Alan Johansen
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Interior Architects
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Jan 2024
279 permits since 2000 (architect on 257 permits, designer on 10 permits, authorized agent-others on 8 permits, engineer on 5 permits): 232 completed, 25 never finaled, 22 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 279.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 30, 2024 | Completed final sign-off May 2024 | 944 Stockton St | G Swanson Constr. Inc. | interior renovation of the back of house in an extg bank branch back of houose area in a high rise, multi-tenant mixed use bldg. scope of work includes: ceiling grid and tile replacement, lighting, finishes, flooring, millwork, furniture and equipment.Details
interior renovation of the back of house in an extg bank branch back of houose area in a high rise, multi-tenant mixed use bldg. scope of work includes: ceiling grid and tile replacement, lighting, finishes, flooring, millwork, furniture and equipment. | $120,000 |
| Dec 13, 2017 | Completed final sign-off Feb 2018 | 100 Montgomery St | Swinerton Builders | 21st floor: one "l" shape low height partition. no ceiling, lighting, & other scope of work. electrical work to be under seperate trade permit. n/a for maher.Details
21st floor: one "l" shape low height partition. no ceiling, lighting, & other scope of work. electrical work to be under seperate trade permit. n/a for maher. | $5,000 |
| Jan 12, 2017 | Completed final sign-off Oct 2017 | 50 Fremont St | Gci, Inc | 8,9,10th flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 naDetails
8,9,10th flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 na | $20,000 |
| Jan 12, 2017 | Completed final sign-off Oct 2017 | 50 Fremont St | Gci, Inc | 5,6,7 flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 naDetails
5,6,7 flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 na | $20,000 |
| Dec 20, 2016 | Never finaled issued Dec 2016, no final | 1 Montgomery St | Bcci Construction Company | 25th flr: commercial tenant improvement which included demolition, new non-structural partitions, mep, lighting, millwork & finishes.Details
25th flr: commercial tenant improvement which included demolition, new non-structural partitions, mep, lighting, millwork & finishes. | $2,200,000 |
| Dec 20, 2016 | Never finaled issued Dec 2016, no final | 1 Montgomery St | Bcci Construction Company | 24th floor: commercial t.i. which included selective demolition, new non-structural partitions, mep, lighting, millwork and finishes.Details
24th floor: commercial t.i. which included selective demolition, new non-structural partitions, mep, lighting, millwork and finishes. | $975,000 |
| Dec 13, 2016 | Completed final sign-off Nov 2017 | 50 Fremont St | Gci, Inc | 16/f- full floor tenant remodel existing office including ceiling partitions, ceilings and mep maher not reqDetails
16/f- full floor tenant remodel existing office including ceiling partitions, ceilings and mep maher not req | $2,750,000 |
| Dec 6, 2016 | Completed final sign-off Sep 2017 | 50 Fremont St | Gci, Inc | remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. ref pa# 201610119947Details
remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. ref pa# 201610119947 | |
| Dec 6, 2016 | Completed final sign-off Sep 2017 | 50 Fremont St | Gci, Inc | remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. ref. 2016-10-11-9943. maher not reqDetails
remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. ref. 2016-10-11-9943. maher not req | |
| Dec 6, 2016 | Completed final sign-off Sep 2017 | 50 Fremont St | Gci, Inc | remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights.Details
remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. | |
| Nov 2, 2016 | Completed final sign-off Feb 2017 | 75 Hawthorne St | Turner Construction Co | revised occupancy type training room to 1:20 b occupancy ref pa 2015-1231-6239Details
revised occupancy type training room to 1:20 b occupancy ref pa 2015-1231-6239 | $996 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 75 Hawthorne St | Turner Construction Co | revision to 3rd floor interior ti of multi-tenant floor. improvements include electrical, mechanical, ceiling, lighting & finishes. no structural scope. no change of use. ref pa 2013-1211-3943Details
revision to 3rd floor interior ti of multi-tenant floor. improvements include electrical, mechanical, ceiling, lighting & finishes. no structural scope. no change of use. ref pa 2013-1211-3943 | $30,000 |
| Oct 11, 2016 | Completed final sign-off Oct 2017 | 50 Fremont St | Gci, Inc | 23rd floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep. alarm/sprinkler deferred.Details
23rd floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep. alarm/sprinkler deferred. | $2,750,000 |
| Oct 11, 2016 | Completed final sign-off Oct 2017 | 50 Fremont St | Gci, Inc | 15th floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mepDetails
15th floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep | $2,750,000 |
| Oct 11, 2016 | Completed final sign-off Sep 2017 | 50 Fremont St | Gci, Inc | 8th floor - full ti including partitions, ceilings, lights and mep. fire alarm & srpinkler on separate permitDetails
8th floor - full ti including partitions, ceilings, lights and mep. fire alarm & srpinkler on separate permit | $700,000 |
| Oct 11, 2016 | Completed final sign-off Nov 2016 | 50 Fremont St | Gci, Inc | 6th floor - full ti including partitions, ceilings, lights and mep. fire alarm & sprinkler on separate permitDetails
