Paul Campbell
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Honeywell
- Based in
- Foster City
- On San Francisco permits
- Oct 2004 to Apr 2016
19 permits since 2000 (engineer on 14 permits, authorized agent-others on 4 permits, architect on 1 permit): 16 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 29, 2016 | Completed final sign-off Jul 2016 | 1455 Market St | Honeywell International, Inc | remove 17 spkrs, ceiling, 15 wall strobes, 3 plenum smk det, 1 duct smk det, 1 dual monitor module, add 12 control module add 8 duct smk det, 3 area smk det, 17 ceiling speakers, 1 spkr/strobe, 1 wall spkr/strobe, 1 rps w/2 batteries, 3 monitor modules, 10 dual monitor module, 10 rib maher naDetails
remove 17 spkrs, ceiling, 15 wall strobes, 3 plenum smk det, 1 duct smk det, 1 dual monitor module, add 12 control module add 8 duct smk det, 3 area smk det, 17 ceiling speakers, 1 spkr/strobe, 1 wall spkr/strobe, 1 rps w/2 batteries, 3 monitor modules, 10 dual monitor module, 10 rib maher na | $10,000 |
| Apr 26, 2016 | Completed final sign-off Jul 2016 | 1 California St | Honeywell International, Inc | upgrade all manual pull stations to addressable device. 1-for-1 replacement. amy missing devices or devices mounted at incorrect height are not to be address at this time. all corrections to be made during future ti work, remove 29 monitor modules, remove 79 convential mps; install 79 addressableDetails
upgrade all manual pull stations to addressable device. 1-for-1 replacement. amy missing devices or devices mounted at incorrect height are not to be address at this time. all corrections to be made during future ti work, remove 29 monitor modules, remove 79 convential mps; install 79 addressable | $32,000 |
| Sep 10, 2013 | Completed final sign-off Nov 2013 | 1455 Market St | Paganini Electric Corp(See Signatories) | 17th floor - add 5 speaker/strobes. t.i pa #2013.09.06.6173 under review)Details
17th floor - add 5 speaker/strobes. t.i pa #2013.09.06.6173 under review) | $10,000 |
| Dec 29, 2011 | Never finaled issued Jan 2012, no final | 1 South Van Ness Av | Honeywell International, Inc | add speakers & strobes to flrs (basemnt, flr 1 & 8) to bring to current standards. mezzanine, roof will have all new devices to bring them up to current standard. all (e) non-addresssable duct smoke detectors to be replaced with new addressable duct smoke detectors to be replacedDetails
add speakers & strobes to flrs (basemnt, flr 1 & 8) to bring to current standards. mezzanine, roof will have all new devices to bring them up to current standard. all (e) non-addresssable duct smoke detectors to be replaced with new addressable duct smoke detectors to be replaced | $200,000 |
| Jun 9, 2008 | Completed final sign-off Oct 2008 | 235 Montgomery St | 16floor - revision to life safety appl #200804038674 to add 28 speakers/strobe. install access-controlled egress devices to doors as per plans. devices already installed without permits. field verify installation. by j. darmaninDetails
16floor - revision to life safety appl #200804038674 to add 28 speakers/strobe. install access-controlled egress devices to doors as per plans. devices already installed without permits. field verify installation. by j. darmanin | $18,000 | |
| May 30, 2008 | Completed final sign-off Jun 2008 | 333 Bush St | Mc Millan Electric | fire alarm on 5th floor - install (2) card readers in elevator lobby; re-connect to (e) door release devices & circuits.Details
fire alarm on 5th floor - install (2) card readers in elevator lobby; re-connect to (e) door release devices & circuits. | $1,000 |
| May 13, 2008 | Completed final sign-off Jun 2008 | 475 Sansome St | C B F Inc | life safety system modifications. 1 smoke sensor, 6 speakers/strobes 1 strobe power supply.Details
life safety system modifications. 1 smoke sensor, 6 speakers/strobes 1 strobe power supply. | $4,200 |
