Permit GraphSan Francisco building permits since 2000

Contractors with stairs permits

Ranked across every stairs permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Showing contractors with a stairs permit in the last 5 years. Include inactive contractors

CompletedIn progressNever finaledExpired or cancelled
  1. 1
    M & L Construction
    License 832092 220 permits: 208 completed, 7 in progress, 3 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 28 days from permit to final inspection.
  2. 2
    Lemus Construction Co
    License 913461 40 permits: 40 completed. Last filed Jun 2026. Typically 62 days from permit to final inspection.
  3. 3
    Mutual Seiko Construction
    License 757312 38 permits: 38 completed. Last filed Sep 2022. Typically 125 days from permit to final inspection.
  4. 4
    Regency General Contractors Inc
    License 773175 46 permits: 29 completed, 17 in progress. Last filed Jun 2025. Typically 167 days from permit to final inspection.
  5. 5
    Gil Construction & Assoc Inc.
    License 703705 173 permits: 157 completed, 7 in progress, 2 never finaled, 7 expired or cancelled. Last filed Sep 2026. Typically 53 days from permit to final inspection.
  6. 6
    Hong Shink Construction
    License 758888 25 permits: 24 completed, 1 in progress. Last filed Apr 2026. Typically 134 days from permit to final inspection.
  7. 7
    Bc United Construction Inc
    License 995115 25 permits: 23 completed, 2 in progress. Last filed Jun 2026. Typically 322 days from permit to final inspection.
  8. 8
    Sure, Inc.
    License 561658 130 permits: 120 completed, 2 in progress, 3 never finaled, 5 expired or cancelled. Last filed Aug 2026. Typically 47 days from permit to final inspection.
  9. 9
    Cht Properties Development
    License 812058 24 permits: 22 completed, 2 in progress. Last filed Dec 2025. Typically 222 days from permit to final inspection.
  10. 10
    Sasso Construction Inc.
    License 911044 20 permits: 19 completed, 1 in progress. Last filed Apr 2025. Typically 155 days from permit to final inspection.
  11. 11
    Richlen Construction
    License 570031 32 permits: 29 completed, 2 in progress, 1 expired or cancelled. Last filed Mar 2026. Typically 231 days from permit to final inspection.
  12. 12
    Citidev Inc.
    License 910730 31 permits: 28 completed, 2 in progress, 1 never finaled. Last filed Nov 2025. Typically 217 days from permit to final inspection.
  13. 13
    Nibbi Bros Assoc Inc.
    License 757362 16 permits: 16 completed. Last filed Aug 2024. Typically 235 days from permit to final inspection.
  14. 14
    R.M.R. Construction Company
    License 404737 17 permits: 16 completed, 1 in progress. Last filed May 2025. Typically 305 days from permit to final inspection.
  15. 15
    Chl Construction Company
    License 960561 17 permits: 16 completed, 1 in progress. Last filed Jun 2026. Typically 318 days from permit to final inspection.
  16. 16
    Arnest Termite Control
    License 8556 28 permits: 27 completed, 1 expired or cancelled. Last filed Jan 2026. Typically 12 days from permit to final inspection.
  17. 17
    Spryscapes Const Inc.
    License 776680 38 permits: 36 completed, 2 expired or cancelled. Last filed Jul 2022. Typically 66 days from permit to final inspection.
  18. 18
    Kwong Associates
    License 913553 15 permits: 15 completed. Last filed Dec 2023. Typically 105 days from permit to final inspection.
  19. 19
    Jason Liu Construction Company
    License 662067 15 permits: 15 completed. Last filed Sep 2022. Typically 266 days from permit to final inspection.
  20. 20
    Darc Ventures Inc Dba Spl Construction S
    License 938513 16 permits: 15 completed, 1 in progress. Last filed Apr 2026. Typically 159 days from permit to final inspection.
  21. 21
    Level 10 Construction Lp
    License 967797 26 permits: 25 completed, 1 expired or cancelled. Last filed Jul 2022. Typically 1087 days from permit to final inspection.
  22. 22
    Reliable Construction Inc
    License 983658 41 permits: 33 completed, 6 in progress, 1 never finaled, 1 expired or cancelled. Last filed Sep 2026. Typically 200 days from permit to final inspection.
  23. 23
    Aurora Builders
    License 759578 15 permits: 14 completed, 1 in progress. Last filed Jan 2023. Typically 68 days from permit to final inspection.
