Permit GraphShortlistSan Francisco building permits since 2000

Permit 202204011394

345 04th St

revision to 201807194942. update fire pump from 75hp to 40hp, update full load amps, update fire pump controller. update fire pump meter fsb to show 400a breaker. add calculations for lra at 312a so. 400a is acceptable. updated feeders to fire pump controller with a conductor size calculations.

Outcome
Completed (city status: complete, Apr 19, 2023)
Filed
Apr 1, 2022
Permit issued
Apr 7, 2022
Final sign-off
Apr 19, 2023
Building use
office
Neighborhood
South of Market
Contractor
Stoer Construction Inc (license 1000445)
Property
All permits at this address (block 3751, lot 165)

Everyone on the permit

The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.

Contractor
Stoer Construction Inc (license 1000445)
Architect
Michael Stanton, Stanton Architecture (license C11562)
Authorized agent-others
John Fogerty, Ars (no license listed), applicant