Permit GraphShortlistSan Francisco building permits since 2000

Randall Dowler

License
C23107
Look the license up with the state
Listed as
architect, designer, engineer
Firm
Dowler Gruman Architects
Based in
San Francisco
On San Francisco permits
Jan 2005 to Sep 2026

145 permits since 2000 (architect on 141 permits, engineer on 5 permits, designer on 1 permit): 110 completed, 8 in progress, 17 never finaled, 10 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 145.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 17, 2026In progress
filed Sep 2026, not yet issued
1450 Owens Stdeferred mech and bulletin 1 wall location and ceiling updates for office ara nd support space at lvl 1,5-7. amend to (e) pa 202512232555 & 202603278446
Details
Permit
202608317416
Status
filed
Filed
Sep 17, 2026
Address
1450 Owens St

deferred mech and bulletin 1 wall location and ceiling updates for office ara nd support space at lvl 1,5-7. amend to (e) pa 202512232555 & 202603278446

Open the permit page

Sep 2, 2026In progress
issued Sep 2026
1800 Owens StHathaway Dinwiddie Co.roof-revision 202406255203 to mount roof top equipment
Details
Permit
202609027622
Status
issued
Filed
Sep 2, 2026
Permit issued
Sep 24, 2026
Address
1800 Owens St

roof-revision 202406255203 to mount roof top equipment

Open the permit page

Feb 27, 2026In progress
issued Mar 2026
1800 Owens StHathaway Dinwiddie Co.revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnoval of sector 2 shaft and roof top equipment scope
Details
Permit
202602276646
Status
issued
Filed
Feb 27, 2026
Permit issued
Mar 16, 2026
Address
1800 Owens St

revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnoval of sector 2 shaft and roof top equipment scope

Open the permit page

Sep 12, 2025In progress
issued Jan 2026
1800 Owens StHathaway Dinwiddie Co.deferred submittal to pa# 202406255203 for frp structural only.
Details
Permit
202509054634
Status
issued
Filed
Sep 12, 2025
Permit issued
Jan 14, 2026
Address
1800 Owens St

deferred submittal to pa# 202406255203 for frp structural only.

Open the permit page

Jun 12, 2025In progress
issued Jul 2025
1800 Owens StXl Construction, Corporationlevel 8 and level 9, 2 new privacy pods on level 8. 3 new privacy pods on level 9. the installation of these pods include associated structural, electrical & sprinkler installation defered.
Details
Permit
202506128629
Status
issued
Filed
Jun 12, 2025
Permit issued
Jul 22, 2025
Declared cost
$50,000
Address
1800 Owens St

level 8 and level 9, 2 new privacy pods on level 8. 3 new privacy pods on level 9. the installation of these pods include associated structural, electrical & sprinkler installation defered.

Open the permit page

$50,000
May 14, 2025Completed
final sign-off Dec 2025
1500 Owens StB N Builders Incl6: ti new interior partitions, doors, windows, ceilings, casework, flooring, finishes, and mep. work isolated to office area only.
Details
Permit
202505146500
Status
complete
Filed
May 14, 2025
Permit issued
Jul 23, 2025
Final sign-off
Dec 8, 2025
Declared cost
$1,385,390
Address
1500 Owens St

l6: ti new interior partitions, doors, windows, ceilings, casework, flooring, finishes, and mep. work isolated to office area only.

Open the permit page

$1,385,390
Apr 24, 2025Completed
final sign-off Feb 2026
449 Avenue HFerma Corporationdemolition of building 258 - type v-b, 2 story commercial structure.
Details
Permit
202503051634
Status
complete
Filed
Apr 24, 2025
Permit issued
May 20, 2025
Final sign-off
Feb 12, 2026
Declared cost
$75,000
Address
449 Avenue H

demolition of building 258 - type v-b, 2 story commercial structure.

Open the permit page

$75,000
Feb 25, 2025In progress
issued Aug 2025
1800 Owens StHathaway Dinwiddie Co.revision to pa # 202406255203: revisions include removal of sector 4 from scope & other revisions to sectors 2 & 3.
Details
Permit
202502100016
Status
issued
Filed
Feb 25, 2025
Permit issued
Aug 29, 2025
Address
1800 Owens St

revision to pa # 202406255203: revisions include removal of sector 4 from scope & other revisions to sectors 2 & 3.

Open the permit page

Feb 7, 2025In progress
issued May 2025
601 Van Ness AvCorporate Interior Solutionssuite 2090 on 2/f: anchoring one single occupant privacy pod manufactured by framery in an (e) office space. there will be no demolition or mep work.
Details
Permit
202502079886
Status
issued
Filed
Feb 7, 2025
Permit issued
May 28, 2025
Declared cost
$1,000
Address
601 Van Ness Av

suite 2090 on 2/f: anchoring one single occupant privacy pod manufactured by framery in an (e) office space. there will be no demolition or mep work.

Open the permit page

$1,000
Nov 6, 2024Completed
final sign-off Feb 2025
1800 Owens StDome Construction Corpevacuation map signage for the 6th and 7th fl
Details
Permit
202411064468
Status
complete
Filed
Nov 6, 2024
Permit issued
Nov 12, 2024
Final sign-off
Feb 25, 2025
Address
1800 Owens St

evacuation map signage for the 6th and 7th fl

Open the permit page

Oct 25, 2024Completed
final sign-off Feb 2025
1800 Owens StDome Construction Corprev 202212128137- clarify lab sink counter height
Details
Permit
202410253731
Status
complete
Filed
Oct 25, 2024
Permit issued
Nov 6, 2024
Final sign-off
Feb 11, 2025
Address
1800 Owens St

rev 202212128137- clarify lab sink counter height

Open the permit page

Aug 30, 2024Completed
final sign-off Dec 2024
550 Terry A Francois BlTruebeck Construction5/fl-rev 202406215017- removal of raised access floor at north portion of buliding level 5
Details
Permit
202408309859
Status
complete
Filed
Aug 30, 2024
Permit issued
Sep 27, 2024
Final sign-off
Dec 11, 2024
Declared cost
$98,282
Address
550 Terry A Francois Bl

5/fl-rev 202406215017- removal of raised access floor at north portion of buliding level 5

Open the permit page

$98,282
Aug 30, 2024Completed
final sign-off Dec 2024
550 Terry A Francois BlTruebeck Construction2-4/fl-rev 202406184792- removal of raised access floor at north portion of buliding level 2,3,4
Details
Permit
202408309855
Status
complete
Filed
Aug 30, 2024
Permit issued
Sep 27, 2024
Final sign-off
Dec 11, 2024
Declared cost
$294,845
Address
550 Terry A Francois Bl

2-4/fl-rev 202406184792- removal of raised access floor at north portion of buliding level 2,3,4

Open the permit page

$294,845
Jul 17, 2024In progress
issued Jan 2025
1800 Owens StHathaway Dinwiddie Co.scope consists of infrastructure upgrades to(e)bldg systems to support future life science tenants.sector 2:(n)rooftop mech equpment & the addition of(2)(n)shafts from the roof(level 7 to level 2)demo & in-fill for accessory stairs added by previous tenant on level 4.
Details
Permit
202406255203
Status
issued
Filed
Jul 17, 2024
Permit issued
Jan 31, 2025
Declared cost
$3,091,676
Address
1800 Owens St

scope consists of infrastructure upgrades to(e)bldg systems to support future life science tenants.sector 2:(n)rooftop mech equpment & the addition of(2)(n)shafts from the roof(level 7 to level 2)demo & in-fill for accessory stairs added by previous tenant on level 4.

