Michael Wilk
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Michael Wilk Architecture
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Aug 2021
134 permits since 2000 (architect on 128 permits, authorized agent-others on 4 permits, engineer on 2 permits): 76 completed, 24 never finaled, 34 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 134.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2021 | Completed final sign-off Nov 2021 | 400 Winston Dr | Centric Construction Inc | racking plan details and structural cals for (n) racking. ref t.i. 201912190042Details
racking plan details and structural cals for (n) racking. ref t.i. 201912190042 | $1,000 |
| Jul 14, 2021 | Completed final sign-off Nov 2021 | 400 Winston Dr | Centric Construction Inc | rev to pa201912190042: including egress & layout revisions.Details
rev to pa201912190042: including egress & layout revisions. | |
| Feb 4, 2021 | Completed final sign-off Jan 2024 | 500 Sansome St | Centric Construction Inc | demolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction.Details
demolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction. | $30,000 |
| Nov 20, 2020 | Completed final sign-off Dec 2021 | 500 Sansome St | Centric Construction Inc | demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1.Details
demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1. | $150,000 |
| Sep 5, 2020 | Completed final sign-off Jul 2021 | 179 West Portal Av | Stone Ink Construction | to comply with nov # 202051711; (n) non-load bearing walls, (n) ada compliant gender neutral bathroom, (n) lighting throughout, (n) flooring, paint, & finishes throughout. (e) mezzanine & employee bathroom to remain.Details
to comply with nov # 202051711; (n) non-load bearing walls, (n) ada compliant gender neutral bathroom, (n) lighting throughout, (n) flooring, paint, & finishes throughout. (e) mezzanine & employee bathroom to remain. | $200,000 |
| Feb 28, 2020 | Never finaled issued Mar 2020, no final | 500 Sansome St | Centric Construction Inc | ste. #402 - demo of (e) non-load bearing partitions, doors & lighting; construction of (n) non-load bearing partitions, doors, finishing & lighting.Details
ste. #402 - demo of (e) non-load bearing partitions, doors & lighting; construction of (n) non-load bearing partitions, doors, finishing & lighting. | $605,646 |
| Dec 19, 2019 | Never finaled issued Feb 2020, no final | 179 West Portal Av | demo of (e) non-load bearing walls, demo of (e) flooring & drop ceilings, demo of (e) bathroom fixtures, mezzanine is (e) to remainDetails
demo of (e) non-load bearing walls, demo of (e) flooring & drop ceilings, demo of (e) bathroom fixtures, mezzanine is (e) to remain | $15,000 | |
| Dec 19, 2019 | Completed final sign-off Nov 2021 | 400 Winston Dr | Centric Construction Inc | new non load bearing walls (n) interior doors (n) ada compliant public bathrooms,(n) employee bathroom & shower room, elec closet, (n) janitors closet, (n) dressing rooms, elec, mech, plumbing, fire sprinkler under sep permitDetails
new non load bearing walls (n) interior doors (n) ada compliant public bathrooms,(n) employee bathroom & shower room, elec closet, (n) janitors closet, (n) dressing rooms, elec, mech, plumbing, fire sprinkler under sep permit | $1,000,000 |
| Sep 4, 2018 | Completed final sign-off Apr 2019 | 350 Treat Av | Centric Construction Inc | demo of (e) non-load bearing demising wall. patch& repair any damaged wall. (n) non-load bearing partition walls and doors. (n) t-bar ceiling and lighting fin fab clean room. (n) wall mounted lights in exist corridor.Details
demo of (e) non-load bearing demising wall. patch& repair any damaged wall. (n) non-load bearing partition walls and doors. (n) t-bar ceiling and lighting fin fab clean room. (n) wall mounted lights in exist corridor. | $5,000 |
| Feb 14, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | revision to app#2011611152731. relocates proposed gurney elevator location to extg atrium.Details
revision to app#2011611152731. relocates proposed gurney elevator location to extg atrium. | |
| Oct 17, 2017 | Completed final sign-off Jan 2018 | 500 Sansome St | Centric Construction Inc | suite 410, construction of new non load bearin partitions, doors paint, lighting, finishes maher not reqDetails
suite 410, construction of new non load bearin partitions, doors paint, lighting, finishes maher not req | $350,000 |
| Sep 29, 2017 | Expired or cancelled cancelled Apr 2018 | 1675 Howard St | Centric Construction Inc | revision to pa #201704285156. remove & replace (e) guardrail with (n) on the 2nd fl. maher naDetails
revision to pa #201704285156. remove & replace (e) guardrail with (n) on the 2nd fl. maher na | $95,000 |
| Apr 28, 2017 | Completed final sign-off May 2018 | 1675 Howard St | Centric Construction Inc | demo of (e) sales counter, remvoe (e) flooring throughout 1st & 2nd floor showroom. construction of 3 (n) pony walls, sales counter & (n) tile, carpet, paint throughout 1st & 2nd floor showroom. n/a maherDetails
demo of (e) sales counter, remvoe (e) flooring throughout 1st & 2nd floor showroom. construction of 3 (n) pony walls, sales counter & (n) tile, carpet, paint throughout 1st & 2nd floor showroom. n/a maher | $484,525 |
| Sep 23, 2016 | Never finaled issued Sep 2016, no final | 545 Post St | Centric Construction Inc | revision to pa 2016-0620-0396 for sffd confirmation of occupant loadDetails
revision to pa 2016-0620-0396 for sffd confirmation of occupant load | |
| Jun 20, 2016 | Expired or cancelled cancelled Mar 2019 | 545 Post St | Centric Construction Inc | remove and replace e windows typ of 2 with new steel frame window system. remove and replace e entry door with newDetails