6th floor - full ti including partitions, ceilings, lights and mep. fire alarm & sprinkler on separate permit | $700,000 |
| Oct 11, 2016 | Completed final sign-off Sep 2017 | 50 Fremont St | Gci, Inc | 5th floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep. life safety deferred.Details
5th floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep. life safety deferred. | $700,000 |
| Oct 11, 2016 | Completed final sign-off Sep 2017 | 50 Fremont St | 7th floor - full ti including partitions, ceilings, lights and mep. fire alarm & srpinkler on separate permitDetails
7th floor - full ti including partitions, ceilings, lights and mep. fire alarm & srpinkler on separate permit | $700,000 | |
| Sep 28, 2016 | Completed final sign-off Oct 2017 | 50 Fremont St | Gci, Inc | flrs: 15 &16: (n)communicating stair; work includes selective demo @ floor opening,stair,glass guardrail and finishes; maher n/aDetails
flrs: 15 &16: (n)communicating stair; work includes selective demo @ floor opening,stair,glass guardrail and finishes; maher n/a | $125,000 |
| Sep 16, 2016 | Completed final sign-off Oct 2016 | 50 Fremont St | Gci, Inc | 3rd floor: new partition, finishes, electrical devicesDetails
3rd floor: new partition, finishes, electrical devices | $50,000 |
| Sep 2, 2016 | Completed final sign-off Oct 2017 | 50 Fremont St | Gci, Inc | 15th flr: selective interior demo of partitions, ceiling & finishes maher na ab017. arch/mpe/life safety deferred. elevator lobby integrity to be maintained.Details
15th flr: selective interior demo of partitions, ceiling & finishes maher na ab017. arch/mpe/life safety deferred. elevator lobby integrity to be maintained. | $50,000 |
| Aug 24, 2016 | Completed final sign-off Oct 2016 | 75 Hawthorne St | Turner Construction Co | revision t0 (e) ti permit to add interior clerestory windows at internal offices on the 9th floor. scope of work limited to gyp board demo, modification of partition framing for (n) window locations patching/finishes (no scope of structural/mep/fire life safety) rev 2013-1218-4509Details
revision t0 (e) ti permit to add interior clerestory windows at internal offices on the 9th floor. scope of work limited to gyp board demo, modification of partition framing for (n) window locations patching/finishes (no scope of structural/mep/fire life safety) rev 2013-1218-4509 | $10,000 |
| Jul 19, 2016 | Completed final sign-off Aug 2016 | 201 03rd St | Bcci Construction Company | 6/f- revision to pa 2015-0828-5519 to reclassify room 674a as an education classroom (training) roomDetails
6/f- revision to pa 2015-0828-5519 to reclassify room 674a as an education classroom (training) room | |
| Jul 15, 2016 | Completed final sign-off Nov 2017 | 50 Fremont St | Gci, Inc | 42nd flr: t.i. including (n)partitions,ceiling finishes, (n)mechanical & electrical devices including lighting. limited structural scope at roof. maher n/aDetails
42nd flr: t.i. including (n)partitions,ceiling finishes, (n)mechanical & electrical devices including lighting. limited structural scope at roof. maher n/a | $274,440 |
| Jul 1, 2016 | Completed final sign-off Feb 2017 | 75 Hawthorne St | Turner Construction Co | partial 2nd floor interior ti on multi-tenant floor improvements include partitions, electrical, mechanical, plumbing, ceiling, lighting, finishes, and life safety. no structural scopeDetails
partial 2nd floor interior ti on multi-tenant floor improvements include partitions, electrical, mechanical, plumbing, ceiling, lighting, finishes, and life safety. no structural scope | $894,800 |
| Jul 1, 2016 | Completed final sign-off Dec 2016 | 100 Pine St | Principal Builders Inc. | partial 31st flr ti for partial floor and 32nd floor ti for full floor - minor demo, partitions, mechanical, electrical, ceiling and finishes. minor accessibility upgrades to the bldg core restrooms, include new accessible, minor toilet partition revisions and accessory adjustmentsDetails
partial 31st flr ti for partial floor and 32nd floor ti for full floor - minor demo, partitions, mechanical, electrical, ceiling and finishes. minor accessibility upgrades to the bldg core restrooms, include new accessible, minor toilet partition revisions and accessory adjustments | $138,000 |
| Jun 27, 2016 | Completed final sign-off Dec 2016 | 555 Mission St | Skyline Construction | 19th floor, partial floor ti on multi-tenant floor including but not limited to selective demolition, partition, ceiling, mechanical, electrical, plumbing and finishes. path of travel is included as reference only, no structural work life safety under a separate permit.Details
19th floor, partial floor ti on multi-tenant floor including but not limited to selective demolition, partition, ceiling, mechanical, electrical, plumbing and finishes. path of travel is included as reference only, no structural work life safety under a separate permit. | $720,000 |
| May 27, 2016 | Completed final sign-off Sep 2016 | 101 California St | Novo Construction Inc | tenant improvement on the 30th fl demo, new partitons, elec, mech, ceiling, finishesDetails
tenant improvement on the 30th fl demo, new partitons, elec, mech, ceiling, finishes | $1,000,000 |
| May 26, 2016 | Never finaled issued Jul 2016, no final | 222 02nd St | Swinerton Builders | 24/f- full floor t.i. new bldg. pa#200711309386. n/a ordinance #155-13Details
24/f- full floor t.i. new bldg. pa#200711309386. n/a ordinance #155-13 | $900,000 |
