83 permits since 2000 (architect on 81 permits, authorized agent-others on 2 permits): 69 completed, 3 in progress, 7 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2026 | In progress issued Mar 2026 | 1358 South Van Ness Av | Bradford Construction | bldg 1: facade refresh, new bay windows, lightwell infull, & interior renovation of van ness facing structure (structure 1). includes structural upgrades,new adu @ ground flr, new slab on grade & upgrades to perimeter footings. new plumbing, electrical wiring, mechanical systems. replace all...Details
bldg 1: facade refresh, new bay windows, lightwell infull, & interior renovation of van ness facing structure (structure 1). includes structural upgrades,new adu @ ground flr, new slab on grade & upgrades to perimeter footings. new plumbing, electrical wiring, mechanical systems. replace all... | $772,404 |
| Jan 14, 2026 | In progress issued Mar 2026 | 61 Cypress St | Bradford Construction | bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & replacement of perimeter footings. move (e) floor framing down 24"± to accommodate for new adu at level above garage...Details
bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & replacement of perimeter footings. move (e) floor framing down 24"± to accommodate for new adu at level above garage... | $171,136 |
| Sep 25, 2025 | In progress issued Sep 2026 | 2320 Ulloa St | Recon Dragon & Building | renovate (e)ground flr w/ new bedrm & bathrm. relocated laundry to garage. enclose (e) lightwell, new inter connecting stair. relocated bathrm @ main flr, new finishes @ (e)kitchen. new elec wiring & lighting @ reconfigured areas & throughout lower lvl. adjust slab on grade. repairs & infill @ roofDetails
renovate (e)ground flr w/ new bedrm & bathrm. relocated laundry to garage. enclose (e) lightwell, new inter connecting stair. relocated bathrm @ main flr, new finishes @ (e)kitchen. new elec wiring & lighting @ reconfigured areas & throughout lower lvl. adjust slab on grade. repairs & infill @ roof | $259,417 |
| Feb 24, 2022 | Never finaled filed Feb 2022, never issued | 433 Lombard St | rear bldg - interior renovation. upgrades to exterior fenestration & exterior facade materials. waterproofing @ basement. (n) roof @ sun room. replace exterior roof deck w/ noncombustible membrane. replace/repair roofing. (e) (3) floors + basement. no increase in interior sq.ft.Details
rear bldg - interior renovation. upgrades to exterior fenestration & exterior facade materials. waterproofing @ basement. (n) roof @ sun room. replace exterior roof deck w/ noncombustible membrane. replace/repair roofing. (e) (3) floors + basement. no increase in interior sq.ft. | $250,000 | |
| Jul 7, 2020 | Completed final sign-off Apr 2021 | 1190 Shafter Av | Abz Contruction | revision to app#201812319360. modification from original permit to remove new 2nd set of stairs from scope and remove interior walls, reportion shear walls.Details
revision to app#201812319360. modification from original permit to remove new 2nd set of stairs from scope and remove interior walls, reportion shear walls. | |
| Jul 3, 2018 | Completed final sign-off Oct 2019 | 1142 Alabama St | Bradford Construction | ref pa# 201605066760; sturctural addendum- removing permitted wood beam to steelDetails
ref pa# 201605066760; sturctural addendum- removing permitted wood beam to steel | $20,000 |
| Jun 22, 2017 | Completed final sign-off Apr 2018 | 3935 25th St | M Douglas Construction Inc. | move kitchen, add new bath, remodel e. move e stair to exterior. remove e brick chimneys. new front planters, new rear patio. replace gas, furnace. vinyl clad windows at side rear, non-visible.Details
move kitchen, add new bath, remodel e. move e stair to exterior. remove e brick chimneys. new front planters, new rear patio. replace gas, furnace. vinyl clad windows at side rear, non-visible. | $100,000 |
| Dec 22, 2016 | Completed final sign-off Jul 2019 | 1304 Florida St | Ryan C Hu | interior renovation & expansion. (n) vertical addition @ rear half w/ bedroom & bathroom; expanded ground floor w/ (n) bedroom & bathroom. interior main floor w/ (n) kitchen & renovated bathroom.Details
interior renovation & expansion. (n) vertical addition @ rear half w/ bedroom & bathroom; expanded ground floor w/ (n) bedroom & bathroom. interior main floor w/ (n) kitchen & renovated bathroom. | $267,433 |
| May 6, 2016 | Completed final sign-off Oct 2019 | 1142 Alabama St | Bradford Construction | horizontal expansion & interior renovation @ all 3 floors w/ (n) plumbing, electrical & mechanical work. 4 total bedrooms, 4 total bathrooms, 2 each per condo.Details
