Michael Stanton
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Stanton Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jan 2003 to Aug 2026
285 permits since 2000 (architect on 266 permits, designer on 10 permits, engineer on 7 permits, authorized agent-others on 2 permits, attorney on 1 permit): 171 completed, 5 in progress, 74 never finaled, 35 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 285.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | Completed final sign-off Aug 2026 | 555 Post St | Centric Construction Inc | revision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit.Details
revision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit. | $7,000 |
| Jan 30, 2026 | In progress filed Jan 2026, not yet issued | 1050 Van Ness Av | revision to pa 202302212276 - add a new bridge connecting the motel to the exterior walkway @ the northeast corner of the hotel, and update walkways. also, the guest bathroom @ rm #535 will be converted from an acc r1 shower to an acc tub to satisfy iib-224.2Details
revision to pa 202302212276 - add a new bridge connecting the motel to the exterior walkway @ the northeast corner of the hotel, and update walkways. also, the guest bathroom @ rm #535 will be converted from an acc r1 shower to an acc tub to satisfy iib-224.2 | ||
| Jan 16, 2026 | Completed final sign-off May 2026 | 401 Taylor St | Artistic Hospitality And Resorts Constr | ti to an (e) restaurant space. scope includes the select removal of walls, accessible improvements, new flooring, finishes, wall tile & upholstrey, select light fixtures & bar equipment to be replaced. elec & plumbing under trade permit. no exterior scope, change to exits or mechanical scopeDetails
ti to an (e) restaurant space. scope includes the select removal of walls, accessible improvements, new flooring, finishes, wall tile & upholstrey, select light fixtures & bar equipment to be replaced. elec & plumbing under trade permit. no exterior scope, change to exits or mechanical scope | $55,000 |
| Oct 28, 2025 | Completed final sign-off Nov 2025 | 188 King St | project scope is to erect two non structural partitions and a single door to create a mail storage room. no structural work. fa, fs, mep under separate permit. (work in lobby/common area)Details
project scope is to erect two non structural partitions and a single door to create a mail storage room. no structural work. fa, fs, mep under separate permit. (work in lobby/common area) | $8,050 | |
| Oct 28, 2025 | In progress filed Oct 2025, not yet issued | 165 Steuart St | replacement of 16 wood window sashes at the penthouse level. new window shall be all wood casement windows to match (e).Details
replacement of 16 wood window sashes at the penthouse level. new window shall be all wood casement windows to match (e). | $45,000 | |
| May 1, 2025 | In progress filed May 2025, not yet issued | 747 Front St | install a partition and glazed al. (pair) doors to create new wellness room. also infill (e) opening on wall. m.i.p. under sep permit.Details
install a partition and glazed al. (pair) doors to create new wellness room. also infill (e) opening on wall. m.i.p. under sep permit. | $6,150 | |
| Oct 28, 2024 | Completed final sign-off Nov 2024 | 1652 Stockton St | Regan's Renovations | comply with nov # 202429451 renovation of (e) restaurant with same layout. demo & replacement of walls, floors, ceiling finishes, fixtures, counters and seating. no change to facade, use or fls.Details
comply with nov # 202429451 renovation of (e) restaurant with same layout. demo & replacement of walls, floors, ceiling finishes, fixtures, counters and seating. no change to facade, use or fls. | $188,500 |
| Mar 15, 2024 | Completed final sign-off Apr 2025 | 335 Powell St | Centric Construction Inc | addition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387Details
addition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387 | $20,000 |
| Feb 23, 2024 | Completed final sign-off Apr 2024 | 400 Alabama St | Barnet Construction | level 2 tenant space: addition of a lactatioin room to an (e) tenant space and demolition of (e) call booths. selective demo of walls and doors. no exterior work. mep & fire sprinkler under separate permit.Details
level 2 tenant space: addition of a lactatioin room to an (e) tenant space and demolition of (e) call booths. selective demo of walls and doors. no exterior work. mep & fire sprinkler under separate permit. | $12,000 |
| Feb 23, 2024 | Completed final sign-off Apr 2024 | 400 Alabama St | Barnet Construction | level 3 tenant space: addition of conference rooms to an (e) tenant space. selective demolition and installation of walls and doors. no exterior work. mep & fire sprinkler under separate permit.Details
level 3 tenant space: addition of conference rooms to an (e) tenant space. selective demolition and installation of walls and doors. no exterior work. mep & fire sprinkler under separate permit. | $9,000 |
| Feb 7, 2024 | In progress filed Feb 2024, not yet issued | 716 Sacramento St | comply with the accessible business entry program. abe#201911258778. scope of work includes leveling entryway at 716 sacramento st to make it compliant with the accessible business entrance regulation. scope includes extension of existing rail and addition of curb and foor operator push buttonDetails
