Robert Williamson
- Listed as
- authorized agent-others, contractor
- Firm
- Novo Construction Inc
- Based in
- Menlo Park
- On San Francisco permits
- Aug 2003 to Nov 2026
2,698 permits since 2000 (contractor on 2,697 permits, authorized agent-others on 12 permits): 2,023 completed, 142 in progress, 391 never finaled, 142 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Marc Penninger (9), Michael Dubitsky (6), Stanley H Lew (6), Lawrence Smith (5), Ariane Lebrilla (4), Michael Castro (4), Ashok Kanagasundram (2), Elizabeth Utley Hagerty (2), Marc Pfenninger (2), Nelson Algaze (2), Seth Hanley (2), Adam Murphy, Albert Law, Anne Torney, Ashley Miller, Brian Braganza, Daniel Baroni, Daniel Pamperin, Katharine Dwyer, Mohit Kotecha, Rudolfo P Bustos Iii
- Engineers
- Rudolfo P Bustos Iii (7), Stephen Shaffer (7), Sargon Yshaya (6), Amit Wadhwa (4), Levi G. Abarte (3), Paul Littler (3), Christopher Jordan Malabed (2), Dean Macy (2), Rey T. Solidum (2), Xuong Quach (2), Alan Charles Burr, Alexander Joseph Pacheco, Carlo Biscocho, David Rossi, David Rossi, Ivano Russo, Justin Dewolfe, Kevin S. Morton, Marc Andrew Steyer, Marc Penninger, Sherry Chaumpluke
- Authorized agents
- Paul Littler (2)
Most recent permits
Showing the 100 most recent of 2,698.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 100 Stockton St | Novo Construction Inc | 7/f: mech, electrical and l,umbing work for t.i. under pa 202610159470.Details
7/f: mech, electrical and l,umbing work for t.i. under pa 202610159470. | $350,000 |
| Nov 13, 2026 | In progress issued Nov 2026 | 255 California St | Novo Construction Inc | interior tenant improvement at suite 450 to include demolition of non structural partitions, 2 new offices and wellness room. mechanical, electrical and sprinklerDetails
interior tenant improvement at suite 450 to include demolition of non structural partitions, 2 new offices and wellness room. mechanical, electrical and sprinkler | $165,756 |
| Nov 13, 2026 | In progress issued Nov 2026 | 655 Montgomery St | Novo Construction Inc | ste 1170: interior ti. to include demolition of non- structural partitions, new non- structural partitions, new flooring and paint.Details
ste 1170: interior ti. to include demolition of non- structural partitions, new non- structural partitions, new flooring and paint. | $150,000 |
| Nov 9, 2026 | In progress filed Nov 2026, not yet issued | 400 Howard St | Novo Construction Inc | 5th flr revision to pa#: 202607235453 to revise smoke control, revise mechanical and add ouver. ref#: 202604219807Details
5th flr revision to pa#: 202607235453 to revise smoke control, revise mechanical and add ouver. ref#: 202604219807 | |
| Nov 9, 2026 | In progress filed Nov 2026, not yet issued | 400 Howard St | Novo Construction Inc | 6th flr revision to pa#: 202610139347 to revise smoke control, revise mechanical and add exterior ouver.Details
6th flr revision to pa#: 202610139347 to revise smoke control, revise mechanical and add exterior ouver. | |
| Nov 5, 2026 | In progress issued Nov 2026 | 300 Howard St | Novo Construction Inc | 9th fl: mdf room ti. mechanical and electrical included, no plumbingDetails
9th fl: mdf room ti. mechanical and electrical included, no plumbing | $50,000 |
| Oct 29, 2026 | In progress filed Oct 2026, not yet issued | 345 Spear St | Novo Construction Inc | 1/f lobby ti: construction of non-load bearing partitions. modifications to (e) ceiling grid and tile. new office doors, frames, millwork and new finishes. no new plumbing fixtures.Details
1/f lobby ti: construction of non-load bearing partitions. modifications to (e) ceiling grid and tile. new office doors, frames, millwork and new finishes. no new plumbing fixtures. | $600,000 |
| Oct 29, 2026 | In progress filed Oct 2026, not yet issued | 100 Stockton St | Novo Construction Inc | new non load bearing partitions, ceilings millwork and finishes to create 2 single user restrooms and 1 multi stall agr, new corridor. plumbing , elec and mech includedDetails
new non load bearing partitions, ceilings millwork and finishes to create 2 single user restrooms and 1 multi stall agr, new corridor. plumbing , elec and mech included | $250,000 |
| Oct 27, 2026 | In progress filed Oct 2026, not yet issued | 415 Kearny St | Novo Construction Inc | construction of interior office space including new partitions, millwork, dodors, frames sidelights, lighting and ceiling tiles.Details