| May 26, 2016 | Never finaled issued Jul 2016, no final | 222 02nd St | Swinerton Builders | 23/f- full floor t.i. new bldg. pa#200711309386. n/a ordinance #155-13Details
23/f- full floor t.i. new bldg. pa#200711309386. n/a ordinance #155-13 | $900,000 |
| May 2, 2016 | Never finaled issued Aug 2016, no final | 222 02nd St | Swinerton Builders | 22nd floor - full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinanceDetails
22nd floor - full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinance | $1,200,000 |
| May 2, 2016 | Never finaled issued Aug 2016, no final | 222 02nd St | Swinerton Builders | 21st floor -full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting, fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinanceDetails
21st floor -full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting, fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinance | $1,200,000 |
| Apr 6, 2016 | Completed final sign-off Aug 2016 | 222 02nd St | Swinerton Builders | build sound barrier on 5th floor roof around exhaust of p.c.u. and mechanical equipmentDetails
build sound barrier on 5th floor roof around exhaust of p.c.u. and mechanical equipment | $29,000 |
| Mar 28, 2016 | Completed final sign-off Apr 2017 | 555 California St | Swinerton Builders | revision to pa#201602190037, split one office into two, lighting, finishes & power. n/a ordinance #155-13Details
revision to pa#201602190037, split one office into two, lighting, finishes & power. n/a ordinance #155-13 | $50,000 |
| Mar 28, 2016 | Completed final sign-off Apr 2017 | 555 California St | Swinerton Builders | revision to pa#201508063571 switch office & conference room, finishes, lighting & power. n/a ordinance #155-13Details
revision to pa#201508063571 switch office & conference room, finishes, lighting & power. n/a ordinance #155-13 | |
| Feb 19, 2016 | Completed final sign-off Apr 2017 | 555 California St | Swinerton Builders | 7th flr: partial floor tenant improvement for full tenant for additional card readers at common path egress door only, not an exit. card reader used only for local alarm and not tied to the building; maher n/aDetails
7th flr: partial floor tenant improvement for full tenant for additional card readers at common path egress door only, not an exit. card reader used only for local alarm and not tied to the building; maher n/a | $158,000 |
| Feb 19, 2016 | Never finaled issued Mar 2016, no final | 555 California St | Swinerton Builders | 11th flr: partial floor tenant improvement for full floor tenant including but not limited to: selective demolition, partition, millwork, electrical & finishes. no mechanical,plumbing or structural. life safety under a separate permit; maher n/a1Details
11th flr: partial floor tenant improvement for full floor tenant including but not limited to: selective demolition, partition, millwork, electrical & finishes. no mechanical,plumbing or structural. life safety under a separate permit; maher n/a1 | $166,000 |
| Feb 2, 2016 | Never finaled issued Jul 2016, no final | 75 Hawthorne St | Turner Construction Co | arch and mep plans with comm kitchen 4 new fsd's 1st and 2nd floors: partial floor t.i. conversion of office space to child care center. selective non-structural demolition, new partitons and finishes. close off and abandon 1 existing stair.Details
arch and mep plans with comm kitchen 4 new fsd's 1st and 2nd floors: partial floor t.i. conversion of office space to child care center. selective non-structural demolition, new partitons and finishes. close off and abandon 1 existing stair. | $880,000 |
| Feb 1, 2016 | Completed final sign-off Feb 2017 | 75 Hawthorne St | Turner Construction Co | 7th/8th floor: partial floor ti, ref pa 2015-1231-6241: mep work. sep permits for fire/life safety/restrooms/elevator lobby/arch.Details
7th/8th floor: partial floor ti, ref pa 2015-1231-6241: mep work. sep permits for fire/life safety/restrooms/elevator lobby/arch. | $800,000 |
| Jan 15, 2016 | Completed final sign-off Feb 2017 | 75 Hawthorne St | Turner Construction Co | 6th floor: partial floor t.i. for mep scope of work. seperate permit: fire sprinkler, fire, life safty, resterooms, elvator lobby, architectural t.i. ab 060 compliant, adding fsd's through rated walls.Details
6th floor: partial floor t.i. for mep scope of work. seperate permit: fire sprinkler, fire, life safty, resterooms, elvator lobby, architectural t.i. ab 060 compliant, adding fsd's through rated walls. | $800,000 |
| Dec 31, 2015 | Completed final sign-off Feb 2017 | 75 Hawthorne St | Turner Construction Co | full floor ti: selective non-structural demolition; new partitions, finishes, minor structural bracing, ceiling, secondary restrooms. under separate permits: mep, fire sprinkler, fire life safety, core restrooms, elevator lobby.Details
full floor ti: selective non-structural demolition; new partitions, finishes, minor structural bracing, ceiling, secondary restrooms. under separate permits: mep, fire sprinkler, fire life safety, core restrooms, elevator lobby. | $996,000 |
| Dec 7, 2015 | Completed final sign-off Apr 2016 | 101 California St | Source Planning And Construction Inc | renovate e shower rooms, selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, salvaged door/fra,e/hardware, new millwork, showers, toilets, sinks, finishes. mep, l/s under separate permit. n/a ordinance #155-13Details