Open the permit page

$3,091,676
Jul 10, 2024Completed
final sign-off Jul 2025
1800 Owens StDome Construction Corprev 202212128137- layout in sec 1 changes from 1 to 2 tenants. no change in use or occupancy
Details
Permit
202407106189
Status
complete
Filed
Jul 10, 2024
Permit issued
Aug 9, 2024
Final sign-off
Jul 21, 2025
Address
1800 Owens St

rev 202212128137- layout in sec 1 changes from 1 to 2 tenants. no change in use or occupancy

Open the permit page

Jun 21, 2024Completed
final sign-off Dec 2024
550 Terry A Francois BlTruebeck Construction5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permit
Details
Permit
202406215017
Status
complete
Filed
Jun 21, 2024
Permit issued
Jul 10, 2024
Final sign-off
Dec 19, 2024
Declared cost
$50,000
Address
550 Terry A Francois Bl

5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permit

Open the permit page

$50,000
Jun 18, 2024Completed
final sign-off Dec 2024
550 Terry A Francois BlTruebeck Constructionfloors 2,3, & 4th floors: non structural, interior demolition per ab-017. including interior non-bearing walls, doors, cabinetry, plumbing fixtures, floor finishes, ceiling hvac diffusers, and lighting fixtures. sprinkler ref pa #2024-0613-4429
Details
Permit
202406184792
Status
complete
Filed
Jun 18, 2024
Permit issued
Jul 10, 2024
Final sign-off
Dec 11, 2024
Declared cost
$180,000
Address
550 Terry A Francois Bl

floors 2,3, & 4th floors: non structural, interior demolition per ab-017. including interior non-bearing walls, doors, cabinetry, plumbing fixtures, floor finishes, ceiling hvac diffusers, and lighting fixtures. sprinkler ref pa #2024-0613-4429

Open the permit page

$180,000
May 30, 2024Completed
final sign-off Jan 2025
1450 Owens StTruebeck Constructiondeferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation.
Details
Permit
202405303298
Status
complete
Filed
May 30, 2024
Permit issued
Aug 6, 2024
Final sign-off
Jan 10, 2025
Declared cost
$10,000
Address
1450 Owens St

deferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation.

Open the permit page

$10,000
Mar 18, 2024Completed
final sign-off Feb 2025
2525 03rd StDome Construction Corpconstruction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external work
Details
Permit
202403188046
Status
complete
Filed
Mar 18, 2024
Permit issued
Apr 24, 2024
Final sign-off
Feb 12, 2025
Declared cost
$75,000
Address
2525 03rd St

construction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external work

Open the permit page

$75,000
Mar 15, 2024Completed
final sign-off May 2024
1450 Owens StTruebeck Constructionrevision to pid pa# 202307263056, pa# 202204202594, & pa# 202210043668. to incorporate final scp revisions required by landscape & public art coordination.
Details
Permit
202403087397
Status
complete
Filed
Mar 15, 2024
Permit issued
Apr 10, 2024
Final sign-off
May 30, 2024
Address
1450 Owens St

revision to pid pa# 202307263056, pa# 202204202594, & pa# 202210043668. to incorporate final scp revisions required by landscape & public art coordination.

Open the permit page

Feb 21, 2024Completed
final sign-off Jul 2025
499 Illinois StDpr Construction A2nd floor: interior t.i. includes new non-load bearing partitions, doors, ceiling and finishes. mep included.
Details
Permit
202402216284
Status
complete
Filed
Feb 21, 2024
Permit issued
Jul 30, 2024
Final sign-off
Jul 1, 2025
Declared cost
$500,000
Address
499 Illinois St

2nd floor: interior t.i. includes new non-load bearing partitions, doors, ceiling and finishes. mep included.

Open the permit page

$500,000
Oct 3, 2023Never finaled
filed Oct 2023, never issued
1800 Owens Stnew condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural.
Details
Permit
202310037923
Status
filed
Filed
Oct 3, 2023
Declared cost
$200,000
Address
1800 Owens St

new condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural.

Open the permit page

$200,000
Sep 14, 2023Completed
final sign-off Aug 2024
1800 Owens StDome Construction Corprevision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5
Details
Permit
202309146604
Status
complete
Filed
Sep 14, 2023
Permit issued
Mar 6, 2024
Final sign-off
Aug 9, 2024
Address
1800 Owens St

revision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5

Open the permit page

Aug 18, 2023Completed
final sign-off Dec 2025
1800 Owens StHathaway Dinwiddie Co.mechanical & electrical work only to convert sector 1 & 3 service elevator to transport hazardous materials.
Details
Permit
202308184788
Status
complete
Filed
Aug 18, 2023
Permit issued
Sep 27, 2024
Final sign-off
Dec 19, 2025
Declared cost
$300,000
Address
1800 Owens St

mechanical & electrical work only to convert sector 1 & 3 service elevator to transport hazardous materials.

Open the permit page

$300,000
Jun 9, 2023Completed
final sign-off Jan 2025
1069 Pennsylvania AvDome Construction Corprevision to pa# 202205023388. interior only. installation of pre-fabricated metal platform structure approximately 170 s.f. for equipment within (e) with building envelope. deferred mep.
Details
Permit
202306099728
Status
complete
Filed
Jun 9, 2023
Permit issued
Sep 21, 2023
Final sign-off
Jan 27, 2025
Declared cost
$150,000
Address
1069 Pennsylvania Av

revision to pa# 202205023388. interior only. installation of pre-fabricated metal platform structure approximately 170 s.f. for equipment within (e) with building envelope. deferred mep.

