Novo Construction Inc
- Based in
- Menlo Park
- On San Francisco permits
- Aug 2003 to Oct 2026
- Last 24 months
- 246 permits filed
2,666 permits since 2000: 2,016 completed, 120 in progress, 388 never finaled, 142 expired or cancelled.
Of the 388 never-finaled permits, 24 are 3 to 5 years old, 211 are 5 to 10 years old, 153 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
70 stairs permits: 50 completed, 2 in progress, 15 never finaled, 3 expired or cancelled. Typically 13 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Aug 2026 | 667 Mission St | new interconnecting stair between level 4-6Details
new interconnecting stair between level 4-6 | $1,197,277 |
| May 21, 2026 | In progress issued Jun 2026 | 188 The Embarcadero | removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included.Details
removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included. | $2,000,000 |
| Jun 12, 2025 | Completed final sign-off Oct 2025 | 1 Maritime Pz | tenant improvement on the 21st fl. to include demo of non load bearing partitions and finishes new finishes applied to (e) stairs new non structural partions, ceiling, finishes mech elec sep permit.Details
tenant improvement on the 21st fl. to include demo of non load bearing partitions and finishes new finishes applied to (e) stairs new non structural partions, ceiling, finishes mech elec sep permit. | $829,881 |
| May 1, 2025 | Completed final sign-off Oct 2025 | 730 Montgomery St | minor revision to pa#: 202502210771 to relocate proposed lift and adjust stair width at mezzanine.Details
minor revision to pa#: 202502210771 to relocate proposed lift and adjust stair width at mezzanine. | |
| Jan 27, 2025 | Completed final sign-off Jan 2026 | 1 Maritime Pz | 20th floor: t.i. to include demolition of non load bearing partitions and finishes. addition of stairs connecting 19th and 20th floors. new non-structural partitions, accoustical ceiling and finishes. mechanical and electrical work as required.Details
20th floor: t.i. to include demolition of non load bearing partitions and finishes. addition of stairs connecting 19th and 20th floors. new non-structural partitions, accoustical ceiling and finishes. mechanical and electrical work as required. | $950,000 |
| Jan 22, 2025 | Completed final sign-off Apr 2025 | 188 The Embarcadero | basement & 8th/f: repair of broken stair tread welds at stair #1 and # 2 on basement through 8th floorDetails
basement & 8th/f: repair of broken stair tread welds at stair #1 and # 2 on basement through 8th floor | $50,000 |
| Nov 6, 2024 | Completed final sign-off Apr 2025 | 1155 Mission St | revision to pa 202304075319 to change layout of conference room 301 and office 303 remove print/copy 304. add door at s200/stair. change door swin at security gate. add card reader at entrance. change training area to open office at basementDetails
revision to pa 202304075319 to change layout of conference room 301 and office 303 remove print/copy 304. add door at s200/stair. change door swin at security gate. add card reader at entrance. change training area to open office at basement | |
| May 29, 2024 | Completed final sign-off Mar 2025 | 505 Brannan St | 3/fl- ti selective of (e) unoccupied floor to include restroom upgrades, communicating stair enclosure, new exit signage mep deferredDetails
3/fl- ti selective of (e) unoccupied floor to include restroom upgrades, communicating stair enclosure, new exit signage mep deferred | $112,606 |
| Jan 11, 2024 | Completed final sign-off Apr 2024 | 188 The Embarcadero | revision to pa#202207279366, 202310239228, 202312122338 for the 5th floor. demolition of phone rooms 518,519, and 520 converting to a hallway at stair #2. relocating 2 phone rooms.Details
revision to pa#202207279366, 202310239228, 202312122338 for the 5th floor. demolition of phone rooms 518,519, and 520 converting to a hallway at stair #2. relocating 2 phone rooms. | |
| Dec 14, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | 3/f: revision to pa# 202212198622, to construct a hallway at stair #2 and the addition of a coffee and bevi machine and fridge with millwork modifications.Details
