Nicholas Brereton
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Brereton Architect
- Based in
- San Francisco
- On San Francisco permits
- Jan 2002 to Nov 2016
85 permits since 2000 (architect on 78 permits, authorized agent-others on 4 permits, engineer on 3 permits, pmt consultant/expediter on 1 permit): 73 completed, 5 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 235 Pine St | Bevilacqua & Sons | 12th flr, suite 1250: modification of (e) ti to include selective demo and const of non load bearing partitions, new ceiling grid & tile, new light fixtures and switches, new office doors & frames, salvage & reuse of (e) selected materials if applicable, millwork & new sink and new finishes maher naDetails
12th flr, suite 1250: modification of (e) ti to include selective demo and const of non load bearing partitions, new ceiling grid & tile, new light fixtures and switches, new office doors & frames, salvage & reuse of (e) selected materials if applicable, millwork & new sink and new finishes maher na | $105,823 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 235 Pine St | Bevilacqua & Sons | 8th flr, suite 850: modification of (e) ti to include selective demo and const of non load bearing partitions, new ceiling grid & tile, new light fixtures and switches, new office doors and frames, salvage & reuse of (e) selected materials if applicable, millwork & new sink and new finishes maher naDetails
8th flr, suite 850: modification of (e) ti to include selective demo and const of non load bearing partitions, new ceiling grid & tile, new light fixtures and switches, new office doors and frames, salvage & reuse of (e) selected materials if applicable, millwork & new sink and new finishes maher na | $154,523 |
| Aug 24, 2016 | Completed final sign-off May 2017 | 235 Pine St | Bevilacqua & Sons | modification of extg elevator lobby to include selective demolition and construction of non-load bearing walls, new ceiling grid and tiles, light fixtures and switches, new doors, frames and finishes. n/a for maher.Details
modification of extg elevator lobby to include selective demolition and construction of non-load bearing walls, new ceiling grid and tiles, light fixtures and switches, new doors, frames and finishes. n/a for maher. | $95,843 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 1 Post St | Skyline Construction | lower level - modification & expansion of existing t.i. selective demolitoin & construction of non-load bearing prtitions, new ceiling grid + tile, new light fixtures, reswitching, relocated millwork & new finishes for mailroom & storage cages.Details
lower level - modification & expansion of existing t.i. selective demolitoin & construction of non-load bearing prtitions, new ceiling grid + tile, new light fixtures, reswitching, relocated millwork & new finishes for mailroom & storage cages. | $185,530 |
| Jan 26, 2015 | Completed final sign-off Aug 2015 | 180 Montgomery St | Bevilacqua & Sons | revision to appl #2014.0618.8784 - remove t-bar ceiling for open ceiling concept, change to mech, upgrade to fire sprinkler system. revise plan layout of t.i.Details
revision to appl #2014.0618.8784 - remove t-bar ceiling for open ceiling concept, change to mech, upgrade to fire sprinkler system. revise plan layout of t.i. | $200,000 |
| Dec 2, 2014 | Completed final sign-off Aug 2015 | 1 Montgomery St | Principal Builders Inc. | tenant improvement on the 10th fl to construct non structural partitions, doors,millwork, finishes, mech and elec. equipment. life safety and spinklers under sep permitDetails
tenant improvement on the 10th fl to construct non structural partitions, doors,millwork, finishes, mech and elec. equipment. life safety and spinklers under sep permit | $189,000 |
| Oct 28, 2014 | Completed final sign-off Dec 2014 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ada upgrades to bathrooms on the 20th flr; maher n/a. barrier removal work only under this permit. compliance with maher ordinance no 155-13 not required.Details
ada upgrades to bathrooms on the 20th flr; maher n/a. barrier removal work only under this permit. compliance with maher ordinance no 155-13 not required. | $65,000 |
| Jun 25, 2014 | Never finaled issued Sep 2014, no final | 20 California St | Gidel & Kocal Construction Co Inc | modification of existing tenant improvement to include construction of non-bearing partitions, light fixtures relocation and new including re-switching, new office doors & frames, new millworks, new smoke/draft rou down doors at elevators & new finishes. n/a for maher.Details
