Timothy Wilson
- License
- S6987
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6987 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Tuan And Robinson Structural
- Based in
- San Francisco
- On San Francisco permits
- Dec 2019 to Nov 2026
3 permits since 2000 (engineer on 3 permits): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Ca United Mechanical, Inc
- Architects
- Brenna Weaver, Jonathan Ennis, Michael Stanton
- Engineers
- Timothy Lindfelt, William Hadinger
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 77 Geary St | Ca United Mechanical, Inc | install new closed loop fluid cooler on the roof. reconnect (e) air handlers to (e) condenser water piping.Details
install new closed loop fluid cooler on the roof. reconnect (e) air handlers to (e) condenser water piping. | $618,136 |
| Jan 30, 2026 | In progress filed Jan 2026, not yet issued | 1050 Van Ness Av | revision to pa 202302212276 - add a new bridge connecting the motel to the exterior walkway @ the northeast corner of the hotel, and update walkways. also, the guest bathroom @ rm #535 will be converted from an acc r1 shower to an acc tub to satisfy iib-224.2Details
revision to pa 202302212276 - add a new bridge connecting the motel to the exterior walkway @ the northeast corner of the hotel, and update walkways. also, the guest bathroom @ rm #535 will be converted from an acc r1 shower to an acc tub to satisfy iib-224.2 | ||
| Dec 17, 2019 | In progress issued May 2026 | 400 Divisadero St | to erect 5 stories type iii-a over 3 stories type i-a mixed use 8 story building, with 203 residential dwelling units and amenity spaces, with a commercial tenant space at level 1. (r-2, a-3, a-2, s-2, b)Details
to erect 5 stories type iii-a over 3 stories type i-a mixed use 8 story building, with 203 residential dwelling units and amenity spaces, with a commercial tenant space at level 1. (r-2, a-3, a-2, s-2, b) | $47,875,275 |