Thomas Lundberg
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Lundberg Design
- Based in
- San Francisco
- On San Francisco permits
- Jan 2001 to Oct 2025
102 permits since 2000 (architect on 93 permits, authorized agent-others on 4 permits, designer on 3 permits, engineer on 3 permits): 61 completed, 7 in progress, 15 never finaled, 19 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 102.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2025 | Completed final sign-off Jan 2026 | 1 Market St | Dpr Construction A | level 2 revision to pa # 2025-0618-9024. dph food service scope.Details
level 2 revision to pa # 2025-0618-9024. dph food service scope. | |
| Oct 10, 2025 | Completed final sign-off Jan 2026 | 1 Market St | Dpr Construction A | level 2: revision to pa #202506189024. revised bathroom layout. no plumbing fixtures added or deleted.Details
level 2: revision to pa #202506189024. revised bathroom layout. no plumbing fixtures added or deleted. | |
| Sep 26, 2025 | In progress issued Nov 2025 | 1 Market St | Dpr Construction A | 4/fl- ti demo (e) and install (n) partitions, millwork, finishes, mech, electrical . no structrual or exterior work . no addition of plumbing fixtures.Details
4/fl- ti demo (e) and install (n) partitions, millwork, finishes, mech, electrical . no structrual or exterior work . no addition of plumbing fixtures. | $387,128 |
| Sep 10, 2025 | Completed final sign-off Jan 2026 | 1 Market St | Dpr Construction A | level 2 - revision to pa 202506189024. minor reivisons to lighting.Details
level 2 - revision to pa 202506189024. minor reivisons to lighting. | |
| Aug 14, 2025 | In progress issued Sep 2025 | 1 Market St | Dpr Construction A | l2: t.i. to demo and install new partitions, millwork, finishes, mep. new rent space, catering pantry, no exterior. dph on seperate permit.Details
l2: t.i. to demo and install new partitions, millwork, finishes, mep. new rent space, catering pantry, no exterior. dph on seperate permit. | $1,964,650 |
| Aug 14, 2025 | In progress issued Sep 2025 | 1 Market St | Dpr Construction A | l5: revision to pa# 202506209163. t.i. deleting facilities qu lab rooms from scope. new taining room, catering pantry, and breakd area. dph on seperate permit.no exterior work. demo and new partitions.Details
l5: revision to pa# 202506209163. t.i. deleting facilities qu lab rooms from scope. new taining room, catering pantry, and breakd area. dph on seperate permit.no exterior work. demo and new partitions. | $2,229,805 |
| Jun 20, 2025 | In progress issued Jul 2025 | 1 Market St | Dpr Construction A | level 5. t.i. (n) partitions, finishes, lighting, restroom remodel. no exterior.Details
level 5. t.i. (n) partitions, finishes, lighting, restroom remodel. no exterior. | $693,000 |
| Jun 18, 2025 | Completed final sign-off Jan 2026 | 1 Market St | Dpr Construction A | 2/fl-ref demo permit 202505237202- ti (n) partitions, finishes, millwork, bathrooms, no exterior work.Details
2/fl-ref demo permit 202505237202- ti (n) partitions, finishes, millwork, bathrooms, no exterior work. | $2,060,000 |
| Jun 18, 2025 | Completed final sign-off Sep 2025 | 1 Market St | Dpr Construction A | 2/fl-revision 202505237202- reduction of soft demo areaDetails
2/fl-revision 202505237202- reduction of soft demo area | |
| Jun 3, 2025 | Completed final sign-off Dec 2025 | 1 Market St | Dpr Construction A | l 4: t.i. new non-structural partitions, finishes, lighting, hvac. no exterior or structural work.Details
l 4: t.i. new non-structural partitions, finishes, lighting, hvac. no exterior or structural work. | $105,000 |
| May 23, 2025 | Completed final sign-off Sep 2025 | 1 Market St | Dpr Construction A | level 2 soft demo only. no exterior, structural, ceiling demo. ab017. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads.Details
level 2 soft demo only. no exterior, structural, ceiling demo. ab017. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $150,000 |
| May 23, 2025 | Completed final sign-off Nov 2025 | 1 Market St | Dpr Construction A | 4th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads.Details
4th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $18,000 |
| May 23, 2025 | In progress issued Jun 2025 | 1 Market St | Dpr Construction A | 5th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads.Details
5th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $40,000 |
| Dec 20, 2024 | Completed final sign-off Mar 2025 | 1000 Sansome St | Gidel & Kocal Construction Co Inc | 3/fl- ti demo 7 offices (n) carpet, paint, slight modifications of hvac registers and ducting in place. deferred lighting and sprinklersDetails
3/fl- ti demo 7 offices (n) carpet, paint, slight modifications of hvac registers and ducting in place. deferred lighting and sprinklers | $40,000 |
| Oct 2, 2024 | Completed final sign-off Jun 2026 | 2040 Broadway | Forma Construction | unit 402- 3rd and 4th floor interior remodel (n) paritions, mep, lighting, finishes. replacement of (e) interior stair. relocated non structural partitions. raised existing stair penthouse per 2024007184prj and add 28sf roof deck and replaced with a pedestal system.Details