construction of interior office space including new partitions, millwork, dodors, frames sidelights, lighting and ceiling tiles. | $353,000 |
| Oct 26, 2026 | In progress filed Oct 2026, not yet issued | 100 Sansome St | Novo Construction Inc | mechanical and electrical work for t.i. at 1st flr. ref arch: 202607155054Details
mechanical and electrical work for t.i. at 1st flr. ref arch: 202607155054 | $190,000 |
| Oct 26, 2026 | In progress issued Oct 2026 | 415 Kearny St | Novo Construction Inc | interior non-structural demolition on the 2nd flr ab-017.Details
interior non-structural demolition on the 2nd flr ab-017. | $5,000 |
| Oct 21, 2026 | In progress issued Oct 2026 | 255 California St | Novo Construction Inc | suite 1350. mechanical and electrical work for t.i. ref pa#202608186744.Details
suite 1350. mechanical and electrical work for t.i. ref pa#202608186744. | $45,000 |
| Oct 21, 2026 | In progress issued Nov 2026 | 720 California St | Novo Construction Inc | this project is limited to the slab infill of two communicating stairs between level 1+2 and level 3+4. work includes selective demolition of stairs, railing, and guards and new ceiling, light fixtures, and finishes.Details
this project is limited to the slab infill of two communicating stairs between level 1+2 and level 3+4. work includes selective demolition of stairs, railing, and guards and new ceiling, light fixtures, and finishes. | $330,000 |
| Oct 20, 2026 | In progress filed Oct 2026, not yet issued | 45 Fremont St | Novo Construction Inc | 3/f, 10/f, and 11/f: anchor details for new phone booths at 3rd, 10th, 11th floor. ref arch 202510288298.Details
3/f, 10/f, and 11/f: anchor details for new phone booths at 3rd, 10th, 11th floor. ref arch 202510288298. | $3,000 |
| Oct 15, 2026 | In progress filed Oct 2026, not yet issued | 100 Stockton St | Novo Construction Inc | tenant improvement on the 7th fl to include conference rooms, concentrated assembly forum, prefunction and ancillary support spaces. industry non load bearing paritoins,ceilings, finishes, millwork.Details
tenant improvement on the 7th fl to include conference rooms, concentrated assembly forum, prefunction and ancillary support spaces. industry non load bearing paritoins,ceilings, finishes, millwork. | $2,200,000 |
| Oct 15, 2026 | In progress issued Oct 2026 | 255 California St | Novo Construction Inc | mechanical and electrical work for tenant improvement at suite 725. ref arch: 202609097835.Details
mechanical and electrical work for tenant improvement at suite 725. ref arch: 202609097835. | $65,000 |
| Oct 13, 2026 | In progress issued Oct 2026 | 400 Howard St | Novo Construction Inc | 6/f: revision to pa#202609168238 to relocate exhaust ef6-1 & remove ef6-2. remove previously approved exterior louver from scope.Details
6/f: revision to pa#202609168238 to relocate exhaust ef6-1 & remove ef6-2. remove previously approved exterior louver from scope. | |
| Oct 13, 2026 | In progress issued Oct 2026 | 225 Bush St | Novo Construction Inc | 2/f: revision to permit 202608046005 - removal of an office and reconfiguration.Details
2/f: revision to permit 202608046005 - removal of an office and reconfiguration. | $100,000 |
| Oct 13, 2026 | In progress issued Oct 2026 | 400 Montgomery St | Novo Construction Inc | to obtain final inspection for work approved under pa# 202008051181. all work is complete.Details
to obtain final inspection for work approved under pa# 202008051181. all work is complete. | |
| Oct 13, 2026 | In progress issued Oct 2026 | 655 Montgomery St | Novo Construction Inc | ste 1000 - mechanical & electrical work for ti ref pa 202607155079Details
ste 1000 - mechanical & electrical work for ti ref pa 202607155079 | $85,000 |
| Oct 8, 2026 | In progress issued Oct 2026 | 300 Howard St | Novo Construction Inc | basement level 1: mpoe permit, mchanical & electrical only, no arch under this permitDetails
basement level 1: mpoe permit, mchanical & electrical only, no arch under this permit | $56,897 |
| Oct 6, 2026 | In progress issued Oct 2026 | 400 Howard St | Novo Construction Inc | 6th fl - revision to pa 202605121069 scope includes finish changes onlyDetails
6th fl - revision to pa 202605121069 scope includes finish changes only | |
| Oct 6, 2026 | In progress issued Oct 2026 | 400 Howard St | Novo Construction Inc | 5th fl - revision to pa 202606183492 scope includes finish changes to room 5q625 onlyDetails
