dome Construction Corp | mechanical, electrical, and plumbing work for approved pa# 202205063728.Details
mechanical, electrical, and plumbing work for approved pa# 202205063728. | $750,000 |
| May 6, 2022 | Completed final sign-off May 2023 | 2525 03rd St | Dome Construction Corp | renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work.Details
renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work. | $3,242,000 |
| May 2, 2022 | Completed final sign-off Aug 2022 | 1470 Owens St | Truebeck Construction | temporary(2) construction of trailers on the roof of adjacement parking garage at 1470 owens st.Details
temporary(2) construction of trailers on the roof of adjacement parking garage at 1470 owens st. | $52,000 |
| May 2, 2022 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | Dome Construction Corp | tenant improvement, (n) installation of equipment including mechanical, electrical, plumbing work. revision to previously approved pa #202112073858 & 202111303330Details
tenant improvement, (n) installation of equipment including mechanical, electrical, plumbing work. revision to previously approved pa #202112073858 & 202111303330 | $3,315,697 |
| Apr 27, 2022 | Expired or cancelled cancelled Jan 2026 | 2505 03rd St | Dome Construction Corp | interior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep workDetails
interior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep work | $3,242 |
| Feb 9, 2022 | Completed final sign-off Mar 2024 | 755 Sansome St | Sc Builders, Inc | t.i new conference rooms, open office areas, demo feature stair including infill of slab. now work in restrooms, exit stairs and exiting breakroom. mep deferredDetails
t.i new conference rooms, open office areas, demo feature stair including infill of slab. now work in restrooms, exit stairs and exiting breakroom. mep deferred | $881,000 |
| Feb 9, 2022 | Completed final sign-off Mar 2024 | 755 Sansome St | Sc Builders, Inc | install door actuators associated with 202202097673.Details
install door actuators associated with 202202097673. | $3,000 |
| Jan 25, 2022 | Never finaled issued Mar 2022, no final | 1100 Van Ness Av | Dome Construction Corp | revision to pa# 202008252611. tissue culture room & post pcr room layout elec outlets + remove window. reduce security cameras, door schedule, 10th fl alcove, elec for sign, elec panel + outlets. revise plumbing to co2 manifold in storage room + drops in tissue culture lab. rev to een & cda.Details
revision to pa# 202008252611. tissue culture room & post pcr room layout elec outlets + remove window. reduce security cameras, door schedule, 10th fl alcove, elec for sign, elec panel + outlets. revise plumbing to co2 manifold in storage room + drops in tissue culture lab. rev to een & cda. | |
| Dec 21, 2021 | Never finaled issued Jan 2022, no final | 1800 Owens St | administrative revision permit to pa# 202108025538 to clarify gas piping, sensors & signage associated w/work under referenced permit.Details
administrative revision permit to pa# 202108025538 to clarify gas piping, sensors & signage associated w/work under referenced permit. | ||
| Dec 7, 2021 | Completed final sign-off Jan 2025 | 1069 Pennsylvania Av | Dome Construction Corp | add a new equipment in existing room. mep deferred under separate permit. add new exterior exist door @ existing opening.Details
add a new equipment in existing room. mep deferred under separate permit. add new exterior exist door @ existing opening. | $422,726 |
| Dec 6, 2021 | Completed final sign-off May 2024 | 1450 Owens St | Truebeck Construction | test section of planned stone column ground improvements reference 202012281760Details
test section of planned stone column ground improvements reference 202012281760 | $10,000 |
| Jul 19, 2021 | Completed final sign-off Mar 2024 | 1450 Owens St | Truebeck Construction | site grading in support of a planned 7 story shell & core lab/office high rise.Details
site grading in support of a planned 7 story shell & core lab/office high rise. | $5,000 |
| May 11, 2021 | Never finaled issued May 2021, no final | 1800 Owens St | Xl Construction, Corporation, Principal Builders Inc. | revisions to pa# 201909121454 & 201909121458. minor revisions to 8th & 9th fl consisting of new huddle rooms, breakrooms, finishes, millwork, cieling & associated electrical, mechanical & plumbing work. maher na.Details
