Yashavant Vishnukulkarni
- License
- M20320
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M20320 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Y V Kulkarni, P.E. Consulting
- Based in
- Davis
- On San Francisco permits
- Jul 2019 to Jul 2022
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Go Green Construction Inc, Level 5 Retail Construction Inc.
- Architects
- Matthew Rieskin, Nicholas Tricarico
- Engineers
- Jayson Haines, Yashavant Vishnu Kulkarni
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2022 | Completed final sign-off Apr 2023 | 584 Hayes St | Go Green Construction Inc | new interior tenant fit out. all structure beams, joists, colums, etc.. to remain. exterior storefront to remain. mep to remain. new power, lighting to be installed. new finishes and display fixtures to be installed in showroom. new shelving and millwork to be installed.Details
new interior tenant fit out. all structure beams, joists, colums, etc.. to remain. exterior storefront to remain. mep to remain. new power, lighting to be installed. new finishes and display fixtures to be installed in showroom. new shelving and millwork to be installed. | $200,000 |
| Jul 26, 2019 | Never finaled issued Sep 2019, no final | 845 Market St | Level 5 Retail Construction Inc. | #183: t.i. of retail space on ground floor, work includes non-structural demo. new non-structural partitions, ceiling, lighting and mep. n/a maherDetails
#183: t.i. of retail space on ground floor, work includes non-structural demo. new non-structural partitions, ceiling, lighting and mep. n/a maher | $430,000 |