5th fl - revision to pa 202606183492 scope includes finish changes to room 5q625 only | |
| Oct 6, 2026 | Completed final sign-off Nov 2026 | 225 Bush St | Novo Construction Inc | mechanical and elecrical work for t.i. on the 14th flr. ref 202606263982Details
mechanical and elecrical work for t.i. on the 14th flr. ref 202606263982 | $25,000 |
| Oct 5, 2026 | In progress issued Nov 2026 | 667 Mission St | Novo Construction Inc | mechanical, electrical and structural work for tenant improvement on 4/f. ref arch 202606233694Details
mechanical, electrical and structural work for tenant improvement on 4/f. ref arch 202606233694 | $175,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 667 Mission St | Novo Construction Inc | 1/f: mechanical work at 1st floor for tenant improvement. ref arch # 202606253939Details
1/f: mechanical work at 1st floor for tenant improvement. ref arch # 202606253939 | $95,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 667 Mission St | Novo Construction Inc | basement - mech work at basement for ti ref pa 202606253939Details
basement - mech work at basement for ti ref pa 202606253939 | $25,000 |
| Oct 5, 2026 | In progress issued Nov 2026 | 657 Mission St | Novo Construction Inc | mechanical, electrical and structural work for tenant improvement on 4/f and roof. ref arch 202606233692Details
mechanical, electrical and structural work for tenant improvement on 4/f and roof. ref arch 202606233692 | $175,000 |
| Oct 5, 2026 | In progress issued Nov 2026 | 667 Mission St | Novo Construction Inc | electrical work for ti @ 1st fl & basement. ref pa#202606253939.Details
electrical work for ti @ 1st fl & basement. ref pa#202606253939. | $35,000 |
| Oct 2, 2026 | In progress issued Oct 2026 | 555 Mission St | Novo Construction Inc | revision 202607155076- 29/fl- work in room 2911 and revised rcpDetails
revision 202607155076- 29/fl- work in room 2911 and revised rcp | $20,000 |
| Sep 28, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | revision to pa#: 202606183492 to modify mechanical work on the 5th flr and add exterior louver.Details
revision to pa#: 202606183492 to modify mechanical work on the 5th flr and add exterior louver. | |
| Sep 25, 2026 | In progress issued Sep 2026 | 425 Market St | Novo Construction Inc | 3/f: interior non-structural demolition per ab-017.Details
3/f: interior non-structural demolition per ab-017. | $45,000 |
| Sep 25, 2026 | In progress issued Oct 2026 | 400 Howard St | Novo Construction Inc | revision to pa 202605121069 scope includes adding a fire rated corridor wall detail at the existing raised access floor. see ab-05 local equivalency request formDetails
revision to pa 202605121069 scope includes adding a fire rated corridor wall detail at the existing raised access floor. see ab-05 local equivalency request form | $6,000 |
| Sep 24, 2026 | In progress issued Oct 2026 | 345 Spear St | Novo Construction Inc | mechanical work for 3rd & 6th floorsDetails
mechanical work for 3rd & 6th floors | $45,000 |
| Sep 18, 2026 | In progress issued Nov 2026 | 600 California St | Novo Construction Inc | 14th floor: t.i demo of non-structural partitions+ building new non-structural partitions. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)Details
14th floor: t.i demo of non-structural partitions+ building new non-structural partitions. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $1,063,722 |
| Sep 18, 2026 | In progress issued Nov 2026 | 600 California St | Novo Construction Inc | 9th floor: space suite: t.i. includes demo, construction of (n) non-str partitions and upgrades to existing restrooms. all new or revised meps, sprinklers and fire alarm work will be design-build and submitted separately(bldg is fully sprinklered)Details
9th floor: space suite: t.i. includes demo, construction of (n) non-str partitions and upgrades to existing restrooms. all new or revised meps, sprinklers and fire alarm work will be design-build and submitted separately(bldg is fully sprinklered) | $2,381,908 |
| Sep 17, 2026 | In progress issued Oct 2026 | 300 Howard St | Novo Construction Inc | 3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes.Details
3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes. | $15,451,442 |
| Sep 16, 2026 | In progress issued Sep 2026 | 240 Stockton St | Novo Construction Inc | 3/f: demolition of (e) non-load bearing interior partitions. ab-017.Details