Open the permit page

$150,000
May 24, 2023Never finaled
issued May 2023, no final
450 Shotwell StRossi Builders Inc.deferred pre fabricated cold rooms from 202303173904
Details
Permit
202305248467
Status
issued
Filed
May 24, 2023
Permit issued
May 26, 2023
Declared cost
$10,000
Address
450 Shotwell St

deferred pre fabricated cold rooms from 202303173904

Open the permit page

$10,000
May 4, 2023Expired or cancelled
cancelled Jan 2026
1800 Owens St4/f & 5/f: revision to bpa#202207259239, isolate scope of demo on 4/5-f under one demo permit. no change to scope
Details
Permit
202305047121
Status
cancelled
Filed
May 4, 2023
Address
1800 Owens St

4/f & 5/f: revision to bpa#202207259239, isolate scope of demo on 4/5-f under one demo permit. no change to scope

Open the permit page

May 4, 2023Expired or cancelled
cancelled Jan 2026
1800 Owens St6/f & 7/f: revision to bpa#202207259239, isolate scope of demo on 6/7-f under one demo permit. no change to scope
Details
Permit
202305047123
Status
cancelled
Filed
May 4, 2023
Address
1800 Owens St

6/f & 7/f: revision to bpa#202207259239, isolate scope of demo on 6/7-f under one demo permit. no change to scope

Open the permit page

Apr 19, 2023Completed
final sign-off May 2025
1450 Owens StTruebeck Constructionmain lobby improvements at the main entrance to a 7-story warm shell and core lab/office building
Details
Permit
202304196000
Status
complete
Filed
Apr 19, 2023
Permit issued
Jun 22, 2023
Final sign-off
May 19, 2025
Declared cost
$800,000
Address
1450 Owens St

main lobby improvements at the main entrance to a 7-story warm shell and core lab/office building

Open the permit page

$800,000
Mar 17, 2023Completed
final sign-off Oct 2023
450 Shotwell StRossi Builders Inc.t.i. of (e) building for food based pdr space w/accessory office use, nonstructural partitions, no exterior work to occur. ref 20208101499/r1 and 202009234840/r1.
Details
Permit
202303173904
Status
complete
Filed
Mar 17, 2023
Permit issued
Mar 29, 2023
Final sign-off
Oct 30, 2023
Declared cost
$950,000
Address
450 Shotwell St

t.i. of (e) building for food based pdr space w/accessory office use, nonstructural partitions, no exterior work to occur. ref 20208101499/r1 and 202009234840/r1.

Open the permit page

$950,000
Dec 12, 2022Completed
final sign-off Jul 2025
1800 Owens StDome Construction Corpsector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.
Details
Permit
202212128137
Status
complete
Filed
Dec 12, 2022
Permit issued
Jun 27, 2024
Final sign-off
Jul 21, 2025
Declared cost
$5,750,000
Address
1800 Owens St

sector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.

Open the permit page

$5,750,000
Aug 1, 2022Completed
final sign-off Aug 2024
1800 Owens StDome Construction Corp, Xl Construction, Corporationtenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.
Details
Permit
202208019663
Status
complete
Filed
Aug 1, 2022
Permit issued
Aug 29, 2023
Final sign-off
Aug 9, 2024
Declared cost
$6,000,000
Address
1800 Owens St

tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.

Open the permit page

$6,000,000
Jul 18, 2022Completed
final sign-off Aug 2024
1800 Owens StDome Construction Corp, Xl Construction, Corporationlevel 4-5: addition of shafts and duct riser only in sector 1 of building.
Details
Permit
202207188714
Status
complete
Filed
Jul 18, 2022
Permit issued
Jul 20, 2022
Final sign-off
Aug 9, 2024
Declared cost
$240,000
Address
1800 Owens St

level 4-5: addition of shafts and duct riser only in sector 1 of building.

Open the permit page

$240,000
Jul 18, 2022Completed
final sign-off Aug 2024
1800 Owens StDome Construction Corp, Xl Construction, Corporationlevel 6-7: addition of shafts and duct riser only in sector 1 of building.
Details
Permit
202207188717
Status
complete
Filed
Jul 18, 2022
Permit issued
Jul 20, 2022
Final sign-off
Aug 9, 2024
Declared cost
$250,000
Address
1800 Owens St

level 6-7: addition of shafts and duct riser only in sector 1 of building.

Open the permit page

$250,000
Jul 1, 2022Completed
final sign-off May 2023
2525 03rd StDome Construction Corpmechanical, electrical, and plumbing work for approved pa# 202205063728.
Details
Permit
202207017662
Status
complete
Filed
Jul 1, 2022
Permit issued
Oct 11, 2022
Final sign-off
May 18, 2023
Declared cost
$750,000
Address
2525 03rd St

mechanical, electrical, and plumbing work for approved pa# 202205063728.

Open the permit page

$750,000
May 6, 2022Completed
final sign-off May 2023
2525 03rd StDome Construction Corprenovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work.
Details
Permit
202205063728
Status
complete
Filed
May 6, 2022
Permit issued
Jun 23, 2022
Final sign-off
May 18, 2023
Declared cost
$3,242,000
Address
2525 03rd St

renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work.

Open the permit page

$3,242,000
May 2, 2022Completed
final sign-off Aug 2022
1470 Owens StTruebeck Constructiontemporary(2) construction of trailers on the roof of adjacement parking garage at 1470 owens st.
Details
Permit
202205023408
Status
complete
Filed
May 2, 2022
Permit issued
Jul 13, 2022
Final sign-off
Aug 9, 2022
Declared cost
$52,000
Address
1470 Owens St

temporary(2) construction of trailers on the roof of adjacement parking garage at 1470 owens st.

Open the permit page

$52,000
May 2, 2022Completed
final sign-off Jan 2025
1069 Pennsylvania AvDome Construction Corptenant improvement, (n) installation of equipment including mechanical, electrical, plumbing work. revision to previously approved pa #202112073858 & 202111303330
Details
Permit
202205023388
Status
complete
Filed
May 2, 2022
Permit issued
Jan 19, 2023
Final sign-off
Jan 27, 2025
Declared cost
$3,315,697
Address
1069 Pennsylvania Av

tenant improvement, (n) installation of equipment including mechanical, electrical, plumbing work. revision to previously approved pa #202112073858 & 202111303330

Open the permit page

$3,315,697
Apr 27, 2022Expired or cancelled
cancelled Jan 2026
2505 03rd StDome Construction Corpinterior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep work
Details
Permit
202204273108
Status
cancelled
Filed
Apr 27, 2022
Declared cost
$3,242
Address
2505 03rd St

interior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep work

Open the permit page

$3,242
Feb 9, 2022Completed
final sign-off Mar 2024
755 Sansome StSc Builders, Incinstall door actuators associated with 202202097673.
Details
Permit
202202097687
Status
complete
Filed
Feb 9, 2022
Permit issued
Feb 24, 2022
Final sign-off
Mar 8, 2024
Declared cost
$3,000
Address
755 Sansome St

install door actuators associated with 202202097673.

