- May 2001 to Jan 2023
183 permits since 2000 (architect on 177 permits, engineer on 3 permits, designer on 2 permits, authorized agent-others on 1 permit): 100 completed, 60 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 183.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 19, 2023 | Expired or cancelled cancelled Jan 2026 | 2675 Geary Bl | exterior finish upgrades with target red metal panels and cultured slate tile as baseDetails
exterior finish upgrades with target red metal panels and cultured slate tile as base | $170,000 | |
| May 21, 2021 | Never finaled issued Jun 2021, no final | 233 Winston Dr | W. L. Butler Construction Inc | revision to previously approved permits 202005217676 and 202005217677. amendments to structural special inspections, seperating them between the two address/spaces whereas before there was 1 special inspection for both.Details
revision to previously approved permits 202005217676 and 202005217677. amendments to structural special inspections, seperating them between the two address/spaces whereas before there was 1 special inspection for both. | |
| Nov 20, 2020 | Completed final sign-off Nov 2021 | 2675 Geary Bl | W. L. Butler Construction Inc | interior t.i.: partitions, celing , flooring, walls, finiehs, structural. includes remodel of (e) starbucks inside of target. maher n/a.Details
interior t.i.: partitions, celing , flooring, walls, finiehs, structural. includes remodel of (e) starbucks inside of target. maher n/a. | $975,000 |
| Nov 20, 2020 | Completed final sign-off Dec 2021 | 2675 Geary Bl | W. L. Butler Construction Inc | t.i. for (e) target store. work consists of seismic anchorage for sales floor shelving and storage shelving. refrigeration, walk-in, and reach in cooler/freezer, mechanical, electrical, plumbing trade work for target and starbucks kiosk inside target storeDetails
t.i. for (e) target store. work consists of seismic anchorage for sales floor shelving and storage shelving. refrigeration, walk-in, and reach in cooler/freezer, mechanical, electrical, plumbing trade work for target and starbucks kiosk inside target store | $850,000 |
| Oct 22, 2020 | Completed final sign-off Apr 2021 | 285 Winston Dr | W. L. Butler Construction Inc | deferred submittal to 2020-0521-7676 & 2020-0521-7677 civil upgrade. accessible ramp to serve loading doc at southeast corner of anchor buildingDetails
deferred submittal to 2020-0521-7676 & 2020-0521-7677 civil upgrade. accessible ramp to serve loading doc at southeast corner of anchor building | $275,000 |
| Sep 26, 2020 | Expired or cancelled withdrawn Oct 2021 | 800 Market St | 3/f: t.i: non-structural partitions, flooring, finisehs, fixturse. memorialize cua 2019-014033 to change from m to b occupancy.Details
3/f: t.i: non-structural partitions, flooring, finisehs, fixturse. memorialize cua 2019-014033 to change from m to b occupancy. | $556,768 | |
| Sep 17, 2020 | Completed final sign-off Nov 2021 | 1 Warriors Wy | Build Group Inc. | revision to permit #2019-1025-5629 to deduct work scope to mechanical, structural & architectural work scope.Details
revision to permit #2019-1025-5629 to deduct work scope to mechanical, structural & architectural work scope. | |
| Aug 7, 2020 | Never finaled filed Aug 2020, never issued | 425 Mission St | base building. install gender neutral restroom & corridor on ground level adjacent to loading dock area. work includes non-structural partitions, doors, fixtures & finishes. no exterior work. mep included.Details
base building. install gender neutral restroom & corridor on ground level adjacent to loading dock area. work includes non-structural partitions, doors, fixtures & finishes. no exterior work. mep included. | $42,000 | |
| May 21, 2020 | Completed final sign-off Dec 2022 | 233 Winston Dr | W. L. Butler Construction Inc | remodel of (e) target & expansion into adjacent nordstrom anchor tenant space. includes interior & exterior demo work, loading dock, mep work. (n) starbucks layout. included for review in this submittal is highpile & hazmat racking.Details
remodel of (e) target & expansion into adjacent nordstrom anchor tenant space. includes interior & exterior demo work, loading dock, mep work. (n) starbucks layout. included for review in this submittal is highpile & hazmat racking. | $4,000,000 |
| May 21, 2020 | Completed final sign-off Dec 2022 | 285 Winston Dr | W. L. Butler Construction Inc | remodel of (e) target & expansion into adjacent nordstrom anchor tenant space. includes interior & exterior demo work, loading dock, mep work. (n) starbucks layout. included for review in this submittal is highpile & hazmat racking.Details
remodel of (e) target & expansion into adjacent nordstrom anchor tenant space. includes interior & exterior demo work, loading dock, mep work. (n) starbucks layout. included for review in this submittal is highpile & hazmat racking. | $3,500,000 |
| Mar 9, 2020 | Expired or cancelled cancelled Nov 2024 | 340 Bryant St | interior ti of 2nd & 4th. non-structural ti to include, but not limited to partitions, flooring, ceilings, furnishings & finishes. no change to other floors in building or (e) egress path to street. no food/beverage or third party catering to be provided by employerDetails