remove and replace e windows typ of 2 with new steel frame window system. remove and replace e entry door with new | $25,000 |
| Jun 20, 2016 | Completed final sign-off Nov 2016 | 545 Post St | Centric Construction Inc | demo of e non load bearing walls per plan at basement. new non load bearing walls,new kitchen equip, furniture and finishes at basement, mezz, 1st flDetails
demo of e non load bearing walls per plan at basement. new non load bearing walls,new kitchen equip, furniture and finishes at basement, mezz, 1st fl | $350,000 |
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 500 Sansome St | Centric Construction Inc | ste 350, demo of (e) non-load bearing partitions, doors, lighting & mechanical system; construction of (n) non-load bearing partitions, doors & paint, (n) lighting & (n) mechanical system. maher naDetails
ste 350, demo of (e) non-load bearing partitions, doors, lighting & mechanical system; construction of (n) non-load bearing partitions, doors & paint, (n) lighting & (n) mechanical system. maher na | $648,490 |
| Mar 31, 2016 | Completed final sign-off Sep 2016 | 545 Post St | Centric Construction Inc | demo of e non load bearing wall at 1st fl mezzanine only. area of work is vacant, per ab017 and exempt from ada improvementsDetails
demo of e non load bearing wall at 1st fl mezzanine only. area of work is vacant, per ab017 and exempt from ada improvements | $25,000 |
| Nov 23, 2015 | Completed final sign-off May 2016 | 2575 Marin St | Centric Construction Inc | demo of (e) entry door & exterior windows; (n) storefront entry & (n) aluminum windows, replace in kind; (n) stand alone 2 story office bldg, (n) load bearing & non-load bearing partitions, 3 (n) ada compliant bathrooms & 1 drinking fountainDetails
demo of (e) entry door & exterior windows; (n) storefront entry & (n) aluminum windows, replace in kind; (n) stand alone 2 story office bldg, (n) load bearing & non-load bearing partitions, 3 (n) ada compliant bathrooms & 1 drinking fountain | $750,000 |
| Sep 15, 2015 | Never finaled issued Feb 2016, no final | 1023 Mission St | Centric Construction Inc | construction of (n) non-load bearing partitions, doors & paint. (n) concrete slab for car wash. (n) anchor support for car lifts. 2 dad compliant bathrooms & drinking foundation. mep, f/a and sprinklers deferred. n/a maher ordinanceDetails
construction of (n) non-load bearing partitions, doors & paint. (n) concrete slab for car wash. (n) anchor support for car lifts. 2 dad compliant bathrooms & drinking foundation. mep, f/a and sprinklers deferred. n/a maher ordinance | $900,000 |
| Aug 10, 2015 | Completed final sign-off Nov 2015 | 2575 Marin St | Centric Construction Inc | demo (e) non-compliant exterior concrete stairs, ramps & guardrails, construct (n) exterior concrete stairs & pedestrian ramp, (n) guardrails & 2 (n) bathrooms. n/a ordinance #155-13Details
demo (e) non-compliant exterior concrete stairs, ramps & guardrails, construct (n) exterior concrete stairs & pedestrian ramp, (n) guardrails & 2 (n) bathrooms. n/a ordinance #155-13 | $400,000 |
| Jul 24, 2015 | Completed final sign-off Feb 2016 | 334 Grant Av | Centric Construction Inc | demolition of (e) floor, stair, walls, equipment + finishes. construction of (n) floor to replace (e), walls, stairs, + finishes. mep under separate permit. compliance with maher ordinance no 155-13 not required.Details
demolition of (e) floor, stair, walls, equipment + finishes. construction of (n) floor to replace (e), walls, stairs, + finishes. mep under separate permit. compliance with maher ordinance no 155-13 not required. | $188,905 |
| Jul 15, 2015 | Completed final sign-off Aug 2016 | 1023 Mission St | Centric Construction Inc | demo: non load bearing walls, concrete slab, mezzanine & exterior wall cuts. construction: (n) stairs, (n) mezzanine, 2 (n) means of egress. maher n/aDetails
demo: non load bearing walls, concrete slab, mezzanine & exterior wall cuts. construction: (n) stairs, (n) mezzanine, 2 (n) means of egress. maher n/a | $370,000 |
| Jul 14, 2015 | Never finaled issued Jul 2015, no final | 500 Sansome St | Centric Construction Inc | 4th floor suite 450 - demo of (e) non-load bearing partitions, doors & lighting. construction of (n) non-load bearing partitions, doors & paint & lighting. n/a maher ordinanceDetails
4th floor suite 450 - demo of (e) non-load bearing partitions, doors & lighting. construction of (n) non-load bearing partitions, doors & paint & lighting. n/a maher ordinance | $605,646 |
| Mar 16, 2015 | Completed final sign-off Dec 2015 | 1301 Illinois St | Centric Construction Inc | to erect new storage shedDetails
to erect new storage shed | $25,000 |
| Mar 11, 2015 | Never finaled issued Mar 2015, no final | 500 Sansome St | Centric Construction Inc | demo of (e) non-load bearing partitions, doors, (e) out of commission, mech duct. construction of (n) non load bearing partitions, doors, paint maher - not req'dDetails
demo of (e) non-load bearing partitions, doors, (e) out of commission, mech duct. construction of (n) non load bearing partitions, doors, paint maher - not req'd | $341,935 |
| Nov 6, 2014 | Completed final sign-off Apr 2015 | 1675 Howard St | Centric Construction Inc | demo of 2 roll up fire doors and strip lighting. construction of new non-load bearing rated walls. new 5/8" type x drywall ceiling and paint. n/a for maherDetails
demo of 2 roll up fire doors and strip lighting. construction of new non-load bearing rated walls. new 5/8" type x drywall ceiling and paint. n/a for maher | $137,000 |