modification of existing tenant improvement to include construction of non-bearing partitions, light fixtures relocation and new including re-switching, new office doors & frames, new millworks, new smoke/draft rou down doors at elevators & new finishes. n/a for maher. | $100,000 |
| Jun 23, 2014 | Expired or cancelled suspend Aug 2025 | 20 California St | 6th flr: project involves minor modification of existing tenant improvement space to include selectrive construction of non-load bearing partitions, selective relocation of existing light fixtures, new interior doors, hardware, glazing & frames & electrical; maher n/aDetails
6th flr: project involves minor modification of existing tenant improvement space to include selectrive construction of non-load bearing partitions, selective relocation of existing light fixtures, new interior doors, hardware, glazing & frames & electrical; maher n/a | $80,000 | |
| May 30, 2014 | Never finaled issued Nov 2014, no final | 180 Montgomery St | Bevilacqua & Sons | suite 1600 & 2180: existing suite modifications to include demo & construction of non-load bearing walls, relocated light fixtures, new office doors & frames, millwork & sink, and new finishes. mep and sprinklers under separate permit.Details
suite 1600 & 2180: existing suite modifications to include demo & construction of non-load bearing walls, relocated light fixtures, new office doors & frames, millwork & sink, and new finishes. mep and sprinklers under separate permit. | $122,000 |
| May 6, 2014 | Expired or cancelled withdrawn May 2015 | 180 Montgomery St | this project involves modification of existing restrooms, elevator lobby and corridors. modification include new building standard light fixtures, new office doors & frames and new finishes. new fire smoke dampers under separate mech. mep and sprinklers under separate permit.Details
this project involves modification of existing restrooms, elevator lobby and corridors. modification include new building standard light fixtures, new office doors & frames and new finishes. new fire smoke dampers under separate mech. mep and sprinklers under separate permit. | $65,000 | |
| Apr 10, 2014 | Never finaled issued Aug 2014, no final | 180 Montgomery St | Bevilacqua & Sons | suite 1580: demolition of non-load bearing partitions, ceiling grid and tile, light fixtures, millwork and finishes. per ab-017Details
suite 1580: demolition of non-load bearing partitions, ceiling grid and tile, light fixtures, millwork and finishes. per ab-017 | $7,950 |
| Apr 9, 2014 | Completed final sign-off Jun 2015 | 180 Montgomery St | Bevilacqua & Sons | demo & construct of non-load bearing partitions, new ceiling grid, light fixtures, office dans, frames, millwork & finishes. mechanical, electrical, plumbing & life safety under seperate permit.Details
demo & construct of non-load bearing partitions, new ceiling grid, light fixtures, office dans, frames, millwork & finishes. mechanical, electrical, plumbing & life safety under seperate permit. | $141,850 |
| Feb 11, 2014 | Completed final sign-off Jan 2015 | 50 Post St | Novo Construction Inc | barrier removal. level 3 restroomsDetails
barrier removal. level 3 restrooms | $20,000 |
| Feb 11, 2014 | Completed final sign-off Jan 2015 | 50 Post St | Novo Construction Inc | barrier removal level 1 restroomsDetails
barrier removal level 1 restrooms | $20,000 |
| Oct 30, 2013 | Completed final sign-off Mar 2014 | 1 Montgomery St | Hathaway Dinwiddie Co. | permit revision to 2013-0828-5425. hardship request to keep existing low drinking fountain on 28th floor.Details
permit revision to 2013-0828-5425. hardship request to keep existing low drinking fountain on 28th floor. | |
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 150 California St | Ward Alan Emery Construction Inc. | 15/f- demo of non structural partitions, construction of ceiling height partitions. rework of grid ceiling and tile. fixture lighting relocate.Details
15/f- demo of non structural partitions, construction of ceiling height partitions. rework of grid ceiling and tile. fixture lighting relocate. | $35,000 |
| Aug 29, 2013 | Completed final sign-off Apr 2014 | 120 Kearny St | Hathaway Dinwiddie Co. | 28th floor suite 2800 - modification of (e) tenant space includies construct non-load bearing paritions, (e) ceiling grid + tile, relocate light fixture & new indluding re-switching, new office doors+frames, new int glass, new millwork, finishes. sprinkler,life safety alarm work, mep under separateDetails
28th floor suite 2800 - modification of (e) tenant space includies construct non-load bearing paritions, (e) ceiling grid + tile, relocate light fixture & new indluding re-switching, new office doors+frames, new int glass, new millwork, finishes. sprinkler,life safety alarm work, mep under separate | $900,000 |
