Permit GraphShortlistSan Francisco building permits since 2000

Robert Nixdorf

License
E16495
Electrical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up E16495 at the Board for Professional Engineers
Listed as
engineer
Firm
Wsp
Based in
San Francisco
On San Francisco permits
Dec 2004 to Jan 2026

40 permits since 2000 (engineer on 40 permits): 30 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Dpr Construction (13), Bohm Environmental Solutions (3), City Building Inc. (3), Novo Construction Inc (3), Skyline Construction (3), Truebeck Construction (3), Dpr Construction A (2), Gci, Inc (2), Calasia Construction Inc, Hathaway Dinwiddie Co., Sc Builders, Inc
Architects
Rene Calara (14), Stanley H Lew (4), Christopher Scott Wasney (3), David De Valeria (2), Kevin Schaeffer (2), Lauren Jordan (2), Barry Bourbon, Brain Corbett, Charles Kridler, Jeffery A. Rabbitt, Luda Hoe, Meimei Chan, Scott Clement
Engineers
Sebastian Fahim (15), Erik Elmtoft (6), Wayne Gaw (6), Hassan Ally (4), Nicole Crone (3), Benjamin Mohr (2), David Mar (2), David Rossi (2), Erik Elmtoft (2), Jeffrey Sacks, Justin Schultz, Lori Lee
Attorneys
Mark Kehoe
Authorized agents
Domagoj Vokic

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 5, 2026In progress
issued Jul 2026
1450 Owens StTruebeck Constructioninterior ti to build-out offices, r & d laboratories & support spaces at levels 1, 5-7 of an (e) 7 story core & shell building.
Details
Permit
202512232555
Permit issued
Jul 14, 2026

interior ti to build-out offices, r & d laboratories & support spaces at levels 1, 5-7 of an (e) 7 story core & shell building.

Open the permit page

$26,400,000
Sep 12, 2025In progress
issued Oct 2025
429 Castro StBohm Environmental Solutionsrevision to pa#202402296854 for architectural, mechanical, & electrical changes related to relocation of mechanical shaft/to relocate mechancical shaft.change of use to include live entertainment programming and bars was extablished under pa #202402296854. priorty project as approved
Details
Permit
202509125223
Permit issued
Oct 3, 2025

revision to pa#202402296854 for architectural, mechanical, & electrical changes related to relocation of mechanical shaft/to relocate mechancical shaft.change of use to include live entertainment programming and bars was extablished under pa #202402296854. priorty project as approved

Open the permit page

Aug 1, 2025In progress
issued Aug 2025
429 Castro StBohm Environmental Solutionspriority project as approved in 202402296854. revise 202402296854, 202503172376 for architectural, structural, and mep changes, including trench details, doors, steel details, sanitary and sewer piping, fixture counts, mechanical grilles, circuits plus emergency lighting
Details
Permit
202508012166
Permit issued
Aug 25, 2025

priority project as approved in 202402296854. revise 202402296854, 202503172376 for architectural, structural, and mep changes, including trench details, doors, steel details, sanitary and sewer piping, fixture counts, mechanical grilles, circuits plus emergency lighting

Open the permit page

Jun 12, 2025In progress
filed Jun 2025, not yet issued
550 Kearny Stlevel 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demo of non-structural partitions, doors, ceilings & finishes.
Details
Permit
202506128606

level 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demo of non-structural partitions, doors, ceilings & finishes.

Open the permit page

$2,725,800
Sep 3, 2024Completed
final sign-off Aug 2025
1 Warriors WyDpr Construction Ainterior renovation to existing staff storage, locker room, restroom, changing rooms, to make room for future wnba locker room and new men's changing space.
Details
Permit
202409039980
Permit issued
Oct 16, 2024
Final sign-off
Aug 15, 2025

interior renovation to existing staff storage, locker room, restroom, changing rooms, to make room for future wnba locker room and new men's changing space.

Open the permit page

$1,498,000
Feb 29, 2024In progress
issued Oct 2024
429 Castro StBohm Environmental Solutionspriority: renovation & addition to historic castro theater.floor system w/an access. path to the platform,(n)organ lift & organ cover,(n)hvac system,thetrical system upgrades & electrical,fire alarm, lighting & plumbing upgrades.addition installed over(e)foundations includes(n)dressing rms & restrms
Details
Permit
202402296854
Permit issued
Oct 10, 2024

priority: renovation & addition to historic castro theater.floor system w/an access. path to the platform,(n)organ lift & organ cover,(n)hvac system,thetrical system upgrades & electrical,fire alarm, lighting & plumbing upgrades.addition installed over(e)foundations includes(n)dressing rms & restrms

Open the permit page

$5,788,309
Jun 26, 2023Completed
final sign-off Sep 2026
1 Warriors WyDpr Construction At.i. furnishing all equipment, materias and labor necessary for the construction and renovation of a laundry facility in room ed.02.19 and ed.02.20 on level 000 of the arena. remove and reinstall in same location.
Details
Permit
202306260826
Permit issued
Aug 30, 2023
Final sign-off
Sep 17, 2026

t.i. furnishing all equipment, materias and labor necessary for the construction and renovation of a laundry facility in room ed.02.19 and ed.02.20 on level 000 of the arena. remove and reinstall in same location.