unit 402- 3rd and 4th floor interior remodel (n) paritions, mep, lighting, finishes. replacement of (e) interior stair. relocated non structural partitions. raised existing stair penthouse per 2024007184prj and add 28sf roof deck and replaced with a pedestal system. | $571,116 |
| Sep 11, 2024 | In progress filed Sep 2024, not yet issued | 584 Valencia St | per ab-017, interior only. selective demo of vacant tenant space in preparation for future tenant: remove finishes. fixtures & non-structural partitions. no change in use or occupancy.Details
per ab-017, interior only. selective demo of vacant tenant space in preparation for future tenant: remove finishes. fixtures & non-structural partitions. no change in use or occupancy. | $30,000 | |
| Sep 29, 2023 | Completed final sign-off Nov 2024 | 1195 Tennessee St | C & C General Engineering Inc. | basement: non-structural interior alteration (creation of 1 bedroom, 1 media room, 1 laundry room and 1 bathroom). no vertical or horizontal changes. no exterior changes.Details
basement: non-structural interior alteration (creation of 1 bedroom, 1 media room, 1 laundry room and 1 bathroom). no vertical or horizontal changes. no exterior changes. | $45,000 |
| Aug 4, 2023 | In progress issued Dec 2023 | 939 Post St | Dead On Construction Llc | rev to pa# 2023-0602-9160; ext.amenity showers, (n) plumbing, ext. site built sauna (n) plumb/elec concrete patio repair/wood framed egress stairs basement to steet level (n) mech room in basementDetails
rev to pa# 2023-0602-9160; ext.amenity showers, (n) plumbing, ext. site built sauna (n) plumb/elec concrete patio repair/wood framed egress stairs basement to steet level (n) mech room in basement | $50,000 |
| Jun 2, 2023 | Never finaled issued Jun 2023, no final | 939 Post St | Dead On Construction Llc | revision to permit 202210134318. add security door to entrance corridor. relayout lockers room and add gender neutral space. add dry sauna and cold room. no structural change.Details
revision to permit 202210134318. add security door to entrance corridor. relayout lockers room and add gender neutral space. add dry sauna and cold room. no structural change. | |
| Jan 12, 2023 | Never finaled issued Feb 2023, no final | 1035 Howard St | Blueline Associates Inc | demo (e) structures detached in yard of building, demo altered, recent abandoned hvac & mep elements. planning record #2019012604Details
demo (e) structures detached in yard of building, demo altered, recent abandoned hvac & mep elements. planning record #2019012604 | $30,000 |
| Nov 22, 2022 | Completed final sign-off Jun 2023 | 532 Columbus Av | Cookline Construction Inc | t.i. remodel (e)grond floor restaurant space, new dining room interior finishes, new dough room & remodel of (e)bar & open kitcen w/partial height walls countertops, equipment, new floor, wall & ceiling inishes, kitchen scope includes nev plumbing, elec, removal of (2)exitisng hoods & replacementDetails
t.i. remodel (e)grond floor restaurant space, new dining room interior finishes, new dough room & remodel of (e)bar & open kitcen w/partial height walls countertops, equipment, new floor, wall & ceiling inishes, kitchen scope includes nev plumbing, elec, removal of (2)exitisng hoods & replacement | $468,090 |
| Oct 5, 2022 | Completed final sign-off Feb 2023 | 532 Columbus Av | Cookline Construction Inc | 1st fl - select removal of interior non-structural partitions, countertops, equipment, fixtures & finishes per ab-017Details
1st fl - select removal of interior non-structural partitions, countertops, equipment, fixtures & finishes per ab-017 | $50,000 |
| May 25, 2022 | Completed final sign-off Aug 2023 | 1129 Tennessee St | Phase 2 Builders | covert ground fl commercial space to a dwelling unit. new kitchen at break room kitchenette remodel bathroom. no structural work.Details
covert ground fl commercial space to a dwelling unit. new kitchen at break room kitchenette remodel bathroom. no structural work. | $30,000 |
| May 25, 2022 | Completed final sign-off Jan 2025 | 1129 Tennessee St | Phase 2 Builders | comply with physical inspection report 8544. no structure work. modify deck railing per dbi specifications e) steel materials to reciece top bar & spacer to raise hright. e) exterior balcony to be raised to mini height, cladding to march e)Details
comply with physical inspection report 8544. no structure work. modify deck railing per dbi specifications e) steel materials to reciece top bar & spacer to raise hright. e) exterior balcony to be raised to mini height, cladding to march e) | $10,000 |
| Sep 1, 2021 | Expired or cancelled withdrawn Apr 2024 | 2345 03rd St | Centric Construction Inc | t.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permitDetails
t.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permit | $653,000 |
| Jan 29, 2021 | Completed final sign-off Sep 2022 | 1090 Chestnut St | Robison Nieri White Construction | unit #12: rev to pa202007019466: entry door rating updated per approved pre-app meeting.Details
unit #12: rev to pa202007019466: entry door rating updated per approved pre-app meeting. | |
| Jan 21, 2021 | Never finaled issued Apr 2021, no final | 1 Market St | Dpr Construction | 2,4,5th floors: interior t.i. of (e) multi-user restrooms. work includes replacement of (e) plumbing and lighting fixtures, new floor and wall finishes.Details
