Permit GraphShortlistSan Francisco building permits since 2000

Douglas Mehl

License
C17504
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C17504 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Fennie + Mehl Architects
Based in
San Francisco
On San Francisco permits
Jun 2005 to Mar 2026

86 permits since 2000 (architect on 83 permits, engineer on 3 permits): 70 completed, 2 in progress, 10 never finaled, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Novo Construction Inc (13), R.M.R. Construction Company (12), A M Rocca Inc. (10), Principal Builders Inc. (9), Bcci Construction Company (6), Truebeck Construction (5), Richlen Construction (4), Sc Builders, Inc (3), Skyline Construction (3), Ideal Dimensions Inc (2), Plant Construction Co, Lp (2), Source Planning And Construction Inc (2), Buck O'neill Builders Inc., Dpr Construction Inc, Gci, Inc, Gidel & Kocal Construction Co Inc, Lombardi Property Development, Modern Construction Inc, Rossi Builders Inc.
Architects
Amit Wadhwa. Pe, Ariane Lebrilla, Omied Arvin
Engineers
Alexander Pacheco (2), Rodolfo Bustos (2), Ryan Bogart (2), Alexander Joseph Pacheco, Amit Wadhwa, Craig Laws, Elizabeth Allen, Meng Hsiu Chen, Pak K Hui.Se, Ryan Bogart, Zack Kardon
Authorized agents
Chris Trzybysz, Karen Anne Eichler, Patrick Buscovich

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 20, 2026Completed
final sign-off Apr 2026
501 02nd StR.M.R. Construction Company1st/f ste# 150: revision to 202512030848, install 2 phone pods
Details
Permit
202603207993
Permit issued
Mar 20, 2026
Final sign-off
Apr 14, 2026

1st/f ste# 150: revision to 202512030848, install 2 phone pods

Open the permit page

$12,000
Mar 12, 2026Completed
final sign-off May 2026
501 02nd StR.M.R. Construction Companyste 501. (2) new privacy pods. provide seismic anchorage to concrete slab.
Details
Permit
202603127477
Permit issued
Mar 13, 2026
Final sign-off
May 27, 2026

ste 501. (2) new privacy pods. provide seismic anchorage to concrete slab.

Open the permit page

$18,000
Dec 3, 2025Completed
final sign-off Apr 2026
501 02nd StR.M.R. Construction Company#150: installing 3 new privacy pods. provide seismic anchorage to concrete slab.
Details
Permit
202512030848
Permit issued
Dec 3, 2025
Final sign-off
Apr 14, 2026

#150: installing 3 new privacy pods. provide seismic anchorage to concrete slab.

Open the permit page

$9,000
Aug 19, 2025Completed
final sign-off Sep 2025
501 02nd StR.M.R. Construction Company1st/f ste# 150: provide seismic anchorage to privacy pods per fire department nov 2506-0190 dated 6/11/25
Details
Permit
202508193408
Permit issued
Aug 21, 2025
Final sign-off
Sep 18, 2025

1st/f ste# 150: provide seismic anchorage to privacy pods per fire department nov 2506-0190 dated 6/11/25

Open the permit page

$12,000
Dec 26, 2024Completed
final sign-off Jul 2025
1 California StNovo Construction Inc8th floor; interior demolition of ceiling height partitions construction of new partiations, doors, glazing, millowrk, finishes, associated mechanical, electrical, and plumbing.
Details
Permit
202412267405
Permit issued
Jan 13, 2025
Final sign-off
Jul 22, 2025

8th floor; interior demolition of ceiling height partitions construction of new partiations, doors, glazing, millowrk, finishes, associated mechanical, electrical, and plumbing.

Open the permit page

$2,500,000
May 20, 2024Completed
final sign-off Nov 2024
501 02nd StPrincipal Builders Inc.6th fl/ ste 615. t.i. n) partitions, millwork, glazing, finishes, power/lighting/mech distribution. all non-structural.
Details
Permit
202405202435
Permit issued
May 31, 2024
Final sign-off
Nov 18, 2024

6th fl/ ste 615. t.i. n) partitions, millwork, glazing, finishes, power/lighting/mech distribution. all non-structural.

Open the permit page

$345,000
May 7, 2024Completed
final sign-off Aug 2026
350 Brannan StLombardi Property Development2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompasses
Details
Permit
202405071584
Permit issued
Apr 8, 2026
Final sign-off
Aug 6, 2026

2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompasses

Open the permit page

$375,000
May 6, 2024In progress
filed May 2024, not yet issued
350 Brannan Stbarrier removal only -demo ofpartitions, entry landing, g/f entry lobby & stair improvement & finishes, structural scope encompasses concrete infill & concrete stair at vestibule, stair stringer & glass guardrail attachment. associated ele/power/lighting distribution.
Details
Permit
202405061460

barrier removal only -demo ofpartitions, entry landing, g/f entry lobby & stair improvement & finishes, structural scope encompasses concrete infill & concrete stair at vestibule, stair stringer & glass guardrail attachment. associated ele/power/lighting distribution.

Open the permit page

$150,000
Dec 13, 2023In progress
issued May 2024
350 Brannan Stdecommission and demolition of (e) freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sf planning code.
Details
Permit
202312132468
Permit issued
May 3, 2024

decommission and demolition of (e) freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sf planning code.