horizontal expansion & interior renovation @ all 3 floors w/ (n) plumbing, electrical & mechanical work. 4 total bedrooms, 4 total bathrooms, 2 each per condo. | $275,340 |
| Jul 2, 2012 | Never finaled issued Jul 2012, no final | 153 Townsend St | Skyline Construction | 6th floor - removal of non-structural, non load bearing partitions, removal of all doors, frames & hardware under ab-017.Details
6th floor - removal of non-structural, non load bearing partitions, removal of all doors, frames & hardware under ab-017. | $7,500 |
| Jun 6, 2012 | Completed final sign-off Mar 2013 | 123 Mission St | Skyline Construction | 10th floor-interior build out of office space including new non structural partitions, relocation of (e) light fixtures. new power & finishes. demolition of demising wall between 2 suites turning 2 suites into 1Details
10th floor-interior build out of office space including new non structural partitions, relocation of (e) light fixtures. new power & finishes. demolition of demising wall between 2 suites turning 2 suites into 1 | $240,000 |
| May 24, 2012 | Completed final sign-off Jan 2013 | 595 Market St | Gci, Inc | 23rd floor - t.i. including demolition, new partition, framing, electric & ceiling construciton update bathrooms to ada compliance will include new plumbing, lighting, & related finishes. no structural work to be performed.Details
23rd floor - t.i. including demolition, new partition, framing, electric & ceiling construciton update bathrooms to ada compliance will include new plumbing, lighting, & related finishes. no structural work to be performed. | $200,000 |
| May 7, 2012 | Completed final sign-off Oct 2012 | 595 Market St | commercial tenant improvement. upgrade of e restrooms to meet ada requirements. some demo and new construction in office space including framing and electricalDetails
commercial tenant improvement. upgrade of e restrooms to meet ada requirements. some demo and new construction in office space including framing and electrical | $294,220 | |
| Mar 30, 2012 | Completed final sign-off Apr 2012 | 581 Market St | Shames Construction Company Ltd | revision to 201105176154. install new 2 hr shaft between 1st and 3rd floors. add new 1 hr partition walls to create new elevator control rm in basement.Details
revision to 201105176154. install new 2 hr shaft between 1st and 3rd floors. add new 1 hr partition walls to create new elevator control rm in basement. | $10,000 |
| Mar 23, 2012 | Never finaled issued May 2012, no final | 101 Montgomery St | Cahill Const Service Inc | tenant improvement consisting of offices, load bearing and non load bearing walls, doors, new lighting, new power and new finishes. meps and life safety under sep permitDetails
tenant improvement consisting of offices, load bearing and non load bearing walls, doors, new lighting, new power and new finishes. meps and life safety under sep permit | $350,000 |
| Mar 16, 2012 | Never finaled issued Oct 2012, no final | 595 Market St | Cannon Constructors North Inc | 23rd floor:interior t.i. (restroom remodel)include demolition, new partitions and related finishes. no structural or mep work to be performed.Details
23rd floor:interior t.i. (restroom remodel)include demolition, new partitions and related finishes. no structural or mep work to be performed. | $25,000 |
| Mar 9, 2012 | Completed final sign-off Jun 2012 | 123 Mission St | Gci, Inc | 11th floor:new ti with mep on the 11th floor to demo and construct new non-load bearing patitions, doors, finishes and equipment.Details
11th floor:new ti with mep on the 11th floor to demo and construct new non-load bearing patitions, doors, finishes and equipment. | $850,000 |
| Jan 19, 2012 | Completed final sign-off Feb 2013 | 595 Market St | Cannon Constructors North Inc | 27th floor - interior, non-structural demo & new constr of interior partitions & associated ceilings,elec,lighting,plumb,millwork & finishes. mep is under separate permit. incl title 24 calculations.Details
27th floor - interior, non-structural demo & new constr of interior partitions & associated ceilings,elec,lighting,plumb,millwork & finishes. mep is under separate permit. incl title 24 calculations. | $90,000 |
| Jan 18, 2012 | Completed final sign-off Dec 2013 | 595 Market St | Cannon Constructors North Inc | interior, non structural, demolitioin new construction of interior partitions and associated ceiling, electrical, lighting and finishes, performed in two phases. mep is design/build to be submitted under separate permit.Details