revisions to pa# 201909121454 & 201909121458. minor revisions to 8th & 9th fl consisting of new huddle rooms, breakrooms, finishes, millwork, cieling & associated electrical, mechanical & plumbing work. maher na. | |
| Apr 14, 2021 | Completed final sign-off Jan 2022 | 1800 Owens St | Xl Construction, Corporation | 10/f,11/f,12/f - selective demo in preparation for tenant improcements. soft demo does not include structural demo or demo of rated construction needed to maintain core x shell conditions for life safety per ab-017.Details
10/f,11/f,12/f - selective demo in preparation for tenant improcements. soft demo does not include structural demo or demo of rated construction needed to maintain core x shell conditions for life safety per ab-017. | $60,000 |
| Dec 28, 2020 | Completed final sign-off May 2025 | 1450 Owens St | Truebeck Construction | construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709Details
construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709 | $68,000,000 |
| Sep 19, 2020 | Never finaled issued Feb 2021, no final | 200 Paul Av | Hitt Contracting Inc. | 4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f.Details
4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f. | $3,000,000 |
| Aug 25, 2020 | Completed final sign-off Jan 2023 | 1100 Van Ness Av | Dome Construction Corp | 2nd fl: lobby add new vestibule. 8th fl: new clinical lab & office ti. 9th fl: new 2 hr fire rated duct shafts. 10th fl: new 2 hr duct shafts & new 877 usf freezer storage room. rooftop: new air handler, exhaust fan, cda & vacuum systems. associated structural, mep.Details
2nd fl: lobby add new vestibule. 8th fl: new clinical lab & office ti. 9th fl: new 2 hr fire rated duct shafts. 10th fl: new 2 hr duct shafts & new 877 usf freezer storage room. rooftop: new air handler, exhaust fan, cda & vacuum systems. associated structural, mep. | $3,100,000 |
| Aug 21, 2020 | Never finaled filed Aug 2020, never issued | 1500 Owens St | (4th flr pharmacy) the scope of works consist of door 460rb replacement in the pharmacy lab anteroom and will interlock with ante-room door 460ra.Details
(4th flr pharmacy) the scope of works consist of door 460rb replacement in the pharmacy lab anteroom and will interlock with ante-room door 460ra. | $45,000 | |
| Jul 15, 2020 | Completed final sign-off Jan 2021 | 200 Paul Av | Dpr Construction | suite f250: rev to pa201910023339: add a card reader, change fire rated wall to non-fire rated.Details
suite f250: rev to pa201910023339: add a card reader, change fire rated wall to non-fire rated. | |
| Dec 11, 2019 | Expired or cancelled cancelled Dec 2021 | 1405 Minnesota St | Novo Construction Inc | revision to pa #201903135084: revise plans to add phase 2 drawings. this project was originally submitted as a single phase. this revisions rename the plans in the original scope of work as phase 2.Details
revision to pa #201903135084: revise plans to add phase 2 drawings. this project was originally submitted as a single phase. this revisions rename the plans in the original scope of work as phase 2. | |
| Oct 24, 2019 | Completed final sign-off Dec 2019 | 1405 Minnesota St | Novo Construction Inc | revision to 201903135084: adding a 1st phase to original permit. this phase includes the construction of a demising wall and finishes to suite 1407.Details
revision to 201903135084: adding a 1st phase to original permit. this phase includes the construction of a demising wall and finishes to suite 1407. | |
| Oct 22, 2019 | Completed final sign-off Aug 2021 | 200 Paul Av | Dpr Construction | supporting equipment rooms & electrical rooms. improvements to consist of new walls, doors, finishes & new mechanical, electrical & plumbing work, exterior improvements of new chillers air handling units on the roof top. new generator pads. **maher n/a**Details
supporting equipment rooms & electrical rooms. improvements to consist of new walls, doors, finishes & new mechanical, electrical & plumbing work, exterior improvements of new chillers air handling units on the roof top. new generator pads. **maher n/a** | $2,000,000 |