Open the permit page

$3,000
Feb 9, 2022Completed
final sign-off Mar 2024
755 Sansome StSc Builders, Inct.i new conference rooms, open office areas, demo feature stair including infill of slab. now work in restrooms, exit stairs and exiting breakroom. mep deferred
Details
Permit
202202097673
Status
complete
Filed
Feb 9, 2022
Permit issued
Feb 24, 2022
Final sign-off
Mar 8, 2024
Declared cost
$881,000
Address
755 Sansome St

t.i new conference rooms, open office areas, demo feature stair including infill of slab. now work in restrooms, exit stairs and exiting breakroom. mep deferred

Open the permit page

$881,000
Jan 25, 2022Never finaled
issued Mar 2022, no final
1100 Van Ness AvDome Construction Corprevision to pa# 202008252611. tissue culture room & post pcr room layout elec outlets + remove window. reduce security cameras, door schedule, 10th fl alcove, elec for sign, elec panel + outlets. revise plumbing to co2 manifold in storage room + drops in tissue culture lab. rev to een & cda.
Details
Permit
202201256574
Status
issued
Filed
Jan 25, 2022
Permit issued
Mar 17, 2022
Address
1100 Van Ness Av

revision to pa# 202008252611. tissue culture room & post pcr room layout elec outlets + remove window. reduce security cameras, door schedule, 10th fl alcove, elec for sign, elec panel + outlets. revise plumbing to co2 manifold in storage room + drops in tissue culture lab. rev to een & cda.

Open the permit page

Dec 21, 2021Never finaled
issued Jan 2022, no final
1800 Owens Stadministrative revision permit to pa# 202108025538 to clarify gas piping, sensors & signage associated w/work under referenced permit.
Details
Permit
202112214828
Status
issued
Filed
Dec 21, 2021
Permit issued
Jan 21, 2022
Address
1800 Owens St

administrative revision permit to pa# 202108025538 to clarify gas piping, sensors & signage associated w/work under referenced permit.

Open the permit page

Dec 7, 2021Completed
final sign-off Jan 2025
1069 Pennsylvania AvDome Construction Corpadd a new equipment in existing room. mep deferred under separate permit. add new exterior exist door @ existing opening.
Details
Permit
202112073858
Status
complete
Filed
Dec 7, 2021
Permit issued
Jan 26, 2022
Final sign-off
Jan 27, 2025
Declared cost
$422,726
Address
1069 Pennsylvania Av

add a new equipment in existing room. mep deferred under separate permit. add new exterior exist door @ existing opening.

Open the permit page

$422,726
Dec 6, 2021Completed
final sign-off May 2024
1450 Owens StTruebeck Constructiontest section of planned stone column ground improvements reference 202012281760
Details
Permit
202112063791
Status
complete
Filed
Dec 6, 2021
Permit issued
Jan 26, 2022
Final sign-off
May 4, 2024
Declared cost
$10,000
Address
1450 Owens St

test section of planned stone column ground improvements reference 202012281760

Open the permit page

$10,000
Jul 19, 2021Completed
final sign-off Mar 2024
1450 Owens StTruebeck Constructionsite grading in support of a planned 7 story shell & core lab/office high rise.
Details
Permit
202107194655
Status
complete
Filed
Jul 19, 2021
Permit issued
Oct 21, 2021
Final sign-off
Mar 14, 2024
Declared cost
$5,000
Address
1450 Owens St

site grading in support of a planned 7 story shell & core lab/office high rise.

Open the permit page

$5,000
May 11, 2021Never finaled
issued May 2021, no final
1800 Owens StXl Construction, Corporation, Principal Builders Inc.revisions to pa# 201909121454 & 201909121458. minor revisions to 8th & 9th fl consisting of new huddle rooms, breakrooms, finishes, millwork, cieling & associated electrical, mechanical & plumbing work. maher na.
Details
Permit
202105110190
Status
issued
Filed
May 11, 2021
Permit issued
May 24, 2021
Address
1800 Owens St

revisions to pa# 201909121454 & 201909121458. minor revisions to 8th & 9th fl consisting of new huddle rooms, breakrooms, finishes, millwork, cieling & associated electrical, mechanical & plumbing work. maher na.

Open the permit page

Apr 14, 2021Completed
final sign-off Jan 2022
1800 Owens StXl Construction, Corporation10/f,11/f,12/f - selective demo in preparation for tenant improcements. soft demo does not include structural demo or demo of rated construction needed to maintain core x shell conditions for life safety per ab-017.
Details
Permit
202104148565
Status
complete
Filed
Apr 14, 2021
Permit issued
Apr 29, 2021
Final sign-off
Jan 12, 2022
Declared cost
$60,000
Address
1800 Owens St

10/f,11/f,12/f - selective demo in preparation for tenant improcements. soft demo does not include structural demo or demo of rated construction needed to maintain core x shell conditions for life safety per ab-017.

Open the permit page

$60,000
Dec 28, 2020Completed
final sign-off May 2025
1450 Owens StTruebeck Constructionconstruction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709
Details
Permit
202012281760
Status
complete
Filed
Dec 28, 2020
Permit issued
Aug 31, 2021
Final sign-off
May 19, 2025
Declared cost
$68,000,000
Address
1450 Owens St

construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709

Open the permit page

$68,000,000
Sep 19, 2020Never finaled
issued Feb 2021, no final
200 Paul AvHitt Contracting Inc.4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f.
Details
Permit
202009194565
Status
issued
Filed
Sep 19, 2020
Permit issued
Feb 25, 2021
Declared cost
$3,000,000
Address
200 Paul Av

4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f.

Open the permit page

$3,000,000
Aug 25, 2020Completed
final sign-off Jan 2023
1100 Van Ness AvDome Construction Corp2nd fl: lobby add new vestibule. 8th fl: new clinical lab & office ti. 9th fl: new 2 hr fire rated duct shafts. 10th fl: new 2 hr duct shafts & new 877 usf freezer storage room. rooftop: new air handler, exhaust fan, cda & vacuum systems. associated structural, mep.
Details
Permit
202008252611
Status
complete
Filed
Aug 25, 2020
Permit issued
Mar 17, 2021
Final sign-off
Jan 13, 2023
Declared cost
$3,100,000
Address
1100 Van Ness Av

2nd fl: lobby add new vestibule. 8th fl: new clinical lab & office ti. 9th fl: new 2 hr fire rated duct shafts. 10th fl: new 2 hr duct shafts & new 877 usf freezer storage room. rooftop: new air handler, exhaust fan, cda & vacuum systems. associated structural, mep.

Open the permit page

$3,100,000
Aug 21, 2020Never finaled
filed Aug 2020, never issued
1500 Owens St(4th flr pharmacy) the scope of works consist of door 460rb replacement in the pharmacy lab anteroom and will interlock with ante-room door 460ra.
Details
Permit
202008212319
Status
filed
Filed
Aug 21, 2020
Declared cost
$45,000
Address
1500 Owens St

(4th flr pharmacy) the scope of works consist of door 460rb replacement in the pharmacy lab anteroom and will interlock with ante-room door 460ra.

Open the permit page

$45,000
Jul 15, 2020Completed
final sign-off Jan 2021
200 Paul AvDpr Constructionsuite f250: rev to pa201910023339: add a card reader, change fire rated wall to non-fire rated.
Details
Permit
202007150267
Status
complete
Filed
Jul 15, 2020
Permit issued
Dec 28, 2020
Final sign-off
Jan 25, 2021
Address
200 Paul Av

suite f250: rev to pa201910023339: add a card reader, change fire rated wall to non-fire rated.

