Lopez Remodeling
- Based in
- San Mateo
- On San Francisco permits
- Dec 2014 to Sep 2026
- Last 24 months
- 4 permits filed
22 permits since 2000: 14 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress | 2914 21st St | repair stairs in back in kind up to 50% | $10,000 |
| Sep 9, 2026 | In progress | 308 College Av | repair and replace dry rot at front of house in kind. | $10,000 |
| Feb 6, 2026 | Completed | 1040 Hampshire St | to comply w/ nov# 202535490, construct 6 feet fence and door to keep homeless from entering, in place of metal gate. | $2,000 |
| Apr 3, 2025 | In progress | 2770 Bryant St | repair wall at side of building. approx 8' x 20". new concrete & frame. | $500 |
| May 3, 2024 | In progress | 51 Ramona Av | remodel 2 kitchens, and 1 bathroom and 3 skylights. | $60,000 |
| Sep 12, 2023 | Never finaled | 1473 Florida St | repair and replace 50% of stairs at rear of bldg. repair in kind less than 50%. | $2,000 |
| May 9, 2023 | Completed | 2770 Bryant St | revision to pa# 202205204705. tie to original permit plans for new floor plan layout. remodel kitchen & bath. | $10,000 |
| Jul 6, 2022 | Completed | 2770 Bryant St | repair stairs at back of building less than 50% replace hand rail treads | $1,000 |
| May 25, 2022 | Completed | 2770 Bryant St | revision to bpa 202205204705: remove lath and plaster and replace with drywall (whole house). replace with 5/8 type x and equivalent fasteners, sfbc 503.11.1. no room changes. | $5,000 |
| May 20, 2022 | Completed | 2770 Bryant St | remodel one kitchen (n) cabinets counters electrical plumbing dry wall floors. remodel one bathroom (n) fixtures electrical plumbing drywall floors. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & 5. | $10,000 |
| Jul 28, 2021 | Completed | 2932 23rd St | remodel kitchen new plumbing, electrical, cabinets, tile flooring. remodel bathroom, new tub shower drywall, fan, vanity tile. | $10,000 |
| Jun 25, 2020 | Expired or cancelled | 1186 Alabama St | remodel bathroom in-kind, new tub, tile and drywall. new electrical & plumbing fixturs. | $5,000 |
| Jun 25, 2020 | Completed | 30 Tiffany Av | remodel bathroom (5x8ft) in-kind. new drywall, new tub & tile, new electrical & plumbing fixturs. | $5,000 |
| Feb 25, 2020 | Completed | 3354 Cesar Chavez St | remodel entire apt: 1 kitchen, drywall cabinets, coutnertops, floros,new electrical, new plumbing. 2 full bathrooms: new drywall, tub, tile, floors, new plumbing & electrical fixturesfan, 1 - subpanel. - no sprinkler, no fire alarm existing | $40,000 |
| Sep 23, 2019 | Completed | 2820 Harrison St | remodel kitchen cabinet fixtures flooring in kind. remodel bathroom in kind tub/shower vanity toilet tile floor and walls. | $15,000 |
| Aug 2, 2019 | Expired or cancelled | 3354 Cesar Chavez St | building a 35lf fence at rear of building. fence will have 2 access doors, 10ft high fence. | $10,000 |
| Oct 1, 2018 | Completed | 3239 Mission St | unit 1: remove partial wall, lighting electrical, replace one sink, paint & trim, to comply with complaint #201894261 | $2,500 |
| May 14, 2018 | Completed | 3251 Cesar Chavez St | legalize ground floor bathroom. revision to pa# 201801088031. to add plan for ground fl bathroom. n/a for maher | $7,000 |
| Jan 8, 2018 | Completed | 3251 Cesar Chavez St | rev to 2017 1205 5492 - remodel 2nd bathrrom, tub, toilet, sink, elect. n/a maher | $10,000 |
| Dec 5, 2017 | Completed | 3251 Cesar Chavez St | remodel bathroom and kitchen - new tub/shower, move toilet and sink, new kitchen cabinets, move sink and stove, new electrical throughout. no structural; n/a maher | $10,000 |
| Oct 29, 2015 | Never finaled | 2770 Bryant St | repair stairs at front of building less than 50% | $1,000 |
| Dec 1, 2014 | Completed | 1477 Florida St | remodel kitchen, new cabinets, counter tops, flooring. remodel 1 bath new sink toilet shower flooring. no structural work. | $32,000 |