| Oct 29, 2014 | Never finaled issued Nov 2014, no final | 500 Sansome St | Centric Construction Inc | 3rd floor - demolition of (e) non load bearing partitions, doors, ceilings, carpet and lighting. construction of new non-load bearing partiions, doors, sidelights, ceiling, paint, carpet, lighting and power. sprinklers, fire alarm sep. permits maher n/a.Details
3rd floor - demolition of (e) non load bearing partitions, doors, ceilings, carpet and lighting. construction of new non-load bearing partiions, doors, sidelights, ceiling, paint, carpet, lighting and power. sprinklers, fire alarm sep. permits maher n/a. | $801,000 |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 500 Sansome St | Centric Construction Inc | 1st flr: demolition of (e) signage, construction of (n)n non-load bearing ceilings & lights; maher n/aDetails
1st flr: demolition of (e) signage, construction of (n)n non-load bearing ceilings & lights; maher n/a | $84,003 |
| Aug 15, 2014 | Never finaled issued Aug 2014, no final | 500 Sansome St | Centric Construction Inc | suite 750 - demolition of (e) non-load bearing partitions + doors. construction of (n) non-load bearing partitions, door, paint. compliance with maher ordinance 155-13 not required.Details
suite 750 - demolition of (e) non-load bearing partitions + doors. construction of (n) non-load bearing partitions, door, paint. compliance with maher ordinance 155-13 not required. | $37,330 |
| Jun 12, 2014 | Completed final sign-off Nov 2014 | 500 Sansome St | Centric Construction Inc | 2nd flr, ste 200: construction of new non-load bearing partitions, ceiling, paint, carpet & lighting; compliance with ord 155-13 not required, fire alarm/sprinkler under seperate permit.Details
2nd flr, ste 200: construction of new non-load bearing partitions, ceiling, paint, carpet & lighting; compliance with ord 155-13 not required, fire alarm/sprinkler under seperate permit. | $1,105,000 |
| Nov 4, 2013 | Expired or cancelled cancelled Jan 2026 | 501 Taylor St | revision to 201303252961. modification to original support beams and welds to match onsite conditionsDetails
revision to 201303252961. modification to original support beams and welds to match onsite conditions | $215,000 | |
| Nov 1, 2013 | Completed final sign-off Mar 2014 | 425 California St | Bcci Construction Company | selective demolition of full floor tenant suite build out of 2 adjacent suites. new tenant and demising partitions, entry doors with associated corridor extension, new power and tele/data, ceiling and light fixt, millwork,finishes. accessible restrooms for full barrier removal. unoccupied space.Details
selective demolition of full floor tenant suite build out of 2 adjacent suites. new tenant and demising partitions, entry doors with associated corridor extension, new power and tele/data, ceiling and light fixt, millwork,finishes. accessible restrooms for full barrier removal. unoccupied space. | $276,000 |
| May 23, 2013 | Never finaled issued Oct 2013, no final | 500 Sansome St | Centric Construction Inc | demolition of (e) elevator shaft at penthouse. construction of new elevator shaft & hoistway beam at penthouse. construction of new mechanical units & support & new rated fresh air shaftDetails
demolition of (e) elevator shaft at penthouse. construction of new elevator shaft & hoistway beam at penthouse. construction of new mechanical units & support & new rated fresh air shaft | $250,000 |
| Apr 26, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | Centric Construction Inc | demolition of (e) non load bearing walls & stairs, construction of (n) wall, doors, stairs, construction of (n) concrete slab, structural support. add (n) elevator smoke door.Details
demolition of (e) non load bearing walls & stairs, construction of (n) wall, doors, stairs, construction of (n) concrete slab, structural support. add (n) elevator smoke door. | $35,000 |
| Apr 16, 2013 | Completed final sign-off Aug 2014 | 3110 Octavia St | Cccs, Inc | at&t mobility is proposing to install unmanned wireless facility. 12 panel antennas are proposed on roof. equipment is on ground.Details
at&t mobility is proposing to install unmanned wireless facility. 12 panel antennas are proposed on roof. equipment is on ground. | $150,000 |
| Mar 25, 2013 | Completed final sign-off Feb 2014 | 501 Taylor St | Electric Tech Construction Inc | this project involves install of att outdoor panel antennas and ancillary equipment to be mounted on (e) roof and bay penthouse. 315 sf. att equipment cabinets to be installed in (n) equipment shelter on lower roof 102 sf. antenna coaxial transmission lines from rrv to antennas.Details
this project involves install of att outdoor panel antennas and ancillary equipment to be mounted on (e) roof and bay penthouse. 315 sf. att equipment cabinets to be installed in (n) equipment shelter on lower roof 102 sf. antenna coaxial transmission lines from rrv to antennas. | $200,000 |
| Mar 4, 2013 | Completed final sign-off Dec 2013 | 611 Folsom St | Roebbelen Contracting Inc | installation of 16 panel antennas & associated equipment within the (e) bldg.Details
installation of 16 panel antennas & associated equipment within the (e) bldg. | $130,000 |
| Feb 26, 2013 | Never finaled issued Mar 2013, no final | 500 Sansome St | Centric Construction Inc | bsmt-rev.to pa #201212075743 storage b06 & 07 changed to bike storage,conf. rm b11 changed into 2 offices, corridor b28- 2 doors removed & 2 doors relocated, addition of rm b04 for bike storage & corridor b31 path of travel revised, addition of mech. sys.-maintain elevator lobbies- sp-ls sep.permitDetails