interior ti of 2nd & 4th. non-structural ti to include, but not limited to partitions, flooring, ceilings, furnishings & finishes. no change to other floors in building or (e) egress path to street. no food/beverage or third party catering to be provided by employer | $1,200,000 | |
| Jan 22, 2020 | Completed final sign-off Mar 2020 | 444 Jackson St | Trainor Commercial Construction Inc. | modify extg concrete slab at entry. revision to pa# 2019-0924-2597 to provide additional front entry upgrades not clearly shown under pa# 2019-0924-2597.Details
modify extg concrete slab at entry. revision to pa# 2019-0924-2597 to provide additional front entry upgrades not clearly shown under pa# 2019-0924-2597. | $2,000 |
| Dec 20, 2019 | Completed final sign-off Mar 2020 | 800 Market St | M C S Construction Services | 6th fl - revision to pa 2019-0503-9707 to capture installation of new wall and door. no change to other floors in building or (e) egress path to street. all mpe, fire alarm, fire sprinkler and structural work shall be under separate permitDetails
6th fl - revision to pa 2019-0503-9707 to capture installation of new wall and door. no change to other floors in building or (e) egress path to street. all mpe, fire alarm, fire sprinkler and structural work shall be under separate permit | $5,000 |
| Dec 6, 2019 | Expired or cancelled withdrawn Jul 2022 | 248 Sutter St | ti of (e) space on basement level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing in a mixed-use building. scope includes new studios, offices, restrooms with showers and reception area. maher naDetails
ti of (e) space on basement level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing in a mixed-use building. scope includes new studios, offices, restrooms with showers and reception area. maher na | $380,000 | |
| Dec 2, 2019 | Completed final sign-off Nov 2020 | 845 Market St | Pacific Wide Builders Inc. | suite #225: tenant improvement including mechanical, electrical, and plumbing scope of work. 2nd fl interior non street facing. (lululemon)Details
suite #225: tenant improvement including mechanical, electrical, and plumbing scope of work. 2nd fl interior non street facing. (lululemon) | $1,398,000 |
| Oct 25, 2019 | Completed final sign-off Apr 2021 | 1 Warriors Wy | Build Group Inc. | renovating (e)vacant space(2)levels with in the chase center for a high end steak house"miller & lux",level 100 is the main dining, kitchen & restrooms level 50 will consist of the bar & back of house services (offices, dry storage, utility)all new hvac,fcu,ele,plumbing finishesDetails
renovating (e)vacant space(2)levels with in the chase center for a high end steak house"miller & lux",level 100 is the main dining, kitchen & restrooms level 50 will consist of the bar & back of house services (offices, dry storage, utility)all new hvac,fcu,ele,plumbing finishes | $887,878 |
| Oct 17, 2019 | Completed final sign-off Mar 2021 | 3060 Fillmore St | Build Group Inc. | small revision to 201905069893. undercounter refrigeration at front counter. add expresso machine and coffee machine and sneeze guardDetails
small revision to 201905069893. undercounter refrigeration at front counter. add expresso machine and coffee machine and sneeze guard | |
| Oct 9, 2019 | Completed final sign-off Sep 2022 | 350 Post St | Marchetti Group | 1st floor: t.i to "tiffany & co" work includes new non-structual partition, furnitures, fixturs, finishes, lighting and mep.Details
1st floor: t.i to "tiffany & co" work includes new non-structual partition, furnitures, fixturs, finishes, lighting and mep. | $275,000 |
| Sep 24, 2019 | Never finaled issued Oct 2019, no final | 444 Jackson St | Trainor Commercial Construction Inc. | t.i. of (e) 1-story retail building including partitionts, door, fixtures,finishes, electrical, mechanical and plumbing. addition of (n) rooftop equiopment, not visilbe from row.Details
t.i. of (e) 1-story retail building including partitionts, door, fixtures,finishes, electrical, mechanical and plumbing. addition of (n) rooftop equiopment, not visilbe from row. | $141,000 |
| Aug 20, 2019 | Completed final sign-off Jan 2020 | 1509 Sloat Bl | R C Pacific Construction Inc | ti- for fit-out for coffee shop. no structral or civil work. installation of new partitions wall, finishes, fixtures, casework, equipment, mepDetails
ti- for fit-out for coffee shop. no structral or civil work. installation of new partitions wall, finishes, fixtures, casework, equipment, mep | $140,000 |
| Aug 7, 2019 | Never finaled issued Oct 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | roof equipment support @ roof. no change to other floors in building or existing egress path to street. mep, fire alarm, sprinkler, shall be under separate permit.Details
roof equipment support @ roof. no change to other floors in building or existing egress path to street. mep, fire alarm, sprinkler, shall be under separate permit. | $20,000 |
| Jun 21, 2019 | Never finaled issued Jun 2019, no final | 60 Francisco St | M C S Construction Services | revision to permit #201812208924, work includes replacements of exisitng internal stair.Details