interior, non structural, demolitioin new construction of interior partitions and associated ceiling, electrical, lighting and finishes, performed in two phases. mep is design/build to be submitted under separate permit. | $220,000 |
| Nov 16, 2011 | Completed final sign-off Dec 2011 | 211 Main St | Swinerton Builders | 4th floor revision to pa #201108223001 - ada upgrades mens & womens room ada stalls.Details
4th floor revision to pa #201108223001 - ada upgrades mens & womens room ada stalls. | $3,782 |
| Oct 6, 2011 | Completed final sign-off Dec 2011 | 211 Main St | Swinerton Builders | revision to appl #201108233001 - removed 3 offices & 1 large office from orig. scope.Details
revision to appl #201108233001 - removed 3 offices & 1 large office from orig. scope. | |
| Sep 19, 2011 | Completed final sign-off Jun 2012 | 595 Market St | Bcci Construction Company | revision to approved pa# 2011.06.16.8294 to resolve ada issue in restroom on the 26th flDetails
revision to approved pa# 2011.06.16.8294 to resolve ada issue in restroom on the 26th fl | |
| Sep 13, 2011 | Completed final sign-off Dec 2011 | 101 Montgomery St | Cahill Const Service Inc | 7th floor-tenant improvement consisting of new non structural partition walls, associated power & tel/data, outlets, plumbing, new ceiling, new lighting & new hvac. creating open offices & breakroom. demo under pa# 2010-0624-5179. m.e.p under seperate permitDetails
7th floor-tenant improvement consisting of new non structural partition walls, associated power & tel/data, outlets, plumbing, new ceiling, new lighting & new hvac. creating open offices & breakroom. demo under pa# 2010-0624-5179. m.e.p under seperate permit | $250,000 |
| Sep 8, 2011 | Completed final sign-off Jan 2012 | 595 Market St | Gci, Inc | interior tenant improvement including demolition, new paritions, new electrical, rework existing ceiling and lighting, related finishes. no structural workDetails
interior tenant improvement including demolition, new paritions, new electrical, rework existing ceiling and lighting, related finishes. no structural work | $125,000 |
| Sep 8, 2011 | Completed final sign-off Dec 2013 | 595 Market St | Cannon Constructors North Inc | interior tenant improvement including demolition, new paritions, new electrical, rework existing ceiling and lighting, related finishes. no structural workDetails
interior tenant improvement including demolition, new paritions, new electrical, rework existing ceiling and lighting, related finishes. no structural work | $125,000 |
| Sep 8, 2011 | Completed final sign-off Dec 2011 | 215 Fremont St | Swinerton Builders | new interior construction of non load bearing partitions and doors with associated mep and telecommunications. no plumbing to be performedDetails
new interior construction of non load bearing partitions and doors with associated mep and telecommunications. no plumbing to be performed | $245,514 |
| Sep 8, 2011 | Expired or cancelled cancelled Jan 2026 | 595 Market St | interior tenant improvement including new demising partition, relocation lighting, related finishes. no structural work.Details
interior tenant improvement including new demising partition, relocation lighting, related finishes. no structural work. | $40,000 | |
| Sep 8, 2011 | Completed final sign-off Dec 2011 | 595 Market St | Dome Construction Corp | interior tenant improvement including demolition, new paritions, new electrical, rework existing ceiling and lighting, related finishes. no structural workDetails
interior tenant improvement including demolition, new paritions, new electrical, rework existing ceiling and lighting, related finishes. no structural work | $110,000 |
| Jul 21, 2011 | Completed final sign-off Feb 2012 | 101 Spear St | Skyline Construction | revision to 201103101803: change server room to telephone closet. elec, lightingDetails
revision to 201103101803: change server room to telephone closet. elec, lighting | $125,000 |
| Jul 19, 2011 | Completed final sign-off Nov 2011 | 1160 Battery St | Skyline Construction | 1st floor-construction of new non structural partitions, suspended ceiling systems. m.e.p, life safety, fire sprinkler under seperate permitDetails
1st floor-construction of new non structural partitions, suspended ceiling systems. m.e.p, life safety, fire sprinkler under seperate permit | $600,000 |