Open the permit page

$10,000
Nov 16, 2023Completed
final sign-off Feb 2024
501 02nd StPrincipal Builders Inc.ste 600: t.i. demo full height partitions, construct new partitions, doors, millwork, mep. demising new ste 600, ste 615 and base buidling corridor.
Details
Permit
202311160961
Permit issued
Nov 30, 2023
Final sign-off
Feb 7, 2024

ste 600: t.i. demo full height partitions, construct new partitions, doors, millwork, mep. demising new ste 600, ste 615 and base buidling corridor.

Open the permit page

$539,280
Nov 16, 2023Completed
final sign-off Feb 2024
501 02nd StPrincipal Builders Inc.6th floor (ste# 615): ti demo millwork; lighting (n) full-weight partitions, millwork, mep.
Details
Permit
202311160969
Permit issued
Nov 30, 2023
Final sign-off
Feb 14, 2024

6th floor (ste# 615): ti demo millwork; lighting (n) full-weight partitions, millwork, mep.

Open the permit page

$239,440
Aug 16, 2023Never finaled
issued Aug 2023, no final
350 Brannan StModern Construction Incdemo: remove all non-structure interior walls and ceiling on the 2nd floor
Details
Permit
202308164568
Permit issued
Aug 16, 2023

demo: remove all non-structure interior walls and ceiling on the 2nd floor

Open the permit page

$35,000
May 25, 2023Expired or cancelled
withdrawn Dec 2023
350 Brannan Stestablish office use per 2021-011143zad zoning administrator determination letter. renovate ground and 2nd floors. no work on 3rd floor. demolition of existing ceiling height partitions, new full height non bearing partition walls, cold form steel infill and glass guardrail attachments, mep deferred
Details
Permit
202305258623

establish office use per 2021-011143zad zoning administrator determination letter. renovate ground and 2nd floors. no work on 3rd floor. demolition of existing ceiling height partitions, new full height non bearing partition walls, cold form steel infill and glass guardrail attachments, mep deferred

Open the permit page

$1,480,488
Jan 6, 2023Completed
final sign-off May 2023
501 02nd StR.M.R. Construction Companydemising (e) suite 120 into 2 separate suites. (e) suite 120 no new construction. (n) suite 150: const new full height partitions, doors, glazing, millwork, finishing and asscos power ltg distribution. deferred life safety, elec & mech
Details
Permit
202301069815
Permit issued
Jan 11, 2023
Final sign-off
May 19, 2023

demising (e) suite 120 into 2 separate suites. (e) suite 120 no new construction. (n) suite 150: const new full height partitions, doors, glazing, millwork, finishing and asscos power ltg distribution. deferred life safety, elec & mech

Open the permit page

$60,000
Dec 27, 2022Completed
final sign-off Aug 2023
501 02nd StR.M.R. Construction Company7/f suite 710: demolition of some existing non bearing ceiling height walls, construction of new full height partitions, glazing, pantry, millwork, plumbing, finishes and assoc. electrical power/light dist. deferred: life safety, elect, mech and plumbing.
Details
Permit
202212279171
Permit issued
Dec 30, 2022
Final sign-off
Aug 16, 2023

7/f suite 710: demolition of some existing non bearing ceiling height walls, construction of new full height partitions, glazing, pantry, millwork, plumbing, finishes and assoc. electrical power/light dist. deferred: life safety, elect, mech and plumbing.

Open the permit page

$312,650
Dec 6, 2022Completed
final sign-off May 2023
501 02nd StR.M.R. Construction Companysuite 650: new millwork base/upper cabinets, new sink, associated electrical power/lighting distribution & associated plumbing
Details
Permit
202212067749
Permit issued
Dec 7, 2022
Final sign-off
May 19, 2023

suite 650: new millwork base/upper cabinets, new sink, associated electrical power/lighting distribution & associated plumbing

Open the permit page

$12,200
Nov 10, 2022Completed
final sign-off Jun 2023
201 Mission StTruebeck Constructionfl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain.
Details
Permit
202211106345
Permit issued
Nov 30, 2022
Final sign-off
Jun 27, 2023

fl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain.

Open the permit page

$27,000
Jun 21, 2022Completed
final sign-off Feb 2023
4 Embarcadero CenterSkyline Construction26th flr ste 2600: interior demolition, new full/partial height partitions, ceiling and millwork. mep & life safety under separate permits. restroom upgrades.
Details
Permit
202206216646
Permit issued
Jul 25, 2022
Final sign-off
Feb 15, 2023

26th flr ste 2600: interior demolition, new full/partial height partitions, ceiling and millwork. mep & life safety under separate permits. restroom upgrades.

Open the permit page

$350,000
May 24, 2022Completed
final sign-off Jan 2023
1 Bush StBcci Construction Company13th floor- revision to approved arch permit. m.e.p revision submittal included in set. ref: 202202047388.
Details
Permit
202205244899
Permit issued
May 25, 2022
Final sign-off
Jan 20, 2023

13th floor- revision to approved arch permit. m.e.p revision submittal included in set. ref: 202202047388.

Open the permit page

$175,000
May 12, 2022Completed
final sign-off Aug 2022
501 02nd StR.M.R. Construction Companyste 500: creating of huddle room. mep & sprinklers deferred.
Details
Permit
202205124172
Permit issued
May 31, 2022
Final sign-off
Aug 1, 2022

ste 500: creating of huddle room. mep & sprinklers deferred.