3/f: demolition of (e) non-load bearing interior partitions. ab-017. | $22,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 255 California St | Novo Construction Inc | floor reinforcement and anchorage details for atm safe and cash recycler.Details
floor reinforcement and anchorage details for atm safe and cash recycler. | $10,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | 6th fl - mechanical work for tenant improvement ref pa 202605121069Details
6th fl - mechanical work for tenant improvement ref pa 202605121069 | $28,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 222 Stockton St | Novo Construction Inc | cellar and level 1. demolition of existing non-load bearing partitions, doors and interior equipment ab-017Details
cellar and level 1. demolition of existing non-load bearing partitions, doors and interior equipment ab-017 | $25,000 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | Novo Construction Inc | 2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms.Details
2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms. | $8,061,217 |
| Sep 11, 2026 | In progress issued Nov 2026 | 505 Howard St | Novo Construction Inc | 4th floor: alterations to walls at existing full floor tenant interior office. mep deferredDetails
4th floor: alterations to walls at existing full floor tenant interior office. mep deferred | $15,194 |
| Sep 10, 2026 | In progress issued Nov 2026 | 600 California St | Novo Construction Inc | 5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)Details
5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $2,750,000 |
| Sep 10, 2026 | In progress issued Sep 2026 | 345 Spear St | Novo Construction Inc | ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures.Details
ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures. | $22,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 255 California St | Novo Construction Inc | ste #725 - tenant improvement to include interior demolition. construction of 4 new private offices. modification of existing finishes. no new plumbing fixtures.Details
ste #725 - tenant improvement to include interior demolition. construction of 4 new private offices. modification of existing finishes. no new plumbing fixtures. | $185,000 |
| Sep 1, 2026 | In progress issued Oct 2026 | 300 Howard St | Novo Construction Inc | 5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishesDetails
5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes | $15,451,442 |
| Sep 1, 2026 | In progress issued Sep 2026 | 600 California St | Novo Construction Inc | 16th and 17th floors: partial demolition to include non-structural partitions. suspended ceilings, finishes etc. ab-017Details
16th and 17th floors: partial demolition to include non-structural partitions. suspended ceilings, finishes etc. ab-017 | $35,000 |
| Aug 24, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 14th/f: structural upgrade to accommodate future t.i.Details
14th/f: structural upgrade to accommodate future t.i. | $165,000 |
| Aug 20, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 15th f/l: structural upgrades to accomodate future tenant buildout.Details
15th f/l: structural upgrades to accomodate future tenant buildout. | $165,000 |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 425 Market St | Novo Construction Inc | full floor tenant improvement on the 3rd fl. new construction of non strucrtural partitions, new ceilings, finishes, restrooms, mechanical, electrical, plumbingDetails
full floor tenant improvement on the 3rd fl. new construction of non strucrtural partitions, new ceilings, finishes, restrooms, mechanical, electrical, plumbing | $3,200,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 255 California St | Novo Construction Inc | suite 1350. t.i. to include interior demolition. new demising walls, new interior partitions.Details
suite 1350. t.i. to include interior demolition. new demising walls, new interior partitions. | $600,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes.Details
7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes. | $15,451,442 |
| Aug 10, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | plumbing work t.i. on the 5th flr. ref#: 202606183492Details
plumbing work t.i. on the 5th flr. ref#: 202606183492 | $20,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 400 Howard St | Novo Construction Inc | plumbing work t.i. on the 6th flr. ref#: 202605121069Details
plumbing work t.i. on the 6th flr. ref#: 202605121069 | $20,000 |