2,4,5th floors: interior t.i. of (e) multi-user restrooms. work includes replacement of (e) plumbing and lighting fixtures, new floor and wall finishes. | $200,000 |
| Jan 7, 2021 | Expired or cancelled cancelled Jan 2026 | 420 23rd St | Plant Construction Co, Lp | 2nd fl: select demolition, construction of new interior walls, finishes, and lighting. mep under a separate permit.Details
2nd fl: select demolition, construction of new interior walls, finishes, and lighting. mep under a separate permit. | $25,000 |
| Dec 23, 2020 | Expired or cancelled cancelled Jan 2026 | 420 23rd St | Plant Construction Co, Lp | select demolition, construction of new interior walls, finishes, lighting. mechanical, electrical, plumbing to be submitted under a separate permitDetails
select demolition, construction of new interior walls, finishes, lighting. mechanical, electrical, plumbing to be submitted under a separate permit | $25,000 |
| Oct 14, 2020 | Never finaled issued Apr 2021, no final | 1 Market St | Dpr Construction | ste 200, 2/f: structural modifications for t.i under pa # 202009265068. scope includes structural support for moveable partition in main event space. support for roll down fire door.Details
ste 200, 2/f: structural modifications for t.i under pa # 202009265068. scope includes structural support for moveable partition in main event space. support for roll down fire door. | $10,000 |
| Sep 25, 2020 | Expired or cancelled withdrawn Oct 2020 | 1 Market St | Dpr Construction | suite 200. tenant improvement of an existing type a3 occupancy. includes remodel of existing elevator lobby, reception area, gallery, meeting rooms, and catering staging pantry. a new event space is being added. fire sprinkler to be submitted under separate permit.Details
suite 200. tenant improvement of an existing type a3 occupancy. includes remodel of existing elevator lobby, reception area, gallery, meeting rooms, and catering staging pantry. a new event space is being added. fire sprinkler to be submitted under separate permit. | $2,557,000 |
| Jul 1, 2020 | Never finaled issued Aug 2020, no final | 140 New Montgomery St | Lwg Construction Inc. | deferred mep for pa #2019-1024-5542.Details
deferred mep for pa #2019-1024-5542. | $20,000 |
| Jul 1, 2020 | Completed final sign-off Sep 2022 | 1090 Chestnut St | Robison Nieri White Construction | unit #12: addition to pa #2019-0614-3421. proposed scope includes relocating non-structural interior walls. new hvac equipment. repair/replace window glazing in (e) frame. no exterior work. no structural.Details
unit #12: addition to pa #2019-0614-3421. proposed scope includes relocating non-structural interior walls. new hvac equipment. repair/replace window glazing in (e) frame. no exterior work. no structural. | $350,000 |
| Jan 2, 2020 | Never finaled issued Jan 2020, no final | 140 New Montgomery St | Lwg Construction Inc. | 19th floor: revision to pa# 209-1024-5542. rectify mislabeling of "ada wc1" to "wc1". no work under this permitDetails
19th floor: revision to pa# 209-1024-5542. rectify mislabeling of "ada wc1" to "wc1". no work under this permit | |
| Dec 10, 2019 | Completed final sign-off Sep 2020 | 1035 Howard St | Blueline Associates Inc | interior soft demo of existing building including demo of all non-structural interior partitions, hvac, and mep items, non-structural flooring and furniture, fixture, and equipment. reference to planning app. #2019-012604. ab-017.Details
interior soft demo of existing building including demo of all non-structural interior partitions, hvac, and mep items, non-structural flooring and furniture, fixture, and equipment. reference to planning app. #2019-012604. ab-017. | $150,000 |
| Oct 24, 2019 | Completed final sign-off Oct 2020 | 140 New Montgomery St | Lwg Construction Inc. | 19th fl - ti work includes non-structural demo, new non-structural walls, finishes, fixtures. mep deferredDetails
19th fl - ti work includes non-structural demo, new non-structural walls, finishes, fixtures. mep deferred | $1,457,820 |
| Aug 23, 2019 | Expired or cancelled withdrawn Apr 2021 | 1129 Tennessee St | memorialize change of use from ground floor studio to seperate dwelling unit by right to 1/f. legalize new res. unit in lieu of previously permitted commercial space with 1 bathroom, 1 kitchen, living/bedroom combo with 1080gsf. change of use.Details
memorialize change of use from ground floor studio to seperate dwelling unit by right to 1/f. legalize new res. unit in lieu of previously permitted commercial space with 1 bathroom, 1 kitchen, living/bedroom combo with 1080gsf. change of use. | $5,000 | |
| Aug 21, 2019 | Completed final sign-off Dec 2020 | 2174 Market St | Bach Construction, Inc. | replacing existing non-historical main doors and supporting framework at 2174 entry; remove & replace non-historic glass window facing market with leaded glass windows to match the balance of the leaded glass facing market street.Details
replacing existing non-historical main doors and supporting framework at 2174 entry; remove & replace non-historic glass window facing market with leaded glass windows to match the balance of the leaded glass facing market street. | $50,000 |