bsmt-rev.to pa #201212075743 storage b06 & 07 changed to bike storage,conf. rm b11 changed into 2 offices, corridor b28- 2 doors removed & 2 doors relocated, addition of rm b04 for bike storage & corridor b31 path of travel revised, addition of mech. sys.-maintain elevator lobbies- sp-ls sep.permit | $150,000 |
| Feb 19, 2013 | Completed final sign-off Jul 2014 | 500 Sansome St | Centric Construction Inc | new mech equipment on roof, new structural platform on roof. new exhaust throughout the bldg.Details
new mech equipment on roof, new structural platform on roof. new exhaust throughout the bldg. | $700,000 |
| Jan 29, 2013 | Completed final sign-off Jun 2014 | 800 Powell St | Electric Tech Construction Inc | revision to 201206082226. relocate hvac condensor to roofDetails
revision to 201206082226. relocate hvac condensor to roof | $5,000 |
| Dec 21, 2012 | Completed final sign-off Dec 2014 | 500 Sansome St | Centric Construction Inc | revision to pa#2012-06-25-3332 (1st floor & basement) electrical room, exit corridor, restroom & basement elevator lobby layout changes.Details
revision to pa#2012-06-25-3332 (1st floor & basement) electrical room, exit corridor, restroom & basement elevator lobby layout changes. | |
| Dec 19, 2012 | Never finaled issued Aug 2013, no final | 474 Ofarrell St | Centric Construction Inc | umb seismic retrofit, ada bathroom.Details
umb seismic retrofit, ada bathroom. | $250,000 |
| Dec 7, 2012 | Never finaled issued Jan 2013, no final | 500 Sansome St | Centric Construction Inc | basement level-construction of new non load bearing partitions, doors, side lights, ceiling & soffits. new carpet, paint, lighting & power. construction of 1 ada shower room & 1 non ada shower room-sprinklers and fire alrm separate permit- new corridors and elevator doors, hvac under separate permitDetails
basement level-construction of new non load bearing partitions, doors, side lights, ceiling & soffits. new carpet, paint, lighting & power. construction of 1 ada shower room & 1 non ada shower room-sprinklers and fire alrm separate permit- new corridors and elevator doors, hvac under separate permit | $850,000 |
| Oct 16, 2012 | Completed final sign-off Jun 2015 | 500 Sansome St | 1st thru 8th floors-new restoom exhaust throughout the building. (restrooms under seperate permits)Details
1st thru 8th floors-new restoom exhaust throughout the building. (restrooms under seperate permits) | $75,000 | |
| Oct 16, 2012 | Completed final sign-off Jun 2013 | 799 Van Ness Av | Centric Construction Inc | basement level-revision to pa# 2012-0809-6937-relocation of accessibile bathroom & storage area. parking layout re-configuredDetails
basement level-revision to pa# 2012-0809-6937-relocation of accessibile bathroom & storage area. parking layout re-configured | |
| Sep 25, 2012 | Completed final sign-off Jun 2014 | 500 Sansome St | Centric Construction Inc | consturction of new accessible bathrooms and drinking fountains at vacant first floor and mezzanineDetails
consturction of new accessible bathrooms and drinking fountains at vacant first floor and mezzanine | $75,000 |
| Aug 24, 2012 | Completed final sign-off Jun 2014 | 536 Mission St | Metropolitan Electrical Construction | installation of 24 at & t outdoor panel antennas & ancillary equipment to be mounted on (e) penthouse & parapet. 300 sq. ft. at & t equipment racks to be mounted in new equipment shelter on (e) roof. 230 sq. ft. antenna coaxial transmission lines from rru to antennas. power & telephone service to beDetails
installation of 24 at & t outdoor panel antennas & ancillary equipment to be mounted on (e) penthouse & parapet. 300 sq. ft. at & t equipment racks to be mounted in new equipment shelter on (e) roof. 230 sq. ft. antenna coaxial transmission lines from rru to antennas. power & telephone service to be | $300,000 |
| Aug 9, 2012 | Completed final sign-off Jun 2013 | 799 Van Ness Av | Centric Construction Inc | install non-load bearing partitions, doors, ceilings. install new lighting & power on all floors (basmt,1st & 2nd flr), construction of four (4) new ada bathrooms on all floors (basmt,1st & 2nd flr). install two (2) new drinking fountains on 2nd floor.Details
install non-load bearing partitions, doors, ceilings. install new lighting & power on all floors (basmt,1st & 2nd flr), construction of four (4) new ada bathrooms on all floors (basmt,1st & 2nd flr). install two (2) new drinking fountains on 2nd floor. | $350,000 |
| Aug 1, 2012 | Completed final sign-off Jun 2015 | 500 Sansome St | Centric Construction Inc | all floors: barrier removal & replacement of elevator. 3rd-8th floors: phase 2 of a 2 phase voluntary seismic strengthening. phase 1 pa# 2011/11/16/9069.Details
all floors: barrier removal & replacement of elevator. 3rd-8th floors: phase 2 of a 2 phase voluntary seismic strengthening. phase 1 pa# 2011/11/16/9069. | $2,000,000 |
| Jul 20, 2012 | Completed final sign-off Jun 2013 | 799 Van Ness Av | Centric Construction Inc | demolition of existing slab and auto ramps for new elevator, stairs,pedestrial and auto ramps. building is vacant per ab-017. disabled access will not be performed until future permitDetails
demolition of existing slab and auto ramps for new elevator, stairs,pedestrial and auto ramps. building is vacant per ab-017. disabled access will not be performed until future permit | $180,310 |
| Jul 12, 2012 | Completed final sign-off Jun 2014 | 500 Sansome St | 2nd/3rd/4th/5th/6th floors-removal of (e) bathrooms, non load bearing walls. construction of new accessible bathrooms & drinking fountains- mep, sprinklers and fire alarm separate permitDetails