| Aug 6, 2026 | In progress issued Sep 2026 | 667 Mission St | Novo Construction Inc | mechanical and electrical work for tenant improvement on the 5th flr. ref#: 202606223612.Details
mechanical and electrical work for tenant improvement on the 5th flr. ref#: 202606223612. | $175,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 188 The Embarcadero | Novo Construction Inc | roof: equipment anchorage for new hvac units. ref #202605211690Details
roof: equipment anchorage for new hvac units. ref #202605211690 | $15,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 225 Bush St | Novo Construction Inc | 2nd fl construction and cosmetic finish updates to a 1429 sq ft portion of the e office area (southeastern corner of the floor plate. the work includes demo of 4 phone rooms in place of 2 new offices, and dividing 1 conference room into 2 offices. no new materials or finishes added to the scopeDetails
2nd fl construction and cosmetic finish updates to a 1429 sq ft portion of the e office area (southeastern corner of the floor plate. the work includes demo of 4 phone rooms in place of 2 new offices, and dividing 1 conference room into 2 offices. no new materials or finishes added to the scope | $400,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 405 Howard St | Novo Construction Inc | 3rd fl - mech work ti ref pa 202607064544Details
3rd fl - mech work ti ref pa 202607064544 | $56,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 405 Howard St | Novo Construction Inc | 3rd fl - electrical work ti ref pa 202607064544Details
3rd fl - electrical work ti ref pa 202607064544 | $199,000 |
| Jul 28, 2026 | In progress filed Jul 2026, not yet issued | 100 Sansome St | Novo Construction Inc | minor permit to alter: replacement of ground floor non- histroic exterior entry doors.Details
minor permit to alter: replacement of ground floor non- histroic exterior entry doors. | $140,260 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 4th floor: electrical work for ti 202604219766. new power and signal dev.Details
4th floor: electrical work for ti 202604219766. new power and signal dev. | $25,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: electrical work for t.i. servery to include new power and signal . new lighting and controls. ref arch. #202605121069Details
6th floor: electrical work for t.i. servery to include new power and signal . new lighting and controls. ref arch. #202605121069 | $275,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 600 California St | Novo Construction Inc | 19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017Details
19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017 | $85,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: electrical work for t.i. to include new power and signal devised throughout the space at 6th floor. ref pa #202604219806Details
6th floor: electrical work for t.i. to include new power and signal devised throughout the space at 6th floor. ref pa #202604219806 | $30,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 5th floor: electrical work for t.i. to include new power and signal devised throughout the space at 5th floor. ref pa #202604219807Details
5th floor: electrical work for t.i. to include new power and signal devised throughout the space at 5th floor. ref pa #202604219807 | $35,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: mechanical work for t.i. ref pa #202604219806Details
6th floor: mechanical work for t.i. ref pa #202604219806 | $125,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | mechanical work for tenant improvement on the 4th floor. ref.202604219766Details
mechanical work for tenant improvement on the 4th floor. ref.202604219766 | $125,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 5th floor: mechanical work for t.i. ref pa #202604219807Details
5th floor: mechanical work for t.i. ref pa #202604219807 | $125,000 |
| Jul 22, 2026 | In progress issued Jul 2026 | 415 Mission St | Novo Construction Inc | 57th and 58th floors:mechanical upgrades to existing system. add under floor terminal fan units with heating coil. add 2 fire/smoke dampers in passenger elevator lobbies.Details
57th and 58th floors:mechanical upgrades to existing system. add under floor terminal fan units with heating coil. add 2 fire/smoke dampers in passenger elevator lobbies. | $100,000 |
| Jul 15, 2026 | In progress issued Aug 2026 | 555 Mission St | Novo Construction Inc | 29/fl- ti to include (n) conferencing rooms, employee break area and storage spaceDetails