3/f: revision to pa# 202212198622, to construct a hallway at stair #2 and the addition of a coffee and bevi machine and fridge with millwork modifications. | |
| Dec 12, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | revision to 202207279366 and 202310239228 to include demolition of phone room 518 and converting to a hallway at stair #2. the addition of a coffee/bevi machine/fridge with related millwork modifications.Details
revision to 202207279366 and 202310239228 to include demolition of phone room 518 and converting to a hallway at stair #2. the addition of a coffee/bevi machine/fridge with related millwork modifications. | |
| Aug 11, 2022 | Never finaled issued Oct 2022, no final | 275 Battery St | new interconnecting stair between tenant spaces on levels 23 & 24. t.i. under sep permit 202208110320. maher n/a.Details
new interconnecting stair between tenant spaces on levels 23 & 24. t.i. under sep permit 202208110320. maher n/a. | $30,000 |
| Jun 29, 2022 | Completed final sign-off Oct 2024 | 69 Green St | speculative office space at (e) commercial building. proposed work includes reconfiguration of (e) lobby stairs and exterior windows at front facade, a roof deck.Details
speculative office space at (e) commercial building. proposed work includes reconfiguration of (e) lobby stairs and exterior windows at front facade, a roof deck. | $500,000 |
| Mar 22, 2022 | Completed final sign-off May 2022 | 88 Kearny St | infill of (e) rated openings into an abandoned communicating stair enclosure & associated demolition & partition construction. demo of an (e) fire-rated double door on 4th fl & demo of (e) fire rated rolldown door on 5th fl. the openings will be infilled with 1 hr rated non-load bearing partitions.Details
infill of (e) rated openings into an abandoned communicating stair enclosure & associated demolition & partition construction. demo of an (e) fire-rated double door on 4th fl & demo of (e) fire rated rolldown door on 5th fl. the openings will be infilled with 1 hr rated non-load bearing partitions. | $5,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2022 | 101 California St | tenant improvement includes construction of new convenience stairs between floor 3/4/5/6. not an egress stair.Details
tenant improvement includes construction of new convenience stairs between floor 3/4/5/6. not an egress stair. | $475,000 |
| Sep 21, 2021 | Completed final sign-off Feb 2023 | 101 Townsend St | basement: demo select interior partitions, storefront, door frames, ceiling tiles, lighting/power/data, new interior partitions, ceiling tiles, minor lighting rework, upgrades power/data & some flloring,k new interconnecting stair @ (e) opening, new ramp & 1-hour passageway @ pass throughDetails
basement: demo select interior partitions, storefront, door frames, ceiling tiles, lighting/power/data, new interior partitions, ceiling tiles, minor lighting rework, upgrades power/data & some flloring,k new interconnecting stair @ (e) opening, new ramp & 1-hour passageway @ pass through | $700,000 |
| Mar 29, 2021 | Completed final sign-off Feb 2023 | 101 Townsend St | sawcut (e) concrete flr slab opening at ground level for future stair. add temp barricade around new slab opening. change room function of (e) all hands space to new open collaboration space. add new interview suite with high ceiling and lighting. add new reception desk and mother's room.Details
sawcut (e) concrete flr slab opening at ground level for future stair. add temp barricade around new slab opening. change room function of (e) all hands space to new open collaboration space. add new interview suite with high ceiling and lighting. add new reception desk and mother's room. | $1,000,000 |
| Sep 4, 2020 | Completed final sign-off Oct 2020 | 600 California St | revision to pa# 201910114277 to provide structural details for exit stair hand rail modificationDetails
revision to pa# 201910114277 to provide structural details for exit stair hand rail modification | $15,000 |
| Sep 2, 2020 | Completed final sign-off Sep 2021 | 27 Maiden Ln | interior improvements to incl new structural stair, new flooring and finishes. new flooring and furniture at roof deck.Details