revision to permit #201812208924, work includes replacements of exisitng internal stair. | |
| Jun 19, 2019 | Never finaled filed Jun 2019, never issued | 425 Mission St | Turner Construction Co | proj-19-0253. tjpa- suite #226 lpc offices. fire sprinklers only.Details
proj-19-0253. tjpa- suite #226 lpc offices. fire sprinklers only. | $21,350 |
| Jun 19, 2019 | Expired or cancelled cancelled Aug 2023 | 425 Mission St | tjpa. suite #232 lpc offices. fire sprinklers only. proj-19-0254Details
tjpa. suite #232 lpc offices. fire sprinklers only. proj-19-0254 | $11,638 | |
| Jun 17, 2019 | Never finaled issued Sep 2019, no final | 1 Peter Yorke Wy | tenant improvement of (e) office space for community clinic, waiting area, reception desk and support offices. work includes, new interior finishes, replacement of flooring, office casework & furniture, interior doors, frames, hardware & signage at new areas. no exterior work, mep, life safety separDetails
tenant improvement of (e) office space for community clinic, waiting area, reception desk and support offices. work includes, new interior finishes, replacement of flooring, office casework & furniture, interior doors, frames, hardware & signage at new areas. no exterior work, mep, life safety separ | $60,580 | |
| May 31, 2019 | Completed final sign-off Feb 2020 | 1 Post St | Dpr Construction | structural permit for work on the 11th, 12th, 13th floors only. no changes to other floors in bulding or (e) egress path to street. maher n/a.Details
structural permit for work on the 11th, 12th, 13th floors only. no changes to other floors in bulding or (e) egress path to street. maher n/a. | $33,655 |
| May 9, 2019 | Never finaled filed May 2019, never issued | 425 Mission St | tjpa-mou project# proj-19-0252. use of common area restrooms for various tenants within the transit center.Details
tjpa-mou project# proj-19-0252. use of common area restrooms for various tenants within the transit center. | $10,000 | |
| May 7, 2019 | Never finaled issued Jun 2019, no final | 300 16th St | Shawmut Woodworking & Supply Inc | ste 8 - new store "fanatics" in gsw arena - interior only ti w/interior finishes, walls, doors, frames, restroom, lighting, new electrical unitsDetails
ste 8 - new store "fanatics" in gsw arena - interior only ti w/interior finishes, walls, doors, frames, restroom, lighting, new electrical units | $475,000 |
| May 6, 2019 | Completed final sign-off Mar 2021 | 3060 Fillmore St | Build Group Inc. | tenant improvement. installation of new finishes, fixtures, furniture, casework, millwork and equipment.Details
tenant improvement. installation of new finishes, fixtures, furniture, casework, millwork and equipment. | $350,000 |
| Apr 4, 2019 | Completed final sign-off Jun 2019 | 530 Washington St | Paradigm General Contractors | replace 4 existing lights with new/t-24 plans. add drinking fountain. ref ti pa #201902153029.Details
replace 4 existing lights with new/t-24 plans. add drinking fountain. ref ti pa #201902153029. | $1,000 |
| Apr 3, 2019 | Never finaled filed Apr 2019, never issued | 425 Mission St | Turner Construction Co | tjpa - proj-19-0242. toping slabs & demising walls for ground & second level retail suites within the transit center. scope of work does not include exterior work. square footage of this project is 24,005 for ground floor & 6,537 for second floor, total of 30,542.Details
tjpa - proj-19-0242. toping slabs & demising walls for ground & second level retail suites within the transit center. scope of work does not include exterior work. square footage of this project is 24,005 for ground floor & 6,537 for second floor, total of 30,542. | $2,100,000 |
| Mar 25, 2019 | Completed final sign-off Feb 2020 | 1 Post St | Dpr Construction | non-structural ti on 12th fl only. remodel to include partitions, floorings, ceilings, furnishings, finishes, etc. no change to other floors in bldg or existing egress path to st. all fire alarm, fire sprinkler and structural shall be under sep. permit. no change to exterior facade.Details
non-structural ti on 12th fl only. remodel to include partitions, floorings, ceilings, furnishings, finishes, etc. no change to other floors in bldg or existing egress path to st. all fire alarm, fire sprinkler and structural shall be under sep. permit. no change to exterior facade. | $1,500,000 |
| Mar 25, 2019 | Completed final sign-off Feb 2020 | 1 Post St | Dpr Construction | non-structural ti on 11th fl only. remodel to include partitions, floorings, ceilings, furnishings, finishes, etc. no change to other floors in bldg or existing egress path to st. all fire alarm, fire sprinkler and structural shall be under sep. permit. no change to exterior facade.Details
non-structural ti on 11th fl only. remodel to include partitions, floorings, ceilings, furnishings, finishes, etc. no change to other floors in bldg or existing egress path to st. all fire alarm, fire sprinkler and structural shall be under sep. permit. no change to exterior facade. | $1,500,000 |
