Block 0288, lot 033
333 Bush St
- City’s use
- Commercial Office
- Built
- 1987
- Stories
- 33
- Building
- 519,235 sq ft
- Lot
- 32,057 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 12, 2012 | Never finaled issued Sep 2012, no final | 333 Bush St | Honeywell International, Inc | 19th floor-adding 1 control relay to interupt ambient audio on 19th floor kixeye tenant space.Details
19th floor-adding 1 control relay to interupt ambient audio on 19th floor kixeye tenant space. | $5,000 |
| Jul 25, 2012 | Completed final sign-off Aug 2012 | 333 Bush St | Honeywell International, Inc | 1/f- fire alarm. add 1 new control relay to shut down kitchen hood lamps per sffdDetails
1/f- fire alarm. add 1 new control relay to shut down kitchen hood lamps per sffd | $3,000 |
| May 24, 2012 | Never finaled issued May 2012, no final | 333 Bush St | Honeywell International, Inc | fire alarm floors 17,18,19. install 70 speaker/strobesDetails
fire alarm floors 17,18,19. install 70 speaker/strobes | $8,000 |
| Apr 13, 2012 | Expired or cancelled cancelled Jan 2026 | 333 Bush St | Swinerton Builders | built out of 2 new offices on existing multi-tenant floor with associated power and tel/data. minor light fixture relocations, new finishes. mech, elec, life safety and plumbing sep permitDetails
built out of 2 new offices on existing multi-tenant floor with associated power and tel/data. minor light fixture relocations, new finishes. mech, elec, life safety and plumbing sep permit | $50,000 |
| Apr 13, 2012 | Completed final sign-off May 2012 | 333 Bush St | Swinerton Builders | built out of (2) new offices on (e) multi-tenant floor with associated power & tel/data; minor light fixture relocations & (n) finishes. mechanical, electrical, life safety & plumbing will be under separate permit.Details
built out of (2) new offices on (e) multi-tenant floor with associated power & tel/data; minor light fixture relocations & (n) finishes. mechanical, electrical, life safety & plumbing will be under separate permit. | $50,000 |
| Jan 31, 2012 | Completed final sign-off Mar 2012 | 333 Bush St | Honeywell International, Inc | 16th floor-fire alarm scope: 19 speaker/strobes, 3 duct detectors, 3 control relays, 12 pilot releays.Details
16th floor-fire alarm scope: 19 speaker/strobes, 3 duct detectors, 3 control relays, 12 pilot releays. | $11,570 |
| Dec 13, 2011 | Completed final sign-off Jan 2012 | 333 Bush St | Honeywell International, Inc | 22nd floor fire alarm: 5 speaker/strobesDetails
22nd floor fire alarm: 5 speaker/strobes | $7,000 |
| Aug 25, 2011 | Completed final sign-off Oct 2011 | 333 Bush St | Honeywell International, Inc | floor 7th & 8th fire alarm - 57 speaker/strobes, 6 smoke detectors, 2 control relays, 2 pilot relays. no work in residential floors , office onlyDetails
floor 7th & 8th fire alarm - 57 speaker/strobes, 6 smoke detectors, 2 control relays, 2 pilot relays. no work in residential floors , office only | $9,000 |
| Jul 14, 2011 | Completed final sign-off Sep 2011 | 333 Bush St | Honeywell International, Inc | floor 27, 28, 29 & 31 fire alarm system, add (9) newe speaker/strobes.Details
floor 27, 28, 29 & 31 fire alarm system, add (9) newe speaker/strobes. | $8,000 |
| Jun 17, 2011 | Completed final sign-off Aug 2011 | 333 Bush St | Honeywell International, Inc | fire alarm on floors 4 - 7. 4th fl: 28 speaker/strobes; 5th fl: 31 speaker/strobes, 2 duct detectors, 2 control relays, 1 pilot relay. 6thfl: 27 speaker/strobes. 7th fl: 1 smoke detector, 1 control relay, 1 pilot relayDetails