Open the permit page

$65,450
Feb 4, 2022Completed
final sign-off Jan 2023
1 Bush StBcci Construction Company13/f suite 1300: new construction of partitions, power and lighting, mep and finishes. sprinkler, emergency lighting, fire alarm all deferred.
Details
Permit
202202047388
Permit issued
Feb 10, 2022
Final sign-off
Jan 11, 2023

13/f suite 1300: new construction of partitions, power and lighting, mep and finishes. sprinkler, emergency lighting, fire alarm all deferred.

Open the permit page

$1,400,000
Dec 30, 2021Completed
final sign-off Mar 2022
501 02nd StR.M.R. Construction Companysuite 403: t.i. new full-height partitions, doors, glazing millwork, finishes & associated electrical power/lighting distribution. fire sprinklers & alarm deferred.
Details
Permit
202112305213
Permit issued
Dec 30, 2021
Final sign-off
Mar 29, 2022

suite 403: t.i. new full-height partitions, doors, glazing millwork, finishes & associated electrical power/lighting distribution. fire sprinklers & alarm deferred.

Open the permit page

$32,000
Dec 6, 2021Completed
final sign-off Apr 2022
1 Bush StBcci Construction Company13th/ fl partial demo only of (e) non-structural partitions per ab-017. no exterior work.
Details
Permit
202112063812
Permit issued
Dec 9, 2021
Final sign-off
Apr 12, 2022

13th/ fl partial demo only of (e) non-structural partitions per ab-017. no exterior work.

Open the permit page

$45,000
Sep 28, 2021Completed
final sign-off Jan 2022
501 02nd StPrincipal Builders Inc.adding a door to existing storage room 49 sf, add a pair of barn doors to e break room 381 sf. add sink in #114. defer mep work
Details
Permit
202109289357
Permit issued
Oct 1, 2021
Final sign-off
Jan 19, 2022

adding a door to existing storage room 49 sf, add a pair of barn doors to e break room 381 sf. add sink in #114. defer mep work

Open the permit page

$15,752
Mar 22, 2021Completed
final sign-off Dec 2021
2300 Harrison StNovo Construction Inc1st,2nd,3rd fl: restrooms upgrades to include new millwork, finishes, and restroom accessories. electrical, plumbing & life safety under separate permit.
Details
Permit
202103227031
Permit issued
May 26, 2021
Final sign-off
Dec 2, 2021

1st,2nd,3rd fl: restrooms upgrades to include new millwork, finishes, and restroom accessories. electrical, plumbing & life safety under separate permit.

Open the permit page

$250,000
Mar 18, 2021Expired or cancelled
cancelled Jan 2026
501 02nd Stste 550: revision to pa# 202002215043. addition of sheet a2.55.
Details
Permit
202103186786

ste 550: revision to pa# 202002215043. addition of sheet a2.55.

Open the permit page

$150,000
Oct 30, 2020Never finaled
issued Aug 2021, no final
2101 Mission StA M Rocca Inc.revision to bpa# 202002245209. base building improvements by property owner, including finishes, lighting & deferred electrical & plumbing. no longer ab-017; t.i. for spaces to be occupied.
Details
Permit
202010307866
Permit issued
Aug 13, 2021

revision to bpa# 202002245209. base building improvements by property owner, including finishes, lighting & deferred electrical & plumbing. no longer ab-017; t.i. for spaces to be occupied.

Open the permit page

$125,000
Sep 21, 2020Completed
final sign-off Mar 2021
501 02nd StNovo Construction Incsuite 211. demolition of millwork, ceiling, elements, electrical & finishes. construction of new wall opening extend existing walls to deck above. mep under separate permit.
Details
Permit
202009214669
Permit issued
Oct 28, 2020
Final sign-off
Mar 18, 2021

suite 211. demolition of millwork, ceiling, elements, electrical & finishes. construction of new wall opening extend existing walls to deck above. mep under separate permit.

Open the permit page

$211,200
Feb 24, 2020Completed
final sign-off Feb 2022
2101 Mission StA M Rocca Inc.infill of existing opening on opening on ground floor; construction of new opening at floor 2; construct full height partitions, partial height partitions and door frames.
Details
Permit
202002245209
Permit issued
Aug 19, 2020
Final sign-off
Feb 28, 2022

infill of existing opening on opening on ground floor; construction of new opening at floor 2; construct full height partitions, partial height partitions and door frames.

Open the permit page

$200,000
Jan 30, 2020Completed
final sign-off Apr 2021
2101 Mission StA M Rocca Inc.no construction work is proposed. administrative permit to document extg improvements in suite #108c. ref pa 201707283290 and 201906214136.
Details
Permit
202001303108
Permit issued
Feb 23, 2021
Final sign-off
Apr 22, 2021

no construction work is proposed. administrative permit to document extg improvements in suite #108c. ref pa 201707283290 and 201906214136.