| Jun 28, 2011 | Completed final sign-off Nov 2011 | 123 Mission St | Skyline Construction | work at 7th floor: interior upgrade of restrooms including new toilet partitions and finishes for accessibility compliance (barrier removal)Details
work at 7th floor: interior upgrade of restrooms including new toilet partitions and finishes for accessibility compliance (barrier removal) | $50,000 |
| Jun 27, 2011 | Completed final sign-off Sep 2011 | 1 Market St | Bcci Construction Company | 6th floor-t.i. including demolition, minimal construction, lighting, electrical & finiahes. life safety under seperate permitDetails
6th floor-t.i. including demolition, minimal construction, lighting, electrical & finiahes. life safety under seperate permit | $200,000 |
| May 17, 2011 | Completed final sign-off Apr 2012 | 579 Market St | Shames Construction Company Ltd | ti-incl demolition of existing stair and restrooms, new partitions, restrooms, and entry at rear of building ( on stevenson street).Details
ti-incl demolition of existing stair and restrooms, new partitions, restrooms, and entry at rear of building ( on stevenson street). | $700,000 |
| May 10, 2011 | Completed final sign-off Jun 2011 | 101 Montgomery St | Cahill Const Service Inc | demolition of extg raised floor and finishes and extg millwork. space shall remain vacant until subsequent approvedbldg permit per sfbc ab-017.Details
demolition of extg raised floor and finishes and extg millwork. space shall remain vacant until subsequent approvedbldg permit per sfbc ab-017. | $10,000 |
| Apr 7, 2011 | Never finaled issued May 2011, no final | 101 Montgomery St | Cahill Const Service Inc | remove (e) escalator & infill of opening with structural slab. escalator goes from 1st to 2nd floor only. t.i. & elevator install to be completed under pa #201011255422.Details
remove (e) escalator & infill of opening with structural slab. escalator goes from 1st to 2nd floor only. t.i. & elevator install to be completed under pa #201011255422. | $100,000 |
| Mar 30, 2011 | Completed final sign-off Jun 2011 | 100 Pine St | Gci, Inc | to correct address on application #201103111882 (from 101 pine st to 100 pine st.)Details
to correct address on application #201103111882 (from 101 pine st to 100 pine st.) | $180 |
| Mar 30, 2011 | Completed final sign-off Jun 2011 | 100 Pine St | Gci, Inc | to correct address on application #201103111886 (from 101 pine st to 100 pine st.)Details
to correct address on application #201103111886 (from 101 pine st to 100 pine st.) | $180 |
| Mar 8, 2011 | Completed final sign-off Apr 2011 | 100 01st St | San Francisco Commercial Builders Inc | floor 3 - new office addition including new prtitions, new door & relocated lighting, patch ceiling & finishes to match existing, mep & life safety & mep to be design build under separate permit.Details
floor 3 - new office addition including new prtitions, new door & relocated lighting, patch ceiling & finishes to match existing, mep & life safety & mep to be design build under separate permit. | $12,000 |
| Feb 15, 2011 | Never finaled issued Feb 2011, no final | 100 Pine St | Gci, Inc | 31st & 32nd floor - demolition of existing non-structural partitions associated fixtures & finishes. no path of travel required per ab-017. space to remain vacant until future ti work.Details
31st & 32nd floor - demolition of existing non-structural partitions associated fixtures & finishes. no path of travel required per ab-017. space to remain vacant until future ti work. | $30,000 |
| Feb 7, 2011 | Completed final sign-off Dec 2011 | 1 Market St | Bcci Construction Company | spear tower. tenant improvement on the 10th floor including new partitions, doors, lighting and associated mechanical and electrical work.Details
spear tower. tenant improvement on the 10th floor including new partitions, doors, lighting and associated mechanical and electrical work. | $150,000 |
| Jan 25, 2011 | Completed final sign-off Jun 2011 | 101 California St | Source Planning And Construction Inc | 45th floor - demolition of wall partitions, fixtures, plumbing outlets & finishes for vacant t.i. space, no pot under ab-017. t.i. build out to be done under separate permit. fire sprinklers and fire alarm on separate permit.Details
45th floor - demolition of wall partitions, fixtures, plumbing outlets & finishes for vacant t.i. space, no pot under ab-017. t.i. build out to be done under separate permit. fire sprinklers and fire alarm on separate permit. | $40,000 |
| Jan 24, 2011 | Completed final sign-off Mar 2011 | 101 Montgomery St | Cahill Const Service Inc | 7th floor mep for pa 2010-1228-7510 title 24/mep install new duckwork, install new vav's, install new lighting. no fsd's and no card readers shown on this permit.Details