| Oct 22, 2019 | Completed final sign-off Aug 2021 | 200 Paul Av | Dpr Construction | new generators on pads 13, 14, and 30 serving suite f200 **maher n/a**Details
new generators on pads 13, 14, and 30 serving suite f200 **maher n/a** | $1,500,000 |
| Oct 18, 2019 | Never finaled issued Dec 2019, no final | 200 Paul Av | Dpr Construction Inc | ste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm.Details
ste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm. | $500,000 |
| Oct 15, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | Dpr Construction Inc | #f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maherDetails
#f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maher | $500,000 |
| Oct 2, 2019 | Completed final sign-off Jan 2021 | 200 Paul Av | Dpr Construction | new office on 2nd fl, restrooms, converence rooms, walls, doors, finishes, mep included. duct connections. expansion of data center on separate permitDetails
new office on 2nd fl, restrooms, converence rooms, walls, doors, finishes, mep included. duct connections. expansion of data center on separate permit | $750,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | Dpr Construction | (4) new generators w/ 4000 gallon belly tanks. on pads 31, 32, 33 & 34 within the generator yard.**maher n/a**Details
(4) new generators w/ 4000 gallon belly tanks. on pads 31, 32, 33 & 34 within the generator yard.**maher n/a** | $2,500,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | Dpr Construction Inc | 2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transformersDetails
2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transformers | $22,750,000 |
| Mar 13, 2019 | Never finaled issued Sep 2019, no final | 1407 Minnesota St | Novo Construction Inc | change of use: renovate the ground and second floor of a tenant suite 1407 & 1409 from warehouse into an analytical lab and office space. new analytical labs with accessory office ti.Details
change of use: renovate the ground and second floor of a tenant suite 1407 & 1409 from warehouse into an analytical lab and office space. new analytical labs with accessory office ti. | $1,500,000 |
| Dec 21, 2018 | Expired or cancelled withdrawn Aug 2019 | 970 Tennessee St | Platinum Builders Inc | revision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes.Details
revision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes. | |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 300 Montgomery St | Novo Construction Inc | interior demo of 3 offices on the 2nd fl. per ab-017. tenant improvement required under separate permit. no ceiling demo. maher naDetails
interior demo of 3 offices on the 2nd fl. per ab-017. tenant improvement required under separate permit. no ceiling demo. maher na | $3,000 |
| Jul 17, 2018 | Never finaled issued Nov 2018, no final | 200 Paul Av | Dpr Construction | new data center on third floor of (e) bldg. (n) walls, doors, finishes, and (n) mechanical, eletrical work. (n) condensors and air handling unit on roofDetails
new data center on third floor of (e) bldg. (n) walls, doors, finishes, and (n) mechanical, eletrical work. (n) condensors and air handling unit on roof | $6,250,000 |
| Jul 10, 2018 | Completed final sign-off Feb 2021 | 499 Illinois St | Dome Construction Corp | 5th floor - renovation of (e) lab space to (e) mep utilites and fnishes. incldes rework of no, co2,cda & vac line.instalationg of new argon inert gas, electrical upgrades on (n) emergency panel to suffice additional emergency power,mechanical upgrades are for new bsl-3 air requirements.Details
5th floor - renovation of (e) lab space to (e) mep utilites and fnishes. incldes rework of no, co2,cda & vac line.instalationg of new argon inert gas, electrical upgrades on (n) emergency panel to suffice additional emergency power,mechanical upgrades are for new bsl-3 air requirements. | $1,265,484 |
| Oct 31, 2017 | Completed final sign-off May 2018 | 1405 Minnesota St | Douglas J Burrows | revision to application #2017-1006-0668. to correct original application #2017-1006-0668. to show a change of use from (e) warehouse (s-2) w/ accessory office to (n) analytical lab (b) w/accessory office. also a minor rev to exit passageway on 1st fl.Details