2nd/3rd/4th/5th/6th floors-removal of (e) bathrooms, non load bearing walls. construction of new accessible bathrooms & drinking fountains- mep, sprinklers and fire alarm separate permit | $500,000 | |
| Jul 10, 2012 | Completed final sign-off Nov 2014 | 1745 Market St | Metropolitan Electrical Construction | the project involves the installation of (n) att (9) outdoor panel antennas to be mounted on facf of (e) bldg. (4) att equipment racks to be mounted in (e) rm on 1st fl. 165 sq ft antenna coaxial transmission lines from rru to antennas. power & telephone service to be provided from (e) sources.Details
the project involves the installation of (n) att (9) outdoor panel antennas to be mounted on facf of (e) bldg. (4) att equipment racks to be mounted in (e) rm on 1st fl. 165 sq ft antenna coaxial transmission lines from rru to antennas. power & telephone service to be provided from (e) sources. | $115,000 |
| Jul 9, 2012 | Completed final sign-off Aug 2013 | 387 Ellis St | Metropolitan Electrical Construction | at&t has received planning approval to add a panel antennas enclosed in chimney & vent pipes on the (e) roof. associated equipment will be located in the basement.Details
at&t has received planning approval to add a panel antennas enclosed in chimney & vent pipes on the (e) roof. associated equipment will be located in the basement. | $160,000 |
| Jul 3, 2012 | Expired or cancelled cancelled Jan 2026 | 3901 Mission St | per case no# 2011.0664c-install 7 panel antennas & associated equipmentDetails
per case no# 2011.0664c-install 7 panel antennas & associated equipment | $75,000 | |
| Jul 2, 2012 | Completed final sign-off Jun 2014 | 500 Sansome St | Centric Construction Inc | 7th floor: removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains. 8th floor: removal of existing non-load bearing walls at vacant suite. removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains.Details
7th floor: removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains. 8th floor: removal of existing non-load bearing walls at vacant suite. removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains. | $300,000 |
| Jun 25, 2012 | Completed final sign-off Dec 2014 | 500 Sansome St | Centric Construction Inc | 1st fl & bsmt - construction of new transformer room, new exit passageway, stairs & accessible restrooms. removal of (e) non load bearing walls, exit passageway & non complying stairs & ramps.Details
1st fl & bsmt - construction of new transformer room, new exit passageway, stairs & accessible restrooms. removal of (e) non load bearing walls, exit passageway & non complying stairs & ramps. | $500,000 |
| Jun 8, 2012 | Completed final sign-off Feb 2013 | 800 Powell St | Electric Tech Construction Inc | (n) att(6) outdoor panel antennas to be mounted on (e) roof. (5) att equipment cabinets to be mounted in (e) storage room in basement (249 sq ft)antenna coaxial transmission lines from rrh to antennas. power and telephone service to be provided from (e) sources.Details
(n) att(6) outdoor panel antennas to be mounted on (e) roof. (5) att equipment cabinets to be mounted in (e) storage room in basement (249 sq ft)antenna coaxial transmission lines from rrh to antennas. power and telephone service to be provided from (e) sources. | $125,000 |
| Apr 27, 2012 | Completed final sign-off Apr 2013 | 799 Van Ness Av | Centric Building Inc. | voluntary seismic strengthening. new shotcrete walls, new steel brace frames and roof diaphram strengthening. work is structural only. no tenant improvement. no ada work per abo17. ada improvements under separate permitDetails
voluntary seismic strengthening. new shotcrete walls, new steel brace frames and roof diaphram strengthening. work is structural only. no tenant improvement. no ada work per abo17. ada improvements under separate permit | $650,000 |
| Apr 27, 2012 | Expired or cancelled cancelled Jul 2015 | 555 De Haro St | att: wireless facility to propose 9 antennas behind radio frequency transparant screening, equipment placed on ground behind wood fence.Details
att: wireless facility to propose 9 antennas behind radio frequency transparant screening, equipment placed on ground behind wood fence. | $195,000 | |
| Mar 26, 2012 | Expired or cancelled expired Jan 2026 | 700 Taylor St | Electric Tech Construction Inc | installation of 9 at&t outdoor panel antennas to be mounted on (e) staircase penthouse. at&t equipment cabinets to be mounted on (e) roof (approx 163 sq. ft.) antenna coaxial transmission lines from bts to equipment. power & telephone services to be provided from (e) sources.Details
installation of 9 at&t outdoor panel antennas to be mounted on (e) staircase penthouse. at&t equipment cabinets to be mounted on (e) roof (approx 163 sq. ft.) antenna coaxial transmission lines from bts to equipment. power & telephone services to be provided from (e) sources. | $115,000 |
| Mar 26, 2012 | Completed final sign-off Apr 2013 | 799 Van Ness Av | Centric Construction Inc | 1st, 2nd floor & basement interior non-structural demo on 2 floors & basement. no exterior work. no construction work per ab-017Details
1st, 2nd floor & basement interior non-structural demo on 2 floors & basement. no exterior work. no construction work per ab-017 | $15,000 |
| Jan 9, 2012 | Completed final sign-off Jun 2013 | 301 Twin Peaks Bl | Centric Construction Inc | revision to pa #200810295441: add guardrail closets, bedrm, data closet,bath,concrete planters,stairs,landing, storage space & associated doors,wall are removed. panty,toilet rm,elevator doors are reconfigured. balcony rails are glass & custom metal. stairs are reconfigured,balcony is cantileavered.Details