| Jan 30, 2008 | Completed final sign-off Oct 2008 | 255 12th St | Honeywell International, Inc | emergency replacement of fire alarm in the whole bldg. replace ex. simplex panel with honeywell x1s200, replace 6 smoke detectors, 18 pullstations, 18 horns/strobes,elevator recall and water flow switch monitor.Details
emergency replacement of fire alarm in the whole bldg. replace ex. simplex panel with honeywell x1s200, replace 6 smoke detectors, 18 pullstations, 18 horns/strobes,elevator recall and water flow switch monitor. | $25,000 |
| Sep 18, 2007 | Completed final sign-off Dec 2007 | 333 Market St | Honeywell International, Inc | 6th/fl 20 area smokes, 2 duct smokes, 31 spkr/strobes, 4 speakers, 11 strobes, 2 conrol moduels (for fsds)Details
6th/fl 20 area smokes, 2 duct smokes, 31 spkr/strobes, 4 speakers, 11 strobes, 2 conrol moduels (for fsds) | $22,000 |
| Sep 18, 2007 | Completed final sign-off Dec 2007 | 333 Market St | Honeywell International, Inc | 7th floor - addition to (20) area smoke detectors, (2) duct smoke detectors, (30) speaker/strobes, (4) speakers, (12) strobes, (2) control modules to fire smoke damper system.Details
7th floor - addition to (20) area smoke detectors, (2) duct smoke detectors, (30) speaker/strobes, (4) speakers, (12) strobes, (2) control modules to fire smoke damper system. | $22,000 |
| Sep 18, 2007 | Completed final sign-off Dec 2007 | 333 Market St | Honeywell International, Inc | 8th floor - addition of (20) smoke detectors, (2) duct smoke detectors, (31) speaker strobes, (4) speakers, (11) strobes, (2) control modules for fire smoke dampers system.Details
8th floor - addition of (20) smoke detectors, (2) duct smoke detectors, (31) speaker strobes, (4) speakers, (11) strobes, (2) control modules for fire smoke dampers system. | $22,000 |
| Jul 24, 2007 | Never finaled issued Jul 2007, no final | 333 Market St | Honeywell International, Inc | 10th floor- fire alarm- 16 smoke detectors, 33 speakers, 47 strobes, 2 duct smoke detectors.Details
10th floor- fire alarm- 16 smoke detectors, 33 speakers, 47 strobes, 2 duct smoke detectors. | $24,700 |
| Jul 24, 2007 | Completed final sign-off Dec 2007 | 333 Market St | Honeywell International, Inc | 9th floor - addition of 16 smoke detectors. fire alarm - 36 speakers, 45 strobes, 3 duct smoke detectors.Details
9th floor - addition of 16 smoke detectors. fire alarm - 36 speakers, 45 strobes, 3 duct smoke detectors. | $24,600 |
| Jul 24, 2007 | Completed final sign-off Dec 2007 | 333 Market St | Honeywell International, Inc | 11th floor - fire alarm - 16 smoke detectors, 32 speakers, 33 strobes, 2 duct smoke detectors.Details
11th floor - fire alarm - 16 smoke detectors, 32 speakers, 33 strobes, 2 duct smoke detectors. | $24,400 |
| Jul 18, 2007 | Completed final sign-off Jun 2008 | 45 Fremont St | Richlen Construction | upgrade speakers, strobes and add smoke detectors as needed for lobby remodel at g/fDetails
upgrade speakers, strobes and add smoke detectors as needed for lobby remodel at g/f | $25,000 |
| Apr 4, 2007 | Expired or cancelled expired Apr 2009 | 475 Sansome St | Gci, Inc | life safety for restaurant space, 8 speaker/strobes, 4 smoke detectors.Details
life safety for restaurant space, 8 speaker/strobes, 4 smoke detectors. | $10,000 |
| Dec 12, 2006 | Completed final sign-off Oct 2007 | 235 Montgomery St | stand alone life safety 11th floor "add four devices".Details
stand alone life safety 11th floor "add four devices". | $3,860 | |
| Jul 25, 2006 | Completed final sign-off Oct 2006 | 180 Montgomery St | C B F Inc | life safety system modifications @ 180 montgomery, 13/f, back of the west. smoke detectors, speakers, strobes, speaker/strobes & door holders.Details
life safety system modifications @ 180 montgomery, 13/f, back of the west. smoke detectors, speakers, strobes, speaker/strobes & door holders. | $25,000 |
| Oct 22, 2004 | Completed final sign-off Aug 2005 | 595 Market St | Tj Ward & Associates Dba Facilities Grp | oti-3, 18th floor, ls.Details
oti-3, 18th floor, ls. | $17,000 |