comply with the accessible business entry program. abe#201911258778. scope of work includes leveling entryway at 716 sacramento st to make it compliant with the accessible business entrance regulation. scope includes extension of existing rail and addition of curb and foor operator push button | $12,000 | |
| Oct 10, 2023 | Completed final sign-off Aug 2024 | 335 Powell St | Centric Construction Inc | revision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space.Details
revision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space. | |
| Oct 3, 2023 | Completed final sign-off Dec 2024 | 345 04th St | Bcci Construction Company | build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. level 3 and 4Details
build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. level 3 and 4 | $1,500,000 |
| Oct 3, 2023 | Completed final sign-off Dec 2024 | 345 04th St | Bcci Construction Company | build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. including gr fl reception/receiving area and cultural education area for level 1 and 2Details
build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. including gr fl reception/receiving area and cultural education area for level 1 and 2 | $1,500,000 |
| Oct 3, 2023 | Completed final sign-off Dec 2024 | 345 04th St | Bcci Construction Company | build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. levels 5-6Details
build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. levels 5-6 | $1,500,000 |
| Oct 3, 2023 | Completed final sign-off Dec 2024 | 345 04th St | Bcci Construction Company | build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. level 7 and roofDetails
build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. level 7 and roof | $1,500,000 |
| Jul 14, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain.Details
renovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain. | $202,500 |
| Jun 15, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado.Details
renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado. | $527,000 |
| May 23, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prepDetails
renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep | $148,850 |
| May 12, 2023 | Completed final sign-off Jun 2025 | 335 Powell St | Centric Construction Inc | proposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittalDetails
proposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittal | $225,000 |
| May 5, 2023 | Completed final sign-off Aug 2026 | 555 Post St | Centric Construction Inc | replace (44) windows along post street facadeDetails
replace (44) windows along post street facade | $50,000 |
| May 5, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | replace (e) revolving door & swing doors w/vestibule and store front. mep under sep permit fire alarm & sprinkler under sep permitDetails
replace (e) revolving door & swing doors w/vestibule and store front. mep under sep permit fire alarm & sprinkler under sep permit | $40,000 |
| May 5, 2023 | Completed final sign-off Jul 2026 | 545 Post St | Centric Construction Inc | replace (90) windows along post street facadeDetails
replace (90) windows along post street facade | $95,000 |
| May 1, 2023 | Expired or cancelled cancelled Oct 2024 | 335 Powell St | Centric Construction Inc | lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms.Details
lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms. | $128,000 |
| Apr 25, 2023 | Completed final sign-off Jan 2024 | 335 Powell St | Trainor Commercial Construction Inc. | mep & food service drawings associted w/pa# 202212218855, fire sprinkler & alarm deferredDetails
mep & food service drawings associted w/pa# 202212218855, fire sprinkler & alarm deferred | $160,000 |
| Apr 7, 2023 | Completed final sign-off Jun 2023 | 222 Mason St | Hp Build | partial reconfiguration of an existing tenant office space @ level 5. includes selective demo & and installation of walls, ceiling and doorsDetails
partial reconfiguration of an existing tenant office space @ level 5. includes selective demo & and installation of walls, ceiling and doors | $5,000 |
| Mar 8, 2023 | Completed final sign-off Sep 2023 | 335 Powell St | Marchetti Group | 31st fl - revision to pa 2022-1221-8859 conversion of (e) ada tub bathroom to ada roll-in shower bathroom. 8 guestrooms converted to 4 master guestrooms by merging 4 rooms to their adjoining room. batroom in guestroom 3194 reconfigured.Details
31st fl - revision to pa 2022-1221-8859 conversion of (e) ada tub bathroom to ada roll-in shower bathroom. 8 guestrooms converted to 4 master guestrooms by merging 4 rooms to their adjoining room. batroom in guestroom 3194 reconfigured. | $190,000 |
| Feb 21, 2023 | In progress issued Dec 2024 | 1050 Van Ness Av | Integrity Builders Inc | the proposed project will renovate 12 motel rooms at the courtyards marriot at 1050 van ness ave. as well as add a new exit stair.Details
the proposed project will renovate 12 motel rooms at the courtyards marriot at 1050 van ness ave. as well as add a new exit stair. | $212,000 |