| Mar 22, 2019 | Completed final sign-off Feb 2020 | 845 Market St | Rylko Builders Inc. | space #100: interior ti of e retail space on gr fl includes non structural partitions, doors, fixtures, finishes, electrical, mech, plumb.Details
space #100: interior ti of e retail space on gr fl includes non structural partitions, doors, fixtures, finishes, electrical, mech, plumb. | $1,000,000 |
| Mar 19, 2019 | Never finaled issued Apr 2019, no final | 3060 Fillmore St | Build Group Inc. | non-structural interior only demo permit per ab-017.Details
non-structural interior only demo permit per ab-017. | $16,850 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | Dpr Construction | 15th - non structural interior ti. remodel to include partitions, floorings, ceiling, furnishings, finishes, etc. no change to other floors in bld, or (e) egresspath to street. all fire and struct under sep permit. no facade changesDetails
15th - non structural interior ti. remodel to include partitions, floorings, ceiling, furnishings, finishes, etc. no change to other floors in bld, or (e) egresspath to street. all fire and struct under sep permit. no facade changes | $1,500,000 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | Dpr Construction | 17th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm and fire sprinklers shall be under separate permit. no changes to ext facadeDetails
17th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm and fire sprinklers shall be under separate permit. no changes to ext facade | $1,500,000 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | Dpr Construction | 16th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm, fire sprinklers and structural work shall be under separate permit. no changes to ext facadeDetails
16th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm, fire sprinklers and structural work shall be under separate permit. no changes to ext facade | $1,500,000 |
| Mar 18, 2019 | Completed final sign-off Feb 2020 | 1 Post St | Dpr Construction | 18th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm and fire sprinklers shall be under separate permit. no changes to ext facadeDetails
18th fl - non structural interior ti. remodel to include partitions, flooring, ceilings, furnishings, finishes, etc. no change to other floors in building or existing egress path to street. all fire alarm and fire sprinklers shall be under separate permit. no changes to ext facade | $1,500,000 |
| Mar 11, 2019 | Completed final sign-off Jul 2019 | 340 Bryant St | Wework Construction Llc Dba Wework Const | 2nd/3rd: t.i. non structural remodel to include, but not limited to partitions, flooring, ceiling, furninshing, and finishes, no changes to other floors on bldg or (e) egress path to streetDetails
2nd/3rd: t.i. non structural remodel to include, but not limited to partitions, flooring, ceiling, furninshing, and finishes, no changes to other floors on bldg or (e) egress path to street | $119,952 |
| Mar 7, 2019 | Completed final sign-off Mar 2021 | 155 Montgomery St | Bevilacqua & Sons | removal of single manual door and installation of new double manual swing storefront doors. **maher n/a**Details
removal of single manual door and installation of new double manual swing storefront doors. **maher n/a** | $45,000 |
| Mar 5, 2019 | Never finaled issued May 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 17th & 18th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit.Details
interior remodel of 17th & 18th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. | $300,000 |
| Mar 5, 2019 | Never finaled issued Jun 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 9th and 11th floor only. non stuctural remodel to include partitions,floorings, ceilings, furnishings finishes etc. no change to other floors in building or existing egress path to street. all fire alarm, fire sprinkler and structural work under seperate permit.Details
interior remodel of 9th and 11th floor only. non stuctural remodel to include partitions,floorings, ceilings, furnishings finishes etc. no change to other floors in building or existing egress path to street. all fire alarm, fire sprinkler and structural work under seperate permit. | $300,000 |
| Mar 5, 2019 | Never finaled issued May 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 12th & 14th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. maher n/a.Details
interior remodel of 12th & 14th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. maher n/a. | $300,000 |
| Mar 5, 2019 | Never finaled issued Oct 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 2nd fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit.Details
interior remodel of 2nd fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. | $150,000 |
| Mar 5, 2019 | Never finaled issued Jun 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 6th & 7th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep permit.Details
interior remodel of 6th & 7th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep permit. | $295,000 |
| Mar 5, 2019 | Never finaled issued Jun 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 3rd & 4th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit.Details