fire alarm on floors 4 - 7. 4th fl: 28 speaker/strobes; 5th fl: 31 speaker/strobes, 2 duct detectors, 2 control relays, 1 pilot relay. 6thfl: 27 speaker/strobes. 7th fl: 1 smoke detector, 1 control relay, 1 pilot relay | $12,000 |
| Feb 4, 2011 | Completed final sign-off May 2011 | 333 Bush St | Honeywell International, Inc | 36th floor-fire alarm scope:add 1 new control relay.Details
36th floor-fire alarm scope:add 1 new control relay. | $6,000 |
| Jan 24, 2011 | Completed final sign-off Mar 2011 | 333 Bush St | 21st & 22nd floors-fire alarm, add: 25 new sprinklers/strobes, 4 duct detectors, 4 control relays, 4 pilot relaysDetails
21st & 22nd floors-fire alarm, add: 25 new sprinklers/strobes, 4 duct detectors, 4 control relays, 4 pilot relays | $9,000 | |
| Sep 1, 2010 | Completed final sign-off Oct 2010 | 333 Bush St | Honeywell International, Inc | fire alarm on the 14th floor. 1 new speaker/strobeDetails
fire alarm on the 14th floor. 1 new speaker/strobe | $7,000 |
| Dec 3, 2009 | Completed final sign-off Feb 2010 | 333 Bush St | Honeywell International, Inc | 15th floor. fire alarm system. one smoke detector, 6 speaker/strobe, 2 stobe, 7 speakers, 2 control relay, 2 pilot relayDetails
15th floor. fire alarm system. one smoke detector, 6 speaker/strobe, 2 stobe, 7 speakers, 2 control relay, 2 pilot relay | $7,500 |
| Nov 23, 2009 | Completed final sign-off Feb 2010 | 333 Bush St | Cisco Fire Sprinklers, Inc. | 15th floor relocate 39 sprinkler & add 9 new to cover new t-bar ceiling layout.Details
15th floor relocate 39 sprinkler & add 9 new to cover new t-bar ceiling layout. | $7,000 |
| Feb 27, 2009 | Completed final sign-off Aug 2009 | 333 Bush St | to obtain final inspection for work approved under pa#200605222179.Details
to obtain final inspection for work approved under pa#200605222179. | ||
| Jun 17, 2008 | Completed final sign-off Dec 2008 | 333 Bush St | Dome Construction Corp | 5 new spec. suites including new partitions, corridors & lighting, upgrade of finishes in elevator lobby. renovation of existing restrooms. no structural work or changes to existing building envelope.Details
5 new spec. suites including new partitions, corridors & lighting, upgrade of finishes in elevator lobby. renovation of existing restrooms. no structural work or changes to existing building envelope. | $750,000 |
| May 30, 2008 | Completed final sign-off Jun 2008 | 333 Bush St | Mc Millan Electric | fire alarm on 5th floor - install (2) card readers in elevator lobby; re-connect to (e) door release devices & circuits.Details
fire alarm on 5th floor - install (2) card readers in elevator lobby; re-connect to (e) door release devices & circuits. | $1,000 |
| Apr 9, 2008 | Completed final sign-off Jun 2008 | 333 Bush St | Novo Construction Inc | 5th floor - revision to app # 200802074273. revise designation for wall per table 1017.1 2007 cbc per district inspector request. to show non rated corridor wall.Details
5th floor - revision to app # 200802074273. revise designation for wall per table 1017.1 2007 cbc per district inspector request. to show non rated corridor wall. | |
| Feb 7, 2008 | Completed final sign-off Jun 2008 | 333 Bush St | Novo Construction Inc | dividing one open space into 2, eliminate door @ end of existing corridor. rework lighting & hvac for new layout. restroom upgrade (ada) partial. install access control devices on elevator lobby doors.Details
