Go Green Construction Inc
- Based in
- Pittsburgh
- On San Francisco permits
- Jan 2022 to Jul 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2022 | Completed final sign-off Apr 2023 | 584 Hayes St | new interior tenant fit out. all structure beams, joists, colums, etc.. to remain. exterior storefront to remain. mep to remain. new power, lighting to be installed. new finishes and display fixtures to be installed in showroom. new shelving and millwork to be installed.Details
new interior tenant fit out. all structure beams, joists, colums, etc.. to remain. exterior storefront to remain. mep to remain. new power, lighting to be installed. new finishes and display fixtures to be installed in showroom. new shelving and millwork to be installed. | $200,000 |
| Jan 20, 2022 | Completed final sign-off Aug 2022 | 548 07th St | provide accessibility upgrades to remove the architectural barriers for the purpose of allowing equal access for persons with disabilities. proposed construction shall be limited to the location identified on sheet a1.3. demolish (e) ramp and install ada compliant ramp. to comply with abeDetails
provide accessibility upgrades to remove the architectural barriers for the purpose of allowing equal access for persons with disabilities. proposed construction shall be limited to the location identified on sheet a1.3. demolish (e) ramp and install ada compliant ramp. to comply with abe | $100,000 |