| Aug 14, 2013 | Expired or cancelled cancelled Jan 2026 | 20 California St | 2nd floor-modification to t.i space includes new card readers & access control emergency egress buttons at tenant entry doors in complaince with sffd ab2.10 checklist, approval of locks on elevator lobby doors & sfbc 2010 section 1008.1.6.6 per sffd request, ref pa# 2013-0514-6824Details
2nd floor-modification to t.i space includes new card readers & access control emergency egress buttons at tenant entry doors in complaince with sffd ab2.10 checklist, approval of locks on elevator lobby doors & sfbc 2010 section 1008.1.6.6 per sffd request, ref pa# 2013-0514-6824 | $2,000 | |
| Jun 19, 2013 | Never finaled issued Jul 2013, no final | 20 California St | Gci, Inc | the project involve modification to existing t.i space to include selective demo & construction of non load bearing partitions, new gypsum ceiling fire protection, new light fixtures, new interior doors, hardware, glazing & frames, new elec, millworks & new finishes.Details
the project involve modification to existing t.i space to include selective demo & construction of non load bearing partitions, new gypsum ceiling fire protection, new light fixtures, new interior doors, hardware, glazing & frames, new elec, millworks & new finishes. | $290,000 |
| Apr 9, 2013 | Completed final sign-off Nov 2013 | 120 Kearny St | Hathaway Dinwiddie Co. | 5th floor-construct partial floor spec suite, modificatoin of (e) vacant t.i.space to include constr non-load bearing partitions, new suspended ceiling grid & acoustic tile,new light fixtures, new office doors, frames, new interior glass, new millwork, new finishes, no demo work, mep separate permitDetails
5th floor-construct partial floor spec suite, modificatoin of (e) vacant t.i.space to include constr non-load bearing partitions, new suspended ceiling grid & acoustic tile,new light fixtures, new office doors, frames, new interior glass, new millwork, new finishes, no demo work, mep separate permit | $250,000 |
| Jan 18, 2013 | Completed final sign-off Nov 2013 | 120 Kearny St | Source Planning And Construction Inc | revision to the 5th floor restrooms. revision to pa# 201211285053. revision to handicap restroom partition & door swingDetails
revision to the 5th floor restrooms. revision to pa# 201211285053. revision to handicap restroom partition & door swing | $50,000 |
| Dec 5, 2012 | Completed final sign-off Jul 2013 | 1 Montgomery St | Source Planning And Construction Inc | ti on 5th fl. to construct a (n) 1 hr rated corridor, elevator lobby suspended ceiling & spec suite to include (n) non-rated doors, partitions & finishes. mech/elect/life safety/sprinklers on separate permit. no occupancy allowed/future t.i. required.Details
ti on 5th fl. to construct a (n) 1 hr rated corridor, elevator lobby suspended ceiling & spec suite to include (n) non-rated doors, partitions & finishes. mech/elect/life safety/sprinklers on separate permit. no occupancy allowed/future t.i. required. | $160,000 |
| Oct 16, 2012 | Completed final sign-off Feb 2013 | 1 Montgomery St | Source Planning And Construction Inc | floors 5,6,7 - interior demo of doors, walls, & finishes to create vacant space for future t.i per ab-017.Details
floors 5,6,7 - interior demo of doors, walls, & finishes to create vacant space for future t.i per ab-017. | $85,000 |
| Sep 20, 2012 | Completed final sign-off Oct 2012 | 1 Montgomery St | Source Planning And Construction Inc | 17th floor- demo of full floor non load bearing partitions, doors, finishes, etc. to create vacant space for future t.i. per ab-017, ceiling to remainDetails
17th floor- demo of full floor non load bearing partitions, doors, finishes, etc. to create vacant space for future t.i. per ab-017, ceiling to remain | $30,000 |
| Sep 13, 2012 | Completed final sign-off Mar 2013 | 1 Montgomery St | Source Planning And Construction Inc | 32nd floor/suite #3220-tenant improvement to demo & construct new non load bearing partitions, doors, finishes, etc. mechanical, electrical, sprinklers, life safety on seperate permitsDetails
32nd floor/suite #3220-tenant improvement to demo & construct new non load bearing partitions, doors, finishes, etc. mechanical, electrical, sprinklers, life safety on seperate permits | $200,000 |
| Sep 13, 2012 | Completed final sign-off Feb 2013 | 1 Montgomery St | Source Planning And Construction Inc | 32nd floor/suite #3230-tenant improvement to demo & construct new non load bearing partitions, doors, finishes, etc. mechanical, electrical, sprinklers, life safety on seperate permitsDetails