interior improvements to incl new structural stair, new flooring and finishes. new flooring and furniture at roof deck. | $200,000 |
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 1 Embarcadero Center | revision to 201907035059 to add structural for stair railing at 34th/35th flDetails
revision to 201907035059 to add structural for stair railing at 34th/35th fl | $15,000 |
| Oct 22, 2019 | Never finaled issued Nov 2019, no final | 2 Henry Adams St | interior construction at level 4 & level 5 for an interior connecting stair & skylight alterationsDetails
interior construction at level 4 & level 5 for an interior connecting stair & skylight alterations | $10,000 |
| Dec 10, 2018 | Never finaled issued Jan 2019, no final | 160 Spear St | 14th fl - revision to pa 2018-0710-4079 to add new emergency push button and card readers at elevator lobby, (1) exit stairway & it closet roomDetails
14th fl - revision to pa 2018-0710-4079 to add new emergency push button and card readers at elevator lobby, (1) exit stairway & it closet room | |
| Oct 29, 2018 | Never finaled issued Nov 2018, no final | 933 20th St | construct 2 doors at openings on the ground and mezzanine levels. upgrafe ada signage at accessible bathrooms and restripe stairsDetails
construct 2 doors at openings on the ground and mezzanine levels. upgrafe ada signage at accessible bathrooms and restripe stairs | $3,000 |
| Oct 4, 2018 | Completed final sign-off May 2019 | 600 California St | 16th and 17th floor: new convience stair to extg tenant space to connect.Details
16th and 17th floor: new convience stair to extg tenant space to connect. | $200,000 |
| Sep 24, 2018 | Completed final sign-off Mar 2019 | 100 01st St | tenant improvement of existing interstitial stairs between floors 14th and 15th. to include new guard rails, handrails finishes. structural work to support of new glass guardrail.Details
tenant improvement of existing interstitial stairs between floors 14th and 15th. to include new guard rails, handrails finishes. structural work to support of new glass guardrail. | $147,952 |
| Sep 24, 2018 | Completed final sign-off Mar 2019 | 100 01st St | tenant improvement of existing interstitial stairs between floors 5th and 6th. to include new guard rails, handrails finishes. structural scope is limited to support of new glass guardrail.Details
tenant improvement of existing interstitial stairs between floors 5th and 6th. to include new guard rails, handrails finishes. structural scope is limited to support of new glass guardrail. | $47,952 |
| Sep 21, 2018 | Never finaled issued Jan 2019, no final | 120 Kearny St | 10th & 11th fl - opening of (e) internal stair. construction of (n) fire roll down door. modification of (e) conditions as pertained to (n) stair enclosureDetails
10th & 11th fl - opening of (e) internal stair. construction of (n) fire roll down door. modification of (e) conditions as pertained to (n) stair enclosure | $50,000 |
| Jun 5, 2018 | Never finaled issued Jun 2018, no final | 415 Mission St | new interior communicating stair between 57th & 58th floorDetails
new interior communicating stair between 57th & 58th floor | |
| May 30, 2018 | Never finaled issued May 2018, no final | 415 Mission St | full floor tenant improvement to include new non load bearing partitions, suspended ceiling, finishes, millwork, mep included. interstory stairway will be under separate permit appplication.Details
full floor tenant improvement to include new non load bearing partitions, suspended ceiling, finishes, millwork, mep included. interstory stairway will be under separate permit appplication. | $1,400,000 |
| Mar 22, 2018 | Completed final sign-off Aug 2018 | 185 Berry St | 5th floor: revision to app#201708164958 to revise occupant load, stair width removal of door b5440/add door b5-425.1/@ lobby. ref app#201708164958 and 201709279967Details
5th floor: revision to app#201708164958 to revise occupant load, stair width removal of door b5440/add door b5-425.1/@ lobby. ref app#201708164958 and 201709279967 | |
| Mar 8, 2018 | Completed final sign-off Dec 2018 | 150 Post St | demo of a switchback communications stairs btwn 1st/2nd. infill 2nd flr opening slab and stair opening. modification of vacant space to include selective demo and construction of non load bearing partitionsDetails