interior remodel of 3rd & 4th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. | $300,000 |
| Mar 5, 2019 | Never finaled issued May 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 15th & 16th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit.Details
interior remodel of 15th & 16th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. | $300,000 |
| Mar 4, 2019 | Never finaled filed Mar 2019, never issued | 425 Mission St | Turner Construction Co | ti-tjpa project. suite 139-charley's philly steaks. interior tenant build out to an existing shell, tenant space approx 971 sf.Details
ti-tjpa project. suite 139-charley's philly steaks. interior tenant build out to an existing shell, tenant space approx 971 sf. | $500,000 |
| Feb 27, 2019 | Completed final sign-off Nov 2019 | 2909 Webster St | J & K Project Mgmt Consultants Llc | t.i. of extg 2-story bldg including non-structural partitions, doors, fixtures, electrical, mechanical and plumbing.Details
t.i. of extg 2-story bldg including non-structural partitions, doors, fixtures, electrical, mechanical and plumbing. | $500,000 |
| Feb 21, 2019 | Completed final sign-off Mar 2021 | 3060 Fillmore St | Build Group Inc. | core & shell- minor exterior work. new wall access opening. new elec and gas room, new restrooms, exit corridor & finishes. roof top mech platform. building remain vacant & future tenants requires ti permits.Details
core & shell- minor exterior work. new wall access opening. new elec and gas room, new restrooms, exit corridor & finishes. roof top mech platform. building remain vacant & future tenants requires ti permits. | $750,000 |
| Feb 15, 2019 | Completed final sign-off Jun 2019 | 530 Washington St | Paradigm General Contractors | interior t.i. of 2nd fl. construction of new interior non structural partitionsDetails
interior t.i. of 2nd fl. construction of new interior non structural partitions | $119,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2019 | 530 Washington St | Paradigm General Contractors | demolition of non-structural walls of e office. per ab-017Details
demolition of non-structural walls of e office. per ab-017 | $3,000 |
| Jan 24, 2019 | Never finaled filed Jan 2019, never issued | 425 Mission St | Turner Construction Co | tjpa lpc office in transbay transit center ste 232. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slab scope does not include exterior work, square footage of ti is 2,385 sq ft. maher n/aDetails
tjpa lpc office in transbay transit center ste 232. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slab scope does not include exterior work, square footage of ti is 2,385 sq ft. maher n/a | $1,100,000 |
| Jan 24, 2019 | Never finaled filed Jan 2019, never issued | 425 Mission St | Turner Construction Co | tjpa office in transbay transit center ste 226. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slabs scope does not include exterior work, square footage of ti is 7,824 sq ft. maher n/aDetails
tjpa office in transbay transit center ste 226. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slabs scope does not include exterior work, square footage of ti is 7,824 sq ft. maher n/a | $2,200,000 |
| Jan 24, 2019 | Never finaled filed Jan 2019, never issued | 425 Mission St | Turner Construction Co | tjpa mail room in transbay transit center ste 114. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, scope does not include exterior work, square footage of ti is 850 sq ft. maher n/aDetails
tjpa mail room in transbay transit center ste 114. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, scope does not include exterior work, square footage of ti is 850 sq ft. maher n/a | $150,000 |
| Dec 20, 2018 | Completed final sign-off Jun 2020 | 60 Francisco St | M C S Construction Services | interior ti of 1st fl only. new partitions, flooring, ceilings, furnishings, finishes, mep to change to exterior structure egress or e rated constructionDetails
interior ti of 1st fl only. new partitions, flooring, ceilings, furnishings, finishes, mep to change to exterior structure egress or e rated construction | $1,600,000 |
| Dec 19, 2018 | Completed final sign-off Jun 2021 | 755 Sansome St | Wework Construction Llc Dba Wework Const | 1/f & 2/f: interior ti to existing office floors. non-structural remodel to include partitions, flooring, ceilings, furnishes & finishes.Details
1/f & 2/f: interior ti to existing office floors. non-structural remodel to include partitions, flooring, ceilings, furnishes & finishes. | $1,245,000 |
| Dec 3, 2018 | Never finaled issued May 2019, no final | 619 Divisadero St | J & K Project Mgmt Consultants Llc | ti of ground flr retail including non structural partitions, doors, fixtures, finishes, ele, mech and plm. change of occupancy.Details
ti of ground flr retail including non structural partitions, doors, fixtures, finishes, ele, mech and plm. change of occupancy. | $450,000 |
| Nov 20, 2018 | Completed final sign-off Mar 2020 | 1690 Folsom St | W. L. Butler Construction Inc | interior and exterior tenant improvement. ;o,oted tp tje omsta;;atopm pf freezer/cooler fixtures on sales fl @ the market area as well as the installation of freezer/cooler storage units in the rear stockroom. addition of rooftop consdesing units. **maher n/a**Details
