29 permits since 2000 (engineer on 26 permits, architect on 2 permits, designer on 1 permit): 16 completed, 2 in progress, 10 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 7, 2026 | In progress issued Jun 2026 | 1434 Yosemite Av | R G Construction | interior improvement of existing warehouse space into coffee roasting facility. space will have a 200 sf tasting area but is not open to the public. demolition of second level, installation of flow drains & clean outs. upgrade of existing restroom including new fixtures, finishes & accessories.Details
interior improvement of existing warehouse space into coffee roasting facility. space will have a 200 sf tasting area but is not open to the public. demolition of second level, installation of flow drains & clean outs. upgrade of existing restroom including new fixtures, finishes & accessories. | $67,500 |
| Mar 18, 2026 | In progress issued Apr 2026 | 1530 Haight St | Ibuild Design And Construction Inc | selective demo on 1st floor & basement. new interior partition on 1st floor, (n) lighting in basement & 1st flr, (n) shelving @ ground flr, 2 (n) communicating openings. new stair to the basement. ref lot line adjustment 2025006002lla. occupancy is dependant on final approval of lot line adjustment.Details
selective demo on 1st floor & basement. new interior partition on 1st floor, (n) lighting in basement & 1st flr, (n) shelving @ ground flr, 2 (n) communicating openings. new stair to the basement. ref lot line adjustment 2025006002lla. occupancy is dependant on final approval of lot line adjustment. | $436,640 |
| Sep 25, 2024 | Completed final sign-off Aug 2025 | 785 Page St | Hubeymar Construction | replacement of (e) concrete retaining wall currently buckling with the potential of collapse. new design includes new footings, concrete stem wall, with a 6'0" privacy fence to match existing conditions.Details
replacement of (e) concrete retaining wall currently buckling with the potential of collapse. new design includes new footings, concrete stem wall, with a 6'0" privacy fence to match existing conditions. | $24,000 |
| Oct 11, 2022 | Expired or cancelled cancelled Jan 2025 | 445 Sutter St | change of use from (e) mercantile to (n) limited restaurant. interior t.i., no exterior work. demo of non-structural walls, partitions & finishes. new mep, including cooking equipment, hood, floor sinks, hvac & lighting. new ada bathroom.Details
change of use from (e) mercantile to (n) limited restaurant. interior t.i., no exterior work. demo of non-structural walls, partitions & finishes. new mep, including cooking equipment, hood, floor sinks, hvac & lighting. new ada bathroom. | $177,810 | |
| Mar 24, 2022 | Never finaled issued Apr 2022, no final | 140 Geary St | Alain Hirsch Construction Corp | revision to pa# 202106253279. add high & low door actuator at storefront entry. revised chandelier to support shown in detail 2/5100. revised tenant column connection to building. interior only.Details
revision to pa# 202106253279. add high & low door actuator at storefront entry. revised chandelier to support shown in detail 2/5100. revised tenant column connection to building. interior only. | $8,000 |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 2040 Chestnut St | Americo Builders Llc | ti to an existing building, formerly clothing retail (gap), change of use to a restaurant. modifications include new wall partition, ceilings, mep for fast casual salad restaurant (sweet greens).Details
ti to an existing building, formerly clothing retail (gap), change of use to a restaurant. modifications include new wall partition, ceilings, mep for fast casual salad restaurant (sweet greens). | $500,000 |
| Apr 26, 2021 | Completed final sign-off Jun 2023 | 186 West Portal Av | Nassif A Ayyad | tenant improvement. partial demolition. rough & finish framing, plumbing, electrical & mechanical works. drywall, carpentry, paint, flooring work. equipment installation.Details
tenant improvement. partial demolition. rough & finish framing, plumbing, electrical & mechanical works. drywall, carpentry, paint, flooring work. equipment installation. | $235,000 |
| Apr 8, 2021 | Completed final sign-off Jan 2022 | 2400 Irving St | Truedge Builds Inc | t.i for the police credit union of ca retail branch. partial demo of an (e) concrete vault, demo of non structural partitions, ceiling, finishes, mep system. construction of new partitions, relocation of post, finishes, mep. ext. work includes restoration of infill at 2nd access and install atm.Details
t.i for the police credit union of ca retail branch. partial demo of an (e) concrete vault, demo of non structural partitions, ceiling, finishes, mep system. construction of new partitions, relocation of post, finishes, mep. ext. work includes restoration of infill at 2nd access and install atm. | $1,259,550 |