| Jan 24, 2023 | Completed final sign-off Jun 2023 | 430 California St | Rylko Builders Inc. | t.i. as a partial reconfiguration of an (e) tenant space, bif, at level b1 this includes selective demo and installation of walls, ceilings and doorsDetails
t.i. as a partial reconfiguration of an (e) tenant space, bif, at level b1 this includes selective demo and installation of walls, ceilings and doors | $85,000 |
| Dec 29, 2022 | Completed final sign-off Apr 2025 | 335 Powell St | minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured.Details
minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured. | $345,000 | |
| Dec 21, 2022 | Completed final sign-off Sep 2023 | 335 Powell St | Marchetti Group | renovation of 8 guest rooms on level 31 no change to number of guest rooms, construction including mior demo, plumbing fixtures, new walls and finishes any mep sprinkler and fire alarm shall be done as part of a seperate permit.Details
renovation of 8 guest rooms on level 31 no change to number of guest rooms, construction including mior demo, plumbing fixtures, new walls and finishes any mep sprinkler and fire alarm shall be done as part of a seperate permit. | $160,000 |
| Dec 21, 2022 | Completed final sign-off Jan 2024 | 335 Powell St | Trainor Commercial Construction Inc. | lobby, level 1 - remodel of oak room and medallion room into private hotel lounge. mep and food service drwgs under separate permits. fire sprinkler and alarm drwgs as deferred submittalDetails
lobby, level 1 - remodel of oak room and medallion room into private hotel lounge. mep and food service drwgs under separate permits. fire sprinkler and alarm drwgs as deferred submittal | $160,000 |
| Sep 29, 2022 | Expired or cancelled withdrawn May 2023 | 851 California St | configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf.Details
configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf. | $7,500,000 | |
| Sep 15, 2022 | Completed final sign-off Feb 2024 | 335 Powell St | Marchetti Group | barrier removal to replace non-accessible rotating doors and side doors with two sets of automatic sliding doors (no public right away)Details
barrier removal to replace non-accessible rotating doors and side doors with two sets of automatic sliding doors (no public right away) | |
| Apr 1, 2022 | Completed final sign-off Apr 2023 | 345 04th St | Stoer Construction Inc | revision to 201807194942. update fire pump from 75hp to 40hp, update full load amps, update fire pump controller. update fire pump meter fsb to show 400a breaker. add calculations for lra at 312a so. 400a is acceptable. updated feeders to fire pump controller with a conductor size calculations.Details
revision to 201807194942. update fire pump from 75hp to 40hp, update full load amps, update fire pump controller. update fire pump meter fsb to show 400a breaker. add calculations for lra at 312a so. 400a is acceptable. updated feeders to fire pump controller with a conductor size calculations. | |
| Mar 2, 2022 | Completed final sign-off Aug 2022 | 550 Geary St | Continental Contractors Inc | interior remodel of hotel public spaces on level 1 and 2. specific work includes new flooring, removal and addition of select doors and new built in cabinets. level 2 work is in (e) fitness center. level 1 work in (e) lounge, breakfast room and meeting room.Details
interior remodel of hotel public spaces on level 1 and 2. specific work includes new flooring, removal and addition of select doors and new built in cabinets. level 2 work is in (e) fitness center. level 1 work in (e) lounge, breakfast room and meeting room. | $120,000 |
| Jan 14, 2022 | Completed final sign-off Jun 2022 | 550 Geary St | Continental Contractors Inc | select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work.Details
select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work. | $150,000 |
| Dec 10, 2021 | Expired or cancelled withdrawn Jan 2022 | 4716 Mission St | construct a 6-story, type 3b over 1b building. lv 1 retail. 24 apartment units.Details
construct a 6-story, type 3b over 1b building. lv 1 retail. 24 apartment units. | $4,383,136 | |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 550 Geary St | Continental Contractors Inc | barrier removal permit: addiion of eight communication feature in (e) rooms. no exterior work. fire life safety under separated permit.Details
barrier removal permit: addiion of eight communication feature in (e) rooms. no exterior work. fire life safety under separated permit. | $30,000 |
| Jul 26, 2021 | Completed final sign-off Apr 2022 | 501 Geary St | painted sign on (e) awning on geary street "tratto"Details
painted sign on (e) awning on geary street "tratto" | ||
| Jul 26, 2021 | Completed final sign-off Apr 2022 | 501 Geary St | change translucent glazing to clear glazing on window facing geary st. remove mirrored bronze film on taylor street and replace (e) opaque graphics with transparent window graphics.Details
change translucent glazing to clear glazing on window facing geary st. remove mirrored bronze film on taylor street and replace (e) opaque graphics with transparent window graphics. | $1,200 | |
| Jul 26, 2021 | Completed final sign-off Apr 2022 | 501 Geary St | +painted sign on geary street & taylor street "tratto"Details