| Sep 18, 2018 | Completed final sign-off Jul 2020 | 1625 Post St | Skender Construction Llc | ground floor mep t.i. for restaurant. ref pa 201806252835Details
ground floor mep t.i. for restaurant. ref pa 201806252835 | $750,000 |
| Jun 25, 2018 | Completed final sign-off Sep 2019 | 1625 Post St | Skender Construction Llc | interior remodel of an (e) restaurant, new configuration of mezz & 1st floor with occupant loads, new type i hood and fan, new teak wood rated class b and new stairwell to mezz. sffd assembly permit req.ul300, sprinklers, fire alarm sep/permit.Details
interior remodel of an (e) restaurant, new configuration of mezz & 1st floor with occupant loads, new type i hood and fan, new teak wood rated class b and new stairwell to mezz. sffd assembly permit req.ul300, sprinklers, fire alarm sep/permit. | $2,500,000 |
| Apr 2, 2018 | Completed final sign-off Jul 2020 | 1625 Post St | Skender Construction Llc | relocate exterior door at post st. entrance from north facade at post st to west face of restaurant (separate ti) near valet entrance of hotel. relocate door would eleminate 18" of grade change from post st to interior of restaurant creating more accessible entrance. separate structural submittal.Details
relocate exterior door at post st. entrance from north facade at post st to west face of restaurant (separate ti) near valet entrance of hotel. relocate door would eleminate 18" of grade change from post st to interior of restaurant creating more accessible entrance. separate structural submittal. | $50,000 |
| Mar 22, 2018 | Completed final sign-off May 2024 | 2544 03rd St | Sw Construction | change of use from medical cannabis dispensary to cannabis retail. no work will be done, all is existing.reference to pa# 201406239115Details
change of use from medical cannabis dispensary to cannabis retail. no work will be done, all is existing.reference to pa# 201406239115 | |
| Jul 25, 2017 | Completed final sign-off Oct 2020 | 2121 Webster St | Black Mountain Development | penthouse #gph-2 remodel fit-out of (e) shell to include new partitions, elevator, lighting, finishes, new interior stair and structural modifications with new entry. mep. & sprinklers under seperate permit. ref. to pa#201311222660Details
penthouse #gph-2 remodel fit-out of (e) shell to include new partitions, elevator, lighting, finishes, new interior stair and structural modifications with new entry. mep. & sprinklers under seperate permit. ref. to pa#201311222660 | $1,764,000 |
| May 15, 2017 | Expired or cancelled cancelled Jan 2026 | 2360 03rd St | Buck O'neill Builders Inc. | 2nd floor suite b- minor interior tenant improvement. replacing one toilet stall with two new toilet stalls & addition of a small coffee counter with a sink, no structural work, no increase in sq ft.Details
2nd floor suite b- minor interior tenant improvement. replacing one toilet stall with two new toilet stalls & addition of a small coffee counter with a sink, no structural work, no increase in sq ft. | $15,000 |
| Apr 19, 2017 | Completed final sign-off Sep 2020 | 60 Broadway | Gci, Inc | t.i. : replacement of (e) lighting and wall, ceiling & floor finishes. ceiling to include framing support for custom table.Details
t.i. : replacement of (e) lighting and wall, ceiling & floor finishes. ceiling to include framing support for custom table. | $150,000 |
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 1000 Sansome St | Gidel & Kocal Construction Co Inc | rev to pa#201611021704: reconfiguration of meeting room, model shop changed to server room exiting into corridor.Details
rev to pa#201611021704: reconfiguration of meeting room, model shop changed to server room exiting into corridor. | |
| Aug 11, 2016 | Completed final sign-off Aug 2022 | 1170 Harrison St | Achill Beg Construction Inc | site permit for change of use from pdr to office, addition of new second level office within(e) historic building structure. mechanical, electrical, plumbing, life safety and fire sprinklers to be submitted under separate permits. n/a for maher ordinance no.155-13Details
site permit for change of use from pdr to office, addition of new second level office within(e) historic building structure. mechanical, electrical, plumbing, life safety and fire sprinklers to be submitted under separate permits. n/a for maher ordinance no.155-13 | $2,500,000 |
| May 4, 2016 | Completed final sign-off Jul 2016 | 1000 Sansome St | C C I Commercial Construction & Improv | basement & 1st flr - revision to pa #201509258133: updated drawings to show correct locations of walls.Details
basement & 1st flr - revision to pa #201509258133: updated drawings to show correct locations of walls. | |
| Feb 11, 2016 | Completed final sign-off Apr 2016 | 2569 03rd St | Thomas Engel | interior renovation of gift shop: removal of non-load bearing partial height partitons addition of new fixed casework and shelfing unit. n/a for maher.Details
interior renovation of gift shop: removal of non-load bearing partial height partitons addition of new fixed casework and shelfing unit. n/a for maher. | $30,000 |
| Jan 20, 2016 | Completed final sign-off Aug 2016 | 1000 Sansome St | C C I Commercial Construction & Improv | installation of glass products for floor panels railing and patitions. ref app#201509258133.Details