7th floor mep for pa 2010-1228-7510 title 24/mep install new duckwork, install new vav's, install new lighting. no fsd's and no card readers shown on this permit. | $175,262 |
| Dec 28, 2010 | Completed final sign-off Aug 2011 | 1 Market St | Bcci Construction Company | tenant improvement on the 3rd fl to upgrade idf room and associated mech workDetails
tenant improvement on the 3rd fl to upgrade idf room and associated mech work | $90,000 |
| Dec 21, 2010 | Completed final sign-off Dec 2010 | 100 01st St | Ayoob & Peery Plumbing Co Inc | 11th floor-relocate fire sprinkler heads per tenant improvements, 2 relocatedDetails
11th floor-relocate fire sprinkler heads per tenant improvements, 2 relocated | $1,200 |
| Nov 30, 2010 | Completed final sign-off Jan 2011 | 595 Market St | Gci, Inc | 9th floor - demolition of partition & installation of new soffit door, new electrical work, no new lighting or plumbing, mep and fire sprinkler and fire alarm under separate permit.Details
9th floor - demolition of partition & installation of new soffit door, new electrical work, no new lighting or plumbing, mep and fire sprinkler and fire alarm under separate permit. | $40,000 |
| Nov 16, 2010 | Completed final sign-off Apr 2011 | 555 Mission St | Swinerton Builders | 19th floor: new construction to include non structural partitions, finishes, ceilings, lighting and other interior finishes. new elec supply/cabling, data cabling, mech hvac systems, plumbingDetails
19th floor: new construction to include non structural partitions, finishes, ceilings, lighting and other interior finishes. new elec supply/cabling, data cabling, mech hvac systems, plumbing | $708,400 |
| Nov 3, 2010 | Completed final sign-off May 2011 | 595 Market St | Gci, Inc | 22nd floor -interior tenant improvement including demoliton of extg ceiling, new ceiling and lighting. exiting and occupancy to remain unchanged in this scope of work. no structural work to be performed. fire alarm, fire sprinkler under separate permit.Details
22nd floor -interior tenant improvement including demoliton of extg ceiling, new ceiling and lighting. exiting and occupancy to remain unchanged in this scope of work. no structural work to be performed. fire alarm, fire sprinkler under separate permit. | $124,650 |
| Oct 28, 2010 | Completed final sign-off Jan 2011 | 101 Montgomery St | Brayer Electric Company | add additional fire alarm devices to the extg systems. on the 8th floorDetails
add additional fire alarm devices to the extg systems. on the 8th floor | $10,000 |
| Oct 21, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | Cahill Const Service Inc | 26th fl: title 24-meps, relocate supply ductwork for permiter and interior zones. install new vavs. demo and cap parital ductwork.Details
26th fl: title 24-meps, relocate supply ductwork for permiter and interior zones. install new vavs. demo and cap parital ductwork. | $50,000 |
| Oct 12, 2010 | Completed final sign-off Jan 2011 | 101 Montgomery St | Cahill Const Service Inc | 8th fl: title 24, mep's. relocate supply ductwork for perimeter and interior zones. new vavs, demo and cap partial ductworkDetails
8th fl: title 24, mep's. relocate supply ductwork for perimeter and interior zones. new vavs, demo and cap partial ductwork | $50,000 |
| Oct 12, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | Cahill Const Service Inc | tenant improvement consisting of offices including non load bearing paritions, doors ide light glazing, new lighting, new power and finishes. associated mech, elec and fire is design build and performed under sep permit. no structural work.Details
tenant improvement consisting of offices including non load bearing paritions, doors ide light glazing, new lighting, new power and finishes. associated mech, elec and fire is design build and performed under sep permit. no structural work. | $400,000 |
| Sep 2, 2010 | Completed final sign-off Sep 2010 | 153 Townsend St | Turner Construction Co | revision to 201006023632 to remove mechanical work from the scope. not required per attached letter from haiDetails
revision to 201006023632 to remove mechanical work from the scope. not required per attached letter from hai | $1,000 |
| Aug 24, 2010 | Expired or cancelled cancelled Jan 2026 | 595 Market St | 25th floor-t.i. consisting of limited demo, construction of new demising wall & tenant entry door. associated ceiling work & finish work. mechanical, electrical, plumbing, fire & life safety to be issued under seperate permit. no structional work to be performedDetails