+painted sign on geary street & taylor street "tratto" | ||
| Jul 26, 2021 | Completed final sign-off Apr 2022 | 501 Geary St | legalization of six awnings on the exteior facade of windows of the buiding. removal of back lighting on menu boxes mounted on the main hotel entry. new down lighting to be installed.Details
legalization of six awnings on the exteior facade of windows of the buiding. removal of back lighting on menu boxes mounted on the main hotel entry. new down lighting to be installed. | $9,000 | |
| Jun 14, 2021 | Never finaled issued Jun 2021, no final | 2310 Polk St | scope of work include replacement of portion of existing bar with an accessible portion that complies with accessibility requirement.Details
scope of work include replacement of portion of existing bar with an accessible portion that complies with accessibility requirement. | $500 | |
| Apr 15, 2021 | Expired or cancelled cancelled Jan 2026 | 501 Geary St | levels 2-7: renovation of 27 guestroom bathrooms including new walls, ceilings, finishes, and plumbing fixtures. mep, fire sprinkler and alarm as necessary will be under a separate permit. no exterior work.Details
levels 2-7: renovation of 27 guestroom bathrooms including new walls, ceilings, finishes, and plumbing fixtures. mep, fire sprinkler and alarm as necessary will be under a separate permit. no exterior work. | $230,000 | |
| Feb 11, 2021 | Never finaled filed Feb 2021, never issued | 161 Steuart St | barrier removal consists of new inclined lift at existing exterior stair alcove. structural connection to existing stair treads. new electrical for inclined lift motor is deferred submittal. partial lift run and lower landing at san francisco port sidewalk at embarcadero.Details
barrier removal consists of new inclined lift at existing exterior stair alcove. structural connection to existing stair treads. new electrical for inclined lift motor is deferred submittal. partial lift run and lower landing at san francisco port sidewalk at embarcadero. | $62,000 | |
| Feb 4, 2021 | Never finaled filed Feb 2021, never issued | 130 Townsend St | adaptive re-use of existing age eligible building in a historic district to retain existing facade & build a 5-story vertical addition, resulting in an office bldg w/ ground flr retail/restaurant use. the proposed office will be under theDetails
adaptive re-use of existing age eligible building in a historic district to retain existing facade & build a 5-story vertical addition, resulting in an office bldg w/ ground flr retail/restaurant use. the proposed office will be under the | $8,000,000 | |
| Feb 4, 2021 | Never finaled filed Feb 2021, never issued | 130 Townsend St | construct a 6 story office building on the existing surface parking on the north side of the property (50 stanford)Details
construct a 6 story office building on the existing surface parking on the north side of the property (50 stanford) | $8,000,000 | |
| Jan 13, 2021 | Completed final sign-off Oct 2021 | 1399 Church St | Cookline Construction Inc | replace (e) window with a new window, frame,size,opening to remain the same glas color to remain the same (front)Details
replace (e) window with a new window, frame,size,opening to remain the same glas color to remain the same (front) | $5,000 |
| Nov 30, 2020 | Never finaled issued Mar 2021, no final | 225 Powell St | Monolith Commercial Group Llc, Award Construction And Restoration Inc | room #307: barrier removal. convert one guestroom into an accessible suite to meet dispersion goals. no exterior work. all electrical and plumbing scope under defered submittal. fire sprinkler & fire alarm wokr under separate permit.Details
room #307: barrier removal. convert one guestroom into an accessible suite to meet dispersion goals. no exterior work. all electrical and plumbing scope under defered submittal. fire sprinkler & fire alarm wokr under separate permit. | $20,000 |
| Oct 26, 2020 | Completed final sign-off Apr 2022 | 4230 18th St | Cookline Construction Inc | first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381.Details
first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381. | $148,000 |
| Oct 22, 2020 | Completed final sign-off Dec 2021 | 222 Mason St | Continental Contractors Inc | renovation of guest bathrooms on l6-l12 and 14-21. slective demo and installation of finishes, doors, bathroom accessories, light fixtures and plumbing fixtures.Details
renovation of guest bathrooms on l6-l12 and 14-21. slective demo and installation of finishes, doors, bathroom accessories, light fixtures and plumbing fixtures. | $896,000 |
| Jul 8, 2020 | Never finaled issued Apr 2021, no final | 225 Powell St | Trainor Commercial Construction Inc. | the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit.Details
the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit. | $90,000 |
| Jul 7, 2020 | Completed final sign-off Jan 2021 | 165 Steuart St | M C S Construction Services | permit consist of cosmetic modifications to the 1st fl lobby, including new wall finishes, casework, lighting & electrical. no work to exterior. no demo or modification of historic elements. maher naDetails