installation of glass products for floor panels railing and patitions. ref app#201509258133. | $5,000 |
| Jul 13, 2015 | Never finaled issued Jul 2015, no final | 2424 Jones St | Superior Structures | exterior garden work to include new patio slab, glass railing and add wood ipe facia. addition to app#201501145729. n/a for maher.Details
exterior garden work to include new patio slab, glass railing and add wood ipe facia. addition to app#201501145729. n/a for maher. | $20,000 |
| Mar 16, 2015 | Completed final sign-off Nov 2015 | 60 Broadway | Gci, Inc | replacement of non historic storefront & entry door system recessed storefront entry door. ref pa# 2015 0206 7699 maher - not req'dDetails
replacement of non historic storefront & entry door system recessed storefront entry door. ref pa# 2015 0206 7699 maher - not req'd | $25,000 |
| Feb 6, 2015 | Completed final sign-off Nov 2015 | 60 Broadway | Gci, Inc | interior t.i. office space renovation. removal of (e) stair to be replaced w/new stair as well as (n) ceiling, (n) floor finishes, (n) interior partitions, (n) plumbing fixtures, (n) mech equipment & (n) lighting. n/a maher ordinanceDetails
interior t.i. office space renovation. removal of (e) stair to be replaced w/new stair as well as (n) ceiling, (n) floor finishes, (n) interior partitions, (n) plumbing fixtures, (n) mech equipment & (n) lighting. n/a maher ordinance | $1,540,000 |
| Jan 16, 2015 | Completed final sign-off May 2015 | 60 Broadway | Gci, Inc | demo of existing office interior in preparation for tenant improvement (per ab017)Details
demo of existing office interior in preparation for tenant improvement (per ab017) | $40,000 |
| Jan 12, 2015 | Completed final sign-off Nov 2015 | 1355 Market St | Novo Construction Inc | tenant improvement on the 9th floor including new partitions & finishes, new cabinetry, relocation of existing lighting. mep. & life safety under separate permit. n/a ordinance #155-13Details
tenant improvement on the 9th floor including new partitions & finishes, new cabinetry, relocation of existing lighting. mep. & life safety under separate permit. n/a ordinance #155-13 | $15,000 |
| Dec 11, 2014 | Completed final sign-off Jan 2015 | 140 New Montgomery St | Terra Nova Industries | suite 1 - build unisex employee only restroom on ground floor level. new interior wall partition, plbmg fixtures, and finishes. relocate extg door and hardware. new restroom exhuast grill and 8x8 round duct tie into extg exhaust. n/a for the maherDetails
suite 1 - build unisex employee only restroom on ground floor level. new interior wall partition, plbmg fixtures, and finishes. relocate extg door and hardware. new restroom exhuast grill and 8x8 round duct tie into extg exhaust. n/a for the maher | $27,150 |
| Jun 23, 2014 | Completed final sign-off Dec 2015 | 2544 03rd St | change of use to mcd (medical cannabis dispensery) compliance with ordinance no. 155-13 not required.Details
change of use to mcd (medical cannabis dispensery) compliance with ordinance no. 155-13 not required. | $5,000 | |
| Jun 13, 2014 | Never finaled issued Jul 2014, no final | 3141 16th St | Bradford Construction | t.i. of full service restaurant, work includes removal interior door & partitions, counter and food service equipment, install of door in opening, interior door, interior partitions, food service equipment, fixtures, furnishing, equipment. mep separate permit.Details
t.i. of full service restaurant, work includes removal interior door & partitions, counter and food service equipment, install of door in opening, interior door, interior partitions, food service equipment, fixtures, furnishing, equipment. mep separate permit. | $139,500 |
| Sep 20, 2013 | Completed final sign-off Apr 2014 | 35 South Park | Build Group Inc. | 1st & 2nd floors-t.i to (e) office-demo of (e) non load bearing partitions, new interior partition to be constructed with a new accessory stair & relocate pantry. m.e.p on seperate permitDetails
1st & 2nd floors-t.i to (e) office-demo of (e) non load bearing partitions, new interior partition to be constructed with a new accessory stair & relocate pantry. m.e.p on seperate permit | $165,000 |
| Jun 5, 2013 | Never finaled issued Jul 2013, no final | 1148 Mission St | J..H. Construction Co./John A Huerta Co | tenant improvement. remodel of a full service restaurant in the ground fl level (e) retail space heaven's dog. of the (e) soma grande hotel at 1160 mission st. work includes (n) interior wall partitions, (n) interiro electrical, (n) lighting, (n) furnishings, (n) interior wall, floor and ceilingDetails
tenant improvement. remodel of a full service restaurant in the ground fl level (e) retail space heaven's dog. of the (e) soma grande hotel at 1160 mission st. work includes (n) interior wall partitions, (n) interiro electrical, (n) lighting, (n) furnishings, (n) interior wall, floor and ceiling | $55,000 |
| May 21, 2013 | Completed final sign-off Sep 2013 | 242 Columbus Av | Terra Nova Industries | interior renovation of non structural partitions extg kitchen with installation and or replacement of kitchen equipment. no change to restrooms. mep and kitchen hoods under seperate permit.Details