Open the permit page

Dec 17, 2019Completed
final sign-off Mar 2020
274 Brannan StSc Builders, Inc6th fl: demolition of selective existing full-height partitions, ceiling elements & lighting. construction of new non-structural partitions, doors, glazing. mep & fire life safety under separate permit. maher na
Details
Permit
201912179704
Permit issued
Dec 19, 2019
Final sign-off
Mar 11, 2020

6th fl: demolition of selective existing full-height partitions, ceiling elements & lighting. construction of new non-structural partitions, doors, glazing. mep & fire life safety under separate permit. maher na

Open the permit page

$400,000
Dec 3, 2019Completed
final sign-off Jan 2020
2101 Mission StA M Rocca Inc.construction of full height partitions, partial height partitions, door frames, & interior glazing partitions. restroom upgrades, finishes, millwork,ceiling grids soffits & associated
Details
Permit
201912038495
Permit issued
Dec 20, 2019
Final sign-off
Jan 23, 2020

construction of full height partitions, partial height partitions, door frames, & interior glazing partitions. restroom upgrades, finishes, millwork,ceiling grids soffits & associated

Open the permit page

$100,000
Nov 26, 2019Completed
final sign-off May 2020
50 Hawthorne StPrincipal Builders Inc.1st floor: demo construction of partitions, glazing, millwork, doors, & finishes on extg t.i. mep on seperate permit. maher n/a.
Details
Permit
201911268213
Permit issued
Nov 27, 2019
Final sign-off
May 15, 2020

1st floor: demo construction of partitions, glazing, millwork, doors, & finishes on extg t.i. mep on seperate permit. maher n/a.

Open the permit page

$172,773
Oct 31, 2019Completed
final sign-off Feb 2022
2101 Mission StA M Rocca Inc.ste 105: restroom barrier removal in restrooms.
Details
Permit
201910316053
Permit issued
Oct 31, 2019
Final sign-off
Feb 28, 2022

ste 105: restroom barrier removal in restrooms.

Open the permit page

$40,000
Oct 31, 2019Never finaled
issued Oct 2019, no final
2101 Mission StA M Rocca Inc.2/f: restroom barrier removal in restrooms.
Details
Permit
201910316056
Permit issued
Oct 31, 2019

2/f: restroom barrier removal in restrooms.

Open the permit page

$40,000
Sep 11, 2019Completed
final sign-off Feb 2020
2101 Mission StA M Rocca Inc.revision to pa 2018-1023-3861 ti to existing industrictive service spance on 3rd floor resulting in two suites, consisteat with planning commission moton 19446, construction of full height partitions, door frames & restrooms, and associates mechanical, electrical and lighting. maher n/a.
Details
Permit
201909111331
Permit issued
Dec 30, 2019
Final sign-off
Feb 5, 2020

revision to pa 2018-1023-3861 ti to existing industrictive service spance on 3rd floor resulting in two suites, consisteat with planning commission moton 19446, construction of full height partitions, door frames & restrooms, and associates mechanical, electrical and lighting. maher n/a.

Open the permit page

$115,000
Jun 21, 2019Never finaled
issued Jul 2019, no final
2101 Mission StA M Rocca Inc.add new ada compliant bathroom, add new lighting.
Details
Permit
201906214136
Permit issued
Jul 17, 2019

add new ada compliant bathroom, add new lighting.

Open the permit page

$35,000
May 24, 2019Completed
final sign-off Feb 2020
2101 Mission StA M Rocca Inc.1/f lobby: revision to pa 201606039129. restoration of finishes at entryway. maher n/a.
Details
Permit
201905241622
Permit issued
May 24, 2019
Final sign-off
Feb 4, 2020

1/f lobby: revision to pa 201606039129. restoration of finishes at entryway. maher n/a.

Open the permit page

Nov 5, 2018Completed
final sign-off Jan 2019
575 Market StNovo Construction Inc36/f: new lighting and branch circuitry to (e) panel. title-24 compliance. ref t.i. 201809261451. maher n/a.
Details
Permit
201811054985
Permit issued
Nov 6, 2018
Final sign-off
Jan 30, 2019

36/f: new lighting and branch circuitry to (e) panel. title-24 compliance. ref t.i. 201809261451. maher n/a.

Open the permit page

$10,000
Sep 17, 2018Completed
final sign-off Oct 2021
2101 Mission StA M Rocca Inc.3rd fl; new ada compliant gender neutal restroom. n/a maher
Details
Permit
201809170465
Permit issued
Oct 1, 2018
Final sign-off
Oct 13, 2021

3rd fl; new ada compliant gender neutal restroom. n/a maher

Open the permit page

$25,000
May 15, 2018Completed
final sign-off Jun 2019
501 02nd StR.M.R. Construction Company1st & 5th floors: restrooms upgrades-barrier removal , mep/fire under separate permits maher na
Details
Permit
201805159114
Permit issued
Jun 21, 2018
Final sign-off
Jun 5, 2019

1st & 5th floors: restrooms upgrades-barrier removal , mep/fire under separate permits maher na

Open the permit page

$10,000
Feb 8, 2018Never finaled
issued Feb 2018, no final
8 Presidio TrPrincipal Builders Inc.administrative revision to pa 2017-0522-7247 to remove dph note requesting an outswing door @ jacuzzi room 032 and modifying for inswing. outswing door is in conflict with cbc 1005.7.1 which states the egress width may not be reduced by more than 50% of the reqd. width; n/a maher
Details
Permit
201802080839
Permit issued
Feb 20, 2018

administrative revision to pa 2017-0522-7247 to remove dph note requesting an outswing door @ jacuzzi room 032 and modifying for inswing. outswing door is in conflict with cbc 1005.7.1 which states the egress width may not be reduced by more than 50% of the reqd. width; n/a maher