Open the permit page

Dec 11, 2019Expired or cancelled
cancelled Dec 2021
1405 Minnesota StNovo Construction Increvision to pa #201903135084: revise plans to add phase 2 drawings. this project was originally submitted as a single phase. this revisions rename the plans in the original scope of work as phase 2.
Details
Permit
201912119188
Status
cancelled
Filed
Dec 11, 2019
Permit issued
Dec 17, 2019
Address
1405 Minnesota St

revision to pa #201903135084: revise plans to add phase 2 drawings. this project was originally submitted as a single phase. this revisions rename the plans in the original scope of work as phase 2.

Open the permit page

Oct 24, 2019Completed
final sign-off Dec 2019
1405 Minnesota StNovo Construction Increvision to 201903135084: adding a 1st phase to original permit. this phase includes the construction of a demising wall and finishes to suite 1407.
Details
Permit
201910245425
Status
complete
Filed
Oct 24, 2019
Permit issued
Oct 24, 2019
Final sign-off
Dec 6, 2019
Address
1405 Minnesota St

revision to 201903135084: adding a 1st phase to original permit. this phase includes the construction of a demising wall and finishes to suite 1407.

Open the permit page

Oct 22, 2019Completed
final sign-off Aug 2021
200 Paul AvDpr Constructionsupporting equipment rooms & electrical rooms. improvements to consist of new walls, doors, finishes & new mechanical, electrical & plumbing work, exterior improvements of new chillers air handling units on the roof top. new generator pads. **maher n/a**
Details
Permit
201910225221
Status
complete
Filed
Oct 22, 2019
Permit issued
Nov 2, 2020
Final sign-off
Aug 19, 2021
Declared cost
$2,000,000
Address
200 Paul Av

supporting equipment rooms & electrical rooms. improvements to consist of new walls, doors, finishes & new mechanical, electrical & plumbing work, exterior improvements of new chillers air handling units on the roof top. new generator pads. **maher n/a**

Open the permit page

$2,000,000
Oct 22, 2019Completed
final sign-off Aug 2021
200 Paul AvDpr Constructionnew generators on pads 13, 14, and 30 serving suite f200 **maher n/a**
Details
Permit
201910225215
Status
complete
Filed
Oct 22, 2019
Permit issued
Jun 16, 2020
Final sign-off
Aug 19, 2021
Declared cost
$1,500,000
Address
200 Paul Av

new generators on pads 13, 14, and 30 serving suite f200 **maher n/a**

Open the permit page

$1,500,000
Oct 18, 2019Never finaled
issued Dec 2019, no final
200 Paul AvDpr Construction Incste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm.
Details
Permit
201910184980
Status
issued
Filed
Oct 18, 2019
Permit issued
Dec 11, 2019
Declared cost
$500,000
Address
200 Paul Av

ste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm.

Open the permit page

$500,000
Oct 15, 2019Completed
final sign-off Dec 2020
200 Paul AvDpr Construction Inc#f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maher
Details
Permit
201910154430
Status
complete
Filed
Oct 15, 2019
Permit issued
Dec 18, 2019
Final sign-off
Dec 7, 2020
Declared cost
$500,000
Address
200 Paul Av

#f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maher

Open the permit page

$500,000
Oct 2, 2019Completed
final sign-off Jan 2021
200 Paul AvDpr Constructionnew office on 2nd fl, restrooms, converence rooms, walls, doors, finishes, mep included. duct connections. expansion of data center on separate permit
Details
Permit
201910023339
Status
complete
Filed
Oct 2, 2019
Permit issued
Nov 12, 2019
Final sign-off
Jan 25, 2021
Declared cost
$750,000
Address
200 Paul Av

new office on 2nd fl, restrooms, converence rooms, walls, doors, finishes, mep included. duct connections. expansion of data center on separate permit

Open the permit page

$750,000
Aug 7, 2019Completed
final sign-off Dec 2020
200 Paul AvDpr Construction Inc2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transformers
Details
Permit
201908078160
Status
complete
Filed
Aug 7, 2019
Permit issued
Feb 5, 2020
Final sign-off
Dec 1, 2020
Declared cost
$22,750,000
Address
200 Paul Av

2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transformers

Open the permit page

$22,750,000
Aug 7, 2019Completed
final sign-off Dec 2020
200 Paul AvDpr Construction(4) new generators w/ 4000 gallon belly tanks. on pads 31, 32, 33 & 34 within the generator yard.**maher n/a**
Details
Permit
201908078167
Status
complete
Filed
Aug 7, 2019
Permit issued
Jun 10, 2020
Final sign-off
Dec 7, 2020
Declared cost
$2,500,000
Address
200 Paul Av

(4) new generators w/ 4000 gallon belly tanks. on pads 31, 32, 33 & 34 within the generator yard.**maher n/a**

Open the permit page

$2,500,000
Mar 13, 2019Never finaled
issued Sep 2019, no final
1407 Minnesota StNovo Construction Incchange of use: renovate the ground and second floor of a tenant suite 1407 & 1409 from warehouse into an analytical lab and office space. new analytical labs with accessory office ti.
Details
Permit
201903135084
Status
issued
Filed
Mar 13, 2019
Permit issued
Sep 26, 2019
Declared cost
$1,500,000
Address
1407 Minnesota St

change of use: renovate the ground and second floor of a tenant suite 1407 & 1409 from warehouse into an analytical lab and office space. new analytical labs with accessory office ti.

Open the permit page

$1,500,000
Dec 21, 2018Expired or cancelled
withdrawn Aug 2019
970 Tennessee StPlatinum Builders Increvision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes.
Details
Permit
201812218976
Status
withdrawn
Filed
Dec 21, 2018
Address
970 Tennessee St

revision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes.