interior renovation of non structural partitions extg kitchen with installation and or replacement of kitchen equipment. no change to restrooms. mep and kitchen hoods under seperate permit. | $20,000 |
| Apr 17, 2013 | Completed final sign-off Dec 2013 | 1170 Sacramento St | Paul Ryan Associates | unit #19b -revision to appl #2012.02.28.4991 - revised exterior railing.Details
unit #19b -revision to appl #2012.02.28.4991 - revised exterior railing. | $10,000 |
| Feb 4, 2013 | Completed final sign-off Jun 2013 | 988 Market St | ti on 8th fl excluding lobby. new interior partitions, finishes, mechanical, electrical, lighting, card reader. fire alarm/life safety & sprinklers under a seperate permitsDetails
ti on 8th fl excluding lobby. new interior partitions, finishes, mechanical, electrical, lighting, card reader. fire alarm/life safety & sprinklers under a seperate permits | $400,000 | |
| Jan 28, 2013 | Completed final sign-off Jun 2013 | 988 Market St | Tico Construction Company Incorporated | 9th floor-tenant improvement excluding lobby, new partitions walls (interior), finishes, electrical & lightingDetails
9th floor-tenant improvement excluding lobby, new partitions walls (interior), finishes, electrical & lighting | $800,000 |
| Nov 9, 2012 | Expired or cancelled cancelled Jun 2014 | 2705 Larkin St | change of flat roof to roof deck. increase railing height to 42". construction of interior wall, garage level, to create exit corridor. ref pa# 2002/11/01/0585.Details
change of flat roof to roof deck. increase railing height to 42". construction of interior wall, garage level, to create exit corridor. ref pa# 2002/11/01/0585. | $10,000 | |
| Apr 2, 2012 | Expired or cancelled cancelled Nov 2024 | 1170 Sacramento St | work @ unit# 19-b only. window replacement & interior remodel. pending merger approval (case# 2012.0254d) & pa# 2012/02/28/4991. these will be no expansion of the (e) units.Details
work @ unit# 19-b only. window replacement & interior remodel. pending merger approval (case# 2012.0254d) & pa# 2012/02/28/4991. these will be no expansion of the (e) units. | $600,000 | |
| Apr 2, 2012 | Expired or cancelled withdrawn Mar 2014 | 1170 Sacramento St | work @ unit# 19-a only. window replacement in (e) openings & interior remodel.Details
work @ unit# 19-a only. window replacement in (e) openings & interior remodel. | $200,000 | |
| Apr 2, 2012 | Expired or cancelled cancelled Nov 2024 | 1170 Sacramento St | work @ unit# 19c only. window replacement & interior remodel. pending merger approval (case# 2012.0254d) & pa# 2012/02/28/4991. these will be no expansion of the (e) units.Details
work @ unit# 19c only. window replacement & interior remodel. pending merger approval (case# 2012.0254d) & pa# 2012/02/28/4991. these will be no expansion of the (e) units. | $600,000 | |
| Mar 22, 2012 | Completed final sign-off Dec 2013 | 3628 19th St | Forsythe General Contractors | replace (e) wood fence with 6' concrete fence & slab.Details
replace (e) wood fence with 6' concrete fence & slab. | $4,500 |
| Oct 31, 2011 | Expired or cancelled cancelled Jan 2026 | 3628 19th St | Forsythe General Contractors | minor revision to pa #201109295771 to match approved structural plan s2.0.Details
minor revision to pa #201109295771 to match approved structural plan s2.0. | |
| Jul 1, 2011 | Expired or cancelled withdrawn Apr 2012 | 1170 Sacramento St | combine penthouse unit a and unit c. all work to penthouse only. move west window wall 4'2", move wouth window wall in 24".Details
combine penthouse unit a and unit c. all work to penthouse only. move west window wall 4'2", move wouth window wall in 24". | $205,000 | |
| Jun 21, 2011 | Completed final sign-off Jul 2011 | 1 Yerba Buena Ln | Terra Nova Industries | confirmation of occupant loads for sffd assembly permit regarding approved pa #2008-12-03-7676. no construction - only sffd occupant verifigation.Details
confirmation of occupant loads for sffd assembly permit regarding approved pa #2008-12-03-7676. no construction - only sffd occupant verifigation. | |
| Jun 7, 2011 | Completed final sign-off Jul 2011 | 1 Yerba Buena Ln | install sign "brasserie" & "bluestem". see drawingslDetails
install sign "brasserie" & "bluestem". see drawingsl | $10,000 | |
| Jun 3, 2011 | Completed final sign-off Oct 2011 | 584 Valencia St | J..H. Construction Co./John A Huerta Co | provide 1 hour fire rated corridor for mezzanine & basement. provide 2hour occupancy separation from a and b occupancies (no work done in kitchen or dining area.Details
provide 1 hour fire rated corridor for mezzanine & basement. provide 2hour occupancy separation from a and b occupancies (no work done in kitchen or dining area. | $35,000 |
| May 13, 2011 | Completed final sign-off Jul 2011 | 875 Howard St | Plant Construction Company Lp | 3rd floor-t.i. in (e) vacant office area-new drywall partitions, doors, hardware, floor covering, cabinetry with sink, painting, etc. no exterior modifications, no increase in office space, havc, electrical, fire sprinkler & life safety under seperate permitDetails
3rd floor-t.i. in (e) vacant office area-new drywall partitions, doors, hardware, floor covering, cabinetry with sink, painting, etc. no exterior modifications, no increase in office space, havc, electrical, fire sprinkler & life safety under seperate permit | $267,500 |
