R.M.R. Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2026
- Last 24 months
- 24 permits filed
464 permits since 2000: 386 completed, 8 in progress, 55 never finaled, 15 expired or cancelled.
Of the 55 never-finaled permits, 4 are 3 to 5 years old, 18 are 5 to 10 years old, 33 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
17 stairs permits: 16 completed, 1 in progress. Typically 15 days from filing to permit and 305 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2025 | Completed final sign-off Mar 2026 | 235 Montgomery St | 16th fl tenant improvement including stair infillDetails
16th fl tenant improvement including stair infill | $620,000 |
| Mar 1, 2024 | Completed final sign-off Apr 2025 | 235 Montgomery St | revision to pa# 202311201136. inteiro t.i of elevator lobby, stair vestiblues restrooms, and corridor, demo of non structural partitiions. new partitions, finishes, fixtures and lighting, mep, fire life safety and sprinler under sep permit.Details
revision to pa# 202311201136. inteiro t.i of elevator lobby, stair vestiblues restrooms, and corridor, demo of non structural partitiions. new partitions, finishes, fixtures and lighting, mep, fire life safety and sprinler under sep permit. | $38,000 |
| Nov 20, 2023 | Completed final sign-off Apr 2025 | 235 Montgomery St | 21st fl - revision to pa 202310249381 interior ti of elevator lobby, stair vestibules, restrooms, and corridor; demo of non-structural partitions; new partitions, finishes and lighting, mep, fire life safety and sprinkler under separate permitDetails
21st fl - revision to pa 202310249381 interior ti of elevator lobby, stair vestibules, restrooms, and corridor; demo of non-structural partitions; new partitions, finishes and lighting, mep, fire life safety and sprinkler under separate permit | $6,500 |
| Oct 24, 2023 | In progress issued Nov 2023 | 235 Montgomery St | 19/f: interior ti of elevator lobby, stair vestibules and restrooms demolition of non-structural partitions. new partitions, finishes, fixtures and lighting mep, fire life safety and sprinkler under separate permit.Details
19/f: interior ti of elevator lobby, stair vestibules and restrooms demolition of non-structural partitions. new partitions, finishes, fixtures and lighting mep, fire life safety and sprinkler under separate permit. | $85,000 |
| Oct 24, 2023 | Completed final sign-off Apr 2025 | 235 Montgomery St | 21/f: interior ti of elevator lobby, stair vestibules and restrooms demolition of non-structural partitions. new partitions, fixtures and lighting mep, fire life safety and sprinkler under separate permit.Details
21/f: interior ti of elevator lobby, stair vestibules and restrooms demolition of non-structural partitions. new partitions, fixtures and lighting mep, fire life safety and sprinkler under separate permit. | $85,000 |
| Dec 8, 2020 | Completed final sign-off Dec 2022 | 215 Eureka St | revision to pa 201810223816 to doc (e) deck at the ground floor level deck existed legally prior to the approval and issuance of pa# 9812512, but was not shown on approved per drawings. legalize(e) stairs layout change shown as "as-built"Details
revision to pa 201810223816 to doc (e) deck at the ground floor level deck existed legally prior to the approval and issuance of pa# 9812512, but was not shown on approved per drawings. legalize(e) stairs layout change shown as "as-built" | |
| Nov 9, 2020 | Completed final sign-off Dec 2022 | 215 Eureka St | comply with complaint # 202061941. repair 50% or less lower level deck & stairs.Details
comply with complaint # 202061941. repair 50% or less lower level deck & stairs. | $2,500 |
| Dec 23, 2019 | Completed final sign-off Oct 2020 | 1 California St | unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.Details
unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work. | $580,000 |
| Jul 30, 2019 | Completed final sign-off Sep 2020 | 1 California St | demo of (e) stair between 30 & 31 , infill slab at 31st fl. no change in occupancy, use or area, life safety & sprinklers & mep under sep permitDetails
demo of (e) stair between 30 & 31 , infill slab at 31st fl. no change in occupancy, use or area, life safety & sprinklers & mep under sep permit | $190,000 |
| Dec 24, 2018 | Completed final sign-off Feb 2019 | 235 Bay Shore Bl | comply w/ nov 201891731. repair fire damage. sister 7 new 2x6 studs to existing patch sheetrock and stucco. strip adjoining stair to 2nd floor.Details
comply w/ nov 201891731. repair fire damage. sister 7 new 2x6 studs to existing patch sheetrock and stucco. strip adjoining stair to 2nd floor. | $1,000 |
| Dec 6, 2016 | Completed final sign-off Oct 2017 | 1355 Market St | demo of non exit stair connection 5th and 6th fl office unoccupied tenant spaces. new concrete deck fill of opening of 6th floor. permit ab-017: exception requirements for disable access to vacant spaces maher not reqDetails
demo of non exit stair connection 5th and 6th fl office unoccupied tenant spaces. new concrete deck fill of opening of 6th floor. permit ab-017: exception requirements for disable access to vacant spaces maher not req | $6,500 |
| Dec 16, 2015 | Completed final sign-off Jan 2017 | 875 Stevenson St | change of use of existing m- occupancy of 3610 sq fr space for fitness use for expansion of a3 occupancy (e) tenant fitness. construct (n) ada ramp stairs & handrail. add mech louver for future tenant mech. (n) door to (e) corridorDetails
change of use of existing m- occupancy of 3610 sq fr space for fitness use for expansion of a3 occupancy (e) tenant fitness. construct (n) ada ramp stairs & handrail. add mech louver for future tenant mech. (n) door to (e) corridor | $20,000 |
| Mar 3, 2015 | Completed final sign-off Apr 2016 | 1 California St | 19th floor non-structural demo. new non-structural partitions cieling, lighting, electrical finishes, stair removal and slab infill. no change in occupancy, use, or area. n/a for the maher.Details
19th floor non-structural demo. new non-structural partitions cieling, lighting, electrical finishes, stair removal and slab infill. no change in occupancy, use, or area. n/a for the maher. | $195,000 |
| Jul 1, 2013 | Completed final sign-off Aug 2013 | 301 Brannan St | new 1-hr rated partitoins to close off convenience stair between 5th & 6th floor. no other work.Details
new 1-hr rated partitoins to close off convenience stair between 5th & 6th floor. no other work. | $11,700 |
| Feb 17, 2012 | Completed final sign-off Jan 2014 | 235 Montgomery St | barrier removal at basement level at (e) steep ramp at a lift & stairs. not exterior work.Details
barrier removal at basement level at (e) steep ramp at a lift & stairs. not exterior work. | $25,001 |
| May 30, 2008 | Completed final sign-off Oct 2008 | 235 Montgomery St | delete power assist door opener for internal tenant stairs at grid 18.1 / e shown in pa# (since not required) 2007/11/07/7583.Details
delete power assist door opener for internal tenant stairs at grid 18.1 / e shown in pa# (since not required) 2007/11/07/7583. | |
| Oct 2, 2006 | Completed final sign-off Nov 2007 | 220 Montgomery St | 21st & 22nd floors-tenant improvement with restroom & stair accessibility upgrades.Details
21st & 22nd floors-tenant improvement with restroom & stair accessibility upgrades. | $180,000 |