R.M.R. Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2026
- Last 24 months
- 24 permits filed
464 permits since 2000: 386 completed, 8 in progress, 55 never finaled, 15 expired or cancelled.
Of the 55 never-finaled permits, 4 are 3 to 5 years old, 18 are 5 to 10 years old, 33 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 never finaled. Typically 2 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2020 | Completed final sign-off Dec 2022 | 215 Eureka St | revision to pa 201810223816 to doc (e) deck at the ground floor level deck existed legally prior to the approval and issuance of pa# 9812512, but was not shown on approved per drawings. legalize(e) stairs layout change shown as "as-built"Details
revision to pa 201810223816 to doc (e) deck at the ground floor level deck existed legally prior to the approval and issuance of pa# 9812512, but was not shown on approved per drawings. legalize(e) stairs layout change shown as "as-built" | |
| Nov 9, 2020 | Completed final sign-off Dec 2022 | 215 Eureka St | comply with complaint # 202061941. repair 50% or less lower level deck & stairs.Details
comply with complaint # 202061941. repair 50% or less lower level deck & stairs. | $2,500 |
| Dec 6, 2016 | Completed final sign-off Oct 2017 | 1355 Market St | demo of non exit stair connection 5th and 6th fl office unoccupied tenant spaces. new concrete deck fill of opening of 6th floor. permit ab-017: exception requirements for disable access to vacant spaces maher not reqDetails
demo of non exit stair connection 5th and 6th fl office unoccupied tenant spaces. new concrete deck fill of opening of 6th floor. permit ab-017: exception requirements for disable access to vacant spaces maher not req | $6,500 |
| Sep 4, 2008 | Never finaled issued Sep 2008, no final | 201 California St | 6th floor-tenant improvement-4 spec suites, non-structural interior demo, acoustic ceiling, drywall partitions, mill work, re-configure toilet partitions & finishes. structural deck patch. m.e.p, life safety, sprinklers on seperate permitsDetails
6th floor-tenant improvement-4 spec suites, non-structural interior demo, acoustic ceiling, drywall partitions, mill work, re-configure toilet partitions & finishes. structural deck patch. m.e.p, life safety, sprinklers on seperate permits | $150,000 |