demo of a switchback communications stairs btwn 1st/2nd. infill 2nd flr opening slab and stair opening. modification of vacant space to include selective demo and construction of non load bearing partitions | $150,000 |
| Jan 23, 2018 | Never finaled issued Feb 2018, no final | 760 Market St | 2nd flr - ti include the demo of non structural celining elements and bld new non structural partitions and mill work. all new or revised meps, life safety and sprinkler work will be design build and submitted sep. str, stair and tech platform submitted sep. demo 201712196895, ti flr sprinkler, bldDetails
2nd flr - ti include the demo of non structural celining elements and bld new non structural partitions and mill work. all new or revised meps, life safety and sprinkler work will be design build and submitted sep. str, stair and tech platform submitted sep. demo 201712196895, ti flr sprinkler, bld | $1,451,095 |
| Dec 8, 2017 | Completed final sign-off May 2018 | 525 Market St | revision to pa 2017-1011-0885 (30th fl) and 2017-1011-0882 (31st fl) to call out stair opening, revise corridor dimension at wall adjacent stair opening. structural calculations for stairs, millwork, elevations and doorsDetails
revision to pa 2017-1011-0885 (30th fl) and 2017-1011-0882 (31st fl) to call out stair opening, revise corridor dimension at wall adjacent stair opening. structural calculations for stairs, millwork, elevations and doors | $60,000 |
| Jul 12, 2017 | Completed final sign-off Aug 2018 | 1 Front St | 20/f: t.i. to include new partitions, finishes, lighting, pantry & restrooms. alarm, sprinkler deferred.(interstory stairway under separate permit for both architectural and structural).Details
20/f: t.i. to include new partitions, finishes, lighting, pantry & restrooms. alarm, sprinkler deferred.(interstory stairway under separate permit for both architectural and structural). | $1,964,000 |
| Jul 12, 2017 | Completed final sign-off Aug 2018 | 1 Front St | 21/f: t.i. to include new partitions, finishes, lighting, pantry & restrooms. alarm, sprinkler deferred. (interstory stairway to 20/f under separate permit for both architectural and structural).Details
21/f: t.i. to include new partitions, finishes, lighting, pantry & restrooms. alarm, sprinkler deferred. (interstory stairway to 20/f under separate permit for both architectural and structural). | $1,964,000 |
| Jul 12, 2017 | Never finaled issued Jul 2017, no final | 275 Battery St | 22/f & 23/f: interior t.i. of 22/23f to include new meeting space, open office, work stations, emplyee only breakfroom, new finishes on (e) communications, stairs. mep & l/s under sep permits.Details
22/f & 23/f: interior t.i. of 22/23f to include new meeting space, open office, work stations, emplyee only breakfroom, new finishes on (e) communications, stairs. mep & l/s under sep permits. | $1,900,000 |
| Jun 20, 2017 | Completed final sign-off Aug 2018 | 1 Front St | new communicating stair between 20th and 21st flDetails
new communicating stair between 20th and 21st fl | $250,000 |
| Mar 20, 2017 | Expired or cancelled expired Jan 2023 | 901 Battery St | 2/f- infill of a single stair opening in existing concrete building, raised floor over structural framing.Details
2/f- infill of a single stair opening in existing concrete building, raised floor over structural framing. | $30,000 |
| Feb 16, 2017 | Completed final sign-off Mar 2017 | 235 02nd St | 4th & 6th flr: arch revision to 201608084427 & 201608084429 - change to stair door; maher naDetails
4th & 6th flr: arch revision to 201608084427 & 201608084429 - change to stair door; maher na | |
| Sep 7, 2016 | Completed final sign-off May 2018 | 2 Embarcadero Center | 23rd and 24th flrs: structural work on stairs and landing area and on interior. ref. arch 201608034056; maher n/aDetails
23rd and 24th flrs: structural work on stairs and landing area and on interior. ref. arch 201608034056; maher n/a | $25,000 |
| Aug 3, 2016 | Completed final sign-off Nov 2016 | 2 Embarcadero Center | 23rd.ti includes building new non-structural partitions all new or revised mep, life safety & sprinklers under separate permit. communicating stairs between 23 and 24. there is an existing communicating stair between 24 and 25. demo previously by owner pa 2016-0429-6107Details