32nd floor/suite #3230-tenant improvement to demo & construct new non load bearing partitions, doors, finishes, etc. mechanical, electrical, sprinklers, life safety on seperate permits | $150,000 |
| Aug 10, 2012 | Completed final sign-off Jan 2013 | 20 California St | Ward Alan Emery Construction Inc. | 5th floor project involves minor additions to an (e) t.i. space to include construction of non-load bearing prtitions, relocation of & new light fixtures, new interior doors, glazing & frames, new electrical outlets, modification ot existing millwork, & new finishes.Details
5th floor project involves minor additions to an (e) t.i. space to include construction of non-load bearing prtitions, relocation of & new light fixtures, new interior doors, glazing & frames, new electrical outlets, modification ot existing millwork, & new finishes. | $35,000 |
| Jul 25, 2012 | Completed final sign-off Oct 2012 | 1 Montgomery St | Source Planning And Construction Inc | modification of existing tenant space to include selective demo and construction of non load bearing partitions, new suspended ceiling grid acoustic tile, new light fixtures, new office doors, frames, new interior glass, new millwork, new finishes. fire sprinkler and life safety alarm work and mepDetails
modification of existing tenant space to include selective demo and construction of non load bearing partitions, new suspended ceiling grid acoustic tile, new light fixtures, new office doors, frames, new interior glass, new millwork, new finishes. fire sprinkler and life safety alarm work and mep | $400,000 |
| Jun 29, 2012 | Completed final sign-off Aug 2012 | 100 01st St | Commercial Interior Builders Inc | suite #2700 -minor tenant improvement to add offices/rooms. includes partitions, framing, doors, glazing. electrical at new walls, light relocations to be design build under sep permit. mech rebalance under sep permitDetails
suite #2700 -minor tenant improvement to add offices/rooms. includes partitions, framing, doors, glazing. electrical at new walls, light relocations to be design build under sep permit. mech rebalance under sep permit | $77,653 |
| Feb 29, 2012 | Completed final sign-off Apr 2012 | 150 California St | Bcci Construction Company | divide 3 offices in existing full floor tenant suite. limited demo of sidelights, new partition and finishes, door, frame, glazing. minor adjustment to ceiling grid and relocate existing lights. relocate existing supply and return mech grilles.Details
divide 3 offices in existing full floor tenant suite. limited demo of sidelights, new partition and finishes, door, frame, glazing. minor adjustment to ceiling grid and relocate existing lights. relocate existing supply and return mech grilles. | $44,500 |
| Feb 23, 2012 | Completed final sign-off Mar 2012 | 525 Market St | path of travel barrieer removal, path of travel serving the area of remodel. building entrances and elevators to be upgraded to be fully compliant with disabled access requirements per title 24, california code of regulations. ref sheet a0.1, a0.2, a0.3Details
path of travel barrieer removal, path of travel serving the area of remodel. building entrances and elevators to be upgraded to be fully compliant with disabled access requirements per title 24, california code of regulations. ref sheet a0.1, a0.2, a0.3 | $4,000 | |
| Dec 21, 2011 | Completed final sign-off Aug 2012 | 300 Clay St | Plant Construction Company Lp | 10th flr - minor expansion of (e) t.i. space to include selective demolition & construction of non-load bearing partitions, partial new suspended ceiling grid & tile, new light fixtures, new office doors & frames & new finishes. mep, fire sprinkler, life safety alarm work under a separate permit.Details
10th flr - minor expansion of (e) t.i. space to include selective demolition & construction of non-load bearing partitions, partial new suspended ceiling grid & tile, new light fixtures, new office doors & frames & new finishes. mep, fire sprinkler, life safety alarm work under a separate permit. | $86,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2013 | 20 California St | Ward Alan Emery Construction Inc. | 5th floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. fire sprinkler, life safety, alarm workDetails
5th floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. fire sprinkler, life safety, alarm work | $50,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2013 | 20 California St | Ward Alan Emery Construction Inc. | 4th floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. fire sprinklers life safety alarm workDetails
4th floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. fire sprinklers life safety alarm work | $50,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2013 | 20 California St | Ward Alan Emery Construction Inc. | 3rd floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes.Details
