Back to kitchen remodel contractors
Lopez Remodeling
- Based in
- San Mateo
- On San Francisco permits
- Dec 2014 to Sep 2026
- Last 24 months
- 4 permits filed
22 permits since 2000: 14 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 in progress. Typically 0 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2024 | In progress issued Jul 2024 | 51 Ramona Av | remodel 2 kitchens, and 1 bathroom and 3 skylights.Details
remodel 2 kitchens, and 1 bathroom and 3 skylights. | $60,000 |
| May 9, 2023 | Completed final sign-off Jan 2024 | 2770 Bryant St | revision to pa# 202205204705. tie to original permit plans for new floor plan layout. remodel kitchen & bath.Details
revision to pa# 202205204705. tie to original permit plans for new floor plan layout. remodel kitchen & bath. | $10,000 |
| May 20, 2022 | Completed final sign-off Jan 2024 | 2770 Bryant St | remodel one kitchen (n) cabinets counters electrical plumbing dry wall floors. remodel one bathroom (n) fixtures electrical plumbing drywall floors. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & 5.Details
remodel one kitchen (n) cabinets counters electrical plumbing dry wall floors. remodel one bathroom (n) fixtures electrical plumbing drywall floors. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & 5. | $10,000 |
| Jul 28, 2021 | Completed final sign-off Mar 2022 | 2932 23rd St | remodel kitchen new plumbing, electrical, cabinets, tile flooring. remodel bathroom, new tub shower drywall, fan, vanity tile.Details
remodel kitchen new plumbing, electrical, cabinets, tile flooring. remodel bathroom, new tub shower drywall, fan, vanity tile. | $10,000 |
| Feb 25, 2020 | Completed final sign-off Jul 2020 | 3354 Cesar Chavez St | remodel entire apt: 1 kitchen, drywall cabinets, coutnertops, floros,new electrical, new plumbing. 2 full bathrooms: new drywall, tub, tile, floors, new plumbing & electrical fixturesfan, 1 - subpanel. - no sprinkler, no fire alarm existingDetails
remodel entire apt: 1 kitchen, drywall cabinets, coutnertops, floros,new electrical, new plumbing. 2 full bathrooms: new drywall, tub, tile, floors, new plumbing & electrical fixturesfan, 1 - subpanel. - no sprinkler, no fire alarm existing | $40,000 |
| Sep 23, 2019 | Completed final sign-off Dec 2020 | 2820 Harrison St | remodel kitchen cabinet fixtures flooring in kind. remodel bathroom in kind tub/shower vanity toilet tile floor and walls.Details
remodel kitchen cabinet fixtures flooring in kind. remodel bathroom in kind tub/shower vanity toilet tile floor and walls. | $15,000 |
| Dec 5, 2017 | Completed final sign-off Feb 2019 | 3251 Cesar Chavez St | remodel bathroom and kitchen - new tub/shower, move toilet and sink, new kitchen cabinets, move sink and stove, new electrical throughout. no structural; n/a maherDetails
remodel bathroom and kitchen - new tub/shower, move toilet and sink, new kitchen cabinets, move sink and stove, new electrical throughout. no structural; n/a maher | $10,000 |
| Dec 1, 2014 | Completed final sign-off May 2015 | 1477 Florida St | remodel kitchen, new cabinets, counter tops, flooring. remodel 1 bath new sink toilet shower flooring. no structural work.Details
remodel kitchen, new cabinets, counter tops, flooring. remodel 1 bath new sink toilet shower flooring. no structural work. | $32,000 |