Open the permit page

Jan 17, 2018Completed
final sign-off Mar 2019
201 Mission StNovo Construction Inctenant improvement to consist of new non load bearing partitions door frames, interior glazing, finishes and millwork. mep & life safety under separate permit
Details
Permit
201801178781
Permit issued
Feb 7, 2018
Final sign-off
Mar 22, 2019

tenant improvement to consist of new non load bearing partitions door frames, interior glazing, finishes and millwork. mep & life safety under separate permit

Open the permit page

$300,000
Oct 16, 2017Never finaled
issued Oct 2017, no final
501 02nd StNovo Construction Incbarrier removal for 3rd fl restrooms upbrade
Details
Permit
201710161324
Permit issued
Oct 16, 2017

barrier removal for 3rd fl restrooms upbrade

Open the permit page

$5,000
Sep 28, 2017Completed
final sign-off Nov 2017
501 02nd StSc Builders, Inc1st fl, ste 120 500 sq ft of ti in existing office space. construct (n) ceiling height partitions, remove some (e) glass partitions associated with mep changes. mep, life safety and sprinklers permits under separate permit if need (fully sprinklered bldg)
Details
Permit
201709289779
Permit issued
Oct 2, 2017
Final sign-off
Nov 14, 2017

1st fl, ste 120 500 sq ft of ti in existing office space. construct (n) ceiling height partitions, remove some (e) glass partitions associated with mep changes. mep, life safety and sprinklers permits under separate permit if need (fully sprinklered bldg)

Open the permit page

$33,000
Aug 17, 2017Completed
final sign-off May 2018
274 Brannan StSource Planning And Construction Inc5/f: rev to pa#201706169558. correcting a wall error. maher n/a
Details
Permit
201708175072
Permit issued
Oct 3, 2017
Final sign-off
May 21, 2018

5/f: rev to pa#201706169558. correcting a wall error. maher n/a

Open the permit page

Aug 9, 2017Completed
final sign-off May 2019
750 02nd StBuck O'neill Builders Inc.construction of new partitions, associated electrical power/lighting distribution, associated mechanical system distribution, associated life safety system changes, finishes, construction of accessible single occ restrooms
Details
Permit
201708094370
Permit issued
Oct 27, 2017
Final sign-off
May 29, 2019

construction of new partitions, associated electrical power/lighting distribution, associated mechanical system distribution, associated life safety system changes, finishes, construction of accessible single occ restrooms

Open the permit page

$400,000
Mar 20, 2017Expired or cancelled
expired Jan 2023
901 Battery StNovo Construction Inc2/f- infill of a single stair opening in existing concrete building, raised floor over structural framing.
Details
Permit
201703201863
Permit issued
Mar 30, 2017

2/f- infill of a single stair opening in existing concrete building, raised floor over structural framing.

Open the permit page

$30,000
Mar 3, 2016Completed
final sign-off Nov 2016
350 Treat AvPlant Construction Co, Lpnew roof mounted boiler and hvac units and assoc. equip. with associated structural, ducting plumbing and electrical; new wall insulation and interior cladding; new electrical service pg&e transformer room, new electrical room, and associate changes. n/a for maher.
Details
Permit
201603031142
Permit issued
May 5, 2016
Final sign-off
Nov 9, 2016

new roof mounted boiler and hvac units and assoc. equip. with associated structural, ducting plumbing and electrical; new wall insulation and interior cladding; new electrical service pg&e transformer room, new electrical room, and associate changes. n/a for maher.

Open the permit page

$480,000
Nov 17, 2015Completed
final sign-off Feb 2018
501 02nd StNovo Construction Incon 4th floor - suite # 403 :construction of new full height partitions, doors, glazing, millwork, & finishes. mep under sep. permit.
Details
Permit
201511172795
Permit issued
Nov 17, 2015
Final sign-off
Feb 9, 2018

on 4th floor - suite # 403 :construction of new full height partitions, doors, glazing, millwork, & finishes. mep under sep. permit.

Open the permit page

$205,000
Oct 5, 2015Completed
final sign-off Dec 2015
1000 Sansome StRossi Builders Inc.3rd floor: t.i.- demo of existing partitions, construction of full height partitions, framed glazing, door, suspend ceiling, carpet finish. minor electrical & mechanical under separate permit.
Details
Permit
201510058857
Permit issued
Oct 7, 2015
Final sign-off
Dec 4, 2015

3rd floor: t.i.- demo of existing partitions, construction of full height partitions, framed glazing, door, suspend ceiling, carpet finish. minor electrical & mechanical under separate permit.

Open the permit page

$110,000
Jul 29, 2015Completed
final sign-off Feb 2018
501 02nd StNovo Construction Incconstruction of new full height partitions, doors, glazing, millwork & finishes. l/s,mep under separate permit. n/a ordinance #155-13
Details
Permit
201507292754
Permit issued
Aug 5, 2015
Final sign-off
Feb 9, 2018

construction of new full height partitions, doors, glazing, millwork & finishes. l/s,mep under separate permit. n/a ordinance #155-13