3rd floor-modification of (e) tenant improvement space to include slective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection. new lights fixtures, interior doors, glazing & frames. new electrical, millwork & finishes. | $50,000 |
| Nov 18, 2011 | Completed final sign-off Mar 2012 | 180 Montgomery St | Hathaway Dinwiddie Co. | suite #100-demolish (e) non load bearing partitions, millwork, flooring & portion of ceiling. space is vacant & will remain vacant following demolition, per ab-017Details
suite #100-demolish (e) non load bearing partitions, millwork, flooring & portion of ceiling. space is vacant & will remain vacant following demolition, per ab-017 | $20,000 |
| Oct 27, 2011 | Completed final sign-off Sep 2012 | 300 Clay St | Plant Construction Company Lp | 10th floor only office improvement - interior only ocnsisting of minor demolition, construction & electrical, hvac & plumbing. sprinkler and life safety under separate permitDetails
10th floor only office improvement - interior only ocnsisting of minor demolition, construction & electrical, hvac & plumbing. sprinkler and life safety under separate permit | $422,722 |
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 150 Spear St | Peacock Construction Inc | renovation of existing tenant space including new non load bearing partitions, new ceiling, lighting, elec outlets, plumbing, accessibility work. mech, elec, plumbing, life safety sep permitDetails
renovation of existing tenant space including new non load bearing partitions, new ceiling, lighting, elec outlets, plumbing, accessibility work. mech, elec, plumbing, life safety sep permit | $210,000 |
| Feb 16, 2011 | Expired or cancelled cancelled Jan 2026 | 88 Kearny St | suite 1600. partial tenant improvement of (e) suite to include selective demolition & construction of non-load bearing partitions, relocated light fixts, relocated (n) office doors & frames, salvage & reuse (e) interior glass as practicable 7 (n) finishes. fire sprinkler & life safety alarm under seDetails
suite 1600. partial tenant improvement of (e) suite to include selective demolition & construction of non-load bearing partitions, relocated light fixts, relocated (n) office doors & frames, salvage & reuse (e) interior glass as practicable 7 (n) finishes. fire sprinkler & life safety alarm under se | $60,000 | |
| Jan 27, 2011 | Completed final sign-off Aug 2011 | 1 Sansome St | Stockham Construction | work on 6th floor includes new non-load bearing partitions, public corridor, new suspended ceiling & lighting, new mechanical, elect & plumbing, 2 new ada compliant restrooms.Details
work on 6th floor includes new non-load bearing partitions, public corridor, new suspended ceiling & lighting, new mechanical, elect & plumbing, 2 new ada compliant restrooms. | $900,000 |
| Dec 14, 2010 | Completed final sign-off Apr 2011 | 1 Front St | Bcci Construction Company | alteration of multi tenant corridor with modified ceiling grid elevator lobby doors, frame and finishes. mep sep permitDetails
alteration of multi tenant corridor with modified ceiling grid elevator lobby doors, frame and finishes. mep sep permit | $30,000 |
| Dec 6, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | Kares Construction Inc | t.i. commercial space include revised locations.relocated doors, glazing rev ceiling, new plumbing, new casework, finishes. revision to permit #201010293995. revision to electrical,mech,fire/life safty under seperate permitDetails
t.i. commercial space include revised locations.relocated doors, glazing rev ceiling, new plumbing, new casework, finishes. revision to permit #201010293995. revision to electrical,mech,fire/life safty under seperate permit | $15,000 |
| Oct 29, 2010 | Completed final sign-off Sep 2011 | 642 Harrison St | Kares Construction Inc | tenant improvment including new non load bearing walls, doors, glaz, ceiling grid, lighting, casework, finsihes. electrical, mech, plumbing under separate permit.Details
tenant improvment including new non load bearing walls, doors, glaz, ceiling grid, lighting, casework, finsihes. electrical, mech, plumbing under separate permit. | $325,000 |
| Aug 19, 2010 | Completed final sign-off Oct 2010 | 101 02nd St | Hathaway Dinwiddie Co. | 10th floor ste 1000 -create conference room by building new walls & adding doors. fire alarm & sprinkler work to be carried under seperate permitDetails
10th floor ste 1000 -create conference room by building new walls & adding doors. fire alarm & sprinkler work to be carried under seperate permit | $45,000 |