23rd.ti includes building new non-structural partitions all new or revised mep, life safety & sprinklers under separate permit. communicating stairs between 23 and 24. there is an existing communicating stair between 24 and 25. demo previously by owner pa 2016-0429-6107 | $250,000 |
| Jul 18, 2016 | Completed final sign-off May 2018 | 2 Embarcadero Center | slab demo permit for demolition of floor slab for new interconnecting stair between 23rd & 24th floor. future stair under separate permit.Details
slab demo permit for demolition of floor slab for new interconnecting stair between 23rd & 24th floor. future stair under separate permit. | $26,000 |
| Jun 29, 2016 | Completed final sign-off Jul 2018 | 999 Brannan St | core & shell improvements- includes ada upgrade to non compliant ramps, stairs and restrooms. maher na. mep/fire/life saftey under sep permit. new framing for rooftop mechanical under seperate permit. t.i. under seperate permit.Details
core & shell improvements- includes ada upgrade to non compliant ramps, stairs and restrooms. maher na. mep/fire/life saftey under sep permit. new framing for rooftop mechanical under seperate permit. t.i. under seperate permit. | $100,000 |
| May 25, 2016 | Completed final sign-off Jul 2018 | 999 Brannan St | demolition of existing partitions, doors, pantry, non compliant stair & restrooms for all floors. n/a maher ordinanceDetails
demolition of existing partitions, doors, pantry, non compliant stair & restrooms for all floors. n/a maher ordinance | $20,000 |
| Jul 30, 2015 | Completed final sign-off Jan 2016 | 55 Hawthorne St | revision to pa#201502107962 to include addition of new elevator lobby exit door to match existing condition. addition of new hallway and exit door at stair exit. no card readers.Details
revision to pa#201502107962 to include addition of new elevator lobby exit door to match existing condition. addition of new hallway and exit door at stair exit. no card readers. | $5,000 |
| Jul 21, 2015 | Never finaled issued Sep 2015, no final | 1 Montgomery St | demo of existing stair and railings, interior partitions, floor wall ceiling finishes. new railing and new stair interior partitions, ceilings and finishesDetails
demo of existing stair and railings, interior partitions, floor wall ceiling finishes. new railing and new stair interior partitions, ceilings and finishes | $200,000 |
| Jun 2, 2015 | Completed final sign-off May 2016 | 651 Brannan St | new communicating open stair between 2nd, 3rd, & 4th floors. fire alarm and sprinkler under seperate permit. n/a maher.Details
new communicating open stair between 2nd, 3rd, & 4th floors. fire alarm and sprinkler under seperate permit. n/a maher. | $200,000 |
| May 7, 2015 | Completed final sign-off Jul 2016 | 651 Brannan St | 2nd floor: t.i. project involves modification of extg tenant space to include non-load bearing partition, new ceilings, and light fixtures and a new interconnecting stair between 1st and 2nd floor.Details
2nd floor: t.i. project involves modification of extg tenant space to include non-load bearing partition, new ceilings, and light fixtures and a new interconnecting stair between 1st and 2nd floor. | $2,000,000 |
| Apr 2, 2015 | Never finaled issued May 2015, no final | 680 Mission St | new connecting stair between 3rd and 4th floors. work includes penetration of slab floor and new steel frame and wood tread convenience stair. n/a for maher.Details
new connecting stair between 3rd and 4th floors. work includes penetration of slab floor and new steel frame and wood tread convenience stair. n/a for maher. | $80,000 |
| Feb 6, 2015 | Never finaled issued Feb 2015, no final | 1 Sansome St | suite# 4000. t.i. on 40th floor to include removal of existing partial & full height partitions @ stairs. new interior non-structural partitions.Details
suite# 4000. t.i. on 40th floor to include removal of existing partial & full height partitions @ stairs. new interior non-structural partitions. | $600,000 |