Open the permit page

$472,000
Jul 17, 2015Completed
final sign-off Oct 2015
350 Rhode Island StRichlen Constructionrelocate pantry and miscellaneous work at second floor suite 230. maher na
Details
Permit
201507171848
Permit issued
Jul 28, 2015
Final sign-off
Oct 16, 2015

relocate pantry and miscellaneous work at second floor suite 230. maher na

Open the permit page

$100,000
Jul 17, 2015Completed
final sign-off Feb 2018
501 02nd StNovo Construction Inc2nd floor suite 200 - safe off electrical, demo walls, floor covering, ceiling, grid, lights & electrical & plumbing fixtures (ab-017). arch., mep, f/a, sprinkler under separate permit. n/a ordinance #155-13
Details
Permit
201507171785
Permit issued
Jul 17, 2015
Final sign-off
Feb 9, 2018

2nd floor suite 200 - safe off electrical, demo walls, floor covering, ceiling, grid, lights & electrical & plumbing fixtures (ab-017). arch., mep, f/a, sprinkler under separate permit. n/a ordinance #155-13

Open the permit page

$15,750
Jul 13, 2015Never finaled
issued Jul 2015, no final
274 Brannan StSc Builders, Incsuite 601 - new full height partitions, (n) partial height partitions, doors, frames, glazing, millwork, finishes etc. meps, life safety changes, if need , will be design build & sumbitted separated. n/a maher ordinance
Details
Permit
201507131343
Permit issued
Jul 29, 2015

suite 601 - new full height partitions, (n) partial height partitions, doors, frames, glazing, millwork, finishes etc. meps, life safety changes, if need , will be design build & sumbitted separated. n/a maher ordinance

Open the permit page

$450,000
Jun 1, 2015Completed
final sign-off Feb 2016
274 Brannan StR.M.R. Construction Company6th floor - ada bathroom upgrade. n/a maher ordinance
Details
Permit
201506017595
Permit issued
Jun 11, 2015
Final sign-off
Feb 3, 2016

6th floor - ada bathroom upgrade. n/a maher ordinance

Open the permit page

$146,000
Mar 4, 2015Never finaled
issued Mar 2015, no final
600 California StBcci Construction Companyrevision to 201502037379 to reconfigure 2 offices
Details
Permit
201503049992
Permit issued
Mar 5, 2015

revision to 201502037379 to reconfigure 2 offices

Open the permit page

Mar 3, 2015Completed
final sign-off Aug 2015
201 03rd StTruebeck Constructiondemolition of some existing partitions and doors. construction of new full height partitions, associated electrical power/lighting distribution, associated mechanical & plumbing, associated life safety changes, new shower and associated finishes.
Details
Permit
201503039779
Permit issued
Mar 11, 2015
Final sign-off
Aug 11, 2015

demolition of some existing partitions and doors. construction of new full height partitions, associated electrical power/lighting distribution, associated mechanical & plumbing, associated life safety changes, new shower and associated finishes.

Open the permit page

$2,220,000
Feb 3, 2015Never finaled
issued Feb 2015, no final
600 California StBcci Construction Company19th & 20th flrs: t.i. including demo of some existing ceiling height partitions,construction of new ceiling height partitions, mech,elec & l/s under separate permit; maher n/a
Details
Permit
201502037379
Permit issued
Feb 3, 2015

19th & 20th flrs: t.i. including demo of some existing ceiling height partitions,construction of new ceiling height partitions, mech,elec & l/s under separate permit; maher n/a

Open the permit page

$125,000
Jan 14, 2015Completed
final sign-off Feb 2018
501 02nd StR.M.R. Construction Company#300- t.i. demo of (e) non-load bearing interior partitions & ceiling. construction of new full height partitions, associate electrical, power, lighting distribution, associated mechanical system distribution & new finishes. n/a ordinance #155-13
Details
Permit
201501145714
Permit issued
Jan 22, 2015
Final sign-off
Feb 27, 2018

#300- t.i. demo of (e) non-load bearing interior partitions & ceiling. construction of new full height partitions, associate electrical, power, lighting distribution, associated mechanical system distribution & new finishes. n/a ordinance #155-13

Open the permit page

$25,000
Dec 16, 2014Completed
final sign-off Aug 2015
201 03rd StTruebeck Construction9th floor - demo of existing partitions, millwork, light fixtures, ceiling elements & associated electrical, mechanical & plumbing fixtures. building security, fire alarm & fire protection systems are to be maintained in place (per ab-017)
Details
Permit
201412163877
Permit issued
Dec 18, 2014
Final sign-off
Aug 10, 2015

9th floor - demo of existing partitions, millwork, light fixtures, ceiling elements & associated electrical, mechanical & plumbing fixtures. building security, fire alarm & fire protection systems are to be maintained in place (per ab-017)

Open the permit page

$65,000
Oct 9, 2014Completed
final sign-off Nov 2014
350 Rhode Island StRichlen Construction2/f- relocation of doors and windows, addition of door, reconfiguration of walls. n/a ordinance #155-13
Details
Permit
201410098507
Permit issued
Oct 10, 2014
Final sign-off
Nov 3, 2014

2/f- relocation of doors and windows, addition of door, reconfiguration of walls. n/a ordinance #155-13

Open the permit page

$70,000
Sep 17, 2014Completed
final sign-off Jan 2015
340 Brannan StGidel & Kocal Construction Co Incsuite 400 - t.i. : demo partitions & construction of new full height partitions & da path of travel upgrades, new finishes. mep & life safety under separate permit.
Details
Permit
201409176557
Permit issued
Sep 24, 2014
Final sign-off
Jan 20, 2015

suite 400 - t.i. : demo partitions & construction of new full height partitions & da path of travel upgrades, new finishes. mep & life safety under separate permit.