Open the permit page

Sep 10, 2018Never finaled
issued Sep 2018, no final
300 Montgomery StNovo Construction Incinterior demo of 3 offices on the 2nd fl. per ab-017. tenant improvement required under separate permit. no ceiling demo. maher na
Details
Permit
201809109501
Status
issued
Filed
Sep 10, 2018
Permit issued
Sep 10, 2018
Declared cost
$3,000
Address
300 Montgomery St

interior demo of 3 offices on the 2nd fl. per ab-017. tenant improvement required under separate permit. no ceiling demo. maher na

Open the permit page

$3,000
Jul 17, 2018Never finaled
issued Nov 2018, no final
200 Paul AvDpr Constructionnew data center on third floor of (e) bldg. (n) walls, doors, finishes, and (n) mechanical, eletrical work. (n) condensors and air handling unit on roof
Details
Permit
201807174756
Status
issued
Filed
Jul 17, 2018
Permit issued
Nov 8, 2018
Declared cost
$6,250,000
Address
200 Paul Av

new data center on third floor of (e) bldg. (n) walls, doors, finishes, and (n) mechanical, eletrical work. (n) condensors and air handling unit on roof

Open the permit page

$6,250,000
Jul 10, 2018Completed
final sign-off Feb 2021
499 Illinois StDome Construction Corp5th floor - renovation of (e) lab space to (e) mep utilites and fnishes. incldes rework of no, co2,cda & vac line.instalationg of new argon inert gas, electrical upgrades on (n) emergency panel to suffice additional emergency power,mechanical upgrades are for new bsl-3 air requirements.
Details
Permit
201807104056
Status
complete
Filed
Jul 10, 2018
Permit issued
Oct 29, 2018
Final sign-off
Feb 19, 2021
Declared cost
$1,265,484
Address
499 Illinois St

5th floor - renovation of (e) lab space to (e) mep utilites and fnishes. incldes rework of no, co2,cda & vac line.instalationg of new argon inert gas, electrical upgrades on (n) emergency panel to suffice additional emergency power,mechanical upgrades are for new bsl-3 air requirements.

Open the permit page

$1,265,484
Oct 31, 2017Completed
final sign-off May 2018
1405 Minnesota StDouglas J Burrowsrevision to application #2017-1006-0668. to correct original application #2017-1006-0668. to show a change of use from (e) warehouse (s-2) w/ accessory office to (n) analytical lab (b) w/accessory office. also a minor rev to exit passageway on 1st fl.
Details
Permit
201710312793
Status
complete
Filed
Oct 31, 2017
Permit issued
Nov 14, 2017
Final sign-off
May 15, 2018
Address
1405 Minnesota St

revision to application #2017-1006-0668. to correct original application #2017-1006-0668. to show a change of use from (e) warehouse (s-2) w/ accessory office to (n) analytical lab (b) w/accessory office. also a minor rev to exit passageway on 1st fl.

Open the permit page

Oct 6, 2017Completed
final sign-off May 2018
1405 Minnesota StDouglas J Burrowsrenovate the ground floor of tenant suite into an analytical lab and office space, add exit corridor. maher na
Details
Permit
201710060668
Status
complete
Filed
Oct 6, 2017
Permit issued
Oct 13, 2017
Final sign-off
May 15, 2018
Declared cost
$60,000
Address
1405 Minnesota St

renovate the ground floor of tenant suite into an analytical lab and office space, add exit corridor. maher na

Open the permit page

$60,000
Sep 22, 2017Completed
final sign-off Aug 2018
200 Paul AvDpr Constructionbldg. d, #350- install new 2000 kw generator and 4000 gal fuel tank under pa#201707071280 and pa#201801108282. pad 28 n/a ordinance #155-13
Details
Permit
201709229371
Status
complete
Filed
Sep 22, 2017
Permit issued
Jan 25, 2018
Final sign-off
Aug 1, 2018
Declared cost
$250,000
Address
200 Paul Av

bldg. d, #350- install new 2000 kw generator and 4000 gal fuel tank under pa#201707071280 and pa#201801108282. pad 28 n/a ordinance #155-13

Open the permit page

$250,000
Sep 22, 2017Never finaled
issued Oct 2017, no final
155 05th StCarrier Corporation5th fl: installation of (2) fire smoke dampers and add (1) return diffuser. ref #201707212567. maher na
Details
Permit
201709229286
Status
issued
Filed
Sep 22, 2017
Permit issued
Oct 6, 2017
Declared cost
$25,061
Address
155 05th St

5th fl: installation of (2) fire smoke dampers and add (1) return diffuser. ref #201707212567. maher na

Open the permit page

$25,061
Aug 7, 2017Completed
final sign-off Jan 2019
499 Illinois StDome Construction Corp5th fl partial 0ffice renovation. m, e, p included. office areas only - lowrise b. maher not required.
Details
Permit
201708074011
Status
complete
Filed
Aug 7, 2017
Permit issued
Aug 22, 2017
Final sign-off
Jan 31, 2019
Declared cost
$1,000,000
Address
499 Illinois St

5th fl partial 0ffice renovation. m, e, p included. office areas only - lowrise b. maher not required.

Open the permit page

$1,000,000
Jul 17, 2017Completed
final sign-off Mar 2018
455 Mission Bay Blvd SouthDome Construction Corp1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinance
Details
Permit
201707172015
Status
complete
Filed
Jul 17, 2017
Permit issued
Jul 26, 2017
Final sign-off
Mar 6, 2018
Declared cost
$600,000
Address
455 Mission Bay Blvd South

1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinance

Open the permit page

$600,000
Jul 7, 2017Completed
final sign-off Aug 2018
200 Paul AvDpr Constructionti for data center including (n) walls, doors, equipment, finishes, mep in interior.0 exterior work includes (n) condensers air handing unit & generator pads on roof. future generator permit will be separate.
Details
Permit
201707071280
Status
complete
Filed
Jul 7, 2017
Permit issued
Dec 18, 2017
Final sign-off
Aug 1, 2018
Declared cost
$600,000
Address
200 Paul Av

ti for data center including (n) walls, doors, equipment, finishes, mep in interior.0 exterior work includes (n) condensers air handing unit & generator pads on roof. future generator permit will be separate.

Open the permit page

$600,000
Apr 18, 2017Never finaled
issued Apr 2017, no final
1700 Owens StMai Construction Inc.installation of nitrogen generator into extg 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13
Details
Permit
201704184214
Status
issued
Filed
Apr 18, 2017
Permit issued
Apr 20, 2017
Declared cost
$300,000
Address
1700 Owens St

installation of nitrogen generator into extg 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13

Open the permit page

$300,000
Mar 21, 2017Completed
final sign-off Jun 2017
1500 Owens StDome Construction Corp6th flr: minor demo & construction to resize an (e) conference room maher na ele deferred
Details
Permit
201703211922
Status
complete
Filed
Mar 21, 2017
Permit issued
Mar 23, 2017
Final sign-off
Jun 12, 2017
Declared cost
$70,000
Address
1500 Owens St

6th flr: minor demo & construction to resize an (e) conference room maher na ele deferred

Open the permit page

$70,000
Oct 5, 2016Completed
final sign-off Jan 2017
1500 Owens StDome Construction Corpconversion of an (e) lab/office space to an all office space (2000 sq ft). fire alarm, sprinklers under separate permit. maher ord 155-13 na
Details
Permit
201610059561
Status
complete
Filed
Oct 5, 2016
Permit issued
Oct 14, 2016
Final sign-off
Jan 10, 2017
Declared cost
$510,000
Address
1500 Owens St

conversion of an (e) lab/office space to an all office space (2000 sq ft). fire alarm, sprinklers under separate permit. maher ord 155-13 na

Open the permit page

$510,000
Jul 13, 2016Completed
final sign-off Oct 2016
1500 Owens StDome Construction Corp6th floor: division of one large office into two smaller offices.
Details
Permit
201607132190
Status
complete
Filed
Jul 13, 2016
Permit issued
Jul 15, 2016
Final sign-off
Oct 3, 2016
Declared cost
$50,000
Address
1500 Owens St

6th floor: division of one large office into two smaller offices.