renovate e shower rooms, selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, salvaged door/fra,e/hardware, new millwork, showers, toilets, sinks, finishes. mep, l/s under separate permit. n/a ordinance #155-13 | $107,021 |
| Dec 3, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | Bcci Construction Company | 5/6 floors: revision to issued pa 201502178521 to revise structural details.Details
5/6 floors: revision to issued pa 201502178521 to revise structural details. | |
| Dec 3, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | Bcci Construction Company | 6 & 7 floors: revision to issued pa 201508103765 to revise structural detail.Details
6 & 7 floors: revision to issued pa 201508103765 to revise structural detail. | |
| Dec 1, 2015 | Completed final sign-off May 2016 | 100 01st St | Commercial Interior Builders Inc | 12th floor; partial floor tenant improvement, demolition of non structural partitions. new partitons, ceilings, finishes, electrical and mechanicalDetails
12th floor; partial floor tenant improvement, demolition of non structural partitions. new partitons, ceilings, finishes, electrical and mechanical | $100,000 |
| Oct 15, 2015 | Completed final sign-off Jul 2016 | 550 Terry A. Francois Bl | Swinerton Builders | partial t.i. of full floor tenant space, scope of work to include construction on new walls, ceilings, floor finishes, mechanical and electrical. n/a ordinance #155-13Details
partial t.i. of full floor tenant space, scope of work to include construction on new walls, ceilings, floor finishes, mechanical and electrical. n/a ordinance #155-13 | $300,000 |
| Oct 9, 2015 | Completed final sign-off Jul 2016 | 222 02nd St | Swinerton Builders | pcu exhaust riser shaft terminates of floor 5 roof. 250 sq ft project area. n/a maherDetails
pcu exhaust riser shaft terminates of floor 5 roof. 250 sq ft project area. n/a maher | $40,000 |
| Oct 6, 2015 | Expired or cancelled cancelled Mar 2017 | 85 02nd St | Gci, Inc | ground floor, suite #100: enlarging server room. duct distribution being modified. 1 new 2.0 tons split ac system for telcom room 114. maher naDetails
ground floor, suite #100: enlarging server room. duct distribution being modified. 1 new 2.0 tons split ac system for telcom room 114. maher na | $50,000 |
| Sep 30, 2015 | Completed final sign-off Dec 2016 | 121 Spear St | Bcci Construction Company | 3rd flr: partial floor t.i. in office portion of the building incl demo,drywall ceilings,doors,finishes,mechanical & electric, fire alarm life safety and sprinklers on seperate permits. maher n/aDetails
3rd flr: partial floor t.i. in office portion of the building incl demo,drywall ceilings,doors,finishes,mechanical & electric, fire alarm life safety and sprinklers on seperate permits. maher n/a | $511,560 |
| Sep 29, 2015 | Completed final sign-off Jul 2016 | 550 Terry A. Francois Bl | Swinerton Builders | demolition of portion of 1st floor space, including partitions, electrical, mechanical, ceiling, lighting and finishes. area of work shall remain vacant per ab-017. n/a ordinance #155-13Details
demolition of portion of 1st floor space, including partitions, electrical, mechanical, ceiling, lighting and finishes. area of work shall remain vacant per ab-017. n/a ordinance #155-13 | $15,000 |
| Sep 17, 2015 | Completed final sign-off Jan 2016 | 1 Embarcadero Center | Dome Construction Corp | 15th floor suite 1550 partial floor t.i. for single tenant including selective demo, new partition, finishes, rcp. mep design build under separate permit. n/a maher ordinanceDetails
15th floor suite 1550 partial floor t.i. for single tenant including selective demo, new partition, finishes, rcp. mep design build under separate permit. n/a maher ordinance | $500,000 |
| Sep 16, 2015 | Never finaled issued Nov 2015, no final | 685 Market St | Truebeck Construction | 5th flr: partial floor administrative office, t.i. selective demo,partitions,ceilings,finishes,meps,no structural work, sprinkler & life safety permits under separate submittal; maher n/aDetails
5th flr: partial floor administrative office, t.i. selective demo,partitions,ceilings,finishes,meps,no structural work, sprinkler & life safety permits under separate submittal; maher n/a | $250,000 |
| Sep 15, 2015 | Completed final sign-off Jun 2016 | 303 02nd St | Skyline Construction | 4/f: multi tenant partial floor ti selective demo of finishes partitions, new partitions, ceilings and finishes. new restrooms. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13 not required.Details
4/f: multi tenant partial floor ti selective demo of finishes partitions, new partitions, ceilings and finishes. new restrooms. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13 not required. | $200,000 |
| Sep 1, 2015 | Completed final sign-off Dec 2015 | 1 Post St | Sc Builders, Inc | revision to app#201507101233 and 201506048075 addressing douglas fir with wood panelling as request by general james fire inspector.Details
revision to app#201507101233 and 201506048075 addressing douglas fir with wood panelling as request by general james fire inspector. | |
| Aug 11, 2015 | Completed final sign-off Jul 2016 | 425 Market St | Skyline Construction | 28th floor - full floor t.i. includes partitions & demountable partitions. mechanical electrical work etc. sprinkler & life safety work if needed, under separate permit. demo under sep permit #201507070783. n/a maher ordinanceDetails
28th floor - full floor t.i. includes partitions & demountable partitions. mechanical electrical work etc. sprinkler & life safety work if needed, under separate permit. demo under sep permit #201507070783. n/a maher ordinance | $2,000,000 |