dividing one open space into 2, eliminate door @ end of existing corridor. rework lighting & hvac for new layout. restroom upgrade (ada) partial. install access control devices on elevator lobby doors. | $50,000 |
| Jan 30, 2008 | Completed final sign-off May 2008 | 333 Bush St | Bcci Construction Company | 30th floor-revisions to approved pa# 200710104968 per sffd request-fire alarm system additionsDetails
30th floor-revisions to approved pa# 200710104968 per sffd request-fire alarm system additions | |
| Dec 14, 2007 | Completed final sign-off Jul 2008 | 333 Bush St | Ayoob & Peery Plumbing Co Inc | 22nd floor: relocate fire sprinkelr heads per tenant improvement. (50 relocated heads, 8 added heads, 1 plugged head).Details
22nd floor: relocate fire sprinkelr heads per tenant improvement. (50 relocated heads, 8 added heads, 1 plugged head). | $10,500 |
| Oct 10, 2007 | Completed final sign-off May 2008 | 333 Bush St | Bcci Construction Company | 30th floor - fire alarm scope - add ac shut down for 1 new ac unit (ac-03): 1 control relay & 1 interposing relay. also mechanical work 30th floor only. install ac shutdown for fire alarm system on 30th floor.Details
30th floor - fire alarm scope - add ac shut down for 1 new ac unit (ac-03): 1 control relay & 1 interposing relay. also mechanical work 30th floor only. install ac shutdown for fire alarm system on 30th floor. | $26,000 |
| Sep 18, 2007 | Completed final sign-off Jun 2008 | 333 Bush St | Paganini Electric Corp(See Signatories) | fire alarm system on the 1st floor. install one monitor module at new exhaust (kitchen of bistro burger) fan ansul.Details
fire alarm system on the 1st floor. install one monitor module at new exhaust (kitchen of bistro burger) fan ansul. | $5,000 |
| Jun 1, 2007 | Completed final sign-off Oct 2007 | 333 Bush St | Novo Construction Inc | add 2 speaker strobe and 2 smoke detectors. 22nd floorDetails
add 2 speaker strobe and 2 smoke detectors. 22nd floor | $62,000 |
| Mar 20, 2007 | Completed final sign-off May 2007 | 333 Bush St | Tj Ward & Associates Dba Facilities Grp | fire alarm work to accomodate remodel. 3 duct detectors, 1 speaker/strobe, retest per sffdDetails
fire alarm work to accomodate remodel. 3 duct detectors, 1 speaker/strobe, retest per sffd | $12,000 |
| Jan 9, 2007 | Completed final sign-off Apr 2007 | 333 Bush St | Honeywell International, Inc | isolate fireman's phonejack riser.Details
isolate fireman's phonejack riser. | $20,000 |
| May 22, 2006 | Expired or cancelled expired Aug 2009 | 333 Bush St | change in kind ceiling light fixtures, add 3 additional feature lights, upgrade all to meet new title 24, sheetrock & paint. no structuralDetails
change in kind ceiling light fixtures, add 3 additional feature lights, upgrade all to meet new title 24, sheetrock & paint. no structural | $9,000 | |
| Jun 7, 2005 | Completed final sign-off Nov 2005 | 333 Bush St | Dome Construction Corp | renew pa 200408090988-200407088314 for finalDetails
renew pa 200408090988-200407088314 for final | |
| May 6, 2005 | Completed final sign-off Sep 2005 | 333 Bush St | Skyline Construction | oti-1 25th floor el me ls spDetails
oti-1 25th floor el me ls sp | $110,000 |
| May 6, 2005 | Completed final sign-off Dec 2005 | 333 Bush St | Skyline Construction | oti-1 4th floor el me ls spDetails
oti-1 4th floor el me ls sp | $110,000 |
| Apr 22, 2005 | Completed final sign-off Dec 2005 | 333 Bush St | Skyline Construction | oti-1 4th flr el me ls spDetails
oti-1 4th flr el me ls sp | $361,167 |
| Oct 18, 2004 | Completed final sign-off Apr 2005 | 333 Bush St | revision to app #200310097027/200312112163/200407098465/additional structural upgrade in addition toDetails