Open the permit page

$50,000
Jun 7, 2016Never finaled
issued Jun 2016, no final
1700 Owens StMai Construction Inc.demo (e) cleanroom on level 4. new vivarium in its place - new process piping in (e) chem lab, new process piping in converted storage to analytical lab. new fume hood in chem (e) 2nd floor to receive new cold room inside (e) mecn space. maher na
Details
Permit
201606079349
Status
issued
Filed
Jun 7, 2016
Permit issued
Jun 16, 2016
Declared cost
$850,000
Address
1700 Owens St

demo (e) cleanroom on level 4. new vivarium in its place - new process piping in (e) chem lab, new process piping in converted storage to analytical lab. new fume hood in chem (e) 2nd floor to receive new cold room inside (e) mecn space. maher na

Open the permit page

$850,000
Apr 29, 2016Completed
final sign-off Jun 2016
200 Paul AvHathaway Dinwiddie Co.2nd flr: interior soft demo in advance of ti per ab-017. maher na
Details
Permit
201604296139
Status
complete
Filed
Apr 29, 2016
Permit issued
May 2, 2016
Final sign-off
Jun 7, 2016
Declared cost
$10,000
Address
200 Paul Av

2nd flr: interior soft demo in advance of ti per ab-017. maher na

Open the permit page

$10,000
Apr 15, 2016Completed
final sign-off Sep 2016
200 Paul AvHathaway Dinwiddie Co.diesel generator & fuel storage associated with (n) data storage under pa #201602190117. maher ordinance is not required.
Details
Permit
201604154927
Status
complete
Filed
Apr 15, 2016
Permit issued
Jul 20, 2016
Final sign-off
Sep 7, 2016
Address
200 Paul Av

diesel generator & fuel storage associated with (n) data storage under pa #201602190117. maher ordinance is not required.

Open the permit page

Feb 19, 2016Completed
final sign-off Sep 2016
200 Paul AvHathaway Dinwiddie Co.new data center tenant suite (d260) w/ supporting equipment rooms & ups rooms. improvement to new walls, doors, finishes & new mechanical & electrical work. exterior improvement tonew condensers & air handling unit on the rooftop, extend roof screen. generator and fuel storage under separate permit.
Details
Permit
201602190117
Status
complete
Filed
Feb 19, 2016
Permit issued
Jun 6, 2016
Final sign-off
Sep 7, 2016
Declared cost
$5,000,000
Address
200 Paul Av

new data center tenant suite (d260) w/ supporting equipment rooms & ups rooms. improvement to new walls, doors, finishes & new mechanical & electrical work. exterior improvement tonew condensers & air handling unit on the rooftop, extend roof screen. generator and fuel storage under separate permit.

Open the permit page

$5,000,000
Jan 14, 2016Completed
final sign-off Feb 2016
1700 Owens StRossi Builders Inc.2nd floor - expanding an existing tissue culture lab (340 sf) work includes demolition, new wall construction, & assoc mech work.
Details
Permit
201601147065
Status
complete
Filed
Jan 14, 2016
Permit issued
Jan 14, 2016
Final sign-off
Feb 29, 2016
Declared cost
$60,000
Address
1700 Owens St

2nd floor - expanding an existing tissue culture lab (340 sf) work includes demolition, new wall construction, & assoc mech work.

Open the permit page

$60,000
Nov 4, 2015Expired or cancelled
cancelled Jan 2026
499 Illinois StDpr Constructionrevision to appl #201508255245 - revision to exiting to utilize existing horizontal exit.
Details
Permit
201511041755
Status
cancelled
Filed
Nov 4, 2015
Address
499 Illinois St

revision to appl #201508255245 - revision to exiting to utilize existing horizontal exit.

Open the permit page

Aug 25, 2015Completed
final sign-off Dec 2015
499 Illinois StDpr Constructiont.i. to 1st floor space. mep included. n/a for maher.
Details
Permit
201508255245
Status
complete
Filed
Aug 25, 2015
Permit issued
Sep 25, 2015
Final sign-off
Dec 22, 2015
Declared cost
$850,000
Address
499 Illinois St

t.i. to 1st floor space. mep included. n/a for maher.

Open the permit page

$850,000
Jul 17, 2015Completed
final sign-off Dec 2015
499 Illinois StDpr Constructionrevision to pa#201401216752, revised wall layout and lab equipment. architectural plans only. n/a ordinance #155-13
Details
Permit
201507171760
Status
complete
Filed
Jul 17, 2015
Permit issued
Aug 18, 2015
Final sign-off
Dec 22, 2015
Declared cost
$50,000
Address
499 Illinois St

revision to pa#201401216752, revised wall layout and lab equipment. architectural plans only. n/a ordinance #155-13

Open the permit page

$50,000
May 4, 2015Expired or cancelled
cancelled Jan 2026
455 Mission Bay Blvd Southbldg 3- addition of a security door with card reader within an existing passageway. n/a ordinance #155-13
Details
Permit
201505045233
Status
cancelled
Filed
May 4, 2015
Declared cost
$10,000
Address
455 Mission Bay Blvd South

bldg 3- addition of a security door with card reader within an existing passageway. n/a ordinance #155-13

Open the permit page

$10,000
Nov 18, 2014Never finaled
issued Feb 2015, no final
1700 Owens StRossi Builders Inc.2nd fl tenant improvement. minor modification to (e) "b" occ. lab/office tenant improvements- mech'l , plumbing,& relacted elect, interior wall modifications, add'l fumehoods, demo of int. non. strl, walls to open up, offices, minor add'l accessiblity sinage. maher n/a.
Details
Permit
201411181795
Status
issued
Filed
Nov 18, 2014
Permit issued
Feb 25, 2015
Declared cost
$350,000
Address
1700 Owens St

2nd fl tenant improvement. minor modification to (e) "b" occ. lab/office tenant improvements- mech'l , plumbing,& relacted elect, interior wall modifications, add'l fumehoods, demo of int. non. strl, walls to open up, offices, minor add'l accessiblity sinage. maher n/a.

Open the permit page

$350,000
Aug 18, 2014Completed
final sign-off Nov 2014
499 Illinois StTruebeck Construction2nd flr: t.i. to small portion of floor, new partitions and some electrical work, no labs, office space work.
Details
Permit
201408184049
Status
complete
Filed
Aug 18, 2014
Permit issued
Sep 15, 2014
Final sign-off
Nov 21, 2014
Declared cost
$205,000
Address
499 Illinois St

2nd flr: t.i. to small portion of floor, new partitions and some electrical work, no labs, office space work.