| Aug 11, 2015 | Never finaled issued Oct 2015, no final | 1455 Market St | Deb Construction Llc | 1st floor: partial floor t.i. including but not limited to: selective demo, partition, ceiling & finishes. life saftey under sep permit. maher naDetails
1st floor: partial floor t.i. including but not limited to: selective demo, partition, ceiling & finishes. life saftey under sep permit. maher na | $467,544 |
| Aug 11, 2015 | Completed final sign-off Oct 2016 | 425 Market St | Skyline Construction | 27th floor - full floor t.i. includes partitions & demountable partitions. mechanical electrical & plumbing. sprinkler & life safety work if needed, under separate permit. demo under sep permit. n/a maher ordinanceDetails
27th floor - full floor t.i. includes partitions & demountable partitions. mechanical electrical & plumbing. sprinkler & life safety work if needed, under separate permit. demo under sep permit. n/a maher ordinance | $2,000,000 |
| Aug 10, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | Bcci Construction Company | new steel stair between 6th and 7th flr including structural work and associated mechanical.Details
new steel stair between 6th and 7th flr including structural work and associated mechanical. | $519,000 |
| Jul 27, 2015 | Expired or cancelled cancelled Apr 2016 | 1 Montgomery St | Skyline Construction | t.i. for full floor tenant, selective demolition, new partitions, mechanical & electrical.Details
t.i. for full floor tenant, selective demolition, new partitions, mechanical & electrical. | $50,000 |
| Jul 27, 2015 | Expired or cancelled cancelled Apr 2016 | 1 Montgomery St | Skyline Construction | t.i. for the 11/f to include selective demolition, new partitions, mechanical & electrical.Details
t.i. for the 11/f to include selective demolition, new partitions, mechanical & electrical. | $50,000 |
| Jul 22, 2015 | Completed final sign-off May 2016 | 303 02nd St | Skyline Construction | north tower- partial floor t.i. to include selective demo, construction of new partitions. mep & fire life safety under seperate permit. n/a ordinance #155-13Details
north tower- partial floor t.i. to include selective demo, construction of new partitions. mep & fire life safety under seperate permit. n/a ordinance #155-13 | $180,000 |
| Jul 21, 2015 | Completed final sign-off Jan 2017 | 222 02nd St | Swinerton Builders | partial commercial t.i. including stairs, handrail, guardrails, selective structural reinforcement. n/a ordinance #155-13Details
partial commercial t.i. including stairs, handrail, guardrails, selective structural reinforcement. n/a ordinance #155-13 | $200,000 |
| Jul 7, 2015 | Completed final sign-off Oct 2016 | 425 Market St | Skyline Construction | partial demolition of 28th fl tenant suite including partitions, elec, mech plumbing, ceiling, lighting, and finish. arch, mep, sprinkler and fire alarm revisions under separate application.Details
partial demolition of 28th fl tenant suite including partitions, elec, mech plumbing, ceiling, lighting, and finish. arch, mep, sprinkler and fire alarm revisions under separate application. | $60,000 |
| Jun 17, 2015 | Completed final sign-off Sep 2016 | 222 02nd St | Swinerton Builders | t.i. including ceiling, partitions, furniture, finishes, lighting fixtures, mechanical, plumbing, electrical, fire alarms, selective structural reinforcements. fire sprinklers deferred. n/a ordinance #155-13Details
t.i. including ceiling, partitions, furniture, finishes, lighting fixtures, mechanical, plumbing, electrical, fire alarms, selective structural reinforcements. fire sprinklers deferred. n/a ordinance #155-13 | $900,000 |
| Jun 17, 2015 | Completed final sign-off Sep 2016 | 222 02nd St | Swinerton Builders | 7th flor t.i.: consisting of ceilings, partitions, furniture, finishes, lighting, fixtures, mech, plumbing, elec, selective structural reinforcements. fire alarm, spklrs, sep permitsDetails
7th flor t.i.: consisting of ceilings, partitions, furniture, finishes, lighting, fixtures, mech, plumbing, elec, selective structural reinforcements. fire alarm, spklrs, sep permits | $900,000 |
| Jun 4, 2015 | Completed final sign-off Dec 2015 | 600 Market St | Sc Builders, Inc | 21st floor, suite 2130: t.i. on multi- tenant floor. (partitions, ceiling, millwork, finishes.)demo under previous permit. under separate permit mep & life safety (fire alarm sprinkler). no structural work.Details
21st floor, suite 2130: t.i. on multi- tenant floor. (partitions, ceiling, millwork, finishes.)demo under previous permit. under separate permit mep & life safety (fire alarm sprinkler). no structural work. | $394,000 |
| May 13, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Bcci Construction Company | revision to pa#201504022678 . this is a revision to a previous exiting design.Details
revision to pa#201504022678 . this is a revision to a previous exiting design. | $25,000 |
| May 12, 2015 | Completed final sign-off Dec 2015 | 801 Montgomery St | Gci, Inc | 3rd floor:full floor t.i. new restroom. no structural, nw partitions, ceiling, finishes, mock data room, mock control rm, bar loundge area, nw training rm, nw mock pantry. oven for heating only. fire place (electric), nw card readers. mep under seperate prmt. n/a for the maher.Details