revision to pa #200810295441: add guardrail closets, bedrm, data closet,bath,concrete planters,stairs,landing, storage space & associated doors,wall are removed. panty,toilet rm,elevator doors are reconfigured. balcony rails are glass & custom metal. stairs are reconfigured,balcony is cantileavered. | $3,000 |
| Dec 20, 2011 | Never finaled issued Apr 2014, no final | 234 01st St | Metropolitan Electrical Construction | unmanned wireless facility consisting of 12 panel antennas and associated equipment on the roof of the subject buildingDetails
unmanned wireless facility consisting of 12 panel antennas and associated equipment on the roof of the subject building | $120,000 |
| Dec 9, 2011 | Completed final sign-off Mar 2012 | 500 Sansome St | Centric Construction Inc | suite #750-remove & replace doors at suite & restrooms, enlarge suite entry, install non load bearing partitions, doors, side lights, ceiling & soffits. new paint, lighting & power/dataDetails
suite #750-remove & replace doors at suite & restrooms, enlarge suite entry, install non load bearing partitions, doors, side lights, ceiling & soffits. new paint, lighting & power/data | $276,562 |
| Oct 25, 2011 | Completed final sign-off Mar 2012 | 500 Sansome St | Centric Construction Inc | 2nd floor-demo non load bearinf interior office walls, install new soffits, double entry doors, carpets & paint. new electrical supply for new work stations. no changes to (e) mechanical & plumbingDetails
2nd floor-demo non load bearinf interior office walls, install new soffits, double entry doors, carpets & paint. new electrical supply for new work stations. no changes to (e) mechanical & plumbing | $75,000 |
| Sep 14, 2011 | Completed final sign-off Aug 2013 | 400 Post St | Metropolitan Electrical Construction | install (n) at&t (12) outdoor panel antennas to be mounted on (e) sign structure on rool. paint to match (e) sign. (8) at&t equip cabinets to be mounted on (n) equip platform on (e) roof. antenna coaxial transmisiion lines from bts to qntennas. power to telco service provided from (e) sources.Details
install (n) at&t (12) outdoor panel antennas to be mounted on (e) sign structure on rool. paint to match (e) sign. (8) at&t equip cabinets to be mounted on (n) equip platform on (e) roof. antenna coaxial transmisiion lines from bts to qntennas. power to telco service provided from (e) sources. | $124,000 |
| Aug 24, 2011 | Never finaled issued Aug 2011, no final | 500 Sansome St | Centric Construction Inc | demolition of all interior non structural improvents inthe following spaces: all tenant space on floors 1, mezzanine, floor 2, suite 325, suite 500 and suite 615 per ab 17Details
demolition of all interior non structural improvents inthe following spaces: all tenant space on floors 1, mezzanine, floor 2, suite 325, suite 500 and suite 615 per ab 17 | $200,000 |
| Aug 5, 2011 | Never finaled issued Dec 2011, no final | 235 Pine St | Metropolitan Electrical Construction | install 1 e-911 omni antenna pursuant to fcc & homeland security on roof top structure, one gps antenna, 2 equipment cabinets.Details
install 1 e-911 omni antenna pursuant to fcc & homeland security on roof top structure, one gps antenna, 2 equipment cabinets. | $5,000 |
| May 20, 2011 | Completed final sign-off May 2012 | 340 Stockton St | Pinnacle Wireless Usa Inc. | revision to pa# 2010.06.29.5554.new mounting for t-mobile antennas. install 4x6 fire-retardent-treated wood blk with l 50 each end, top and bottom to studs. use 8 d nails from l50 to blockingDetails
revision to pa# 2010.06.29.5554.new mounting for t-mobile antennas. install 4x6 fire-retardent-treated wood blk with l 50 each end, top and bottom to studs. use 8 d nails from l50 to blocking | $500 |
| Mar 10, 2011 | Expired or cancelled cancelled Jul 2016 | 609 Sutter St | install 4 panel antennas, 2 equipment cabinets on rooftop, antenna coaxial transmission lines from bts to antennas.Details
install 4 panel antennas, 2 equipment cabinets on rooftop, antenna coaxial transmission lines from bts to antennas. | $100,000 | |
| Feb 24, 2011 | Never finaled issued Dec 2011, no final | 75 Hawthorne St | Metropolitan Electrical Construction | installation of e-911 antenna as required by fcc.Details
installation of e-911 antenna as required by fcc. | $5,000 |
| Feb 24, 2011 | Never finaled issued Dec 2011, no final | 55 Cyril Magnin St | installation of e-911 antenna as required by fcc.Details
installation of e-911 antenna as required by fcc. | $5,000 | |
| Feb 24, 2011 | Expired or cancelled expired Jan 2015 | 50 03rd St | installation of e-911 antenna as required by fcc.Details
installation of e-911 antenna as required by fcc. | $5,000 | |
| Dec 13, 2010 | Never finaled issued Jan 2011, no final | 444 Presidio Av | Cccs, Inc | rooftop wireless facitlity: install 1 equipment cabinets, 3 panel antennas, 1 gps antenna. approved by planning/sf planning commision 9/30/10 per motion 18187Details
rooftop wireless facitlity: install 1 equipment cabinets, 3 panel antennas, 1 gps antenna. approved by planning/sf planning commision 9/30/10 per motion 18187 | $45,000 |
| Nov 30, 2010 | Never finaled issued Jan 2011, no final | 5 Embarcadero Center | Metropolitan Electrical Construction | wireless facility, roof top: install 1 base transreceiver cabinet on the roof top, 6 panel antennas, 1 internet services exchange switch antenna & 1 gps antenna. modification to pa# 2009/08/10/4513. relocate 1 internet services exchange switch antenna from penthouse to (e) sprint platform.Details