permit consist of cosmetic modifications to the 1st fl lobby, including new wall finishes, casework, lighting & electrical. no work to exterior. no demo or modification of historic elements. maher na | $400,000 |
| Jun 10, 2020 | Never finaled issued Jan 2021, no final | 225 Powell St | Trainor Commercial Construction Inc. | the project scope consists of the renovation of the ground floor public space of an existing hotel. specific works includes the removal of an existing bar and the creation of new retail tenant space fronting powell street. no exterior work is proposed.Details
the project scope consists of the renovation of the ground floor public space of an existing hotel. specific works includes the removal of an existing bar and the creation of new retail tenant space fronting powell street. no exterior work is proposed. | $75,000 |
| May 22, 2020 | Never finaled issued Oct 2021, no final | 2 Turk St | Complete Property Services Llc | installation of mechanical unit on level 1 mezzanine roof and level 9 roof to meet article 38 related to 2019-002900prj, install ducts within building.Details
installation of mechanical unit on level 1 mezzanine roof and level 9 roof to meet article 38 related to 2019-002900prj, install ducts within building. | $120,000 |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 200 Ofarrell St | to comply with accessible buiness entrance programa per ordinance 51-16 due to tehnical infeasibility or unreasonable hardship. (e) conditions shall remian. no work to be done.Details
to comply with accessible buiness entrance programa per ordinance 51-16 due to tehnical infeasibility or unreasonable hardship. (e) conditions shall remian. no work to be done. | ||
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 220 Ofarrell St | to comply with accessible buiness entrance program per ordinance 51-16: install push button shall be provided to operate door interior and exterior. approval of technical infeasability request.Details
to comply with accessible buiness entrance program per ordinance 51-16: install push button shall be provided to operate door interior and exterior. approval of technical infeasability request. | $1,000 | |
| Nov 12, 2019 | Expired or cancelled cancelled Nov 2024 | 128 King St | selective demo, wall relocation , change use/enlarge of (e) ground mezzanine floors from (e) restaurant space to office. no exterior & structural modifications proposed. no change in egress maher not reqDetails
selective demo, wall relocation , change use/enlarge of (e) ground mezzanine floors from (e) restaurant space to office. no exterior & structural modifications proposed. no change in egress maher not req | $24,000 | |
| Oct 10, 2019 | Completed final sign-off Jan 2021 | 430 California St | Bana Construction Inc | scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher naDetails
scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher na | $1,634,000 |
| Sep 13, 2019 | Expired or cancelled withdrawn Dec 2019 | 425 Mason St | replace all (e) windows on levels 2-7 in kind within (e) opening. full bldg renovation permit is under appln #201702219754. lobby & roof windows replace uner minor permit to alter #2016005799ptaDetails
replace all (e) windows on levels 2-7 in kind within (e) opening. full bldg renovation permit is under appln #201702219754. lobby & roof windows replace uner minor permit to alter #2016005799pta | $168,000 | |
| Aug 14, 2019 | Never finaled issued Sep 2019, no final | 138 King St | O'keeffe Construction Inc | modification within existing hotel to provide a guestroom with mobility features. mep is part of separate permitDetails
modification within existing hotel to provide a guestroom with mobility features. mep is part of separate permit | $30,000 |
| Jul 26, 2019 | Never finaled issued Aug 2019, no final | 140 Mason St | Centric Construction Inc | all floors: evacuation signage related to pa 2016-1115-2731 interior signs only. maher n/a.Details
all floors: evacuation signage related to pa 2016-1115-2731 interior signs only. maher n/a. | $20,000 |
| May 24, 2019 | Expired or cancelled cancelled Dec 2022 | 2 Turk St | Espitia General Contractors Incorporated, Complete Property Services Llc | replace extg fire scissor ladder with cantilever counterbalanced ladderDetails
replace extg fire scissor ladder with cantilever counterbalanced ladder | $5,000 |
| Apr 18, 2019 | Completed final sign-off Dec 2019 | 430 California St | Sc Builders, Inc | removal of non-structural partitions, ceilings, architectural finishes. electrical & mechanical to prepare floors for future tenant improvements. demolition to occur on levels 2-3, 5-11. fire sprinkler & fire alarm under separate permit. n/a for maher.Details
removal of non-structural partitions, ceilings, architectural finishes. electrical & mechanical to prepare floors for future tenant improvements. demolition to occur on levels 2-3, 5-11. fire sprinkler & fire alarm under separate permit. n/a for maher. | $20,000 |
| Mar 26, 2019 | Completed final sign-off Apr 2019 | 562 Sutter St | Centric Construction Inc | rev to pa201809170423; remove of scope of levl 1 recessed entry. scope includes door j, door h and type a5 eterior wall. this scope under sep pa201811054938. this permit to satisy requ from dcp kelly wong.Details