| Jul 28, 2010 | Completed final sign-off Oct 2010 | 45 Fremont St | R.M.R. Construction Company | office ti on the 22nd floor incl. mail/reprograph and break room, demo and const of non load partitions, misc electrical, and disabled access bathroom. mep under separate permit.Details
office ti on the 22nd floor incl. mail/reprograph and break room, demo and const of non load partitions, misc electrical, and disabled access bathroom. mep under separate permit. | $80,000 |
| Jun 4, 2010 | Completed final sign-off Sep 2010 | 642 Harrison St | Bcci Construction Company | minor revision to approve pa#201003258984 to remove soffit & non-operational roll-down smoke screen at elevator lobby.Details
minor revision to approve pa#201003258984 to remove soffit & non-operational roll-down smoke screen at elevator lobby. | $5,000 |
| Jun 1, 2010 | Completed final sign-off Jun 2010 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | remodel existing suite, new non load bearing walls, new doors, new sidelights, finishes, relocate power and lights. elec, fire alarm & sprinklers to be under seperate permit.Details
remodel existing suite, new non load bearing walls, new doors, new sidelights, finishes, relocate power and lights. elec, fire alarm & sprinklers to be under seperate permit. | $86,150 |
| May 12, 2010 | Completed final sign-off Sep 2010 | 71 Stevenson St | Novo Construction Inc | 5th floor minor demolition & construction of non-load bearing partitions, new finishes, mill work, mechanical & electrical. life safety & fire sprinkler under separate permit.Details
5th floor minor demolition & construction of non-load bearing partitions, new finishes, mill work, mechanical & electrical. life safety & fire sprinkler under separate permit. | $45,000 |
| May 10, 2010 | Completed final sign-off Aug 2010 | 1 Montgomery St | Bcci Construction Company | service level: add accessible shower stall at basement; barrier removal; mep under separate permit.Details
service level: add accessible shower stall at basement; barrier removal; mep under separate permit. | $30,000 |
| Mar 25, 2010 | Completed final sign-off Sep 2010 | 642 Harrison St | Bcci Construction Company | 4th floor-tenant improvement-interior construction includes demolition & construction of non bearing non rated & 1 hour rated partitions. also includes electrical, mechanical, plumbing. fire sprinklers and fire alarm on separate permit.Details
4th floor-tenant improvement-interior construction includes demolition & construction of non bearing non rated & 1 hour rated partitions. also includes electrical, mechanical, plumbing. fire sprinklers and fire alarm on separate permit. | $425,000 |
| Mar 11, 2010 | Completed final sign-off Jun 2011 | 300 Clay St | Bcci Construction Company | 10th floor -structural calcs. associated with approved p.a.#2010/0302/7427. including cabinet & wall support calculations.Details
10th floor -structural calcs. associated with approved p.a.#2010/0302/7427. including cabinet & wall support calculations. | |
| Feb 22, 2010 | Completed final sign-off Jun 2010 | 1 Front St | Bcci Construction Company | 5th floor alteration to the multi tenant corridor including drywall, ceilings, finishes & minar restroom alterations, fire sprinklers & life safety, mech, elec under separate permit.Details
5th floor alteration to the multi tenant corridor including drywall, ceilings, finishes & minar restroom alterations, fire sprinklers & life safety, mech, elec under separate permit. | $200,000 |
| Jan 5, 2010 | Completed final sign-off Jul 2010 | 425 Market St | Peacock Construction Inc | office ti on 8th floor. minor alterations to (e) suite, construction of new load bearing partitions. relocate light fixtures, new power and data. mep and life safety under separate permitDetails
office ti on 8th floor. minor alterations to (e) suite, construction of new load bearing partitions. relocate light fixtures, new power and data. mep and life safety under separate permit | $112,000 |
| Dec 4, 2009 | Completed final sign-off Jan 2010 | 100 Spear St | Richlen Construction | 12th floor demo work: remove millwork, flooring, sink, dishwasher, some electrical, doors/frames, partitions.Details
12th floor demo work: remove millwork, flooring, sink, dishwasher, some electrical, doors/frames, partitions. | $17,450 |
| Dec 4, 2009 | Completed final sign-off Mar 2010 | 100 Spear St | Richlen Construction | 12th floor tnenat improvment, install flooring, millwork, paint, microwave, dishwasher,refrigerator, sink, faucet, water follration system. electiral work: add & relocate lights, rework switching, comply w/t-24,install new epo switch, ground bus bar & ups, hvac: relcoate air differs.Details