| Dec 27, 2010 | Never finaled issued Jul 2012, no final | 2705 Larkin St | demolish rear wall and build new horizontal addtion at the rear of (e) residence while conforming to residential design quidelines by stepping back in two direction.Details
demolish rear wall and build new horizontal addtion at the rear of (e) residence while conforming to residential design quidelines by stepping back in two direction. | $650,000 | |
| Aug 19, 2010 | Completed final sign-off Oct 2010 | 875 Howard St | Plant Construction Company Lp | 3rd floor-t.i. to (e) vacant space includes new drywall paritions, doors/hardware, acoustic ceilings, floor covering, cabinetry with sink, modify (e) hvac & lighting. no exterior modifications, no increase in office space. life safety system & fire sprinklers under seperate permitDetails
3rd floor-t.i. to (e) vacant space includes new drywall paritions, doors/hardware, acoustic ceilings, floor covering, cabinetry with sink, modify (e) hvac & lighting. no exterior modifications, no increase in office space. life safety system & fire sprinklers under seperate permit | $372,500 |
| Jun 16, 2010 | Completed final sign-off Dec 2010 | 795 Folsom St | Skyline Construction | 3rd floor-revision to pa# 2010-0218-6735-add new card reader (10)Details
3rd floor-revision to pa# 2010-0218-6735-add new card reader (10) | $1,000 |
| Nov 17, 2009 | Completed final sign-off Jan 2010 | 875 Howard St | Plant Construction Company Lp | 6th floor construct new full height non fire rated wall w/new entrance doors to create suites for future tenants. (existing bldg is fully vacant, no exterior modifications, no increase in office space.) occupancy to be detrmined under ti- mep. sp and fire alarm separate permits.Details
6th floor construct new full height non fire rated wall w/new entrance doors to create suites for future tenants. (existing bldg is fully vacant, no exterior modifications, no increase in office space.) occupancy to be detrmined under ti- mep. sp and fire alarm separate permits. | $22,500 |
| Nov 13, 2009 | Completed final sign-off Feb 2010 | 875 Howard St | Plant Construction Company Lp | basement, 1st & 6th floors. reference pa# 2009-0226-2931-for fire review only, previous review missed fire department-tenant work. soft demo basement, 1st & 6th floor.Details
basement, 1st & 6th floors. reference pa# 2009-0226-2931-for fire review only, previous review missed fire department-tenant work. soft demo basement, 1st & 6th floor. | |
| Nov 13, 2009 | Completed final sign-off Feb 2010 | 875 Howard St | Plant Construction Company Lp | 1st floor-reference pa# 2009-0804-4070-for fire dept. review only, previous review missed fire department-tenant work.Details
1st floor-reference pa# 2009-0804-4070-for fire dept. review only, previous review missed fire department-tenant work. | |
| Nov 13, 2009 | Completed final sign-off Apr 2010 | 875 Howard St | Plant Construction Company Lp | basement level-reference pa# 2009-0818-5016-for fire review only, previous review missed fire department-tenant work. add panic hardware on basement vestibule door to stair sta.Details
basement level-reference pa# 2009-0818-5016-for fire review only, previous review missed fire department-tenant work. add panic hardware on basement vestibule door to stair sta. | |
| Aug 4, 2009 | Completed final sign-off Mar 2010 | 875 Howard St | Plant Construction Company Lp | revision to 200905047617, construct new ada toilet and shower rooms in lieu modify existing, new sheetmetal parapet cap, raised exterior sign panel, modifications to lobby interior finishes, signage, fire sprinkler, life safety sep permitDetails
revision to 200905047617, construct new ada toilet and shower rooms in lieu modify existing, new sheetmetal parapet cap, raised exterior sign panel, modifications to lobby interior finishes, signage, fire sprinkler, life safety sep permit | $35,000 |
| Jul 29, 2009 | Completed final sign-off Oct 2009 | 470 Pacific Av | Terra Nova Industries | mech. equipment penetrations at 2nd fl and roof including curb details at roof. structural work revisions to approved pa# 2009.04.17.6554Details
mech. equipment penetrations at 2nd fl and roof including curb details at roof. structural work revisions to approved pa# 2009.04.17.6554 | $33,000 |
| May 18, 2009 | Completed final sign-off Oct 2009 | 470 Pacific Av | Terra Nova Industries | new lighting and power for ti previously approved under 200904176554Details
new lighting and power for ti previously approved under 200904176554 | $30,000 |
| Jan 13, 2009 | Never finaled issued Apr 2009, no final | 490 Pacific Av | remodel (e) cafe on ground floor. work includes new partitions, kitchen equipment, lighting and mechanical, new finishes, minor slab infill. no exterior work. fire protection under separate permit.Details
remodel (e) cafe on ground floor. work includes new partitions, kitchen equipment, lighting and mechanical, new finishes, minor slab infill. no exterior work. fire protection under separate permit. | $350,000 | |
| Dec 3, 2008 | Completed final sign-off Jun 2011 | 1 Yerba Buena Ln | Terra Nova Industries | tenant improvement of ground floor restaurant space with new finishes, structural and m.e.p. sprinkler and fire alarm under seperate permitDetails