rev to pa201809170423; remove of scope of levl 1 recessed entry. scope includes door j, door h and type a5 eterior wall. this scope under sep pa201811054938. this permit to satisy requ from dcp kelly wong. | |
| Mar 22, 2019 | Never finaled issued Apr 2019, no final | 2 Turk St | Espitia General Contractors Incorporated | provide (n) bathrooms in units at nw corner of bldg at levels 3-10. swap guestrm & lounge on levels 3-10. relocate unit from 2nd fl to 10th flr. mep, fire spirnkler and fire alarm as separate permit as needed.Details
provide (n) bathrooms in units at nw corner of bldg at levels 3-10. swap guestrm & lounge on levels 3-10. relocate unit from 2nd fl to 10th flr. mep, fire spirnkler and fire alarm as separate permit as needed. | $120,000 |
| Mar 22, 2019 | Expired or cancelled cancelled Jan 2026 | 952 Sutter St | revision to pa 2016-0516-7516 additionof wall heater into 5 existing residential units. no change in unit 29 ft or occupancy. fire protection under separate permitDetails
revision to pa 2016-0516-7516 additionof wall heater into 5 existing residential units. no change in unit 29 ft or occupancy. fire protection under separate permit | ||
| Mar 21, 2019 | Never finaled issued Jan 2020, no final | 562 Sutter St | Trainor Commercial Construction Inc. | permit consists of modifications to basment maintenance room and office to support new sidewalk lift and machine room. existing lift gate opening at sutter st sidewalk to be revised; no change to sidewalk grading. new lift pit. no structural modification to sidewalkDetails
permit consists of modifications to basment maintenance room and office to support new sidewalk lift and machine room. existing lift gate opening at sutter st sidewalk to be revised; no change to sidewalk grading. new lift pit. no structural modification to sidewalk | $242,000 |
| Feb 27, 2019 | Expired or cancelled cancelled Jul 2024 | 2 Turk St | change of use from r1 (tourist hotel) to r2 (student housing), modiry fire escape on level. change of door hardware, any required fire alarm and sprinkler work are part of a separate permitDetails
change of use from r1 (tourist hotel) to r2 (student housing), modiry fire escape on level. change of door hardware, any required fire alarm and sprinkler work are part of a separate permit | $6,000 | |
| Jan 10, 2019 | Completed final sign-off Apr 2019 | 430 California St | remodel of an extg basement office and includes selective wall demolition and installation of new doors and walls. no exterior work or change of occupancy. fire life safety and mep under seperate permit.Details
remodel of an extg basement office and includes selective wall demolition and installation of new doors and walls. no exterior work or change of occupancy. fire life safety and mep under seperate permit. | $2,000 | |
| Dec 4, 2018 | Completed final sign-off Apr 2019 | 562 Sutter St | Centric Construction Inc | revision to app#201810294431: electrical work to support renovation of level 1 public spaces. work includes new lighting and elec. cafe, library bar/fire alarm & sprinkler scope to be addressed in seperate permit. n/a for maher.Details
revision to app#201810294431: electrical work to support renovation of level 1 public spaces. work includes new lighting and elec. cafe, library bar/fire alarm & sprinkler scope to be addressed in seperate permit. n/a for maher. | |
| Nov 30, 2018 | Completed final sign-off Dec 2022 | 345 04th St | Stoer Construction Inc | shoring for future work. maher n/a.Details
shoring for future work. maher n/a. | $143,000 |
| Nov 30, 2018 | Completed final sign-off Dec 2022 | 343 04th St | Stoer Construction Inc | demolish 2-story, type 1, office building. maher n/a.Details
demolish 2-story, type 1, office building. maher n/a. | $432,700 |
| Nov 28, 2018 | Completed final sign-off Apr 2019 | 701 03rd St | Charles Pankow Builders Ltd | rev to pa# 20160512726753; food service equipment drawings for 1st fl. pantry/eating areaDetails
rev to pa# 20160512726753; food service equipment drawings for 1st fl. pantry/eating area | $2,000 |
| Nov 13, 2018 | Expired or cancelled cancelled Jul 2024 | 1055 Market St | demolish a 2-story, type 3b commercial bldg w/ 1 basement.Details
demolish a 2-story, type 3b commercial bldg w/ 1 basement. | $147,921 | |
| Nov 5, 2018 | Never finaled issued Jul 2020, no final | 562 Sutter St | minor permit to alter consits of replacing selected (e) wood single hung windows in-kind with (n)wood single hung windows, scope limited to guest room at suter st facade. now work to be done to level 1 storefront glazingDetails
minor permit to alter consits of replacing selected (e) wood single hung windows in-kind with (n)wood single hung windows, scope limited to guest room at suter st facade. now work to be done to level 1 storefront glazing | $81,000 | |
| Nov 5, 2018 | Completed final sign-off Mar 2020 | 562 Sutter St | Centric Construction Inc | facade modifcations,limited to fire escape ladder & ground fl storefront zone, scope inlcudes new finishes & fixed marquee. demo of existing fabric awnigs, decorative architrave & column strouds. signage under separate permitDetails