3rd floor:full floor t.i. new restroom. no structural, nw partitions, ceiling, finishes, mock data room, mock control rm, bar loundge area, nw training rm, nw mock pantry. oven for heating only. fire place (electric), nw card readers. mep under seperate prmt. n/a for the maher. | $650,000 |
| May 11, 2015 | Completed final sign-off Jul 2015 | 188 Spear St | Hathaway Dinwiddie Co. | 2nd floor - revision to pa #201406239080: storage room changed to green screen room, control, & recording rooms (new architectrual, mechanical & electrical sheets). n/a maher ordinanceDetails
2nd floor - revision to pa #201406239080: storage room changed to green screen room, control, & recording rooms (new architectrual, mechanical & electrical sheets). n/a maher ordinance | $54,770 |
| Apr 30, 2015 | Never finaled issued May 2015, no final | 801 Montgomery St | Gci, Inc | selective demo (interior only, no structural) inclduing partitions, ceiling, light fixtures, finishes, millwork & interior glazing. n/a ordinance #155-13.Details
selective demo (interior only, no structural) inclduing partitions, ceiling, light fixtures, finishes, millwork & interior glazing. n/a ordinance #155-13. | $15,000 |
| Mar 31, 2015 | Completed final sign-off Aug 2015 | 1 Post St | Sc Builders, Inc | 20th partial tenant improvement consisting of adding one partition, a door in (e) wall, millwork, ceiling patch/repair, relocation of lighting, finishes & adjusting accessible entry door into bld to meet 5lb max. for da 20% rule. maher - not req'dDetails
20th partial tenant improvement consisting of adding one partition, a door in (e) wall, millwork, ceiling patch/repair, relocation of lighting, finishes & adjusting accessible entry door into bld to meet 5lb max. for da 20% rule. maher - not req'd | $10,000 |
| Mar 26, 2015 | Completed final sign-off Jul 2015 | 1 Post St | Sc Builders, Inc | 21st fl, suite 2130 - demolition of portion including partitions, elect, mech ,plumbing, ceiling, lighting & finishes. life safety to be deferred submittal. no structural work.Details
21st fl, suite 2130 - demolition of portion including partitions, elect, mech ,plumbing, ceiling, lighting & finishes. life safety to be deferred submittal. no structural work. | $20,000 |
| Mar 23, 2015 | Completed final sign-off Mar 2017 | 1 Post St | Sc Builders, Inc | 19th partial tenant improvement consisting of adding one partition, a door in (e) wall, millwork, ceiling patch/repair, relocation of lighting, finishes & adjusting accessible entry door into bld to meet 5lb max. for da 20% rule. maher - not req'd-sprinkler separate permitDetails
19th partial tenant improvement consisting of adding one partition, a door in (e) wall, millwork, ceiling patch/repair, relocation of lighting, finishes & adjusting accessible entry door into bld to meet 5lb max. for da 20% rule. maher - not req'd-sprinkler separate permit | $10,000 |
| Feb 27, 2015 | Completed final sign-off Nov 2015 | 525 Market St | Skyline Construction | 37th floor:single tenant floor t.i. consisting of non-structural demolition of extg office. new construction to include partition and interior window wall, doors millwork. mep under seperate permit.Details
37th floor:single tenant floor t.i. consisting of non-structural demolition of extg office. new construction to include partition and interior window wall, doors millwork. mep under seperate permit. | $2,500,000 |
| Feb 5, 2015 | Completed final sign-off Aug 2015 | 1355 Market St | Novo Construction Inc | 2nd floor:partial 2nd floor t.i. to include selective demolition, new non load bearing partitions. mep and fire/life safety under seperate permit. n/a for the maher.Details
2nd floor:partial 2nd floor t.i. to include selective demolition, new non load bearing partitions. mep and fire/life safety under seperate permit. n/a for the maher. | $5,000 |
| Dec 23, 2014 | Completed final sign-off Apr 2015 | 455 Market St | Swinerton Builders | 20th floor - build a new print/supply room enclosure. ref t.i. #2014.0618.8720. n/a maher ordinanceDetails
20th floor - build a new print/supply room enclosure. ref t.i. #2014.0618.8720. n/a maher ordinance | $25,000 |
| Nov 20, 2014 | Completed final sign-off Jun 2016 | 201 03rd St | Bcci Construction Company | 5th floor interior demolition only - including selective demo of partitions, electrical, finishes & mechanical. no exterior or structural elements shall be modified or altered. per ab-017, there is no requirement to provide disabled access ot vacant space.Details
5th floor interior demolition only - including selective demo of partitions, electrical, finishes & mechanical. no exterior or structural elements shall be modified or altered. per ab-017, there is no requirement to provide disabled access ot vacant space. | $128,000 |
| Nov 20, 2014 | Completed final sign-off Jun 2015 | 201 03rd St | Bcci Construction Company | suite 620, 6th floor tenant improvement - replace cabinet door pulls, add power & data at (5) locations & apply new fiishes. m,e as needed, under separate permit.Details
suite 620, 6th floor tenant improvement - replace cabinet door pulls, add power & data at (5) locations & apply new fiishes. m,e as needed, under separate permit. | $128,500 |
| Nov 4, 2014 | Never finaled issued Aug 2015, no final | 75 Hawthorne St | Turner Construction Co | administratie permit for the purpose of documentation of swing up grab bar installed on the 12th fl mens room. reasonable accomodation requestDetails
administratie permit for the purpose of documentation of swing up grab bar installed on the 12th fl mens room. reasonable accomodation request | |