interior and exterior tenant improvement. ;o,oted tp tje omsta;;atopm pf freezer/cooler fixtures on sales fl @ the market area as well as the installation of freezer/cooler storage units in the rear stockroom. addition of rooftop consdesing units. **maher n/a** | $7,900,000 |
| Oct 16, 2018 | Completed final sign-off Jun 2019 | 350 Mission St | Novo Construction Inc | 2/f: smoke control system modificaiton. maher n/aDetails
2/f: smoke control system modificaiton. maher n/a | |
| Sep 11, 2018 | Completed final sign-off May 2019 | 222 Kearny St | M C S Construction Services | interior ti of 7th & 9th floors only. non-structural demo & renovation to include but not limited to partitions, flooring, ceilings, furnishings & finishes. no other work under this pa. mep, life safety, sprinklers under sep permit.Details
interior ti of 7th & 9th floors only. non-structural demo & renovation to include but not limited to partitions, flooring, ceilings, furnishings & finishes. no other work under this pa. mep, life safety, sprinklers under sep permit. | $1,199,779 |
| Sep 6, 2018 | Expired or cancelled withdrawn Nov 2018 | 55 Green St | interior non structural demo of 1st-5th floors. to include partitions, flooring, ceilings, finishes & furnishing. no change to egress no ext work. all other work under sep paDetails
interior non structural demo of 1st-5th floors. to include partitions, flooring, ceilings, finishes & furnishing. no change to egress no ext work. all other work under sep pa | $175,000 | |
| Sep 4, 2018 | Completed final sign-off Jun 2019 | 800 Market St | Sajo, Inc. | fourth fl ti interior only. work includes new partitons, new floor, ceiling finishes and bathroom finishes. mep, f/a and sprinklers under separate permit.Details
fourth fl ti interior only. work includes new partitons, new floor, ceiling finishes and bathroom finishes. mep, f/a and sprinklers under separate permit. | $500,000 |
| Aug 30, 2018 | Expired or cancelled cancelled Jan 2026 | 730 Montgomery St | revision to pa #201806192254. owner wishes to utilize beverage service & water cooler in lieu of water fountain requirement. ab-05 form included.Details
revision to pa #201806192254. owner wishes to utilize beverage service & water cooler in lieu of water fountain requirement. ab-05 form included. | $700 | |
| Aug 24, 2018 | Completed final sign-off Oct 2019 | 300 Post St | Seabay Building Group Llc | installation of new rooftop swingstage for (e) green wall maintenance. maher naDetails
installation of new rooftop swingstage for (e) green wall maintenance. maher na | $10,000 |
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 100 Church St | Teel Construction Inc. | demo of (e) non-structural partitions, finishes and fixtures. ti pa under 2018-0524-9985. soft demo only. all life/safety systems to remain intact. ada deferred under ab-017.Details
demo of (e) non-structural partitions, finishes and fixtures. ti pa under 2018-0524-9985. soft demo only. all life/safety systems to remain intact. ada deferred under ab-017. | $15,000 |
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 730 Montgomery St | Michilli Inc | 1/f: electrical and lighting for retail ti ref 201806192254Details
1/f: electrical and lighting for retail ti ref 201806192254 | $50,000 |
| Jun 19, 2018 | Never finaled issued Jul 2018, no final | 730 Montgomery St | Michilli Inc | interior remodel of 1082sq ft of retail space on ground fl.Details
interior remodel of 1082sq ft of retail space on ground fl. | $140,000 |
| May 24, 2018 | Completed final sign-off Jan 2019 | 100 Church St | Teel Construction Inc. | tenant improvement of existing ground level space to include non-structural partitions, doors, fixtures, finishes, electrical, mechanical, plumbing. change of use from mercantile to gymnasium yoga exercise use. reference to conditional use #2017-014466cuaDetails
tenant improvement of existing ground level space to include non-structural partitions, doors, fixtures, finishes, electrical, mechanical, plumbing. change of use from mercantile to gymnasium yoga exercise use. reference to conditional use #2017-014466cua | $520,000 |
| May 21, 2018 | Completed final sign-off Aug 2018 | 400 Howard St | Dpr Construction | revision to 201803294909 address minor structural supports for new audio visual wall on 2nd flrDetails
revision to 201803294909 address minor structural supports for new audio visual wall on 2nd flr | $10,000 |
| May 3, 2018 | Completed final sign-off Jul 2018 | 278 Post St | Gray West Construction Inc | installation of temporary wall at 2nd level. n/a for maherDetails
installation of temporary wall at 2nd level. n/a for maher | $4,500 |
| Mar 28, 2018 | Completed final sign-off Mar 2021 | 272 Sutter St | Hathaway Dinwiddie Co. | demolish 1-story commercial buildingDetails
demolish 1-story commercial building | $15,000 |
| Mar 26, 2018 | Completed final sign-off Nov 2018 | 845 Market St | Pacific Wide Builders Inc. | suite 167 - ti - (e) retail space on ground floor interior (not visible from street) work includes new partitions, fixtures, finishes, mall storefront. mep, fire protection, signage & racking under sep permitsDetails