revision to app #200310097027/200312112163/200407098465/additional structural upgrade in addition to | ||
| Jul 28, 2004 | Expired or cancelled expired Apr 2006 | 333 Bush St | Honeywell International, Inc | revise existing life safety audio eval message from "relocate" to "evaluate" for residential flrs 37Details
revise existing life safety audio eval message from "relocate" to "evaluate" for residential flrs 37 | $5,800 |
| Jul 20, 2004 | Completed final sign-off Nov 2005 | 333 Bush St | Dome Construction Corp | oti-3 20/f elDetails
oti-3 20/f el | $43,000 |
| Jul 9, 2004 | Never finaled issued Jul 2004, no final | 333 Bush St | renew 200312112163, revision to 200310097027Details
renew 200312112163, revision to 200310097027 | ||
| Jul 9, 2004 | Never finaled issued Jul 2004, no final | 333 Bush St | revision to pa 200310097027 & 200312112163- additional structural upgrade in addition to apprvd planDetails
revision to pa 200310097027 & 200312112163- additional structural upgrade in addition to apprvd plan | ||
| Dec 11, 2003 | Expired or cancelled expired Apr 2005 | 333 Bush St | South Bay Construction | clarification w/ additional sheets of structural drawings. no change to design only to connections &Details
clarification w/ additional sheets of structural drawings. no change to design only to connections & | |
| Oct 29, 2003 | Expired or cancelled expired Aug 2006 | 333 Bush St | Paganini Electric Corp(See Signatories) | 12/f- add 3 duct smoke detectors to (e) heat pumps.provide 4 shut down heat pumps. upon fire alarmDetails
12/f- add 3 duct smoke detectors to (e) heat pumps.provide 4 shut down heat pumps. upon fire alarm | $4,000 |
| Oct 9, 2003 | Expired or cancelled expired Apr 2005 | 333 Bush St | South Bay Construction | new space frame marquee at existing entry. new guard desk. painting of lobbyDetails
new space frame marquee at existing entry. new guard desk. painting of lobby | $300,000 |
| Oct 3, 2003 | Completed final sign-off Dec 2003 | 333 Bush St | Hathaway Dinwiddie Co. | oti-2, 20th floor, lsDetails
oti-2, 20th floor, ls | $10,000 |
| Nov 27, 2001 | Expired or cancelled expired May 2004 | 333 Bush St | Honeywell | fire alarm system replacement;repl orig bldg edwards 8500 ysystem w/new honeywellDetails
fire alarm system replacement;repl orig bldg edwards 8500 ysystem w/new honeywell | $739,750 |
| Jan 11, 2001 | Expired or cancelled expired May 2001 | 333 Bush St | Siemens Industry, Inc. | addition of 1 speaker ointo existing fire alarm system for a copy room rmdl on flr 16 addtnl wk on dDetails
addition of 1 speaker ointo existing fire alarm system for a copy room rmdl on flr 16 addtnl wk on d | $1,970 |
| Apr 24, 2000 | Expired or cancelled cancelled Oct 2024 | 333 Bush St | fire alarm additions @ 24th fl as per/plansDetails
fire alarm additions @ 24th fl as per/plans | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Honeywell International, Inc (13), Dome Construction Corp (3), Novo Construction Inc (3), Skyline Construction (3), Bcci Construction Company (2), Paganini Electric Corp(See Signatories) (2), South Bay Construction (2), Swinerton Builders (2), Ayoob & Peery Plumbing Co Inc, Cisco Fire Sprinklers, Inc., Hathaway Dinwiddie Co., Honeywell, Mc Millan Electric, Siemens Industry, Inc., Tj Ward & Associates Dba Facilities Grp
- Architects
- Miguel Engudanos (2), Brett Saners, Honeywell, Nicholas Brereton
- Engineers
- Honeywell
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.