Open the permit page

$350,000
Aug 11, 2014Completed
final sign-off Feb 2015
139 Townsend StIdeal Dimensions Incti 3rd fl to construct new walls, doors, finishes, mill work on 3rd fl. mep fire alarms, sprinklers on sep permit maher not req-155-13
Details
Permit
201408113530
Permit issued
Aug 21, 2014
Final sign-off
Feb 12, 2015

ti 3rd fl to construct new walls, doors, finishes, mill work on 3rd fl. mep fire alarms, sprinklers on sep permit maher not req-155-13

Open the permit page

$310,000
Jul 18, 2014Completed
final sign-off Nov 2014
139 Townsend StIdeal Dimensions Incdemo of (e) ceiling height partitions and doors per ab017;maher n/a
Details
Permit
201407181605
Permit issued
Jul 30, 2014
Final sign-off
Nov 25, 2014

demo of (e) ceiling height partitions and doors per ab017;maher n/a

Open the permit page

$10,000
May 23, 2014Completed
final sign-off Sep 2014
1 Bush StGci, Inc14th floor: t.i. to construct new partition doors, millwork and finishes. mep sprinklers and life safety on seperate permit.
Details
Permit
201405236646
Permit issued
Jun 3, 2014
Final sign-off
Sep 2, 2014

14th floor: t.i. to construct new partition doors, millwork and finishes. mep sprinklers and life safety on seperate permit.

Open the permit page

$1,115,000
May 15, 2014Completed
final sign-off Oct 2014
534 04th StTruebeck Constructioninterior soft demo only - on ground floor per ab017 no construciton work. n /a maher
Details
Permit
201405155875
Permit issued
May 15, 2014
Final sign-off
Oct 1, 2014

interior soft demo only - on ground floor per ab017 no construciton work. n /a maher

Open the permit page

$15,000
Jan 6, 2014Completed
final sign-off May 2014
2300 Harrison StNovo Construction Incground floor:demolition of existing ceiling height partitions, construction of new full height partitions, mep & life safety under seperate permit.
Details
Permit
201401065620
Permit issued
Jan 29, 2014
Final sign-off
May 5, 2014

ground floor:demolition of existing ceiling height partitions, construction of new full height partitions, mep & life safety under seperate permit.

Open the permit page

$20,000
Dec 23, 2013Completed
final sign-off Jun 2014
909 Montgomery StPrincipal Builders Inc.5th floor. demolition of non-load bearing partitions, ceilings & lighting fixts. space to remain vacant under ab-017. all ada will be addressed under future ti permit.
Details
Permit
201312234867
Permit issued
Jan 8, 2014
Final sign-off
Jun 17, 2014

5th floor. demolition of non-load bearing partitions, ceilings & lighting fixts. space to remain vacant under ab-017. all ada will be addressed under future ti permit.

Open the permit page

$150,000
Aug 5, 2013Completed
final sign-off Jun 2014
901 Battery StPlant Construction Co, Lpvoluntary structural strengthening. construction of foundation for one interior steel braced frame and one interior shear wall
Details
Permit
201308053557
Permit issued
Sep 13, 2013
Final sign-off
Jun 18, 2014

voluntary structural strengthening. construction of foundation for one interior steel braced frame and one interior shear wall

Open the permit page

$175,000
Apr 11, 2013Expired or cancelled
cancelled Jan 2020
130 08th StSource Planning And Construction Incbasement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof.
Details
Permit
201304114315

basement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof.

Open the permit page

$1,000,000
Feb 13, 2013Completed
final sign-off Sep 2013
275 Brannan StTruebeck Constructiontenant improvement for 1st, 2nd & 3rd floors. core & shell & ada approves under pa# 201207164925. fire alarm & sprinkler under separate permit. new partitions and full height partitions. full service kitchen for tenants only.
Details
Permit
201302130103
Permit issued
Apr 26, 2013
Final sign-off
Sep 13, 2013

tenant improvement for 1st, 2nd & 3rd floors. core & shell & ada approves under pa# 201207164925. fire alarm & sprinkler under separate permit. new partitions and full height partitions. full service kitchen for tenants only.

Open the permit page

$1,995,000
May 21, 2012Completed
final sign-off Aug 2012
501 02nd StNovo Construction Incbarrier removal only to add power door operator at mens and womens restroom, add high low drinking fountain
Details
Permit
201205210863
Permit issued
May 29, 2012
Final sign-off
Aug 27, 2012

barrier removal only to add power door operator at mens and womens restroom, add high low drinking fountain

Open the permit page

$14,000
Nov 30, 2011Completed
final sign-off May 2012
501 02nd StNovo Construction Inctenant improvement of 7th floor 2 include demo of partitions, new ceiling height and slab to slab to slab for addition of rated exit corridor. 2 private office break room and electrical room
Details
Permit
201111309764
Permit issued
Nov 30, 2011
Final sign-off
May 15, 2012

tenant improvement of 7th floor 2 include demo of partitions, new ceiling height and slab to slab to slab for addition of rated exit corridor. 2 private office break room and electrical room

Open the permit page

$40,000
Oct 14, 2011Completed
final sign-off Nov 2011
655 Montgomery StPrincipal Builders Inc.suite 1490 demo of 3 interior offices, new carpet, paint, elec and data, new glass partition/door
Details
Permit
201110146889
Permit issued
Oct 18, 2011
Final sign-off
Nov 28, 2011

suite 1490 demo of 3 interior offices, new carpet, paint, elec and data, new glass partition/door

Open the permit page

$30,000
Jul 19, 2011Completed
final sign-off Dec 2011
1 Montgomery StBcci Construction Companyconstruction of full-ht. + clg. ht. partitions for offices, conf. rooms & break area. demolition of millwork, partial clg. partial walls, new finishes.
Details
Permit
201107190530
Permit issued
Aug 11, 2011
Final sign-off
Dec 27, 2011

construction of full-ht. + clg. ht. partitions for offices, conf. rooms & break area. demolition of millwork, partial clg. partial walls, new finishes.