25th floor-t.i. consisting of limited demo, construction of new demising wall & tenant entry door. associated ceiling work & finish work. mechanical, electrical, plumbing, fire & life safety to be issued under seperate permit. no structional work to be performed | $15,000 | |
| Jul 30, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | Cahill Const Service Inc | 27th & 28th floor: demolition of existing stairs and infill fo opening. construction of new conference room @ 27th floor only.Details
27th & 28th floor: demolition of existing stairs and infill fo opening. construction of new conference room @ 27th floor only. | $150,000 |
| Jul 30, 2010 | Completed final sign-off May 2011 | 101 Montgomery St | Cahill Const Service Inc | 1st floor demolition of approx 50 lineal ft of drywall partition, demolition of 600 sp ft fo ceiling tile & carpe. demolition of concrete stairs & glass radius wall. install new unisex reatroom, 30 lineal ft of partition wall, carpet & ceiling tile.Details
1st floor demolition of approx 50 lineal ft of drywall partition, demolition of 600 sp ft fo ceiling tile & carpe. demolition of concrete stairs & glass radius wall. install new unisex reatroom, 30 lineal ft of partition wall, carpet & ceiling tile. | $163,000 |
| Jun 18, 2010 | Completed final sign-off Jan 2011 | 101 Montgomery St | Cahill Const Service Inc | office ti-18th fl. demo of approx. 525 lf of drywall partition, 10,00 sf of acoustic ceiling, install 788 lf of drywall partition, new acoustic clg, and new doors and franes. mep under separate permitDetails
office ti-18th fl. demo of approx. 525 lf of drywall partition, 10,00 sf of acoustic ceiling, install 788 lf of drywall partition, new acoustic clg, and new doors and franes. mep under separate permit | $550,000 |
| Apr 14, 2010 | Completed final sign-off Mar 2011 | 575 Market St | Field Construction Inc. | suite 1800. interior tenant improvement including demolition, (n) partitions, (n) electrical, re-work of (e) ceiling & lighting, & related finishes, no structural work to be performed, title 24 calculations to be submitted with mechanical & electrical engineer drawings under separate permit.Details
suite 1800. interior tenant improvement including demolition, (n) partitions, (n) electrical, re-work of (e) ceiling & lighting, & related finishes, no structural work to be performed, title 24 calculations to be submitted with mechanical & electrical engineer drawings under separate permit. | $273,103 |
| Feb 9, 2010 | Completed final sign-off Jul 2010 | 1 California St | Bcci Construction Company | 8th. flr.: tenant improvement of (e) office space including (n) drywall, ceiling, lighting, electrical & hvac.Details
8th. flr.: tenant improvement of (e) office space including (n) drywall, ceiling, lighting, electrical & hvac. | $1,400,000 |
| Nov 6, 2009 | Completed final sign-off Mar 2010 | 595 Market St | Dome Construction Corp | 21st floor -revision to appl #200908114539: removal of exit sign at doorway in hallway #2113. doorway not required to serve as an exit.Details
21st floor -revision to appl #200908114539: removal of exit sign at doorway in hallway #2113. doorway not required to serve as an exit. | $500 |
| Oct 29, 2009 | Completed final sign-off Aug 2010 | 1 Market St | Bcci Construction Company | 7th floor. demo of existing utilization labs and build out of new utilization labs with associated ceiling, electrical, lighting, finish work. mep and fire/life safety under seperate permitDetails
7th floor. demo of existing utilization labs and build out of new utilization labs with associated ceiling, electrical, lighting, finish work. mep and fire/life safety under seperate permit | $200,000 |
| Sep 23, 2009 | Completed final sign-off May 2010 | 555 Mission St | Skyline Construction | new communicating stair between floors 16 and 17. new mep for floors 16 and 17. fire alarm and sprinkler under separate permit.Details
new communicating stair between floors 16 and 17. new mep for floors 16 and 17. fire alarm and sprinkler under separate permit. | $975,000 |
| Aug 17, 2009 | Completed final sign-off Nov 2009 | 555 Mission St | Skyline Construction | 18th floor interior buildout of elevator lobby & multi tenant corridor work includes new partition, ceiling, lighting,mechanical & finishes. fire sprinkler & life safety under separate permit.Details