revision to application #2017-1006-0668. to correct original application #2017-1006-0668. to show a change of use from (e) warehouse (s-2) w/ accessory office to (n) analytical lab (b) w/accessory office. also a minor rev to exit passageway on 1st fl. | |
| Oct 6, 2017 | Completed final sign-off May 2018 | 1405 Minnesota St | Douglas J Burrows | renovate the ground floor of tenant suite into an analytical lab and office space, add exit corridor. maher naDetails
renovate the ground floor of tenant suite into an analytical lab and office space, add exit corridor. maher na | $60,000 |
| Sep 22, 2017 | Completed final sign-off Aug 2018 | 200 Paul Av | Dpr Construction | bldg. d, #350- install new 2000 kw generator and 4000 gal fuel tank under pa#201707071280 and pa#201801108282. pad 28 n/a ordinance #155-13Details
bldg. d, #350- install new 2000 kw generator and 4000 gal fuel tank under pa#201707071280 and pa#201801108282. pad 28 n/a ordinance #155-13 | $250,000 |
| Sep 22, 2017 | Never finaled issued Oct 2017, no final | 155 05th St | Carrier Corporation | 5th fl: installation of (2) fire smoke dampers and add (1) return diffuser. ref #201707212567. maher naDetails
5th fl: installation of (2) fire smoke dampers and add (1) return diffuser. ref #201707212567. maher na | $25,061 |
| Aug 7, 2017 | Completed final sign-off Jan 2019 | 499 Illinois St | Dome Construction Corp | 5th fl partial 0ffice renovation. m, e, p included. office areas only - lowrise b. maher not required.Details
5th fl partial 0ffice renovation. m, e, p included. office areas only - lowrise b. maher not required. | $1,000,000 |
| Jul 17, 2017 | Completed final sign-off Mar 2018 | 455 Mission Bay Blvd South | Dome Construction Corp | 1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinanceDetails
1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinance | $600,000 |
| Jul 7, 2017 | Completed final sign-off Aug 2018 | 200 Paul Av | Dpr Construction | ti for data center including (n) walls, doors, equipment, finishes, mep in interior.0 exterior work includes (n) condensers air handing unit & generator pads on roof. future generator permit will be separate.Details
ti for data center including (n) walls, doors, equipment, finishes, mep in interior.0 exterior work includes (n) condensers air handing unit & generator pads on roof. future generator permit will be separate. | $600,000 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 1700 Owens St | Mai Construction Inc. | installation of nitrogen generator into extg 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13Details
installation of nitrogen generator into extg 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13 | $300,000 |
| Mar 21, 2017 | Completed final sign-off Jun 2017 | 1500 Owens St | Dome Construction Corp | 6th flr: minor demo & construction to resize an (e) conference room maher na ele deferredDetails
6th flr: minor demo & construction to resize an (e) conference room maher na ele deferred | $70,000 |
| Oct 5, 2016 | Completed final sign-off Jan 2017 | 1500 Owens St | Dome Construction Corp | conversion of an (e) lab/office space to an all office space (2000 sq ft). fire alarm, sprinklers under separate permit. maher ord 155-13 naDetails
conversion of an (e) lab/office space to an all office space (2000 sq ft). fire alarm, sprinklers under separate permit. maher ord 155-13 na | $510,000 |
| Jul 13, 2016 | Completed final sign-off Oct 2016 | 1500 Owens St | Dome Construction Corp | 6th floor: division of one large office into two smaller offices.Details
6th floor: division of one large office into two smaller offices. | $50,000 |
| Jun 7, 2016 | Never finaled issued Jun 2016, no final | 1700 Owens St | Mai Construction Inc. | demo (e) cleanroom on level 4. new vivarium in its place - new process piping in (e) chem lab, new process piping in converted storage to analytical lab. new fume hood in chem (e) 2nd floor to receive new cold room inside (e) mecn space. maher naDetails
demo (e) cleanroom on level 4. new vivarium in its place - new process piping in (e) chem lab, new process piping in converted storage to analytical lab. new fume hood in chem (e) 2nd floor to receive new cold room inside (e) mecn space. maher na | $850,000 |