| Jul 1, 2020 | Completed final sign-off Oct 2021 | 303 02nd St | Skyline Construction | ti of existing office space on the entire 9th fl. work includes non-structural partitions, new lighting , ceilings, doors, carpets and paint. mep included.Details
ti of existing office space on the entire 9th fl. work includes non-structural partitions, new lighting , ceilings, doors, carpets and paint. mep included. | $8,782,000 |
| Jun 24, 2020 | Completed final sign-off Oct 2021 | 303 02nd St | Skyline Construction | ti of existing office space on the entire 10th fl. work includes non-structural partitions, mep, finishes, and re-cladding of an (e) communicating stair.Details
ti of existing office space on the entire 10th fl. work includes non-structural partitions, mep, finishes, and re-cladding of an (e) communicating stair. | $8,249,316 |
| Jun 24, 2020 | Completed final sign-off Sep 2021 | 303 02nd St | Skyline Construction | suite #350: ti work entails construction of new non-bearing partitions, millwork, ceiling system w/new lighting, doors & frames, power & communication, fixtures & furniture systems, carpet & paint finishes. maher naDetails
suite #350: ti work entails construction of new non-bearing partitions, millwork, ceiling system w/new lighting, doors & frames, power & communication, fixtures & furniture systems, carpet & paint finishes. maher na | $5,892,369 |
| Mar 12, 2020 | Never finaled issued Jan 2023, no final | 101 Cargo Wy | Accutite Technology Engineering | above ground fuel tank & 500 gallon propane tank. install (1) ul-2085 ast and (1) ul-644ast. install tank top accessories and tank labels. install vehicle protection k-rails at ul-644 tank. maher naDetails
above ground fuel tank & 500 gallon propane tank. install (1) ul-2085 ast and (1) ul-644ast. install tank top accessories and tank labels. install vehicle protection k-rails at ul-644 tank. maher na | $10,000 |
| Aug 6, 2019 | Completed final sign-off Dec 2019 | 2234 Polk St | Tri-Quest Builders & Developers Inc | resubmit structural plans that were missing from pa# 201806111469Details
resubmit structural plans that were missing from pa# 201806111469 | |
| Jul 26, 2019 | Never finaled issued Sep 2019, no final | 845 Market St | Level 5 Retail Construction Inc. | #183: t.i. of retail space on ground floor, work includes non-structural demo. new non-structural partitions, ceiling, lighting and mep. n/a maherDetails
#183: t.i. of retail space on ground floor, work includes non-structural demo. new non-structural partitions, ceiling, lighting and mep. n/a maher | $430,000 |
| Jul 18, 2019 | Never finaled issued Sep 2019, no final | 303 02nd St | Skyline Construction | 8/f: steel beam to be removed/demolished beams were part of a 1990 floor stregthening for high density file storage the space is no longer used for file storageDetails
8/f: steel beam to be removed/demolished beams were part of a 1990 floor stregthening for high density file storage the space is no longer used for file storage | $5,000 |
| Feb 5, 2019 | Completed final sign-off Apr 2019 | 615 Bay Shore Bl | Accutite Technology Engineering | install concrete footing, relocate, reinstall (e) automotive liftsDetails
install concrete footing, relocate, reinstall (e) automotive lifts | $25,000 |
| Jan 24, 2019 | Never finaled filed Jan 2019, never issued | 425 Mission St | Turner Construction Co | tjpa lpc office in transbay transit center ste 232. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slab scope does not include exterior work, square footage of ti is 2,385 sq ft. maher n/aDetails
tjpa lpc office in transbay transit center ste 232. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slab scope does not include exterior work, square footage of ti is 2,385 sq ft. maher n/a | $1,100,000 |
| Jan 24, 2019 | Never finaled filed Jan 2019, never issued | 425 Mission St | Turner Construction Co | tjpa office in transbay transit center ste 226. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slabs scope does not include exterior work, square footage of ti is 7,824 sq ft. maher n/aDetails
tjpa office in transbay transit center ste 226. first time tenant improvement of lpc office at second level, non-structural partitions, fixtures & finishes, topping slabs scope does not include exterior work, square footage of ti is 7,824 sq ft. maher n/a | $2,200,000 |
| Jun 10, 2016 | Never finaled issued Jun 2016, no final | 201 California St | Gci, Inc | strengthening of 16th floor for added weight of proposed ups. only required strengthening of floor is added channels between extg composite steel beams. pa# 201603222729. n/a for maherDetails