18th floor interior buildout of elevator lobby & multi tenant corridor work includes new partition, ceiling, lighting,mechanical & finishes. fire sprinkler & life safety under separate permit. | $100,000 |
| Aug 17, 2009 | Completed final sign-off Mar 2010 | 345 California St | Novo Construction Inc | 22nd floor limited demolition & construction of a lorge conference room, war room, pantry & executive offices. new floor finishes & paint throughout. mep, fire sprinkler & life safety under separate permit.Details
22nd floor limited demolition & construction of a lorge conference room, war room, pantry & executive offices. new floor finishes & paint throughout. mep, fire sprinkler & life safety under separate permit. | $150,000 |
| Jun 25, 2009 | Completed final sign-off Aug 2009 | 101 California St | Hathaway Dinwiddie Co. | interior tenant improvement of 3352 sf suite on 10th floor including demo of some partitons, removal of casework and existing flooring. replacement of flooring, existing doors and casework. entire space to be repainted. sprinklers, and life safety sep permitDetails
interior tenant improvement of 3352 sf suite on 10th floor including demo of some partitons, removal of casework and existing flooring. replacement of flooring, existing doors and casework. entire space to be repainted. sprinklers, and life safety sep permit | $115,000 |
| Jun 17, 2009 | Completed final sign-off Oct 2009 | 1 Market St | Bcci Construction Company | 7th floor-tenant improvement including minor demolition & electrical tele/data & idf room upgrades. mechanical work includes new heat pumps, fire smoke dampers & piping. life safety & sprinklers under seperate permitDetails
7th floor-tenant improvement including minor demolition & electrical tele/data & idf room upgrades. mechanical work includes new heat pumps, fire smoke dampers & piping. life safety & sprinklers under seperate permit | $325,600 |
| Apr 30, 2009 | Completed final sign-off Feb 2010 | 101 Kearny St | Hathaway Dinwiddie Co. | mep work only. reference app#200904277102Details
mep work only. reference app#200904277102 | $100,000 |
| Apr 27, 2009 | Completed final sign-off Feb 2010 | 101 Kearny St | Hathaway Dinwiddie Co. | new tenant improvement at 2nd floor. existing condition is warm shell. new work includes new partitons, ceilings, lighting, electrical finishes. mep sep permit.Details
new tenant improvement at 2nd floor. existing condition is warm shell. new work includes new partitons, ceilings, lighting, electrical finishes. mep sep permit. | $400,000 |
| Apr 24, 2009 | Completed final sign-off Aug 2009 | 101 Montgomery St | Cahill Const Service Inc | demo 100 lf of drywall partition, 4500 sf of ceiling tile, 7 doors and frames. install 4500 of new acoustic ceiling tile, 7 doors and frames. install 4500 of new acoustic, 140 lf of ceiling high partition, to 10 doors and frames. mep sep permit.fire alarm&sprinklers sep permit.Details
demo 100 lf of drywall partition, 4500 sf of ceiling tile, 7 doors and frames. install 4500 of new acoustic ceiling tile, 7 doors and frames. install 4500 of new acoustic, 140 lf of ceiling high partition, to 10 doors and frames. mep sep permit.fire alarm&sprinklers sep permit. | $221,000 |
| Apr 24, 2009 | Completed final sign-off Feb 2010 | 101 Kearny St | Hathaway Dinwiddie Co. | 4th floor-new tenant improvement-(e) conditions is warm shell. new work includes: new partitions, new ceiling, new lighting, new electrical, new plumbing & new finishes. m.e.p under seperate permitDetails
4th floor-new tenant improvement-(e) conditions is warm shell. new work includes: new partitions, new ceiling, new lighting, new electrical, new plumbing & new finishes. m.e.p under seperate permit | $400,000 |
| Apr 24, 2009 | Completed final sign-off Feb 2010 | 101 Kearny St | Hathaway Dinwiddie Co. | 3rd floor-new tenant improvement-(e) conditions is warm shell. new work includes: new partitions, new ceiling, new lighting, new electrical, new plumbing & new finishes. m.e.p under seperate permitDetails
3rd floor-new tenant improvement-(e) conditions is warm shell. new work includes: new partitions, new ceiling, new lighting, new electrical, new plumbing & new finishes. m.e.p under seperate permit | $400,000 |
| Apr 14, 2009 | Expired or cancelled cancelled Jan 2026 | 100 Post St | Hathaway Dinwiddie Co. | Details
| $1,500,000 |
| Mar 5, 2009 | Never finaled issued Mar 2009, no final | 50 California St | Ayoob & Peery Plumbing Co Inc | 24th floor-relocate fire sprinkler heads per tenant improvement-relocate 154.Details
24th floor-relocate fire sprinkler heads per tenant improvement-relocate 154. | $25,000 |