suite 167 - ti - (e) retail space on ground floor interior (not visible from street) work includes new partitions, fixtures, finishes, mall storefront. mep, fire protection, signage & racking under sep permits | $800,000 |
| Feb 27, 2018 | Completed final sign-off Jul 2019 | 475 06th St | change of use/occupancy to an f-1 occupancy commercial kitchen located on ground lvl. (e) bldg will be fully sprinklered. const of interior walls, gyp board & t-bar ceilings. (n) restrooms, installation of toilets, urinals, lavatories & floor tle. remove & replace damaged ext siding & service doors.Details
change of use/occupancy to an f-1 occupancy commercial kitchen located on ground lvl. (e) bldg will be fully sprinklered. const of interior walls, gyp board & t-bar ceilings. (n) restrooms, installation of toilets, urinals, lavatories & floor tle. remove & replace damaged ext siding & service doors. | $800,000 | |
| Feb 20, 2018 | Never finaled issued May 2018, no final | 1560 40th Av | voluntary minimum life safety retrofit. private school seismic retrofit sfbc 3428.5.Details
voluntary minimum life safety retrofit. private school seismic retrofit sfbc 3428.5. | $1,000,000 | |
| Jan 26, 2018 | Completed final sign-off Mar 2018 | 30 Hotaling Pl | King Rem & Construction | revision to app#201712045369 to relocate/move phone rooms on 2nd floor and remove phone rooms on 1st floor.Details
revision to app#201712045369 to relocate/move phone rooms on 2nd floor and remove phone rooms on 1st floor. | |
| Jan 24, 2018 | Completed final sign-off Apr 2018 | 30 Hotaling Pl | Paradigm General Contractors | new internal stair in existing 2 level office space; revision to permit 201712045369Details
new internal stair in existing 2 level office space; revision to permit 201712045369 | $190,000 |
| Jan 22, 2018 | Never finaled issued Jul 2018, no final | 278 Post St | Gray West Construction Inc | adheisve sign on (e) canopy, w/ led lights connected to (e) j-box, single faced, exsting awning. maher n/a.Details
adheisve sign on (e) canopy, w/ led lights connected to (e) j-box, single faced, exsting awning. maher n/a. | $5,000 |
| Jan 22, 2018 | Completed final sign-off Apr 2019 | 241 California St | J & K Project Mgmt Consultants Llc | ti of the (e) space on ground level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing. maher naDetails
ti of the (e) space on ground level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing. maher na | $700,000 |
| Jan 9, 2018 | Never finaled issued Jul 2018, no final | 278 Post St | Gray West Construction Inc | adhesive decal sign adhere to bldg storefront, no electricalDetails
adhesive decal sign adhere to bldg storefront, no electrical | $12,500 |
| Jan 9, 2018 | Expired or cancelled withdrawn Jun 2018 | 278 Post St | erect electric, wall, single-faced, direct, new signDetails
erect electric, wall, single-faced, direct, new sign | $12,500 | |
| Dec 4, 2017 | Completed final sign-off Mar 2018 | 30 Hotaling Pl | King Rem & Construction | 1st & 2nd level interior tenant improvement. demolition of (e) non-structural partitions. construct new interior & non-structural partitions. update less than 10% of existing lighting & mechanical systems. n/a maher ordinance.Details
1st & 2nd level interior tenant improvement. demolition of (e) non-structural partitions. construct new interior & non-structural partitions. update less than 10% of existing lighting & mechanical systems. n/a maher ordinance. | $254,000 |
| Nov 27, 2017 | Expired or cancelled withdrawn Jun 2018 | 278 Post St | minor exterior facade alteration. signage & signs at existing canopy under seperate permit.Details
minor exterior facade alteration. signage & signs at existing canopy under seperate permit. | $35,000 | |
| Nov 21, 2017 | Completed final sign-off Dec 2018 | 855 Brannan St | Ybj Construction Services | t.i. for coffee/tea shop. installation of new interior partitions, finishes, fixtures, furniture, caswork, millwork, equipment. mech difuser and duct installation. elec: new power/data along with lighting throughout. plumbing: new toilets, floor sinks, floor drains, hand sinks, 3 compartment sink,Details
t.i. for coffee/tea shop. installation of new interior partitions, finishes, fixtures, furniture, caswork, millwork, equipment. mech difuser and duct installation. elec: new power/data along with lighting throughout. plumbing: new toilets, floor sinks, floor drains, hand sinks, 3 compartment sink, | $115,000 |
| Nov 8, 2017 | Never finaled issued Nov 2017, no final | 278 Post St | Gray West Construction Inc | revision to app#201710121075 to reduce scope of work angled wall not to be added. n/a for maherDetails
revision to app#201710121075 to reduce scope of work angled wall not to be added. n/a for maher | |
| Oct 12, 2017 | Never finaled issued Oct 2017, no final | 278 Post St | Gray West Construction Inc | b/1/2 levels: interior tenant improvement with new furring walls installation & paint finishes throughout, basement/ground & 2nd levelDetails