| Apr 29, 2016 | Completed final sign-off Jun 2016 | 200 Paul Av | Hathaway Dinwiddie Co. | 2nd flr: interior soft demo in advance of ti per ab-017. maher naDetails
2nd flr: interior soft demo in advance of ti per ab-017. maher na | $10,000 |
| Apr 15, 2016 | Completed final sign-off Sep 2016 | 200 Paul Av | Hathaway Dinwiddie Co. | diesel generator & fuel storage associated with (n) data storage under pa #201602190117. maher ordinance is not required.Details
diesel generator & fuel storage associated with (n) data storage under pa #201602190117. maher ordinance is not required. | |
| Feb 19, 2016 | Completed final sign-off Sep 2016 | 200 Paul Av | Hathaway Dinwiddie Co. | new data center tenant suite (d260) w/ supporting equipment rooms & ups rooms. improvement to new walls, doors, finishes & new mechanical & electrical work. exterior improvement tonew condensers & air handling unit on the rooftop, extend roof screen. generator and fuel storage under separate permit.Details
new data center tenant suite (d260) w/ supporting equipment rooms & ups rooms. improvement to new walls, doors, finishes & new mechanical & electrical work. exterior improvement tonew condensers & air handling unit on the rooftop, extend roof screen. generator and fuel storage under separate permit. | $5,000,000 |
| Jan 14, 2016 | Completed final sign-off Feb 2016 | 1700 Owens St | Rossi Builders Inc. | 2nd floor - expanding an existing tissue culture lab (340 sf) work includes demolition, new wall construction, & assoc mech work.Details
2nd floor - expanding an existing tissue culture lab (340 sf) work includes demolition, new wall construction, & assoc mech work. | $60,000 |
| Nov 4, 2015 | Expired or cancelled cancelled Jan 2026 | 499 Illinois St | Dpr Construction | revision to appl #201508255245 - revision to exiting to utilize existing horizontal exit.Details
revision to appl #201508255245 - revision to exiting to utilize existing horizontal exit. | |
| Aug 25, 2015 | Completed final sign-off Dec 2015 | 499 Illinois St | Dpr Construction | t.i. to 1st floor space. mep included. n/a for maher.Details
t.i. to 1st floor space. mep included. n/a for maher. | $850,000 |
| Jul 17, 2015 | Completed final sign-off Dec 2015 | 499 Illinois St | Dpr Construction | revision to pa#201401216752, revised wall layout and lab equipment. architectural plans only. n/a ordinance #155-13Details
revision to pa#201401216752, revised wall layout and lab equipment. architectural plans only. n/a ordinance #155-13 | $50,000 |
| May 4, 2015 | Expired or cancelled cancelled Jan 2026 | 455 Mission Bay Blvd South | bldg 3- addition of a security door with card reader within an existing passageway. n/a ordinance #155-13Details
bldg 3- addition of a security door with card reader within an existing passageway. n/a ordinance #155-13 | $10,000 | |
| Nov 18, 2014 | Never finaled issued Feb 2015, no final | 1700 Owens St | Rossi Builders Inc. | 2nd fl tenant improvement. minor modification to (e) "b" occ. lab/office tenant improvements- mech'l , plumbing,& relacted elect, interior wall modifications, add'l fumehoods, demo of int. non. strl, walls to open up, offices, minor add'l accessiblity sinage. maher n/a.Details
2nd fl tenant improvement. minor modification to (e) "b" occ. lab/office tenant improvements- mech'l , plumbing,& relacted elect, interior wall modifications, add'l fumehoods, demo of int. non. strl, walls to open up, offices, minor add'l accessiblity sinage. maher n/a. | $350,000 |
| Aug 18, 2014 | Completed final sign-off Nov 2014 | 499 Illinois St | Truebeck Construction | 2nd flr: t.i. to small portion of floor, new partitions and some electrical work, no labs, office space work.Details
2nd flr: t.i. to small portion of floor, new partitions and some electrical work, no labs, office space work. | $205,000 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 455 Mission Bay Blvd South | Dome Construction Corp | 3rd floor:soft demolition, constuction of new partitions and mep upgrades for new offices. n/a for maher 155-13. fire sprinkler under deferred submittalDetails