| Apr 21, 2014 | Expired or cancelled cancelled Jan 2026 | 505 Howard St | cut an opening in extg slab and then will fill slab. no stairs is currently planned. n/a for the maher ordinance #155-13Details
cut an opening in extg slab and then will fill slab. no stairs is currently planned. n/a for the maher ordinance #155-13 | $150,000 |
| Mar 20, 2014 | Completed final sign-off Oct 2014 | 505 Howard St | north side of 4th floor and multi tenant corridor work will include new offices, conference rooms and break areas in addition to elevator lobby finishes. mep, sprinklers, fire alarm under separate permit. conviwence stairs under approve permit. horizontal ext under 201402259268/9272.Details
north side of 4th floor and multi tenant corridor work will include new offices, conference rooms and break areas in addition to elevator lobby finishes. mep, sprinklers, fire alarm under separate permit. conviwence stairs under approve permit. horizontal ext under 201402259268/9272. | $835,273 |
| Feb 25, 2014 | Completed final sign-off Oct 2014 | 505 Howard St | installation of convenience stair between 4th & 5th floors. tenant improvements, fire alarm, sprinklers, mep under separate permit. compliance with ordinance #155-13 not requiredDetails
installation of convenience stair between 4th & 5th floors. tenant improvements, fire alarm, sprinklers, mep under separate permit. compliance with ordinance #155-13 not required | $250,000 |
| Jan 29, 2014 | Completed final sign-off Jul 2014 | 680 Folsom St | revision to app#201310018188 to provide structural plans for intercommunication stairs between 6th- 7th floor.n/a for interim control #428-13Details
revision to app#201310018188 to provide structural plans for intercommunication stairs between 6th- 7th floor.n/a for interim control #428-13 | $100,000 |
| Nov 6, 2013 | Completed final sign-off Jul 2014 | 1355 Market St | 5th/6th floors-revision to pa# 2013-0916-6872-minor modifications to the interconnecting stairs between 5th & 6th floors. vif smoke control report is updated to reflect interconnection of 5th and 6th fls into single zone matrix & sequence of events required to be updated / programmed prior to final.Details
5th/6th floors-revision to pa# 2013-0916-6872-minor modifications to the interconnecting stairs between 5th & 6th floors. vif smoke control report is updated to reflect interconnection of 5th and 6th fls into single zone matrix & sequence of events required to be updated / programmed prior to final. | |
| Sep 16, 2013 | Completed final sign-off Jul 2014 | 1355 Market St | revision to architectural pa#2013091169491 (6/f) & #201309116494 (5/f) -new interconnecting stair with new floor opening.Details
revision to architectural pa#2013091169491 (6/f) & #201309116494 (5/f) -new interconnecting stair with new floor opening. | $145,000 |
| May 15, 2013 | Completed final sign-off Oct 2013 | 1355 Market St | 9th & 11th floor - electrical work for new intervening stairs, ref pa #2013.02.07.9684 & 2012.12.18.6453Details
9th & 11th floor - electrical work for new intervening stairs, ref pa #2013.02.07.9684 & 2012.12.18.6453 | $40,000 |
| Feb 7, 2013 | Completed final sign-off Oct 2013 | 1355 Market St | 9th & 10th floor- revision to appl #2012.12.18.6454: 9th floor - demolitoin of existing ceiling & installation of new internal stair. 10th floor - installation of new internal stair 9spans to 11th floor). ref #201302079684Details
9th & 10th floor- revision to appl #2012.12.18.6454: 9th floor - demolitoin of existing ceiling & installation of new internal stair. 10th floor - installation of new internal stair 9spans to 11th floor). ref #201302079684 | $50,000 |
| Feb 7, 2013 | Completed final sign-off Oct 2013 | 1355 Market St | 9th/10th/11th floors-structural work for new internal stair from 9th floor to 10th floor & from 10th floor to 11th floor. ref #2013.0207.9683 & 201302079681.Details
9th/10th/11th floors-structural work for new internal stair from 9th floor to 10th floor & from 10th floor to 11th floor. ref #2013.0207.9683 & 201302079681. | $75,000 |
| Feb 7, 2013 | Completed final sign-off Oct 2013 | 1355 Market St | 10th & 11th floors- revision to appl #2012.12.18.6453: installation of new internal stair.revisoin to it office/idf room prototype room.Details