b/1/2 levels: interior tenant improvement with new furring walls installation & paint finishes throughout, basement/ground & 2nd level | $45,000 |
| Oct 11, 2017 | Completed final sign-off Feb 2018 | 405 Howard St | Peacock Construction | t.i. interior only for extg coffee shop. installation of new partitions, finishes, fixtures, furnitures, casework, millwork and equipments. n/a for maher.Details
t.i. interior only for extg coffee shop. installation of new partitions, finishes, fixtures, furnitures, casework, millwork and equipments. n/a for maher. | $140,000 |
| Oct 3, 2017 | Completed final sign-off Jan 2018 | 1837 Union St | Hillhouse Construction Company Inc | revision to pa#201709117528 to remove bearing wall and adjust restroom.Details
revision to pa#201709117528 to remove bearing wall and adjust restroom. | |
| Oct 2, 2017 | Expired or cancelled cancelled Jan 2026 | 865 Market St | #9102, 1st fl: build new pre-fabricated kiosk and front & rear display areas, including new mech & electrical systems, integral to the kiosk, as well as fire protection systems connected to existing base building systems. maher naDetails
#9102, 1st fl: build new pre-fabricated kiosk and front & rear display areas, including new mech & electrical systems, integral to the kiosk, as well as fire protection systems connected to existing base building systems. maher na | $140,000 | |
| Sep 20, 2017 | Expired or cancelled withdrawn Aug 2021 | 3419 California St | remodel (e) coffee/tea shop, new interior partitions, finishes, fixtures, furniture, casework, millwork, equipment. mech- install diffuser & duct. elec- new power/data, lighting throughout. plumb- new toilet, floor sink, floor drain, hand sinks, hot water heater, cold brew system and a dump sink.Details
remodel (e) coffee/tea shop, new interior partitions, finishes, fixtures, furniture, casework, millwork, equipment. mech- install diffuser & duct. elec- new power/data, lighting throughout. plumb- new toilet, floor sink, floor drain, hand sinks, hot water heater, cold brew system and a dump sink. | $165,000 | |
| Sep 19, 2017 | Expired or cancelled cancelled Jan 2026 | 54 West Portal Av | remodel coffee/tea shop - new int partitions, finishes, fixtures, furnure, casewwork, millwork, equip. mech-diffuser, duct installation. elect-new power/data, lighting thru-out, plbg, new toilets, floor/hand sinks,3 compartment sinks. hot water heater,dump sink, reverse osmosis system.Details
remodel coffee/tea shop - new int partitions, finishes, fixtures, furnure, casewwork, millwork, equip. mech-diffuser, duct installation. elect-new power/data, lighting thru-out, plbg, new toilets, floor/hand sinks,3 compartment sinks. hot water heater,dump sink, reverse osmosis system. | $165,000 | |
| Sep 1, 2017 | Never finaled filed Sep 2017, never issued | 865 Market St | tenant improvement for a licensed cannabis dispensaryDetails
tenant improvement for a licensed cannabis dispensary | $300,000 | |
| Jul 12, 2017 | Never finaled issued Aug 2017, no final | 1320 14th Av | Sc Builders, Inc | installation of ada ramp and accessible path of travel for access to temp. portable classroom and restroom by others, under seperate permit. temporary classroom not to exceed 2/2/2018.Details
installation of ada ramp and accessible path of travel for access to temp. portable classroom and restroom by others, under seperate permit. temporary classroom not to exceed 2/2/2018. | $10,000 |
| Mar 13, 2017 | Never finaled issued Jun 2017, no final | 1320 14th Av | Sc Builders, Inc | seismic retrofit of (e) school. path o f travel upgradesDetails
seismic retrofit of (e) school. path o f travel upgrades | $2,000,000 |
| Mar 2, 2017 | Never finaled issued Apr 2017, no final | 233 Winston Dr | The Whiting-Turner Contracting Company | revision to app#2016-0921-8422 for retail space to include electrical and controller rm swap locations and minor mep redesign.Details
revision to app#2016-0921-8422 for retail space to include electrical and controller rm swap locations and minor mep redesign. | |
| Dec 20, 2016 | Completed final sign-off Feb 2017 | 789 Mission St | Swinerton Builders | ground floor - existing interior space to be modified per new interior furniture, finishes, equipmentsDetails
ground floor - existing interior space to be modified per new interior furniture, finishes, equipments | $120,000 |
| Nov 21, 2016 | Completed final sign-off Jan 2017 | 730 Montgomery St | King Rem & Construction | interior tenant improvement. new walls, flooring, conference rooms, breakroom. correction to (e) layout plan in prior pa#201609198114. maher 1/f: ord 155-13 naDetails
interior tenant improvement. new walls, flooring, conference rooms, breakroom. correction to (e) layout plan in prior pa#201609198114. maher 1/f: ord 155-13 na | $109,000 |
| Nov 14, 2016 | Expired or cancelled withdrawn Jan 2017 | 350 Post St | installation of 2 (n) knox boxesDetails
installation of 2 (n) knox boxes | $1,000 | |
| Oct 28, 2016 | Never finaled issued Oct 2016, no final | 3251 20th Av | Gray West Construction Inc | suite 1062: shelving anchoring ref 201602260662Details
suite 1062: shelving anchoring ref 201602260662 |