3rd floor:soft demolition, constuction of new partitions and mep upgrades for new offices. n/a for maher 155-13. fire sprinkler under deferred submittal | $33,000 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 499 Illinois St | Truebeck Construction | t.i. first floor to create demising wall between existing bathrooms and future tenant space. future tenant space under separate permit.Details
t.i. first floor to create demising wall between existing bathrooms and future tenant space. future tenant space under separate permit. | $130,000 |
| May 28, 2014 | Completed final sign-off Dec 2014 | 499 Illinois St | Truebeck Construction | ti to 2/fl. mep & process piping work. install lab casework and utility services, new hvac equipment on roof, gypsum board walls, flooring, finishes, suspended accoustical ceiling, and doors and windows.Details
ti to 2/fl. mep & process piping work. install lab casework and utility services, new hvac equipment on roof, gypsum board walls, flooring, finishes, suspended accoustical ceiling, and doors and windows. | $3,591,069 |
| Apr 16, 2014 | Completed final sign-off Jul 2014 | 1700 Owens St | Rossi Builders Inc. | 2nd floor phase 2 - addition of (5) new fume hoods & laboratory casework relocation & assoc mep work in an existing chemistry lab. compliance with ordinance # 155-13 not requiredDetails
2nd floor phase 2 - addition of (5) new fume hoods & laboratory casework relocation & assoc mep work in an existing chemistry lab. compliance with ordinance # 155-13 not required | $198,500 |
| Mar 26, 2014 | Completed final sign-off Nov 2014 | 499 Illinois St | Decker Electric Co Inc Electrical Contra | provide&install 1 ea 750 kw 480 v 3 phase 4 wire at 1/fl.provide&install 1 ea 1000 kw 480 v 3 phase 4 wire at 1/fl. fuel oil was submitted on 3/14/14 appl 2014-03-14-0753. both generators to be installed in (e) generator room. mech pumbing under ap#2013-1219-4661.Details
provide&install 1 ea 750 kw 480 v 3 phase 4 wire at 1/fl.provide&install 1 ea 1000 kw 480 v 3 phase 4 wire at 1/fl. fuel oil was submitted on 3/14/14 appl 2014-03-14-0753. both generators to be installed in (e) generator room. mech pumbing under ap#2013-1219-4661. | $5,000 |
| Mar 4, 2014 | Expired or cancelled cancelled Jan 2020 | 499 Illinois St | Truebeck Construction | partial 1st floor interior tenant improvement, work also includes mep.Details
partial 1st floor interior tenant improvement, work also includes mep. | $1,500,000 |
| Jan 21, 2014 | Completed final sign-off Dec 2015 | 499 Illinois St | Truebeck Construction | 5th flr t.i to a b-laboratory, includes mep. fire alarm & sprinklers, evac signage under separate permits.Details
5th flr t.i to a b-laboratory, includes mep. fire alarm & sprinklers, evac signage under separate permits. | $7,000,000 |
| Dec 19, 2013 | Completed final sign-off Jan 2015 | 499 Illinois St | Truebeck Construction | construction of new shafts through floor 2-6 & new mep.Details
construction of new shafts through floor 2-6 & new mep. | $9,408,000 |
| Nov 14, 2013 | Completed final sign-off Dec 2013 | 1700 Owens St | R C Benson & Sons Inc. | office ti : new ceiling high drywall, 2 new interior doors, relocate one light, add outlets, modify hvac.Details
office ti : new ceiling high drywall, 2 new interior doors, relocate one light, add outlets, modify hvac. | $84,000 |
| Oct 8, 2013 | Completed final sign-off Nov 2013 | 1700 Owens St | R C Benson & Sons Inc. | revision to appl #2013.0808.3808 - relcoate one door & wall, relocate one light, add two swks.Details
revision to appl #2013.0808.3808 - relcoate one door & wall, relocate one light, add two swks. | $6,500 |
| Sep 19, 2013 | Completed final sign-off Dec 2014 | 499 Illinois St | The Whiting-Turner Contracting Company | revision to 201112201008. scope of work to be removed: mechanical for core restrooms added at floors 2-6. toilet room exhaust, floors 2-6. (not to be built) ref ti 201112201009- removing duct detectors and fire smoke dampersDetails
revision to 201112201008. scope of work to be removed: mechanical for core restrooms added at floors 2-6. toilet room exhaust, floors 2-6. (not to be built) ref ti 201112201009- removing duct detectors and fire smoke dampers |