| Oct 29, 2014 | Completed final sign-off Apr 2017 | 555 California St | Swinerton Builders | 6th floor revision to pa #2014.0619.8862: card readers & emergency release buttons added to elev lobbies, revised door hardware groups, renumbering door schedule. compliance with maher ordinance 155-13 not required.Details
6th floor revision to pa #2014.0619.8862: card readers & emergency release buttons added to elev lobbies, revised door hardware groups, renumbering door schedule. compliance with maher ordinance 155-13 not required. | $10,000 |
| Oct 29, 2014 | Completed final sign-off Apr 2017 | 555 California St | Swinerton Builders | revision to #2014.0619.8843: added aiphones & card readers to suite a entry doors, occupant load calc's, layout revised ste b added doors, changed hardwr groups,revised demo, added wellness rm, revised furniture, finishes,revised t-24 cal's, altered fixtures, outlets update havc layouts,add ht pumpDetails
revision to #2014.0619.8843: added aiphones & card readers to suite a entry doors, occupant load calc's, layout revised ste b added doors, changed hardwr groups,revised demo, added wellness rm, revised furniture, finishes,revised t-24 cal's, altered fixtures, outlets update havc layouts,add ht pump | $788,000 |
| Oct 23, 2014 | Completed final sign-off Jan 2015 | 201 03rd St | Bcci Construction Company | tenant improvement on the 5th fl to replace existing chain link fence and lockable gate doors with new full height partition and door with card reader. existing ceiling grid and tile to remain and associated m and e. ls and fire alarm under separate permitDetails
tenant improvement on the 5th fl to replace existing chain link fence and lockable gate doors with new full height partition and door with card reader. existing ceiling grid and tile to remain and associated m and e. ls and fire alarm under separate permit | $50,000 |
| Sep 24, 2014 | Completed final sign-off Jul 2015 | 1 Post St | C B 2 Builders Incorporated | 22nd flr, ste 2250: partial tenant improvement to the 22nd flr, no structural. includes: ceiling height partitions, millwork & finishes, some electrical & data wiring.Details
22nd flr, ste 2250: partial tenant improvement to the 22nd flr, no structural. includes: ceiling height partitions, millwork & finishes, some electrical & data wiring. | $75,000 |
| Sep 12, 2014 | Completed final sign-off Feb 2015 | 1390 Market St | Hathaway Dinwiddie Co. | 1st floor-space 110- demolition of a 5,500 sq.ft. office, all ceiling grid/tiles, lighting fixtures, carpet and partial drywalls per ab-17. t.i. will be under seperate. n/a ordinance #155-13. ref arch ti application # 2014/08/06/3107.Details
1st floor-space 110- demolition of a 5,500 sq.ft. office, all ceiling grid/tiles, lighting fixtures, carpet and partial drywalls per ab-17. t.i. will be under seperate. n/a ordinance #155-13. ref arch ti application # 2014/08/06/3107. | $20,000 |
| Sep 9, 2014 | Completed final sign-off Jul 2015 | 1 Post St | C B 2 Builders Incorporated | 22nd flr, #2250: partial demolition of partitions and light fixtures, at ste 2250, within demised partitions, no new constructions.Details
22nd flr, #2250: partial demolition of partitions and light fixtures, at ste 2250, within demised partitions, no new constructions. | |
| Sep 8, 2014 | Completed final sign-off Oct 2014 | 201 03rd St | Commercial Interior Builders Inc | stair enclosure on the 5th fl. full floor single tenant. existing communicating stair between 4th and 5th fl to remain. work includes selective demo of light fistures and ceiling panels, new 2 hr rated partitions, ceiling & associated finishes.Details
stair enclosure on the 5th fl. full floor single tenant. existing communicating stair between 4th and 5th fl to remain. work includes selective demo of light fistures and ceiling panels, new 2 hr rated partitions, ceiling & associated finishes. | $40,000 |
| Aug 26, 2014 | Never finaled issued Aug 2015, no final | 75 Hawthorne St | Turner Construction Co | document smoke control sequence for building. no work to be done for this application.Details
document smoke control sequence for building. no work to be done for this application. | |
| Aug 6, 2014 | Completed final sign-off Apr 2015 | 1390 Market St | Hathaway Dinwiddie Co. | 1st flr: a tenant improvement project of 5,560 sf space with new floor & ceiling finishes, (e) restrooms, new lighting fixtures & hvac ducts, exhaust fan & ac unit; life safety under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
1st flr: a tenant improvement project of 5,560 sf space with new floor & ceiling finishes, (e) restrooms, new lighting fixtures & hvac ducts, exhaust fan & ac unit; life safety under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $472,600 |
| Jul 24, 2014 | Completed final sign-off Dec 2014 | 455 Market St | Swinerton Builders | 20th flr: this permit application is a revision to 201406188720, scope is limited to changing the rating of door 2022 (elevator lobby door) and removing the ab 2.10 requirement. elec, mech, fire/life safety under separate permits. maher n/aDetails
20th flr: this permit application is a revision to 201406188720, scope is limited to changing the rating of door 2022 (elevator lobby door) and removing the ab 2.10 requirement. elec, mech, fire/life safety under separate permits. maher n/a | |
| Jun 27, 2014 | Never finaled issued Jul 2014, no final | 555 Mission St | Skyline Construction | 23rd floor: t.i. to include selective demolition, new non-load bearing partitions. mep and life safety under seperate permit. n/a for the maher ordinance #155-13Details
