Permit GraphShortlistSan Francisco building permits since 2000

Anson Shumcheng

License
S4835
Structural engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up S4835 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Murphy, Burr & Curry Inc.
Based in
San Francisco
On San Francisco permits
May 2005 to Apr 2016

14 permits since 2000 (engineer on 11 permits, architect on 3 permits): 11 completed, 2 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Balfour Beatty Construction Llc (4), Ferma Corporation (3), Oliver & Company Inc. (3), Bcci Construction Company (2), Build Group Inc. (2), Mircea Ilie Construction, Northern Sun Associates
Architects
Robert Baum (2), Russell Naylor/Gary Murakami (2), David Darling, Jim Samuels, Nicholas Brereton
Engineers
Meng Chen
Pmt consultant/expediters
Jonathan C. Bradley (2)

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 21, 2016Expired or cancelled
expired Dec 2018
801 Brannan StFerma Corporation, Balfour Beatty Construction Llcrevision to s1 app#201309045886. provide additional drainage from the garage open to the sky. n/a for maher.
Details
Permit
201604215391
Permit issued
Apr 26, 2016

revision to s1 app#201309045886. provide additional drainage from the garage open to the sky. n/a for maher.

Open the permit page

Mar 2, 2016Completed
final sign-off Nov 2016
315 Montgomery StBcci Construction Company16th flr: addition of light weight concrete topping slab over (e) sloped floor for leveling. maher na
Details
Permit
201603020976
Permit issued
Mar 2, 2016
Final sign-off
Nov 10, 2016

16th flr: addition of light weight concrete topping slab over (e) sloped floor for leveling. maher na

Open the permit page

$23,000
Feb 5, 2016Completed
final sign-off May 2017
801 Brannan StFerma Corporation, Balfour Beatty Construction Llcadditional structural detail as corrective measure requested by inspector at area they were unable to inspect. ref 201601278143, 201601257916, 201309045886 maher not req
Details
Permit
201602058965
Permit issued
Feb 5, 2016
Final sign-off
May 8, 2017

additional structural detail as corrective measure requested by inspector at area they were unable to inspect. ref 201601278143, 201601257916, 201309045886 maher not req

Open the permit page

Jan 27, 2016Completed
final sign-off May 2017
801 Brannan StBalfour Beatty Construction Llcrevision to 201601257916. additonal clarification regarding corner condition detail as requested by bldg inspector to comply with correction notice and report filed under 201309045886. compliance with maher ordinance no 155-13 not required.
Details
Permit
201601278143
Permit issued
Jan 27, 2016
Final sign-off
May 8, 2017

revision to 201601257916. additonal clarification regarding corner condition detail as requested by bldg inspector to comply with correction notice and report filed under 201309045886. compliance with maher ordinance no 155-13 not required.

Open the permit page

Aug 21, 2015Completed
final sign-off May 2017
801 Brannan StFerma Corporation, Balfour Beatty Construction Llcrev. to addendum 1 ref pa#201309045886. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. n/a for maher ordinance.
Details
Permit
201508214980
Permit issued
Sep 8, 2015
Final sign-off
May 5, 2017

rev. to addendum 1 ref pa#201309045886. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. n/a for maher ordinance.

Open the permit page

$4,500,000
Dec 11, 2014Completed
final sign-off Nov 2019
53 Kirkwood AvBuild Group Inc.erect 3-story, type 5-b, no basement, single family dwelling.
Details
Permit
201412113582
Permit issued
Oct 7, 2016
Final sign-off
Nov 13, 2019

erect 3-story, type 5-b, no basement, single family dwelling.

Open the permit page

$5,600,000
Dec 11, 2014Completed
final sign-off Nov 2019
77 Kirkwood AvBuild Group Inc.erect 3-story, type 5-b, no basement, single family dwelling.
Details
Permit
201412113580
Permit issued
Oct 7, 2016
Final sign-off
Nov 13, 2019

erect 3-story, type 5-b, no basement, single family dwelling.

Open the permit page

$3,600,000
Nov 26, 2013Completed
final sign-off Jul 2014
300 Ivy StNorthern Sun Associatestenant improvement to create a new 2972 sf restaurant within an existing building. occupancy class to be changed from m to a-2. restaurant will include dining areas kitchen, bar, and restroom. no additions or alterations to exterior of existing building. sprinkler, life safety on separate permit
Details
Permit
201311262913
Permit issued
Mar 20, 2014
Final sign-off
Jul 7, 2014

tenant improvement to create a new 2972 sf restaurant within an existing building. occupancy class to be changed from m to a-2. restaurant will include dining areas kitchen, bar, and restroom. no additions or alterations to exterior of existing building. sprinkler, life safety on separate permit

Open the permit page

$531,760
Apr 2, 2013Never finaled
issued Apr 2013, no final
1370 Harrison Stt-i & seismic voluntary strengthening to (e) 2 story bldf. add new 2 story steel moment frame in store front & new 2 story concrete shear walls on back of bldg. provide concrete wall out of pland horizontal seismic anchores to roof and flr. reframe 2nd fl to provide new stair openings. fill in (e
Details
Permit
201304023575
Permit issued
Apr 25, 2013

t-i & seismic voluntary strengthening to (e) 2 story bldf. add new 2 story steel moment frame in store front & new 2 story concrete shear walls on back of bldg. provide concrete wall out of pland horizontal seismic anchores to roof and flr. reframe 2nd fl to provide new stair openings. fill in (e

Open the permit page

$45,000
Apr 1, 2013Completed
final sign-off Jan 2014
750 02nd StOliver & Company Inc.new painted steel vehicle and person gate. chipseal driveway and restripe.
Details
Permit
201304013487
Permit issued
Jun 24, 2013
Final sign-off
Jan 13, 2014

new painted steel vehicle and person gate. chipseal driveway and restripe.

Open the permit page

$10,000
Apr 1, 2013Completed
final sign-off Jan 2014
101 Townsend StOliver & Company Inc.new painted steel vehicle and person gate. chipseal driveway and restripe.
Details
Permit
201304013490
Permit issued
Jun 27, 2013
Final sign-off
Jan 13, 2014

new painted steel vehicle and person gate. chipseal driveway and restripe.

Open the permit page

$10,000
Jan 11, 2011Completed
final sign-off Nov 2012
750 02nd StOliver & Company Inc.revision to appl #200807318072-s1/r2: revisio to shearwall boundary elements reinforcement, revision to slab to shearwall conneciton details, elimination of 90 degree hooks on shearwall vertical rebars.
Details
Permit
201101118208
Permit issued
Jan 11, 2011
Final sign-off
Nov 27, 2012

revision to appl #200807318072-s1/r2: revisio to shearwall boundary elements reinforcement, revision to slab to shearwall conneciton details, elimination of 90 degree hooks on shearwall vertical rebars.

Open the permit page

$10
Mar 11, 2010Completed
final sign-off Jun 2011
300 Clay StBcci Construction Company10th floor -structural calcs. associated with approved p.a.#2010/0302/7427. including cabinet & wall support calculations.
Details
Permit
201003118031
Permit issued
Mar 11, 2010
Final sign-off
Jun 6, 2011

10th floor -structural calcs. associated with approved p.a.#2010/0302/7427. including cabinet & wall support calculations.

Open the permit page

May 27, 2005Never finaled
issued May 2005, no final
2752 Harrison StMircea Ilie Constructionrevision to app#200409295497. addition of skylight/lightwell.
Details
Permit
200505273688
Permit issued
May 27, 2005

revision to app#200409295497. addition of skylight/lightwell.

Open the permit page

$900