10th & 11th floors- revision to appl #2012.12.18.6453: installation of new internal stair.revisoin to it office/idf room prototype room. | $50,000 |
| Dec 18, 2012 | Completed final sign-off Oct 2013 | 1355 Market St | 9th and 10th floor:full floor interior t.i. includes selective demolition, partition ceiling and finishes. mep, life safety and fire sprinkler under seperate permit. escalator removal and stairway construction under a separate permitDetails
9th and 10th floor:full floor interior t.i. includes selective demolition, partition ceiling and finishes. mep, life safety and fire sprinkler under seperate permit. escalator removal and stairway construction under a separate permit | $3,000,000 |
| Oct 2, 2012 | Expired or cancelled expired Jul 2017 | 572 07th St | enlarge mezzanine to become 2nd floor. new stairs to 2nd floor, new ada lift centry modify entry to accomodate access.Details
enlarge mezzanine to become 2nd floor. new stairs to 2nd floor, new ada lift centry modify entry to accomodate access. | $100,000 |
| Jul 10, 2012 | Completed final sign-off Jan 2013 | 301 Howard St | construction of new 2 hour rated exit stair vestibule extension. new millwork at existing break area. new finishes at elevator lobby. new paint. mech. and life safety under separate permit.Details
construction of new 2 hour rated exit stair vestibule extension. new millwork at existing break area. new finishes at elevator lobby. new paint. mech. and life safety under separate permit. | $50,000 |
| Jun 12, 2012 | Completed final sign-off Jan 2013 | 1 Sansome St | communication stair to be removed. infill the 28th floor. (27th & 28th floors are where communication stair is)Details
communication stair to be removed. infill the 28th floor. (27th & 28th floors are where communication stair is) | $50,000 |
| May 9, 2012 | Completed final sign-off Sep 2013 | 808 Brannan St | new interior stair, ramp, and guardrails, upgrade to ada lift.Details
new interior stair, ramp, and guardrails, upgrade to ada lift. | $25,000 |
| Jun 20, 2011 | Completed final sign-off Nov 2011 | 101 Spear St | 2nd floor #200 ti renovation including: demo work, new breakroom/sink, new lighting throughout, finishes upgrades, convert 2 small rooms to conference, replace stair to (e) mezzanine, new power/data where noted.Details
2nd floor #200 ti renovation including: demo work, new breakroom/sink, new lighting throughout, finishes upgrades, convert 2 small rooms to conference, replace stair to (e) mezzanine, new power/data where noted. | $420,000 |
| Jun 1, 2009 | Completed final sign-off Apr 2010 | 35 Stanford St | demolition of existing colling roll down door, header and glazing above.construction of new storefront, new interior concrete slab, floor/ramp stair,, new storefront lighting and related structural modifications. mep under separate permit.Details
demolition of existing colling roll down door, header and glazing above.construction of new storefront, new interior concrete slab, floor/ramp stair,, new storefront lighting and related structural modifications. mep under separate permit. | $100,000 |
| Dec 15, 2008 | Completed final sign-off Jul 2009 | 370 03rd St | revision to 200809091082 to change details for stair railings. ref arch 200808118863Details
revision to 200809091082 to change details for stair railings. ref arch 200808118863 | |
| Sep 9, 2008 | Never finaled issued Sep 2008, no final | 370 03rd St | revision to appl #200808118863 to add stair between floors 1st & 2nd floor for tenant use. ref pa #200808118863.Details
revision to appl #200808118863 to add stair between floors 1st & 2nd floor for tenant use. ref pa #200808118863. | $175,000 |
| Nov 17, 2005 | Never finaled issued Nov 2005, no final | 2400 19th Av | repair ofbank branch inccluding replacing east walls & parapet aobe patching of (e) roof, repair (e) steel floor joists in telecom & janitor room & partially upgrading (e) restrooms and stairsDetails
repair ofbank branch inccluding replacing east walls & parapet aobe patching of (e) roof, repair (e) steel floor joists in telecom & janitor room & partially upgrading (e) restrooms and stairs | $40,000 |