wireless facility, roof top: install 1 base transreceiver cabinet on the roof top, 6 panel antennas, 1 internet services exchange switch antenna & 1 gps antenna. modification to pa# 2009/08/10/4513. relocate 1 internet services exchange switch antenna from penthouse to (e) sprint platform. | $15,000 |
| Nov 19, 2010 | Expired or cancelled cancelled Jan 2012 | 221 Main St | Metropolitan Electrical Construction | modification to pa# 2009/11/20/1849 - add 1 internet services exchange antennas (orginallly approv with 2) and replacement of 2 internet services exchange antenas.Details
modification to pa# 2009/11/20/1849 - add 1 internet services exchange antennas (orginallly approv with 2) and replacement of 2 internet services exchange antenas. | $15,000 |
| Nov 2, 2010 | Expired or cancelled cancelled Feb 2012 | 333 Ofarrell St | Metropolitan Electrical Construction | wireless facility, rooftop: install 1 equipment rack & 3 internet services exchange switch antennas. modification to pa# 2010/01/29/5602.Details
wireless facility, rooftop: install 1 equipment rack & 3 internet services exchange switch antennas. modification to pa# 2010/01/29/5602. | $15,000 |
| Nov 1, 2010 | Expired or cancelled cancelled May 2012 | 101 California St | Metropolitan Electrical Construction | wireless facility, roof top: install 2 internet services exchange antennas, modification to pa# 2010/01/29/5605 (install 1 equipment cabinet, 4 internet services exchange switch antenna & 1 gps antenna on roof).Details
wireless facility, roof top: install 2 internet services exchange antennas, modification to pa# 2010/01/29/5605 (install 1 equipment cabinet, 4 internet services exchange switch antenna & 1 gps antenna on roof). | $15,000 |
| Nov 1, 2010 | Expired or cancelled cancelled Jan 2012 | 380 Clementina St | Metropolitan Electrical Construction | wireless facility, roof top: install 1 new equipment cabinet, 4 internet services exchange switch antennas, 3 panel antennas, & 1 gps antenna. mofigication to pa#200912223083.Details
wireless facility, roof top: install 1 new equipment cabinet, 4 internet services exchange switch antennas, 3 panel antennas, & 1 gps antenna. mofigication to pa#200912223083. | $15,000 |
| Nov 1, 2010 | Expired or cancelled cancelled May 2012 | 735 Montgomery St | Metropolitan Electrical Construction | wireless facility, roof top: install 1 new equipment cabinet, 3 internet services exchange switch antennas, 3 panel antennas, & 1 gps antenna.Details
wireless facility, roof top: install 1 new equipment cabinet, 3 internet services exchange switch antennas, 3 panel antennas, & 1 gps antenna. | $45,000 |
| Oct 25, 2010 | Completed final sign-off Feb 2011 | 77 Beale St | Capital Tower & Communications | modification of an (e) wireless telecommunications facility in kind replacement of 2 (e) cabinets & in kind replacement of 1 panel antennaDetails
modification of an (e) wireless telecommunications facility in kind replacement of 2 (e) cabinets & in kind replacement of 1 panel antenna | $12,000 |
| Oct 21, 2010 | Expired or cancelled cancelled Jan 2012 | 633 Folsom St | Metropolitan Electrical Construction | wireless facility: install (1) equipment cabinet, (1) internet serveces exchange switch antenna, (3) panel antennas, and (1) 6 ps antenna. located on roof. modification to pa#201003057651.Details
wireless facility: install (1) equipment cabinet, (1) internet serveces exchange switch antenna, (3) panel antennas, and (1) 6 ps antenna. located on roof. modification to pa#201003057651. | $15,000 |
| Oct 6, 2010 | Completed final sign-off Jun 2011 | 2601 Mission St | Capital Tower & Communications | modify existing unmanned wireless facility. scope of work: replace (one) existing panel with in-kind. replacement & add (one) rbs cabient & (one) battery back-up unit in existing equipment room.Details
modify existing unmanned wireless facility. scope of work: replace (one) existing panel with in-kind. replacement & add (one) rbs cabient & (one) battery back-up unit in existing equipment room. | $12,000 |
| Oct 6, 2010 | Completed final sign-off Jan 2011 | 701 10th Av | Capital Tower & Communications | replacement of one existing telecommunications. cabinet in existing garage with one new cabinet.Details
replacement of one existing telecommunications. cabinet in existing garage with one new cabinet. | $12,000 |
| Oct 5, 2010 | Expired or cancelled cancelled May 2018 | 191 02nd St | Metropolitan Electrical Construction | uts facility: installation of: 1 bts equipment cabinet on rooftop, 3 internet servies exchange switch antennas, 3 panel atnennas, and 1 gps antenna.Details
uts facility: installation of: 1 bts equipment cabinet on rooftop, 3 internet servies exchange switch antennas, 3 panel atnennas, and 1 gps antenna. | $45,000 |
| Sep 29, 2010 | Expired or cancelled withdrawn Feb 2011 | 5 Thomas Mellon Cr | installation of wireless facility: (6) panel antennas mounted on existing penthouse; (1) gps antenna; (4) t-mobile equipment cabinets will be mounted on existing steel platform on roof; coax lines from bts to antennas.Details
installation of wireless facility: (6) panel antennas mounted on existing penthouse; (1) gps antenna; (4) t-mobile equipment cabinets will be mounted on existing steel platform on roof; coax lines from bts to antennas. | $131,000 | |
| Aug 27, 2010 | Expired or cancelled cancelled Mar 2020 | 500 Washington St | installation of unmanned telecommunications facility with equipment cabinets on roof top & antennas mounted to (e) building penthouse structure. 6 new attenas; 2 new equip cabinets (2 future)Details