facade modifcations,limited to fire escape ladder & ground fl storefront zone, scope inlcudes new finishes & fixed marquee. demo of existing fabric awnigs, decorative architrave & column strouds. signage under separate permit | $67,000 |
| Oct 29, 2018 | Completed final sign-off Apr 2019 | 562 Sutter St | Centric Construction Inc | interior modifications limitted to level 1 reception cafe and library bar. new casework, door and finishes. new electrical and plumbing and food service equipment. fire alarm/sprinkler to be addressed in seperate permit. deferred mechanical.Details
interior modifications limitted to level 1 reception cafe and library bar. new casework, door and finishes. new electrical and plumbing and food service equipment. fire alarm/sprinkler to be addressed in seperate permit. deferred mechanical. | $101,000 |
| Oct 29, 2018 | Completed final sign-off Apr 2019 | 562 Sutter St | Centric Construction Inc | electrical work to support renovation of level 1 public spaces. work includes new lighting and electrical. cafe, library bar, fire alarm and sprinkler scope to be addressed in seperate permit. n/a for maher. electrical for new sidewalk liftDetails
electrical work to support renovation of level 1 public spaces. work includes new lighting and electrical. cafe, library bar, fire alarm and sprinkler scope to be addressed in seperate permit. n/a for maher. electrical for new sidewalk lift | $60,000 |
| Oct 9, 2018 | Never finaled filed Oct 2018, never issued | 1055 Market St | to erect a 10-story w/ one basement, type 1b, mixed use bldg w/ 157 hotel rooms.Details
to erect a 10-story w/ one basement, type 1b, mixed use bldg w/ 157 hotel rooms. | $25,250,000 | |
| Sep 17, 2018 | Completed final sign-off Apr 2019 | 562 Sutter St | Centric Construction Inc | rev to # 201804206916, consists of interior modifications limited to level 1 1 public spaces & basement scope includes new ceiling, partitions, doors, finishes & casework mep scope is seperate permitDetails
rev to # 201804206916, consists of interior modifications limited to level 1 1 public spaces & basement scope includes new ceiling, partitions, doors, finishes & casework mep scope is seperate permit | |
| Sep 14, 2018 | Never finaled issued Feb 2019, no final | 562 Sutter St | Elements Of Hospitality Inc | revision to app#201804045507, consists of interior modifications to guest room mechanical and bathrooms. showers reverted back to extg tubs in 30 guest bathrooms. mechanical units reduced on level 2. no exterior work. no change to guest room count. n/a for maherDetails
revision to app#201804045507, consists of interior modifications to guest room mechanical and bathrooms. showers reverted back to extg tubs in 30 guest bathrooms. mechanical units reduced on level 2. no exterior work. no change to guest room count. n/a for maher | |
| Aug 22, 2018 | Completed final sign-off May 2019 | 140 Mason St | Centric Construction Inc | replacement of 54 windows facing mason streetDetails
replacement of 54 windows facing mason street | $45,000 |
| Aug 16, 2018 | Never finaled issued Feb 2019, no final | 562 Sutter St | Elements Of Hospitality Inc | floors 2-7: revision to pa #201804045507; consist of interior modifications to guest level corridors. scope includes electrical & plumbing work for corridor amenity stations and new lighting. no exterior work. no change to guest room count. maher naDetails
floors 2-7: revision to pa #201804045507; consist of interior modifications to guest level corridors. scope includes electrical & plumbing work for corridor amenity stations and new lighting. no exterior work. no change to guest room count. maher na | $30,000 |
| Aug 7, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | revision to app#201611152731 and 201806252863. revision to proposed kitchen equipment layout at basement and ground level. remove sheets ka-1 to kb-4. new euipment for existing kitchen.Details
revision to app#201611152731 and 201806252863. revision to proposed kitchen equipment layout at basement and ground level. remove sheets ka-1 to kb-4. new euipment for existing kitchen. | |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 140 Mason St | Centric Construction Inc | revision to app#201611021718. relocate proposed passanger ada curb rampDetails
revision to app#201611021718. relocate proposed passanger ada curb ramp | |
| Jul 19, 2018 | Completed final sign-off Jun 2023 | 345 04th St | Stoer Construction Inc | to erect 7 stories, no basement, type i-b, office building. ** disturbance of at least 50 cu.yd. of soil, route to dph **Details
to erect 7 stories, no basement, type i-b, office building. ** disturbance of at least 50 cu.yd. of soil, route to dph ** | $15,000,000 |
| Jul 5, 2018 | Completed final sign-off Jan 2019 | 450 Powell St | Centric Construction Inc | removing bathtubs & replacing with showers in 187 hotel guest rooms, tile will be repaired as needed, no change in occupancy or egress mep and fire protection under separate permitDetails
removing bathtubs & replacing with showers in 187 hotel guest rooms, tile will be repaired as needed, no change in occupancy or egress mep and fire protection under separate permit | $400,000 |