Open the permit page

$200,000
Jul 7, 2011Completed
final sign-off Sep 2013
814 Mission Stbarrier removal work only on 2nd fl. new disabled restrooms. life safety upgrades to corridor. all mep under sep permit
Details
Permit
201107079644
Permit issued
Aug 24, 2011
Final sign-off
Sep 5, 2013

barrier removal work only on 2nd fl. new disabled restrooms. life safety upgrades to corridor. all mep under sep permit

Open the permit page

$220,000
Jul 6, 2011Completed
final sign-off Apr 2013
814 Mission Strelocate (e) deli entrance and new storefront (tenant improvement under separate permit).
Details
Permit
201107069568
Permit issued
Nov 4, 2011
Final sign-off
Apr 5, 2013

relocate (e) deli entrance and new storefront (tenant improvement under separate permit).

Open the permit page

$100,000
Dec 19, 2008Completed
final sign-off Feb 2009
350 Rhode Island StRichlen Construction2nd fl connecting power to new or relocated light fixtures,power outlets & tenant equipment,installation of (7) new vav boxes (6 reheat,1 no reheat) & all associated ducting, distributio & controls to match (e) bldg system. reference appl #200811035691. life safety, fire sprink under separate permit
Details
Permit
200812198891
Permit issued
Dec 19, 2008
Final sign-off
Feb 12, 2009

2nd fl connecting power to new or relocated light fixtures,power outlets & tenant equipment,installation of (7) new vav boxes (6 reheat,1 no reheat) & all associated ducting, distributio & controls to match (e) bldg system. reference appl #200811035691. life safety, fire sprink under separate permit

Open the permit page

$150,000
Nov 3, 2008Completed
final sign-off Mar 2009
350 Rhode Island StRichlen Construction2nd floor - demolition of existing non-structural partitions, construction of new non-structural petitions, associated elec power & lighting distribution, associed life safety system changes, & associated disabled access upgrades. elec, mech, fire sprinkler & life safety under separate permit.
Details
Permit
200811035691
Permit issued
Nov 7, 2008
Final sign-off
Mar 2, 2009

2nd floor - demolition of existing non-structural partitions, construction of new non-structural petitions, associated elec power & lighting distribution, associed life safety system changes, & associated disabled access upgrades. elec, mech, fire sprinkler & life safety under separate permit.

Open the permit page

$300,000
Aug 7, 2008Never finaled
issued Aug 2008, no final
300 Brannan St5th floor - demolish (2) existing unaccessible toilet rooms (2) and construct (2) accessible toilet rooms. barrier removal.
Details
Permit
200808078594
Permit issued
Aug 7, 2008

5th floor - demolish (2) existing unaccessible toilet rooms (2) and construct (2) accessible toilet rooms. barrier removal.

Open the permit page

$30,000
Aug 9, 2006Completed
final sign-off Mar 2007
1 Embarcadero CenterDpr Construction Incoti-1, 40th floor, el, me, ls, sp.
Details
Permit
200608098985
Permit issued
Aug 29, 2006
Final sign-off
Mar 20, 2007

oti-1, 40th floor, el, me, ls, sp.

Open the permit page

$500,000
Jun 28, 2005Completed
final sign-off Aug 2005
101 California StSkyline Constructionoti-1,20th/fl. el, me, ls,sp.
Details
Permit
200506286227
Permit issued
Jul 21, 2005
Final sign-off
Aug 25, 2005

oti-1,20th/fl. el, me, ls,sp.

Open the permit page

$109,000
Jun 10, 2005Completed
final sign-off Apr 2006
595 Market StPrincipal Builders Inc.add interior partitions for new private office (n) ceiliings (n) finishes for law firm tenant
Details
Permit
200506104831
Permit issued
Jun 10, 2005
Final sign-off
Apr 20, 2006

add interior partitions for new private office (n) ceiliings (n) finishes for law firm tenant

Open the permit page

$150,000
Jun 10, 2005Completed
final sign-off Aug 2005
101 California StSkyline Constructiondemolation only. no increase in office space 20th/fl. all non structural.
Details
Permit
200506104820
Permit issued
Jun 10, 2005
Final sign-off
Aug 25, 2005

demolation only. no increase in office space 20th/fl. all non structural.

Open the permit page

$7,500
Jun 3, 2005Completed
final sign-off Aug 2005
101 California Sttenant improvement on 8th floor including partition, millwork, doors & reflected ceiling per
Details
Permit
200506034176
Permit issued
Jun 3, 2005
Final sign-off
Aug 12, 2005

tenant improvement on 8th floor including partition, millwork, doors & reflected ceiling per

Open the permit page

$450,000