12th floor tnenat improvment, install flooring, millwork, paint, microwave, dishwasher,refrigerator, sink, faucet, water follration system. electiral work: add & relocate lights, rework switching, comply w/t-24,install new epo switch, ground bus bar & ups, hvac: relcoate air differs. | $321,470 |
| Oct 29, 2009 | Completed final sign-off Feb 2010 | 120 Howard St | Richlen Construction | tenant improvements 2nd floor. new classroomsDetails
tenant improvements 2nd floor. new classrooms | $120,000 |
| May 6, 2009 | Completed final sign-off Aug 2009 | 45 Fremont St | R.M.R. Construction Company | 15th floor-upgrade restrooms to meet titel 24 accessibility, minor non-structural demo. new toilet partitions & finishes. no m.e.p, life safety or fire sprinklers this permit.Details
15th floor-upgrade restrooms to meet titel 24 accessibility, minor non-structural demo. new toilet partitions & finishes. no m.e.p, life safety or fire sprinklers this permit. | $78,000 |
| Apr 1, 2009 | Completed final sign-off May 2009 | 1 Montgomery St | Peacock Construction Inc | demolish of all interior partitions non structural and ceiling to comply with ab17 (exception for ada requirementsDetails
demolish of all interior partitions non structural and ceiling to comply with ab17 (exception for ada requirements | $50,000 |
| Mar 18, 2009 | Completed final sign-off Jul 2009 | 380 Clementina St | D.F.P.F Corp Dba Fine Line Construction | revision to appl #200803187413 - for construction of concrete housekeeping pad for replacement generator at rear bldg of ground level.Details
revision to appl #200803187413 - for construction of concrete housekeeping pad for replacement generator at rear bldg of ground level. | $1,000 |
| Jan 27, 2009 | Completed final sign-off Feb 2009 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 15th floor-demolition of non load bearing walls, construction of non load bearing walls. demo of doors, relocation of doors, new millwork, outlets and finishes as per plan. mep (mechanical, electrical and plumbing) under separate permit.Details
15th floor-demolition of non load bearing walls, construction of non load bearing walls. demo of doors, relocation of doors, new millwork, outlets and finishes as per plan. mep (mechanical, electrical and plumbing) under separate permit. | $24,000 |
| Jan 16, 2009 | Completed final sign-off Jun 2009 | 1 Montgomery St | Ward Alan Emery Construction Inc. | 34th floor ti mechancial, electrical, and plumbing. architectural appl#200812178677.Details
34th floor ti mechancial, electrical, and plumbing. architectural appl#200812178677. | $60,000 |
| Dec 17, 2008 | Completed final sign-off Jun 2009 | 1 Montgomery St | Ward Alan Emery Construction Inc. | 34th floor tenant improvement to include construction of new non-rated, non load bearing partitions, elec, mech & plbg. (mep permits will be deferred) ref pa#200812178672Details
34th floor tenant improvement to include construction of new non-rated, non load bearing partitions, elec, mech & plbg. (mep permits will be deferred) ref pa#200812178672 | $500,000 |
| Nov 24, 2008 | Completed final sign-off Jun 2010 | 300 California St | voluntary seismic upgrade br basement to 8th fl, all finish damaged will be repaired, no exterior facade wall involved, existing path of travel upgrade.Details
voluntary seismic upgrade br basement to 8th fl, all finish damaged will be repaired, no exterior facade wall involved, existing path of travel upgrade. | $1,000,000 | |
| Aug 4, 2008 | Completed final sign-off Nov 2008 | 45 Fremont St | Skyline Construction | ti for 17th floor. minor demolition, construction of non-rated & rated partitions. electrical, mechanical & plumbing including toilet rooms upgrade. fire/life safety under separate permit.Details
ti for 17th floor. minor demolition, construction of non-rated & rated partitions. electrical, mechanical & plumbing including toilet rooms upgrade. fire/life safety under separate permit. | $850,000 |
| May 22, 2008 | Expired or cancelled expired Dec 2013 | 333 03rd St | construction of non load bearing partitions, relocation of lighting fixtures, new outlets and finishes. elec, mech, and life safety drawings under separate permitDetails
construction of non load bearing partitions, relocation of lighting fixtures, new outlets and finishes. elec, mech, and life safety drawings under separate permit | $74,500 | |
| Mar 25, 2008 | Completed final sign-off Dec 2008 | 1 Front St | Skyline Construction | removal of wall between the low rise and the high rise on the 2nd floor on front st. within same building. ref. pa# 2008/02/21/5301 for accessibility requirements.Details
