2,666 permits since 2000: 2,016 completed, 120 in progress, 388 never finaled, 142 expired or cancelled.
Of the 388 never-finaled permits, 24 are 3 to 5 years old, 211 are 5 to 10 years old, 153 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 5 completed, 1 in progress, 6 never finaled. Typically 25 days from filing to permit and 400 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2026 | In progress issued May 2026 | 259 California St | ground fl - commercial interior ti. remodel existing cafe space with new service counter, floor & ceiling treatments, finishes, equipment and limited partition changes. enlarge existing bathroom for barrier removal. no structural work. no changes to exterior envelope. mep included.Details
ground fl - commercial interior ti. remodel existing cafe space with new service counter, floor & ceiling treatments, finishes, equipment and limited partition changes. enlarge existing bathroom for barrier removal. no structural work. no changes to exterior envelope. mep included. | $650,000 |
| Dec 16, 2020 | Never finaled filed Dec 2020, never issued | 2265 03rd St | new case work, new grab bars in bathroom, 1 boys urinalDetails
new case work, new grab bars in bathroom, 1 boys urinal | $45,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 150 Post St | suite 200. mechanical work for t.i. 1 (n) vav box and 1 bathroom exhaust fan. ref pa 201804136315Details
suite 200. mechanical work for t.i. 1 (n) vav box and 1 bathroom exhaust fan. ref pa 201804136315 | $20,000 |
| Oct 29, 2018 | Never finaled issued Nov 2018, no final | 933 20th St | construct 2 doors at openings on the ground and mezzanine levels. upgrafe ada signage at accessible bathrooms and restripe stairsDetails
construct 2 doors at openings on the ground and mezzanine levels. upgrafe ada signage at accessible bathrooms and restripe stairs | $3,000 |
| Jun 14, 2018 | Completed final sign-off Dec 2019 | 1 California St | 17th fl - bathrooms & corridors - demolition of non-structural partitions and ceilings. construction of new non-structural walls, ceiling, electrical, mechanical & plumbing life safety & fire sprinkler under separate permitDetails
17th fl - bathrooms & corridors - demolition of non-structural partitions and ceilings. construction of new non-structural walls, ceiling, electrical, mechanical & plumbing life safety & fire sprinkler under separate permit | $2,300,000 |
| Mar 21, 2018 | Never finaled issued Mar 2018, no final | 353 Sacramento St | install new exhaust fan in bathroom. install new supply grilles and transfer grilles. ref pa 2018-0126-9683Details
install new exhaust fan in bathroom. install new supply grilles and transfer grilles. ref pa 2018-0126-9683 | $40,000 |
| Dec 15, 2017 | Never finaled issued Jan 2018, no final | 405 Howard St | ti of (e) showroom space by converting (e) vacant showrm to new model unit gallery for the transbay block & residential development. new lobby/recept desk, bld & site model rooms. material library and model res living /kit/mast bath. remodel (e) bathrm w/2 new ofc/mtg and kitchenette at base lvl.Details
ti of (e) showroom space by converting (e) vacant showrm to new model unit gallery for the transbay block & residential development. new lobby/recept desk, bld & site model rooms. material library and model res living /kit/mast bath. remodel (e) bathrm w/2 new ofc/mtg and kitchenette at base lvl. | $235,000 |
| Jun 23, 2017 | Completed final sign-off Jun 2019 | 350 Mission St | t.i. for extg restaurant on 2nd floor. work includes new bathrooms, fixtures, finishes, int. walls, ceilings, insulation. fire protection under seperate permit. n/a for maherDetails
t.i. for extg restaurant on 2nd floor. work includes new bathrooms, fixtures, finishes, int. walls, ceilings, insulation. fire protection under seperate permit. n/a for maher | $200,000 |
| Apr 28, 2016 | Never finaled issued May 2016, no final | 680 Mission St | administrative change of use for transfer of 10000 sq ft of extg office space from 3rd floor to 2nd floor, currently vacant small institutional use. 3rd floor changed to residential amenities space prevously approved under app#201408042914. misc repairs include temporary walls and bathroom upgrade.Details
administrative change of use for transfer of 10000 sq ft of extg office space from 3rd floor to 2nd floor, currently vacant small institutional use. 3rd floor changed to residential amenities space prevously approved under app#201408042914. misc repairs include temporary walls and bathroom upgrade. | $15,000 |
| Apr 11, 2016 | Completed final sign-off Oct 2017 | 600 California St | 16th floor: install new bathroom exhaust and supply diffusers. install new supply diffuser in elevator lobby. compliance with maher ordinance no 155-13 not required.Details
16th floor: install new bathroom exhaust and supply diffusers. install new supply diffuser in elevator lobby. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Dec 14, 2012 | Completed final sign-off Mar 2013 | 199 Fremont St | 23rd floor-tenant improvement of existing office space on 23rd fl. 1997 sq ft. new partitions and bathroom hardware upgrades. no structural. fa/sprinkler under seperate permit.Details
23rd floor-tenant improvement of existing office space on 23rd fl. 1997 sq ft. new partitions and bathroom hardware upgrades. no structural. fa/sprinkler under seperate permit. | $56,900 |
| Nov 28, 2007 | Completed final sign-off Apr 2008 | 185 Post St | alternate 6th floor plan to exclude bathroom construction. revision to permit 2007 0904 1683.Details
alternate 6th floor plan to exclude bathroom construction. revision to permit 2007 0904 1683. |