| Feb 13, 2009 | Completed final sign-off Nov 2009 | 1 California St | Bcci Construction Company | 16th floor-revision to pa# 2008-1028-5271-to remove electrical, furniture and finishes from previously permitted scope of workDetails
16th floor-revision to pa# 2008-1028-5271-to remove electrical, furniture and finishes from previously permitted scope of work | |
| Feb 13, 2009 | Completed final sign-off Nov 2009 | 1 California St | Bcci Construction Company | 17th floor-revision to pa# 2008-1028-5270-to remove electrical, furniture and finishes from previously permitted scope of workDetails
17th floor-revision to pa# 2008-1028-5270-to remove electrical, furniture and finishes from previously permitted scope of work | |
| Jan 13, 2009 | Completed final sign-off Aug 2009 | 1 California St | Bcci Construction Company | revision to 200810295360 including revised east side of floor plan, elimination of showers and reconfiguration of work sales and associated mep.Details
revision to 200810295360 including revised east side of floor plan, elimination of showers and reconfiguration of work sales and associated mep. | $5,000 |
| Nov 6, 2008 | Completed final sign-off Jan 2009 | 595 Market St | Dome Construction Corp | 27th floor-interior t.i consisting of minor demolition, construction of new conference and break rooms with associated ceiling, electrical and finish work. m.e.p under seperate permitDetails
27th floor-interior t.i consisting of minor demolition, construction of new conference and break rooms with associated ceiling, electrical and finish work. m.e.p under seperate permit | $148,000 |
| Oct 28, 2008 | Completed final sign-off Dec 2009 | 1 California St | Bcci Construction Company | 16th floor-tenant improvement including minor demolition, new partitions, ceilings, lighting, finishes, electrical & mechanical. life safety and sprinkler under seperate permitDetails
16th floor-tenant improvement including minor demolition, new partitions, ceilings, lighting, finishes, electrical & mechanical. life safety and sprinkler under seperate permit | $750,000 |
| Oct 27, 2008 | Completed final sign-off Jul 2009 | 1 California St | Bcci Construction Company | 6th floor tenant improvement including new partitions, ceilings, lighting, finishes, mechanical & electrical. l.s./sprinkler under separate permit.Details
6th floor tenant improvement including new partitions, ceilings, lighting, finishes, mechanical & electrical. l.s./sprinkler under separate permit. | $750,000 |
| Sep 24, 2008 | Completed final sign-off Dec 2008 | 595 Market St | Ayoob & Peery Plumbing Co Inc | on ground fl: relocate fire sprinklers per t.i. 8 sprinkler relocated, 8 added sprinklers, 5 heads removed.Details
on ground fl: relocate fire sprinklers per t.i. 8 sprinkler relocated, 8 added sprinklers, 5 heads removed. | $4,000 |
| Jun 19, 2008 | Completed final sign-off Feb 2009 | 2 Embarcadero Center | 17th floor-demolition of (e) interior office space to accomodate new interior construction of partitions, ceilings, lighting & finishes. new electrical, plumbing & mechanical work is to integrate with (e) systems. new telephone, data, security systems to be installes to coordinate with (e) systemsDetails
17th floor-demolition of (e) interior office space to accomodate new interior construction of partitions, ceilings, lighting & finishes. new electrical, plumbing & mechanical work is to integrate with (e) systems. new telephone, data, security systems to be installes to coordinate with (e) systems | $950,000 | |
| Jun 9, 2008 | Completed final sign-off Jun 2009 | 1 California St | Bcci Construction Company | 29th floor-tenant improvement of (e) office space including new partitions, ceilings, lighting, finishes, electrical and hvac. nov 200854763-pid.Details
29th floor-tenant improvement of (e) office space including new partitions, ceilings, lighting, finishes, electrical and hvac. nov 200854763-pid. | $887,250 |
| Mar 7, 2006 | Completed final sign-off Nov 2006 | 301 Battery St | Principal Builders Inc. | demolition: interior partitions and ceilings. 5th flr. no base bldg work. per ab-017.Details
demolition: interior partitions and ceilings. 5th flr. no base bldg work. per ab-017. | $30,000 |
| Feb 14, 2006 | Expired or cancelled cancelled Mar 2007 | 555 Market St | fixture demolition work in restrooms to prepare area for installations of (n) air handling unitDetails
fixture demolition work in restrooms to prepare area for installations of (n) air handling unit | $10,000 |