removal of wall between the low rise and the high rise on the 2nd floor on front st. within same building. ref. pa# 2008/02/21/5301 for accessibility requirements. | $85,000 |
| Feb 21, 2008 | Completed final sign-off Dec 2008 | 1 Front St | install an accessable elevator into a new elevator shaft in ex 2 story portion of bldg. construct new 1hr fire rated elevator lobby. mep and fire safety will be under a separate permit, at 2nd fl.Details
install an accessable elevator into a new elevator shaft in ex 2 story portion of bldg. construct new 1hr fire rated elevator lobby. mep and fire safety will be under a separate permit, at 2nd fl. | $85,000 | |
| Feb 7, 2008 | Completed final sign-off Jun 2008 | 333 Bush St | Novo Construction Inc | dividing one open space into 2, eliminate door @ end of existing corridor. rework lighting & hvac for new layout. restroom upgrade (ada) partial. install access control devices on elevator lobby doors.Details
dividing one open space into 2, eliminate door @ end of existing corridor. rework lighting & hvac for new layout. restroom upgrade (ada) partial. install access control devices on elevator lobby doors. | $50,000 |
| Jun 29, 2007 | Completed final sign-off Oct 2007 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 9th floor-fire life safety permitDetails
9th floor-fire life safety permit | $8,000 |
| Feb 28, 2007 | Never finaled issued Feb 2007, no final | 684 Ellis St | D.F.P.F Corp Dba Fine Line Construction | misc patch & repair of apartment interior. prep for painting for 15 units. patch repair only.Details
misc patch & repair of apartment interior. prep for painting for 15 units. patch repair only. | $25,000 |
| Jan 31, 2007 | Completed final sign-off May 2007 | 333 Bush St | Dome Construction Corp | 0ti-4 4th fl el, me, ls, spDetails
0ti-4 4th fl el, me, ls, sp | $30,000 |
| Jan 30, 2007 | Completed final sign-off Apr 2007 | 333 Bush St | Dome Construction Corp | ada upgrades to path of travel from street to floor elev. lobbies. revision to appl#200405254809.Details
ada upgrades to path of travel from street to floor elev. lobbies. revision to appl#200405254809. | $23,456 |
| Dec 20, 2006 | Completed final sign-off Nov 2007 | 909 Montgomery St | oti-1 2nd floor, el, me, ls, spDetails
oti-1 2nd floor, el, me, ls, sp | $250,000 | |
| Dec 7, 2006 | Completed final sign-off Jun 2007 | 1 Front St | Skyline Construction | oti-2, jones lang la salle, 22/fl, el, me.Details
oti-2, jones lang la salle, 22/fl, el, me. | $633,620 |
| Nov 8, 2006 | Expired or cancelled expired Mar 2008 | 1 Front St | Gci, Inc | oti-1, 6th floor, el, sp, ls.Details
oti-1, 6th floor, el, sp, ls. | $294,558 |
| Aug 1, 2006 | Completed final sign-off Apr 2007 | 1 California St | Principal Builders Inc. | 16th floor - conversion of 2 primeter cubicles to private office misc. upgrade ofexisting doors & millwork.Details
16th floor - conversion of 2 primeter cubicles to private office misc. upgrade ofexisting doors & millwork. | $40,000 |
| Jul 21, 2006 | Completed final sign-off May 2007 | 333 Bush St | Dome Construction Corp | oti-1 12/f el ls sp meDetails
oti-1 12/f el ls sp me | $431,875 |
| Jul 20, 2006 | Completed final sign-off Feb 2007 | 600 Montgomery St | Field Construction Inc. | oti-2, 2nd floor, el, me, ls, sp.Details
oti-2, 2nd floor, el, me, ls, sp. | $537,209 |
| Jul 18, 2006 | Completed final sign-off Feb 2007 | 600 Montgomery St | Field Construction Inc. | oti-1, 2nd fl, el, me, ls, sp.Details
oti-1, 2nd fl, el, me, ls, sp. | $537,209 |
| May 17, 2006 | Completed final sign-off Aug 2007 | 455 Market St | oti-1 6th flor, el, ls, sp t.i. demolition, construction, electrical, plumbingDetails
oti-1 6th flor, el, ls, sp t.i. demolition, construction, electrical, plumbing | $175,000 | |
| May 11, 2006 | Completed final sign-off Oct 2006 | 71 Stevenson St | Wcp Svcs, Dba: Venture Builders | oti-1 13th floor, el, me, ls. demo walls, (n) restroom upgrade.Details
oti-1 13th floor, el, me, ls. demo walls, (n) restroom upgrade. | $337,860 |
| Jul 21, 2005 | Completed final sign-off Feb 2006 | 221 Main St | Principal Builders Inc. | oti-1 14th floor, el, me, ls, spDetails
oti-1 14th floor, el, me, ls, sp | $40,000 |
| Mar 11, 2005 | Completed final sign-off Jun 2005 | 3542 California St | removal of non load bearing wall t construction of closet. electrical-additional (2) recessed cans aDetails
removal of non load bearing wall t construction of closet. electrical-additional (2) recessed cans a | $3,000 | |
| Jan 25, 2002 | Expired or cancelled expired Aug 2005 | 100 01st St | barrier removal only to provide exterior entry doors at existing vacant retail spaceDetails
barrier removal only to provide exterior entry doors at existing vacant retail space | $5,000 |