23rd floor: t.i. to include selective demolition, new non-load bearing partitions. mep and life safety under seperate permit. n/a for the maher ordinance #155-13 | $650,000 |
| Jun 24, 2014 | Completed final sign-off Dec 2015 | 101 California St | Swinerton Builders | 13th flr: revision to existing permit 201405125469, offices changed to conference rooms and conference room changed to office; maher not requiredDetails
13th flr: revision to existing permit 201405125469, offices changed to conference rooms and conference room changed to office; maher not required | |
| Jun 23, 2014 | Completed final sign-off Jul 2015 | 188 Spear St | Hathaway Dinwiddie Co. | commercial tenant improvement including selective demolition, interior partitions, ceilings, lighting, finishes, furniture, mechanical, plumbing & electrical. f/a and sprinklers under separate permit. n/a ordinance #155-13.Details
commercial tenant improvement including selective demolition, interior partitions, ceilings, lighting, finishes, furniture, mechanical, plumbing & electrical. f/a and sprinklers under separate permit. n/a ordinance #155-13. | $1,040,000 |
| Jun 19, 2014 | Completed final sign-off Apr 2017 | 555 California St | Swinerton Builders | 7th floor: partial floor tenant improvement for full floor tenant to create 4 offices including selective demolition, partition, ceiling, finishes, mechanical. life safety under a seperate permit. n/a ordinance #155-13.Details
7th floor: partial floor tenant improvement for full floor tenant to create 4 offices including selective demolition, partition, ceiling, finishes, mechanical. life safety under a seperate permit. n/a ordinance #155-13. | $289,000 |
| Jun 19, 2014 | Completed final sign-off Apr 2017 | 555 California St | Swinerton Builders | 11th floor: partial floor tenant improvement for full floor tenant including selective demolition, partition, ceiling, finishes, electrical, mechanical & plumbing. life safety under a seperate permit. n/a ordinance #155-13.Details
11th floor: partial floor tenant improvement for full floor tenant including selective demolition, partition, ceiling, finishes, electrical, mechanical & plumbing. life safety under a seperate permit. n/a ordinance #155-13. | $788,000 |
| Jun 18, 2014 | Completed final sign-off Dec 2014 | 455 Market St | Swinerton Builders | 20th flr: partial floor tenant improvement on multi tenant floor includes demo, new partitions, ceiling revisions, electrical, mechanical, fire/life safety under separate permit. construction is on the 20th flr; compliance with ord 155-13 not required includes elevator lobby locksDetails
20th flr: partial floor tenant improvement on multi tenant floor includes demo, new partitions, ceiling revisions, electrical, mechanical, fire/life safety under separate permit. construction is on the 20th flr; compliance with ord 155-13 not required includes elevator lobby locks | $300,000 |
| May 15, 2014 | Completed final sign-off Nov 2014 | 1455 Market St | Skyline Construction | t.i. improvement to include new partitions, cieiling & finishes, structural support at operable partition system.n/a maherDetails
t.i. improvement to include new partitions, cieiling & finishes, structural support at operable partition system.n/a maher | $750,000 |
| May 12, 2014 | Completed final sign-off Dec 2015 | 101 California St | Swinerton Builders | partial floor tenant improvement including selective demo, partitons, electrical, ceiling and finishes. life safety, fire alarm and sprinkler under separate permit. access controlled egress doors are part of this submittal. n/a maher ordinance 155-13Details
partial floor tenant improvement including selective demo, partitons, electrical, ceiling and finishes. life safety, fire alarm and sprinkler under separate permit. access controlled egress doors are part of this submittal. n/a maher ordinance 155-13 | $408,000 |
| Apr 28, 2014 | Completed final sign-off Nov 2014 | 685 Market St | 5/f- partial floor office t.i. on multi tenant floor including selective demo, partitions, ceilings, finishes, mechanical, plumbing and electrical, fire sprinklers and life safety under seperate permit. n/a ordinance #155-13.Details
5/f- partial floor office t.i. on multi tenant floor including selective demo, partitions, ceilings, finishes, mechanical, plumbing and electrical, fire sprinklers and life safety under seperate permit. n/a ordinance #155-13. | $250,000 | |
| Apr 10, 2014 | Completed final sign-off Sep 2014 | 450 Bryant St | D.P. Stearns | revision to pa#201312234861, relocate existing permitted metal stairs, add office at original stair location. enclose existing meeting room into storage closet @ 2nd floor. n/a ordinance #155-13.Details
revision to pa#201312234861, relocate existing permitted metal stairs, add office at original stair location. enclose existing meeting room into storage closet @ 2nd floor. n/a ordinance #155-13. | $22,500 |
| Mar 18, 2014 | Completed final sign-off Oct 2014 | 360 03rd St | Skyline Construction | interior tenant improvement. demising paritions for multi tenant floor. mep. life safety, fire sprinkler under separate permit. compliance with ordinance #155-13 not requiredDetails
interior tenant improvement. demising paritions for multi tenant floor. mep. life safety, fire sprinkler under separate permit. compliance with ordinance #155-13 not required | $150,000 |