29/fl- ti to include (n) conferencing rooms, employee break area and storage space | $2,790,000 |
| Jul 15, 2026 | In progress issued Aug 2026 | 100 Sansome St | Novo Construction Inc | ground floor: interior tenant improvement, new partitions, finishes & restrooms. installation and seismic anchorage of (8) phone booths. mep deferred. change of use from retail to office.Details
ground floor: interior tenant improvement, new partitions, finishes & restrooms. installation and seismic anchorage of (8) phone booths. mep deferred. change of use from retail to office. | $1,107,603 |
| Jul 15, 2026 | In progress issued Jul 2026 | 655 Montgomery St | Novo Construction Inc | 10th/f ste# 1000: interior t.i. demo of non-structural partitions, new const of non-structural partitions, ceiling & lighting, millwork, and finishes, mep under separated permitDetails
10th/f ste# 1000: interior t.i. demo of non-structural partitions, new const of non-structural partitions, ceiling & lighting, millwork, and finishes, mep under separated permit | $1,800,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 300 Howard St | Novo Construction Inc | 9/f: structural upgrades to accommodate future tenant buildout.Details
9/f: structural upgrades to accommodate future tenant buildout. | $135,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 657 Mission St | Novo Construction Inc | mechanical & electrical work for tenant improvement on the 6th fl. ref arch 202606223622Details
mechanical & electrical work for tenant improvement on the 6th fl. ref arch 202606223622 | $700,000 |
| Jul 6, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 16th fl: structural upgrades to accommodate future tenant buildoutDetails
16th fl: structural upgrades to accommodate future tenant buildout | $165,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 405 Howard St | Novo Construction Inc | 3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred.Details
3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred. | $1,714,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 505 Brannan St | Novo Construction Inc | selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred.Details
selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred. | $94,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 415 Kearny St | Novo Construction Inc | 3/f and 4/f: electrical work for tenant improvement. ref arch permits: 202603137505 (3/f), 202604139310 (3/f), 202603137502 (4/f), 202604109248 (4/f).Details
3/f and 4/f: electrical work for tenant improvement. ref arch permits: 202603137505 (3/f), 202604139310 (3/f), 202603137502 (4/f), 202604109248 (4/f). | $120,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 415 Kearny St | Novo Construction Inc | 4/f: mechanical work for tenant improvement. ref arch permit 202603137502 and 202604109248.Details
4/f: mechanical work for tenant improvement. ref arch permit 202603137502 and 202604109248. | $75,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 415 Kearny St | Novo Construction Inc | 3/f: mechanical work for tenant improvement. ref arch permit 202603137505 and 202604139310.Details
3/f: mechanical work for tenant improvement. ref arch permit 202603137505 and 202604139310. | $75,000 |
| Jun 26, 2026 | Completed final sign-off Nov 2026 | 225 Bush St | Novo Construction Inc | 14th floor ti: remodel office spaceincluding break rooms, open and private offices, and conference rooms.new ceilings, 2 new single-user restrooms an new finishes. mep deferredDetails
14th floor ti: remodel office spaceincluding break rooms, open and private offices, and conference rooms.new ceilings, 2 new single-user restrooms an new finishes. mep deferred | $637,369 |
| Jun 25, 2026 | In progress issued Aug 2026 | 667 Mission St | Novo Construction Inc | basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit.Details
basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit. | $1,504,200 |
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 888 Brannan St | Novo Construction Inc | 2nd fl interior tenant improvement to include construction of non structural non rated partition and doorDetails
2nd fl interior tenant improvement to include construction of non structural non rated partition and door | $71,725 |
| Jun 23, 2026 | In progress issued Sep 2026 | 667 Mission St | Novo Construction Inc | 4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.Details