installation of unmanned telecommunications facility with equipment cabinets on roof top & antennas mounted to (e) building penthouse structure. 6 new attenas; 2 new equip cabinets (2 future) | $80,000 | |
| Aug 10, 2010 | Expired or cancelled expired Apr 2013 | 1390 Market St | Metropolitan Electrical Construction | revision to 200908205254. re-design of structural platform for bts equipment cabinetDetails
revision to 200908205254. re-design of structural platform for bts equipment cabinet | $1,000 |
| Aug 6, 2010 | Completed final sign-off Aug 2011 | 555 Market St | Cccs, Inc | installation of an unmanned telecommunications facility, consisting of equipment cabinets installed within an (e) room on the 21st floor, and antennas mounted on the roof.Details
installation of an unmanned telecommunications facility, consisting of equipment cabinets installed within an (e) room on the 21st floor, and antennas mounted on the roof. | $65,000 |
| Jun 29, 2010 | Expired or cancelled cancelled Mar 2020 | 982 Market St | installation of an unmanned telecommunications facility, consisting of equipment cabinets mounted within existing room on 9th floor and antennas installed on existing roof.Details
installation of an unmanned telecommunications facility, consisting of equipment cabinets mounted within existing room on 9th floor and antennas installed on existing roof. | $65,000 | |
| Jun 29, 2010 | Never finaled issued Jan 2011, no final | 2500 24th St | Pinnacle Wireless Usa Inc. | installation of an unmaned telecomunications facility, consisting of antennas mounted behind screen panels on the roof of existing stairwell structure & equipment cabinets mounted on 3rd. level of parking garage.Details
installation of an unmaned telecomunications facility, consisting of antennas mounted behind screen panels on the roof of existing stairwell structure & equipment cabinets mounted on 3rd. level of parking garage. | $70,000 |
| Jun 29, 2010 | Completed final sign-off May 2012 | 340 Stockton St | Pinnacle Wireless Usa Inc. | installation of an unmanned telecommunications facility, consisting of equipment cabinets mounted within existing penthouse structure and antennas installed on existing building walls.Details
installation of an unmanned telecommunications facility, consisting of equipment cabinets mounted within existing penthouse structure and antennas installed on existing building walls. | $60,000 |
| May 14, 2010 | Completed final sign-off Feb 2019 | 470 Columbus Av | Cccs, Inc | mod. to approved appl.#200702053389 to add a faux vent pipe to conceal antenna & to add 2'-2 1/2"x2'-5 7/8" lmu box for e-911 capability.Details
mod. to approved appl.#200702053389 to add a faux vent pipe to conceal antenna & to add 2'-2 1/2"x2'-5 7/8" lmu box for e-911 capability. | $6,500 |
| Apr 30, 2010 | Completed final sign-off Feb 2011 | 70 Charter Oak Av | Metropolitan Electrical Construction | installation of (3) panel antennas, (2) internet services exchange antennas in (e) frp screens on roof; (1) equipment rack inside (e) equipment room adjacent to the bldg.Details
installation of (3) panel antennas, (2) internet services exchange antennas in (e) frp screens on roof; (1) equipment rack inside (e) equipment room adjacent to the bldg. | $45,000 |
| Jan 29, 2010 | Completed final sign-off May 2011 | 390 Clementina St | Metropolitan Electrical Construction, Wpcs International - Suisun City Inc | t-mobile proposes to construct/operate a telecommunications facility (antenna) on the facade of an (e) building with associated equiptment on the rooftop.Details
t-mobile proposes to construct/operate a telecommunications facility (antenna) on the facade of an (e) building with associated equiptment on the rooftop. | $75,000 |
| Nov 20, 2009 | Completed final sign-off May 2012 | 221 Main St | Metropolitan Electrical Construction, Cccs, Inc | clearwire. installation of 1 equipment cabinet, 2 internet services exchange antennas, 3 panel antennas and 1 gps antennas located on the roof.Details
clearwire. installation of 1 equipment cabinet, 2 internet services exchange antennas, 3 panel antennas and 1 gps antennas located on the roof. | $45,000 |
| Oct 27, 2009 | Completed final sign-off May 2011 | 1881 Post St | Metropolitan Electrical Construction | sprint. minor mod. installation of (1) equipment rack in parking lot in (e) nextel shelter; (1) gps antenna; (3) rf panel antennas on rooftop on existing mounts as prev appd bp#9720158, case # 97.577c.Details
sprint. minor mod. installation of (1) equipment rack in parking lot in (e) nextel shelter; (1) gps antenna; (3) rf panel antennas on rooftop on existing mounts as prev appd bp#9720158, case # 97.577c. | $45,000 |
| Oct 15, 2009 | Completed final sign-off Aug 2010 | 5000 Geary Bl | Metropolitan Electrical Construction | wireless modification: build out (e) entitlements, installation of 1 equipment cabinet inside (e) equipment area on ground level, 3 panel antennas, 1 gps antenna on roof, build out (e) entitlementsDetails
wireless modification: build out (e) entitlements, installation of 1 equipment cabinet inside (e) equipment area on ground level, 3 panel antennas, 1 gps antenna on roof, build out (e) entitlements | $45,000 |
| Sep 18, 2009 | Expired or cancelled cancelled Oct 2010 | 3838 California St | Metropolitan Electrical Construction | wireless modification - add (3) rf panel antennas; (4) internet services exchange antennas; (1) equip cabeent, all one th roof; utilizing previosly approved entitlements.Details
wireless modification - add (3) rf panel antennas; (4) internet services exchange antennas; (1) equip cabeent, all one th roof; utilizing previosly approved entitlements. | $45,000 |