Anson Shumcheng
- Listed as
- architect, engineer
- Firm
- Murphy, Burr & Curry Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Apr 2016
14 permits since 2000 (engineer on 11 permits, architect on 3 permits): 11 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2016 | Expired or cancelled expired Dec 2018 | 801 Brannan St | Ferma Corporation, Balfour Beatty Construction Llc | revision to s1 app#201309045886. provide additional drainage from the garage open to the sky. n/a for maher.Details
revision to s1 app#201309045886. provide additional drainage from the garage open to the sky. n/a for maher. | |
| Mar 2, 2016 | Completed final sign-off Nov 2016 | 315 Montgomery St | Bcci Construction Company | 16th flr: addition of light weight concrete topping slab over (e) sloped floor for leveling. maher naDetails
16th flr: addition of light weight concrete topping slab over (e) sloped floor for leveling. maher na | $23,000 |
| Feb 5, 2016 | Completed final sign-off May 2017 | 801 Brannan St | Ferma Corporation, Balfour Beatty Construction Llc | additional structural detail as corrective measure requested by inspector at area they were unable to inspect. ref 201601278143, 201601257916, 201309045886 maher not reqDetails
additional structural detail as corrective measure requested by inspector at area they were unable to inspect. ref 201601278143, 201601257916, 201309045886 maher not req | |
| Jan 27, 2016 | Completed final sign-off May 2017 | 801 Brannan St | Balfour Beatty Construction Llc | revision to 201601257916. additonal clarification regarding corner condition detail as requested by bldg inspector to comply with correction notice and report filed under 201309045886. compliance with maher ordinance no 155-13 not required.Details
revision to 201601257916. additonal clarification regarding corner condition detail as requested by bldg inspector to comply with correction notice and report filed under 201309045886. compliance with maher ordinance no 155-13 not required. | |
| Aug 21, 2015 | Completed final sign-off May 2017 | 801 Brannan St | Ferma Corporation, Balfour Beatty Construction Llc | rev. to addendum 1 ref pa#201309045886. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. n/a for maher ordinance.Details
rev. to addendum 1 ref pa#201309045886. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. n/a for maher ordinance. | $4,500,000 |
| Dec 11, 2014 | Completed final sign-off Nov 2019 | 53 Kirkwood Av | Build Group Inc. | erect 3-story, type 5-b, no basement, single family dwelling.Details
erect 3-story, type 5-b, no basement, single family dwelling. | $5,600,000 |
| Dec 11, 2014 | Completed final sign-off Nov 2019 | 77 Kirkwood Av | Build Group Inc. | erect 3-story, type 5-b, no basement, single family dwelling.Details
erect 3-story, type 5-b, no basement, single family dwelling. | $3,600,000 |
| Nov 26, 2013 | Completed final sign-off Jul 2014 | 300 Ivy St | Northern Sun Associates | tenant improvement to create a new 2972 sf restaurant within an existing building. occupancy class to be changed from m to a-2. restaurant will include dining areas kitchen, bar, and restroom. no additions or alterations to exterior of existing building. sprinkler, life safety on separate permitDetails
tenant improvement to create a new 2972 sf restaurant within an existing building. occupancy class to be changed from m to a-2. restaurant will include dining areas kitchen, bar, and restroom. no additions or alterations to exterior of existing building. sprinkler, life safety on separate permit | $531,760 |
| Apr 2, 2013 | Never finaled issued Apr 2013, no final | 1370 Harrison St | t-i & seismic voluntary strengthening to (e) 2 story bldf. add new 2 story steel moment frame in store front & new 2 story concrete shear walls on back of bldg. provide concrete wall out of pland horizontal seismic anchores to roof and flr. reframe 2nd fl to provide new stair openings. fill in (eDetails
t-i & seismic voluntary strengthening to (e) 2 story bldf. add new 2 story steel moment frame in store front & new 2 story concrete shear walls on back of bldg. provide concrete wall out of pland horizontal seismic anchores to roof and flr. reframe 2nd fl to provide new stair openings. fill in (e | $45,000 | |
| Apr 1, 2013 | Completed final sign-off Jan 2014 | 750 02nd St | Oliver & Company Inc. | new painted steel vehicle and person gate. chipseal driveway and restripe.Details
new painted steel vehicle and person gate. chipseal driveway and restripe. | $10,000 |
| Apr 1, 2013 | Completed final sign-off Jan 2014 | 101 Townsend St | Oliver & Company Inc. | new painted steel vehicle and person gate. chipseal driveway and restripe.Details
new painted steel vehicle and person gate. chipseal driveway and restripe. | $10,000 |
| Jan 11, 2011 | Completed final sign-off Nov 2012 | 750 02nd St | Oliver & Company Inc. | revision to appl #200807318072-s1/r2: revisio to shearwall boundary elements reinforcement, revision to slab to shearwall conneciton details, elimination of 90 degree hooks on shearwall vertical rebars.Details
revision to appl #200807318072-s1/r2: revisio to shearwall boundary elements reinforcement, revision to slab to shearwall conneciton details, elimination of 90 degree hooks on shearwall vertical rebars. | $10 |
| Mar 11, 2010 | Completed final sign-off Jun 2011 | 300 Clay St | Bcci Construction Company | 10th floor -structural calcs. associated with approved p.a.#2010/0302/7427. including cabinet & wall support calculations.Details
10th floor -structural calcs. associated with approved p.a.#2010/0302/7427. including cabinet & wall support calculations. | |
| May 27, 2005 | Never finaled issued May 2005, no final | 2752 Harrison St | Mircea Ilie Construction | revision to app#200409295497. addition of skylight/lightwell.Details
revision to app#200409295497. addition of skylight/lightwell. | $900 |