strengthening of 16th floor for added weight of proposed ups. only required strengthening of floor is added channels between extg composite steel beams. pa# 201603222729. n/a for maher | $4,000 |
| Mar 21, 2016 | Never finaled issued Apr 2016, no final | 2047 Fillmore St | Michilli Inc | adding 4" shotcret to rear extg exterior wall, new exterior window and replace extg new column on extg rear wall and reverse door swing.Details
adding 4" shotcret to rear extg exterior wall, new exterior window and replace extg new column on extg rear wall and reverse door swing. | $80,000 |
| Jun 22, 2015 | Never finaled issued Sep 2015, no final | 300 Folsom St | Trainor Commercial Construction Inc. | t.i.- construction of coffee ship, 1990 sq.ft., install wall partitions, susp. ceiling, plumbing, electrical. installation of food service equipment. modify fire sprinklers, mechanical system. n/a ordinance #155-13Details
t.i.- construction of coffee ship, 1990 sq.ft., install wall partitions, susp. ceiling, plumbing, electrical. installation of food service equipment. modify fire sprinklers, mechanical system. n/a ordinance #155-13 | $250,000 |
| Aug 6, 2014 | Completed final sign-off Mar 2015 | 3251 20th Av | W G Fritz Construction Inc. | exterior structural improvements for future storefront of future blaze pizza. provide structural support for the entry glass wall at and exterior metal stud wallsDetails
exterior structural improvements for future storefront of future blaze pizza. provide structural support for the entry glass wall at and exterior metal stud walls | $90,000 |
| Jul 6, 2012 | Never finaled issued Jul 2012, no final | 865 Market St | 3rd floor-revision to pa# 2012-0326-6889/2012-0323-6778-to include new communicationing stairs & interior elevator cab build outDetails
3rd floor-revision to pa# 2012-0326-6889/2012-0323-6778-to include new communicationing stairs & interior elevator cab build out | $70,000 | |
| May 22, 2012 | Completed final sign-off Feb 2013 | 2565 03rd St | Oliver & Company Inc. | tenant improvement for ground floor, change of use from warehouse to museum. construction of glass storefront system, platform infill and stair at entry, construct interior wall partitons, plumbing and electric work and modification to existing mechanical. fire sprinker separate permit.Details
tenant improvement for ground floor, change of use from warehouse to museum. construction of glass storefront system, platform infill and stair at entry, construct interior wall partitons, plumbing and electric work and modification to existing mechanical. fire sprinker separate permit. | $187,000 |
| Jan 20, 2009 | Completed final sign-off Jul 2009 | 3251 20th Av | Dickinson Cameron Construction Company I, Hathaway Dinwiddie Co. | space #262 t.i.-combine 2 tenant space,demolish demising wall bet 2 tenant spaces to make 1 larger space,demolish & provide all finishes & fixtures.provide new toilet rooms, ductwork, elec equip,sprinklers,storefront.relocating (e)mall fire hose valve.fire sprinkler,signage under separate permit.Details
space #262 t.i.-combine 2 tenant space,demolish demising wall bet 2 tenant spaces to make 1 larger space,demolish & provide all finishes & fixtures.provide new toilet rooms, ductwork, elec equip,sprinklers,storefront.relocating (e)mall fire hose valve.fire sprinkler,signage under separate permit. | $602,394 |
| Dec 12, 2008 | Completed final sign-off Feb 2009 | 1200 Irving St | John Sutti & Associates, Inc. | repair damage roof screen. effectively replace in kind with minor structural improvements.Details
repair damage roof screen. effectively replace in kind with minor structural improvements. | $13,750 |
| Feb 13, 2008 | Completed final sign-off Apr 2008 | 300 Cortland Av | Alo-I-Talau Construction | comply with n.o.v. # 200718416. replacement of stairs at front of building.Details
comply with n.o.v. # 200718416. replacement of stairs at front of building. | $3,500 |
| Feb 13, 2008 | Completed final sign-off Apr 2008 | 300 Cortland Av | Alo-I-Talau Construction | correct n.o.v # 200718416 (#4). structural beam replacement at carport area.Details
correct n.o.v # 200718416 (#4). structural beam replacement at carport area. | $10,000 |
| Feb 8, 2008 | Completed final sign-off Aug 2008 | 437 Sutter St | interior tenant imporvement only. new partitions floor & ceiling finishes, lighting & hvac distribution. (exterior store front under appl.(200801102276). reinforce (e) landing w/ (n) framing joists and posts. (n) framing for 2 roof top units. no change in use or floor area.Details
interior tenant imporvement only. new partitions floor & ceiling finishes, lighting & hvac distribution. (exterior store front under appl.(200801102276). reinforce (e) landing w/ (n) framing joists and posts. (n) framing for 2 roof top units. no change in use or floor area. | $500,000 |