Open the permit page

$420,000
Feb 13, 2023Completed
final sign-off Sep 2024
120 Stockton StCalasia Construction Incsuite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit.
Details
Permit
202302131882
Permit issued
Dec 14, 2023
Final sign-off
Sep 16, 2024

suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit.

Open the permit page

Apr 28, 2022Completed
final sign-off Mar 2023
405 Howard StSkyline Construction2/f: mechanical, electrical, and plumbing system for 2/f tenant improvement. ref ti permit 202201186188.
Details
Permit
202204283228
Permit issued
Jul 29, 2022
Final sign-off
Mar 8, 2023

2/f: mechanical, electrical, and plumbing system for 2/f tenant improvement. ref ti permit 202201186188.

Open the permit page

Jan 27, 2022Completed
final sign-off Sep 2023
1 Market StGci, Inc42/f: tenant improvement to include demo of non structural partitions, lighting, power and data. new ceilings and lighting. new mep. new all gender restrooms and structural work.
Details
Permit
202201276745
Permit issued
Mar 4, 2022
Final sign-off
Sep 7, 2023

42/f: tenant improvement to include demo of non structural partitions, lighting, power and data. new ceilings and lighting. new mep. new all gender restrooms and structural work.

Open the permit page

$2,615,022
Jan 26, 2022Completed
final sign-off Jan 2024
1 Market StGci, Inc40th fl - interior ti, demo non-structural partition & lighting. new non-structural load bearing partitions, suspended ceilings & lighting, new mech throughout, new plumbing & break rooms; mother's room, new data cabling and av
Details
Permit
202201266664
Permit issued
Jul 27, 2022
Final sign-off
Jan 5, 2024

40th fl - interior ti, demo non-structural partition & lighting. new non-structural load bearing partitions, suspended ceilings & lighting, new mech throughout, new plumbing & break rooms; mother's room, new data cabling and av

Open the permit page

$2,615,022
Nov 15, 2021Completed
final sign-off Nov 2022
555 California StSkyline Constructionmechanical, electrical, plumbing system for 7th fl tenant improvement 202109178673
Details
Permit
202111152398
Permit issued
Jan 5, 2022
Final sign-off
Nov 4, 2022

mechanical, electrical, plumbing system for 7th fl tenant improvement 202109178673

Open the permit page

Aug 25, 2021Completed
final sign-off Nov 2022
555 California StSkyline Construction8th floor: mechanical, electrical, and plumbing system. tenant improvement per permit app# 202106253245
Details
Permit
202108257098
Permit issued
Jan 5, 2022
Final sign-off
Nov 4, 2022

8th floor: mechanical, electrical, and plumbing system. tenant improvement per permit app# 202106253245

Open the permit page

$1,135,250
Oct 9, 2020Completed
final sign-off Jul 2021
185 Berry StSc Builders, Inc6th flr. t.i., demo (non-structural), (n) construction of conference rooms and lobby. mep included (work in (n) conference & lobby area only.
Details
Permit
202010096233
Permit issued
Nov 30, 2020
Final sign-off
Jul 8, 2021

6th flr. t.i., demo (non-structural), (n) construction of conference rooms and lobby. mep included (work in (n) conference & lobby area only.

Open the permit page

$550,000
Mar 10, 2020Completed
final sign-off Feb 2022
1655 03rd StDpr Construction3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.
Details
Permit
202003106696
Permit issued
Jan 12, 2021
Final sign-off
Feb 17, 2022

3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.

Open the permit page

$1,475,000
Dec 23, 2019Never finaled
issued Feb 2020, no final
100 01st StNovo Construction Incpartial floor ti on the 12th fl - to include new partitions, ceiling, lighting, finishes. mep included.
Details
Permit
201912230297
Permit issued
Feb 25, 2020

partial floor ti on the 12th fl - to include new partitions, ceiling, lighting, finishes. mep included.

Open the permit page

$1,755,675
Dec 23, 2019Never finaled
issued Jan 2020, no final
100 01st StNovo Construction Incfull fl ti on 16th fl to include partitions, ceiling, lighting and finishes. new mothers room, new cafeteria w/no prep. mep included.
Details
Permit
201912230290
Permit issued
Jan 30, 2020

full fl ti on 16th fl to include partitions, ceiling, lighting and finishes. new mothers room, new cafeteria w/no prep. mep included.