  24. 24
    R P Construction Inc.
    License 804086 14 permits: 14 completed. Last filed Nov 2021. Typically 208 days from permit to final inspection.
  25. 25
    Sc Builders, Inc
    License 767196 17 permits: 14 completed, 3 in progress. Last filed Jul 2026. Typically 390 days from permit to final inspection.
  26. 26
    O'pro Construction Inc.
    License 1029997 13 permits: 13 completed. Last filed Feb 2026. Typically 361 days from permit to final inspection.
  27. 27
    Bryce C B Construction Inc
    License 886936 13 permits: 13 completed. Last filed Jan 2025. Typically 370 days from permit to final inspection.
  28. 28
    He & Kuang Inc
    License 892144 13 permits: 13 completed. Last filed Jun 2025. Typically 262 days from permit to final inspection.
  29. 29
    T T General Construction
    License 927524 14 permits: 13 completed, 1 in progress. Last filed May 2026. Typically 228 days from permit to final inspection.
  30. 30
    J & T Diodati Construction
    License 811255 39 permits: 36 completed, 3 never finaled. Last filed May 2024. Typically 148 days from permit to final inspection.
  31. 31
    R & D Construction Co Inc
    License 825438 79 permits: 67 completed, 4 in progress, 4 never finaled, 4 expired or cancelled. Last filed Jun 2026. Typically 230 days from permit to final inspection.
  32. 32
    Jimmy Wong
    License 884883 12 permits: 12 completed. Last filed Oct 2023. Typically 470 days from permit to final inspection.
  33. 33
    Benjamin Shaw
    License 646136 13 permits: 12 completed, 1 in progress. Last filed Jun 2025. Typically 176 days from permit to final inspection.
  34. 34
    O'shea Co. Home Grown Construction
    License 890253 15 permits: 12 completed, 3 in progress. Last filed Aug 2026. Typically 233 days from permit to final inspection.
  35. 35
    Rua Woods Construction Inc
    License 995753 12 permits: 12 completed. Last filed Mar 2026. Typically 254 days from permit to final inspection.
  36. 36
    Mark Scott Construction Inc
    License 682814 13 permits: 12 completed, 1 in progress. Last filed Nov 2025. Typically 144 days from permit to final inspection.
  37. 37
    Hargens Inc.
    License 592325 21 permits: 20 completed, 1 expired or cancelled. Last filed Aug 2024. Typically 122 days from permit to final inspection.
  38. 38
    Traube Construction Company
    License 974146 21 permits: 20 completed, 1 expired or cancelled. Last filed Nov 2023. Typically 182 days from permit to final inspection.
  39. 39
    Upscale Construction Inc.
    License 707506 46 permits: 40 completed, 2 in progress, 1 never finaled, 3 expired or cancelled. Last filed Jun 2026. Typically 352 days from permit to final inspection.
  40. 40
    Keegan Contruction Inc.
    License 792673 29 permits: 27 completed, 1 never finaled, 1 expired or cancelled. Last filed Feb 2025. Typically 242 days from permit to final inspection.