4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit. | $1,671,340 |
| Jun 23, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 2 : structural upgrades to accommodate future tenant buildoutDetails
2 : structural upgrades to accommodate future tenant buildout | $200,000 |
| Jun 23, 2026 | In progress issued Sep 2026 | 657 Mission St | Novo Construction Inc | 4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.Details
4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit. | $1,671,340 |
| Jun 22, 2026 | In progress issued Aug 2026 | 667 Mission St | Novo Construction Inc | new interconnecting stair between level 4-6Details
new interconnecting stair between level 4-6 | $1,197,277 |
| Jun 22, 2026 | In progress issued Jun 2026 | 657 Mission St | Novo Construction Inc | tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep.Details
tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep. | $2,139,556 |
| Jun 22, 2026 | In progress issued Jul 2026 | 657 Mission St | Novo Construction Inc | tenant improvement on the 5th fl to include interior demolition and construction of new partitions, millwork, ceiling. drywall coverage at windows overlooking 667 mission. mep, life safety, and fire sprinkler under sep permit.Details
tenant improvement on the 5th fl to include interior demolition and construction of new partitions, millwork, ceiling. drywall coverage at windows overlooking 667 mission. mep, life safety, and fire sprinkler under sep permit. | $2,929,920 |
| Jun 18, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee stationDetails
rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee station | $19,596 |
| Jun 10, 2026 | Completed final sign-off Jul 2026 | 130 Sutter St | Novo Construction Inc | to obtain final inspection for work approved under pa# 202503273183. all work is complete.Details
to obtain final inspection for work approved under pa# 202503273183. all work is complete. | |
| Jun 8, 2026 | Completed final sign-off Jul 2026 | 77 Geary St | Novo Construction Inc | to obtain final inspection for work approved under pa# 202409060232. all work is complete.Details
to obtain final inspection for work approved under pa# 202409060232. all work is complete. | |
| May 21, 2026 | In progress issued Jul 2026 | 100 Stockton St | Novo Construction Inc | shoring and demo. levels 1-3 interior.Details
shoring and demo. levels 1-3 interior. | $173,545 |
| May 21, 2026 | In progress issued Jun 2026 | 188 The Embarcadero | Novo Construction Inc | removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included.Details
removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included. | $2,000,000 |
| May 19, 2026 | Completed final sign-off May 2026 | 69 Green St | Novo Construction Inc | to obtain final inspection for work approved under pa# 202504114212. all work is complete.Details
to obtain final inspection for work approved under pa# 202504114212. all work is complete. | |
| May 14, 2026 | Completed final sign-off Oct 2026 | 188 The Embarcadero | Novo Construction Inc | this set of docs are for construction of a furniture storage room in the sub-level parking, the scope of work consists of the construction of non bearing partitions, ceilings, door, frames, hardware, and finishes.Details
this set of docs are for construction of a furniture storage room in the sub-level parking, the scope of work consists of the construction of non bearing partitions, ceilings, door, frames, hardware, and finishes. | $55,000 |
| May 12, 2026 | In progress issued Jun 2026 | 400 Howard St | Novo Construction Inc | 6th fl, new dining hall tenant improvement, includes non-structural partitions, doors, lighting, millwork, plumbing, electrical, and finishes. mep deferred.Details
6th fl, new dining hall tenant improvement, includes non-structural partitions, doors, lighting, millwork, plumbing, electrical, and finishes. mep deferred. | $1,965,424 |
| May 5, 2026 | In progress issued Sep 2026 | 350 Bush St | Novo Construction Inc | fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring.Details
fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring. | $6,500 |
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 1/f: electrical work for tenant improvement on the 1st floor storage area. ref arch 202604078996.Details
1/f: electrical work for tenant improvement on the 1st floor storage area. ref arch 202604078996. | $15,000 |