tenant improvement of ground floor restaurant space with new finishes, structural and m.e.p. sprinkler and fire alarm under seperate permit | $1,200,000 |
| Mar 7, 2008 | Never finaled issued Mar 2008, no final | 348 06th St | rev to appl 200710155363. install metal roll up door at main entry & 1 light. install stainless steel panels of facade @ base between doors. select windows panes made opaque using applied film. *sign at entry will be under separate permit.Details
rev to appl 200710155363. install metal roll up door at main entry & 1 light. install stainless steel panels of facade @ base between doors. select windows panes made opaque using applied film. *sign at entry will be under separate permit. | $5,000 | |
| Dec 20, 2007 | Completed final sign-off Sep 2008 | 55 Concourse Dr | ti of cafe/ restaurant area on 1st floor and 1st basement level. no exterior work. fire alarm and sprinkler under a separate permit.Details
ti of cafe/ restaurant area on 1st floor and 1st basement level. no exterior work. fire alarm and sprinkler under a separate permit. | $1,750,000 | |
| Jul 2, 2007 | Completed final sign-off Nov 2008 | 2226 Bush St | Donald Lewis Gen. Contr.Inc. | 1st floor: new accessible storefront & entry at bush street. facade, new 1 hour separation to residential unit above, new garage & curb cut @ wilmot street. 2nd floor: new single family r-3 unit build out, new roof deck & access stair. new entry efficient windows & insulation. variance granted forDetails
1st floor: new accessible storefront & entry at bush street. facade, new 1 hour separation to residential unit above, new garage & curb cut @ wilmot street. 2nd floor: new single family r-3 unit build out, new roof deck & access stair. new entry efficient windows & insulation. variance granted for | $447,000 |
| Aug 18, 2006 | Expired or cancelled expired Apr 2009 | 55 Sheridan St | increasing part of property line wall (east) 2' from 3'6" off deck to 5'6". 12'4"long to provide additional privacy for neighbor. remove existing opening in prop. line wall (west elev.). add new opening in prop. line wall fully sprinklered, local equilivancy info. provided.Details
increasing part of property line wall (east) 2' from 3'6" off deck to 5'6". 12'4"long to provide additional privacy for neighbor. remove existing opening in prop. line wall (west elev.). add new opening in prop. line wall fully sprinklered, local equilivancy info. provided. | $2,500 | |
| May 22, 2006 | Completed final sign-off Dec 2006 | 845 Market St | cti-2, out the door, b level, space 080, el, me.Details
cti-2, out the door, b level, space 080, el, me. | $400,000 | |
| May 22, 2006 | Completed final sign-off Dec 2006 | 845 Market St | cti-1 out the door, b level, space 080 el, me, ls, spDetails
cti-1 out the door, b level, space 080 el, me, ls, sp | $583,850 | |
| May 16, 2006 | Expired or cancelled expired Jan 2024 | 2232 Bush St | new accessible storefront at bush st. facade (replace garage door), new hc bathrooms, new residential unit at 2/f, roof deck & single car garage @ rear of bldg.Details
new accessible storefront at bush st. facade (replace garage door), new hc bathrooms, new residential unit at 2/f, roof deck & single car garage @ rear of bldg. | $64,000 | |
| Dec 12, 2005 | Expired or cancelled expired Oct 2006 | 2606 Jackson St | Van Acker Const Assoc Inc | renewal permit for final inspecation. pa# 2001/12/24/5878 & pa# 2004/02/27/7326.Details
renewal permit for final inspecation. pa# 2001/12/24/5878 & pa# 2004/02/27/7326. | |
| Dec 6, 2005 | Expired or cancelled expired Jul 2006 | 2226 Bush St | demolish selected non load bearing partitions on first and second floors. no exterior or structural work. work to comply with san francisco ab-017. remove non working elevator.Details
demolish selected non load bearing partitions on first and second floors. no exterior or structural work. work to comply with san francisco ab-017. remove non working elevator. | $10,000 | |
| Nov 16, 2005 | Expired or cancelled expired Jul 2006 | 2232 Bush St | remove a number of etal stud walls & drywall. all walls to be removed are non load bearing. interior work only to comply w/ab-017.Details
remove a number of etal stud walls & drywall. all walls to be removed are non load bearing. interior work only to comply w/ab-017. | $12,000 | |
| Jul 11, 2005 | Never finaled issued Aug 2005, no final | 416 Jessie St | concrete demolition for osha required exit stairs & basement slab required pa# 2005/04/14/0069.Details
concrete demolition for osha required exit stairs & basement slab required pa# 2005/04/14/0069. | $15,000 | |
| Mar 28, 2005 | Expired or cancelled expired Aug 2006 | 416 Jessie St | interior non structural demolition "soft demo"in preparation for appl#200407269825Details
interior non structural demolition "soft demo"in preparation for appl#200407269825 | $20,000 | |
| Jul 26, 2004 | Never finaled issued Oct 2006, no final | 416 Jessie St | conversion of (e) building into 25 residential units with restaurant space on the ground floor. restaurant t.i. under separate permit.Details
conversion of (e) building into 25 residential units with restaurant space on the ground floor. restaurant t.i. under separate permit. | $1,200,000 |