Open the permit page

$205,000
Jun 30, 2014Completed
final sign-off Nov 2014
455 Mission Bay Blvd SouthDome Construction Corp3rd floor:soft demolition, constuction of new partitions and mep upgrades for new offices. n/a for maher 155-13. fire sprinkler under deferred submittal
Details
Permit
201406300071
Status
complete
Filed
Jun 30, 2014
Permit issued
Aug 22, 2014
Final sign-off
Nov 24, 2014
Declared cost
$33,000
Address
455 Mission Bay Blvd South

3rd floor:soft demolition, constuction of new partitions and mep upgrades for new offices. n/a for maher 155-13. fire sprinkler under deferred submittal

Open the permit page

$33,000
Jun 10, 2014Completed
final sign-off Dec 2014
499 Illinois StTruebeck Constructiont.i. first floor to create demising wall between existing bathrooms and future tenant space. future tenant space under separate permit.
Details
Permit
201406107959
Status
complete
Filed
Jun 10, 2014
Permit issued
Jun 27, 2014
Final sign-off
Dec 22, 2014
Declared cost
$130,000
Address
499 Illinois St

t.i. first floor to create demising wall between existing bathrooms and future tenant space. future tenant space under separate permit.

Open the permit page

$130,000
May 28, 2014Completed
final sign-off Dec 2014
499 Illinois StTruebeck Constructionti to 2/fl. mep & process piping work. install lab casework and utility services, new hvac equipment on roof, gypsum board walls, flooring, finishes, suspended accoustical ceiling, and doors and windows.
Details
Permit
201405286875
Status
complete
Filed
May 28, 2014
Permit issued
Aug 14, 2014
Final sign-off
Dec 18, 2014
Declared cost
$3,591,069
Address
499 Illinois St

ti to 2/fl. mep & process piping work. install lab casework and utility services, new hvac equipment on roof, gypsum board walls, flooring, finishes, suspended accoustical ceiling, and doors and windows.

Open the permit page

$3,591,069
Apr 16, 2014Completed
final sign-off Jul 2014
1700 Owens StRossi Builders Inc.2nd floor phase 2 - addition of (5) new fume hoods & laboratory casework relocation & assoc mep work in an existing chemistry lab. compliance with ordinance # 155-13 not required
Details
Permit
201404163328
Status
complete
Filed
Apr 16, 2014
Permit issued
Apr 23, 2014
Final sign-off
Jul 2, 2014
Declared cost
$198,500
Address
1700 Owens St

2nd floor phase 2 - addition of (5) new fume hoods & laboratory casework relocation & assoc mep work in an existing chemistry lab. compliance with ordinance # 155-13 not required

Open the permit page

$198,500
Mar 26, 2014Completed
final sign-off Nov 2014
499 Illinois StDecker Electric Co Inc Electrical Contraprovide&install 1 ea 750 kw 480 v 3 phase 4 wire at 1/fl.provide&install 1 ea 1000 kw 480 v 3 phase 4 wire at 1/fl. fuel oil was submitted on 3/14/14 appl 2014-03-14-0753. both generators to be installed in (e) generator room. mech pumbing under ap#2013-1219-4661.
Details
Permit
201403261699
Status
complete
Filed
Mar 26, 2014
Permit issued
Jul 24, 2014
Final sign-off
Nov 4, 2014
Declared cost
$5,000
Address
499 Illinois St

provide&install 1 ea 750 kw 480 v 3 phase 4 wire at 1/fl.provide&install 1 ea 1000 kw 480 v 3 phase 4 wire at 1/fl. fuel oil was submitted on 3/14/14 appl 2014-03-14-0753. both generators to be installed in (e) generator room. mech pumbing under ap#2013-1219-4661.

Open the permit page

$5,000
Mar 4, 2014Expired or cancelled
cancelled Jan 2020
499 Illinois StTruebeck Constructionpartial 1st floor interior tenant improvement, work also includes mep.
Details
Permit
201403049857
Status
cancelled
Filed
Mar 4, 2014
Declared cost
$1,500,000
Address
499 Illinois St

partial 1st floor interior tenant improvement, work also includes mep.

Open the permit page

$1,500,000
Jan 21, 2014Completed
final sign-off Dec 2015
499 Illinois StTruebeck Construction5th flr t.i to a b-laboratory, includes mep. fire alarm & sprinklers, evac signage under separate permits.
Details
Permit
201401216752
Status
complete
Filed
Jan 21, 2014
Permit issued
May 16, 2014
Final sign-off
Dec 22, 2015
Declared cost
$7,000,000
Address
499 Illinois St

5th flr t.i to a b-laboratory, includes mep. fire alarm & sprinklers, evac signage under separate permits.

Open the permit page

$7,000,000
Dec 19, 2013Completed
final sign-off Jan 2015
499 Illinois StTruebeck Constructionconstruction of new shafts through floor 2-6 & new mep.
Details
Permit
201312194661
Status
complete
Filed
Dec 19, 2013
Permit issued
Apr 1, 2014
Final sign-off
Jan 5, 2015
Declared cost
$9,408,000
Address
499 Illinois St

construction of new shafts through floor 2-6 & new mep.

Open the permit page

$9,408,000
Nov 14, 2013Completed
final sign-off Dec 2013
1700 Owens StR C Benson & Sons Inc.office ti : new ceiling high drywall, 2 new interior doors, relocate one light, add outlets, modify hvac.
Details
Permit
201311141889
Status
complete
Filed
Nov 14, 2013
Permit issued
Nov 15, 2013
Final sign-off
Dec 19, 2013
Declared cost
$84,000
Address
1700 Owens St

office ti : new ceiling high drywall, 2 new interior doors, relocate one light, add outlets, modify hvac.

Open the permit page

$84,000
Oct 8, 2013Completed
final sign-off Nov 2013
1700 Owens StR C Benson & Sons Inc.revision to appl #2013.0808.3808 - relcoate one door & wall, relocate one light, add two swks.
Details
Permit
201310088769
Status
complete
Filed
Oct 8, 2013
Permit issued
Oct 8, 2013
Final sign-off
Nov 13, 2013
Declared cost
$6,500
Address
1700 Owens St

revision to appl #2013.0808.3808 - relcoate one door & wall, relocate one light, add two swks.

Open the permit page

$6,500
Sep 19, 2013Completed
final sign-off Dec 2014
499 Illinois StThe Whiting-Turner Contracting Companyrevision to 2011-1220-1009. scope of work to be removed from 2011-1220-1009: core restrooms at floors 2-6 (mens and womens). mechanical removal under separate permit.
Details
Permit
201309197207
Status
complete
Filed
Sep 19, 2013
Permit issued
Oct 16, 2013
Final sign-off
Dec 24, 2014
Address
499 Illinois St

revision to 2011-1220-1009. scope of work to be removed from 2011-1220-1009: core restrooms at floors 2-6 (mens and womens). mechanical removal under separate permit.

Open the permit page