| Jun 25, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | revision to 201611152731 & 201802141310. relocate proposed accessible restrooms on the ground flr and minor modifications to basement utility room and hotel back of house space. mep/fa/fs under sep permitDetails
revision to 201611152731 & 201802141310. relocate proposed accessible restrooms on the ground flr and minor modifications to basement utility room and hotel back of house space. mep/fa/fs under sep permit | |
| Jun 6, 2018 | Completed final sign-off Jan 2019 | 335 Powell St | M C S Construction Services | 32nd fl - demolition of a non-load bearing partition, ceiling, detailing and repair. updating of light fixtures. no change to occupant loadDetails
32nd fl - demolition of a non-load bearing partition, ceiling, detailing and repair. updating of light fixtures. no change to occupant load | $64,000 |
| May 24, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | layout revision to app#201611152731. scope of work includes revisions to proposed accessible guestroom bath types, standard bathrooms, and shared kitchen/jaundry, mep, fa, fs under seperate permit. no increase to occupancy. no rduction to sro count. to comply with nov 201459891.Details
layout revision to app#201611152731. scope of work includes revisions to proposed accessible guestroom bath types, standard bathrooms, and shared kitchen/jaundry, mep, fa, fs under seperate permit. no increase to occupancy. no rduction to sro count. to comply with nov 201459891. | |
| Apr 20, 2018 | Never finaled issued Sep 2018, no final | 562 Sutter St | Centric Construction Inc | renovation of level 1 public spaces, and basement fitness room and office. work includes non-structural demo and construction of walls, doors, ceilings and finishes. mep, fire alarm and sprinkler scope to be addressed in separate permit. n/a for maherDetails
renovation of level 1 public spaces, and basement fitness room and office. work includes non-structural demo and construction of walls, doors, ceilings and finishes. mep, fire alarm and sprinkler scope to be addressed in separate permit. n/a for maher | $330,000 |
| Apr 4, 2018 | Never finaled issued Aug 2018, no final | 562 Sutter St | Elements Of Hospitality Inc | reno of 91 out of 96 guest bathrooms. work shall include replacement of plumbing fixtures, a-2 bathroom doors and 11 guest entry doors, and modification of 49 bathroom doors and replacement of guest floor corridor lightingDetails
reno of 91 out of 96 guest bathrooms. work shall include replacement of plumbing fixtures, a-2 bathroom doors and 11 guest entry doors, and modification of 49 bathroom doors and replacement of guest floor corridor lighting | $430,000 |
| Mar 20, 2018 | Never finaled issued Mar 2018, no final | 1050 Van Ness Av | reference to 201803143660 and 201506027875 clarification of door locations on basement level. no structural. no change to egress. mep under sep permitDetails
reference to 201803143660 and 201506027875 clarification of door locations on basement level. no structural. no change to egress. mep under sep permit | ||
| Mar 16, 2018 | Expired or cancelled cancelled Jan 2026 | 562 Sutter St | correction of a labeling error to guest room #713 and #714. drawing set is a revision to app#201711224717. n/a for maherDetails
correction of a labeling error to guest room #713 and #714. drawing set is a revision to app#201711224717. n/a for maher | ||
| Feb 27, 2018 | Never finaled issued Apr 2018, no final | 1050 Van Ness Av | renovation of fitness room. meeting room, and storage areas on level. b1 mech work only. ref pa#201803204144Details
renovation of fitness room. meeting room, and storage areas on level. b1 mech work only. ref pa#201803204144 | $25,000 | |
| Feb 14, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | revision to app#2011611152731. relocates proposed gurney elevator location to extg atrium.Details
revision to app#2011611152731. relocates proposed gurney elevator location to extg atrium. | |
| Feb 13, 2018 | Never finaled issued Aug 2018, no final | 562 Sutter St | alteration: renovation of 5 accessible guest bathrooms. work shall include replacement of plumbing fixtures, partitions, finishes and doors. rooms include #311,406,506,606,711. no fire alarm or sprinkler work per this permit scope of work. n/a for maherDetails
alteration: renovation of 5 accessible guest bathrooms. work shall include replacement of plumbing fixtures, partitions, finishes and doors. rooms include #311,406,506,606,711. no fire alarm or sprinkler work per this permit scope of work. n/a for maher | $94,103 | |
| Dec 6, 2017 | Completed final sign-off Nov 2018 | 165 Steuart St | Award Construction And Restoration Inc | 4,5,6,7,8 flrs: revision to 201706209811 & 201710302669 arch and mep revision to x16 stack due to unforseen site conditions on the chase wall. 416 layout change removed from scope, (e) room layout to remain. 516-816 chase wall be be remove from scope. demo of doors added rm layout revised 531-831Details
4,5,6,7,8 flrs: revision to 201706209811 & 201710302669 arch and mep revision to x16 stack due to unforseen site conditions on the chase wall. 416 layout change removed from scope, (e) room layout to remain. 516-816 chase wall be be remove from scope. demo of doors added rm layout revised 531-831 |