Most recent stairs permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 1, 2026In progress148 Caine Avto comply with nov# 202657051. 1/f: add media room, 2 bedroom and 1 full bath. 2/f: remodel kitchen and bathroom. add new exterior stair at rear, replace garage door with in kind (w00d) replace front windows with kind (vinyl).$180,000
Oct 1, 2026In progress36 College Av1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs.$80,000
Oct 1, 2026In progress1972 Green Stadd adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic.$85,000
Oct 1, 2026In progress500 Washington St1 + mezz/fl-construct (n) beverage bar and food prep area, construct new seating and gallery areas, install (n) stair serving (e) mezzaine, install (n) lula elevator serving (e) mezzaine, install associated food service equipment, casework, finishes and fixtures. mep deferred$675,000
Oct 1, 2026In progress2072 Ellis St1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit.$550,000
Sep 30, 2026In progress346 Edinburgh Stcomply w/ nov #202649935. repair stairs (wood) (less than 50%), remedy support post. repair or replace deteriorated drainage pipes. eliminate rodent infestation. repair damaged ceilings, remove/cover paint. not street visible.$5,000
Sep 30, 2026In progress1954 10th Avrevision to pa#: 202601204144, add a new firewall on stair and footing.$1,200
Sep 30, 2026In progress1736 Larkin Stvertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access...$500,000
Sep 30, 2026In progress236 08th St1st flr. enlarge existing stair vesitibule and add new door into stair, relocate existing mailbox. all interior work.$7,630
Sep 30, 2026In progress341 Avila Stexpansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance.$744,000
Sep 30, 2026In progress2914 21st StLopez Remodelingrepair stairs in back in kind up to 50%$10,000
Sep 30, 2026In progress2040 Fell StM & L Constructionexterior stair repair for common staircase. less than 50%. replace with new wood in kind. not visible from the street.$12,000
Sep 29, 2026In progress663 09th Avnew plan configuration: move existing kitchen and 2 bathrooms for the new layout and remodel them. remove load bearing wall in the kitchen. replace the existing fire egress stair ladder with new stairs and landing in the rear.$160,000
Sep 29, 2026In progress616 Laguna Honda Blreplace steps & landing, demo & remove debris (50%) of structure. remove & replace rotten wood frame & reframe structure. clean up and haul away trash/paint stairs after replacement. install water proof membrane (50%) of structure. stairs located at front of house and repair garage door frame.$16,000
Sep 28, 2026In progress2230 22nd Avrevision to work under construction permit #202609178306. remodel existing second floor of single family residence to add new bathroom and relocate stair to 1st floor.$120,000
Sep 28, 2026In progress500 Beach Stinterior demolition and consturction ofn non structural elements including but not necessarily limted to interior partitions, door, finishes,ceilings, lighting, mech, electrical outlets switches. new multi stall and gnr rr5 pot and ramp and stair under prev appvd 202607024493 mep deferred$800,000
Sep 28, 2026In progress4 Embarcadero CenterGci, Inclevel 16 - 18: finish and guardrail work to (e) stair.$29,000
Sep 28, 2026In progress270 Parker AvD3 Constructionremove non-compliant ballaster and add 2x2 ballasters no greater than 4" apart at rear deck/stairs. (2x4 horizontal). not visible from the street.$3,500
Sep 25, 2026In progress61 Pearl Stto comply wiht nov 202654861; metal stair case approx 20' in height and located in the rear commiting the ground floor for the second story deck.$500
Sep 25, 2026In progress158 Stanyan Strevision to #202510288259: add bathroom & living quarters downstairs (ada complaint). engineered foundation repairs, rebar epoxy retaining wall, stairlift for stairway. new interior walls downstairs, beam reinforcement, frame modifications.$200,000
Sep 25, 2026In progress1445 Eddy StM & L Constructionexterior stair repair, 50% or less, replace with new wood in-kind. not visible from the street.$5,500
Sep 25, 2026In progress3861 23rd StBai Yuan Lireplace back yard stair, some dryrock, handrail riser tread. less than 50%$4,800
Sep 25, 2026In progress2121 Laguna StEmpnc Inc. Dba Empire Community Paintingreplace and repair exterior stair guardrails and stair nosing. common staircase. exterior, as needed.$138,624
Sep 25, 2026In progress226 Rutledge StSuperbuiltremodel of front and rear facades with new design, windows and siding. remodel of existing 1st floor entry. new interior spiral stair to connect 1st and 2nd floors. no added square footage.$75,000
Sep 24, 2026In progress1370 20th Av1.) add a spiral stair to connect 1st floor and 2nd floor living space. 2.) convert (e) laundry/ storage room to a media room with a (n) wet bar.$30,000
Sep 24, 2026In progress151 Elsie Staltered site permit for pa#201904057254 currently approved as prj#2025002553, reconfigure front bay window & replace garage door, add addition to rear façade, replace existing siding with (n) cement plaster, replace all wins & entry door, update staircase treads and railing, remodel kitchen, bath &
Sep 24, 2026In progress2930 21st Stunit 2930 and 2930a- the project consist of a remodel of 2 units (e) duplex at the rear portion of the lot. replace (e) wood access stairs in the rear yard with (n) wood stairs. no work visible from street or exterior work.$200,000
Sep 24, 2026In progress1089 03rd Stmou port-proj#26-0642:deferred submittal base stair & workplace stair(reference pa#202511079166 & b-2025-025)
Sep 24, 2026In progress876 Haight StGil Construction & Assoc Inc.repair damaged back stairs less than 50" in kind. not visible from street.$4,800
Sep 24, 2026In progress233 30th StMireles Construction Increplace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line.$10,000