Open the permit page

$1,755,675
Sep 30, 2019Completed
final sign-off Apr 2021
1515 03rd Stmb2-l1 - revision to previously approved pa #201810032102. scope of work includes revisions to architectural walls, ceilings, structure and mep tsav. maher na
Details
Permit
201909303034
Permit issued
Dec 19, 2019
Final sign-off
Apr 5, 2021

mb2-l1 - revision to previously approved pa #201810032102. scope of work includes revisions to architectural walls, ceilings, structure and mep tsav. maher na

Open the permit page

Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.
Details
Permit
201909232413
Permit issued
Dec 20, 2019
Final sign-off
Sep 18, 2020

mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.

Open the permit page

$2,116,305
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th Stmb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290
Details
Permit
201909232409
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290

Open the permit page

$2,250,015
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232386
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,133,034
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232391
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,250,015
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher
Details
Permit
201909232408
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher

Open the permit page

$2,145,835
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher
Details
Permit
201909232384
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher

Open the permit page

$2,235,187
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher
Details
Permit
201909232389
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher

Open the permit page

$2,236,961
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232383
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,235,187
Jun 20, 2019Completed
final sign-off Apr 2021
1455 03rd Stlevel 4 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na
Details
Permit
201906203977
Permit issued
Sep 11, 2019
Final sign-off
Apr 6, 2021

level 4 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na

Open the permit page

$2,400,000
Jun 20, 2019Completed
final sign-off Apr 2021
1455 03rd StTruebeck Constructionlevel 2 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na
Details
Permit
201906203971
Permit issued
Oct 16, 2019
Final sign-off
Apr 5, 2021

level 2 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na

Open the permit page

$2,300,000
Jun 20, 2019Completed
final sign-off Apr 2021
1455 03rd StTruebeck Constructionlevel 3 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na
Details
Permit
201906203975
Permit issued
Sep 25, 2019
Final sign-off
Apr 6, 2021

level 3 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na

Open the permit page

$2,300,000
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructioninstallation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.
Details
Permit
201905221413
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.

Open the permit page

$16,000
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221416
Permit issued
Oct 21, 2019
Final sign-off
Sep 24, 2020

mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$4,055,807
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221406
Permit issued
Oct 22, 2019
Final sign-off
Sep 18, 2020

mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$4,807,428
May 22, 2019Completed
final sign-off Nov 2020
300 16th StDpr Constructionmb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.
Details
Permit
201905221410
Permit issued
Oct 22, 2019
Final sign-off
Nov 4, 2020

mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.

Open the permit page

$4,868,336
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221411
Permit issued
Oct 21, 2019
Final sign-off
Sep 24, 2020

mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$3,979,382
Mar 9, 2017Never finaled
issued Nov 2017, no final
222 Sansome StHathaway Dinwiddie Co.interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a **
Details
Permit
201703091093
Permit issued
Nov 7, 2017

interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a **

Open the permit page

$624,825
May 15, 2013Completed
final sign-off Oct 2013
1355 Market StNovo Construction Inc9th & 11th floor - electrical work for new intervening stairs, ref pa #2013.02.07.9684 & 2012.12.18.6453
Details
Permit
201305156996
Permit issued
Jun 4, 2013
Final sign-off
Oct 11, 2013

9th & 11th floor - electrical work for new intervening stairs, ref pa #2013.02.07.9684 & 2012.12.18.6453

Open the permit page

$40,000
Nov 30, 2005Completed
final sign-off Feb 2006
450 Bryant StCity Building Inc.remove fire alarm system, previously submitted (not required). add card reader on entry doors. addendum to permits #200510115208 & #200509304377.
Details
Permit
200511309196
Permit issued
Nov 30, 2005
Final sign-off
Feb 23, 2006

remove fire alarm system, previously submitted (not required). add card reader on entry doors. addendum to permits #200510115208 & #200509304377.

Open the permit page

$500
Nov 22, 2005Completed
final sign-off Feb 2006
450 Bryant StCity Building Inc.addition of small idf closet - two walls & door, revision to sheet a00.50 of permit 200510115208 only
Details
Permit
200511228848
Permit issued
Nov 22, 2005
Final sign-off
Feb 23, 2006

addition of small idf closet - two walls & door, revision to sheet a00.50 of permit 200510115208 only

Open the permit page

$2,040
Aug 12, 2005Expired or cancelled
expired May 2007
1 Harrison StCity Building Inc.addendum to permit #200410136681 contractor has chosen alternate routing for conduits no adjustment
Details
Permit
200508120207
Permit issued
Aug 12, 2005

addendum to permit #200410136681 contractor has chosen alternate routing for conduits no adjustment

Open the permit page

Dec 20, 2004Expired or cancelled
expired Jun 2007
1 Harrison Stadding 3 walls to 2nd, 3rd, & 4th floor open area. removing gyp. bd. clg. & replacing w/ drop-in
Details
Permit
200412201760
Permit issued
Dec 20, 2004
Final sign-off
May 9, 2005

adding 3 walls to 2nd, 3rd, & 4th floor open area. removing gyp. bd. clg. & replacing w/ drop-in

Open the permit page

$150,000