Back to kitchen remodel contractors
R.M.R. Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2026
- Last 24 months
- 24 permits filed
464 permits since 2000: 386 completed, 8 in progress, 55 never finaled, 15 expired or cancelled.
Of the 55 never-finaled permits, 4 are 3 to 5 years old, 18 are 5 to 10 years old, 33 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 6 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2023 | Completed final sign-off Feb 2024 | 1456 Page St | unit# a: remodeling of one kitchen including replacing of cabinets and countertops. non structural.Details
unit# a: remodeling of one kitchen including replacing of cabinets and countertops. non structural. | $18,000 |
| Aug 17, 2022 | Completed final sign-off Feb 2023 | 1119 Webster St | unit 2: remodeling kitchen and bathroom including replacing cabinets, counter tops, plumbing fixtures, electrical fixtures and tiling. lighting shall comply with cec 150.0(k).Details
unit 2: remodeling kitchen and bathroom including replacing cabinets, counter tops, plumbing fixtures, electrical fixtures and tiling. lighting shall comply with cec 150.0(k). | $32,000 |
| Sep 18, 2018 | Never finaled issued Sep 2018, no final | 1 Sansome St | 29th fl: t.i. in casework for kitchen, ceiling light.Details
29th fl: t.i. in casework for kitchen, ceiling light. | $200,000 |
| Aug 17, 2018 | Completed final sign-off Apr 2021 | 3560 Jackson St | comply with nov 201886491. remove metal balcony platform on 3 level upgrade kitchen door to 20 min on closerDetails
comply with nov 201886491. remove metal balcony platform on 3 level upgrade kitchen door to 20 min on closer | $10,000 |
| May 5, 2010 | Completed final sign-off Sep 2010 | 1456 Page St | remove side door at apt #a to apt #b, relocate entry door for apt #b. relocate kitchen & bathroom for apt #bDetails
remove side door at apt #a to apt #b, relocate entry door for apt #b. relocate kitchen & bathroom for apt #b | $45,000 |
| Mar 23, 2010 | Completed final sign-off Jun 2010 | 1456 Page St | unit # 6: remodel (e) 6'x8' bathroom. remodel (e) 6'x10' kitchen. all work in-kind. provide h.e. or t-24 o.s.Details
unit # 6: remodel (e) 6'x8' bathroom. remodel (e) 6'x10' kitchen. all work in-kind. provide h.e. or t-24 o.s. | $18,500 |
| May 22, 2009 | Completed final sign-off Nov 2009 | 3523 21st St | add a new beam in the 3rd floor ceiling and remove bearing and non bearings on the 3rd floor. interior renovation including kitchen and e bath. add 2nd full bath. install 1 n exterior door, 16 windows, 1 skylightDetails
add a new beam in the 3rd floor ceiling and remove bearing and non bearings on the 3rd floor. interior renovation including kitchen and e bath. add 2nd full bath. install 1 n exterior door, 16 windows, 1 skylight | $25,000 |