Kathryn Cahill Thompson
- Listed as
- authorized agent-others, contractor, subcontractor
- Firm
- Cahill Contractors Llc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to Aug 2026
285 permits since 2000 (contractor on 284 permits, authorized agent-others on 14 permits, subcontractor on 1 permit): 202 completed, 38 in progress, 35 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 285.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 700 Golden Gate Av | Cahill Contractors Llc. | deferred structural for automatic rolling vehicle gate. ref #202606243786Details
deferred structural for automatic rolling vehicle gate. ref #202606243786 | |
| Jul 23, 2026 | In progress issued Jul 2026 | 750 Golden Gate Av | Cahill Contractors Llc. | revision to arch and mep addendum for fire alarm and solar pv addendum comments. reference 202401083599 s4 and 202409171003 s4Details
revision to arch and mep addendum for fire alarm and solar pv addendum comments. reference 202401083599 s4 and 202409171003 s4 | |
| Jun 26, 2026 | In progress issued Jul 2026 | 1750 Van Ness Av | Cahill Contractors Llc. | revise issued bpa 202111232980 s2, update profilesof decoratedfinishes, revise lighting design, move louver within main shrine hall, rm 206, east side of level 2.Details
revise issued bpa 202111232980 s2, update profilesof decoratedfinishes, revise lighting design, move louver within main shrine hall, rm 206, east side of level 2. | |
| Jun 24, 2026 | In progress issued Jul 2026 | 700 Golden Gate Av | Cahill Contractors Llc. | temp parking lot until phase 2 construction. improvement of e) parking lot on state lands tp serve california state employees, no change of use, occuapancy. improvement included pole lighting, pedestrian gates & revise space striping.Details
temp parking lot until phase 2 construction. improvement of e) parking lot on state lands tp serve california state employees, no change of use, occuapancy. improvement included pole lighting, pedestrian gates & revise space striping. | $155,000 |
| Jun 15, 2026 | Completed final sign-off Jul 2026 | 2350 Turk Bl | Cahill Contractors Llc. | revision to pa # 202503041492: close-out permit to record approved as built condition approved by inspector request. drawing revise to document a approved complete work. for record purpose.Details
revision to pa # 202503041492: close-out permit to record approved as built condition approved by inspector request. drawing revise to document a approved complete work. for record purpose. | |
| May 6, 2026 | In progress issued Jun 2026 | 1111 Gough St | Cahill Contractors Llc. | drilling through diaphram of plaza/cross baseplate to install a sculpture. there will be no modification to the structure of the cathedral bldg & plaza other than the sculpture's attachment to concrete deck. sculpture will be anchored on the (e) plaza of the st. mary's cathedral at gough & geary.Details
drilling through diaphram of plaza/cross baseplate to install a sculpture. there will be no modification to the structure of the cathedral bldg & plaza other than the sculpture's attachment to concrete deck. sculpture will be anchored on the (e) plaza of the st. mary's cathedral at gough & geary. | $2,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 101 Memory Ln | Cahill Contractors Llc. | administrative permit to correct the address and block/lot on pa# 202409201259 from 1151 fairfax ave 4624/033 to 101 memory ln 4624/451. all work authorized on pa# 202409201259 applies to 101 memory ln and associated parcel 4624/451.Details
administrative permit to correct the address and block/lot on pa# 202409201259 from 1151 fairfax ave 4624/033 to 101 memory ln 4624/451. all work authorized on pa# 202409201259 applies to 101 memory ln and associated parcel 4624/451. | |
| Mar 25, 2026 | Completed final sign-off Mar 2026 | 1360 43rd Av | Cahill Contractors Llc. | to obtain final inspection for work approved under pa# 202302272702. all work is complete.Details
to obtain final inspection for work approved under pa# 202302272702. all work is complete. | |
| Mar 23, 2026 | In progress filed Mar 2026, not yet issued | 2245 Post St | Cahill Contractors Llc. | to erect 4 stories, 1 basement, type ii-a, philanthoropic facility.Details
to erect 4 stories, 1 basement, type ii-a, philanthoropic facility. | $41,000,000 |
| Feb 5, 2026 | In progress issued Feb 2026 | 750 Golden Gate Av | Cahill Contractors Llc. | revision to arch & mep addendum for elevator hoistway smoke detection access hatch details. ref# 202401083599 & 202409171003 s-4.Details
revision to arch & mep addendum for elevator hoistway smoke detection access hatch details. ref# 202401083599 & 202409171003 s-4. | |
| Dec 15, 2025 | Completed final sign-off Jan 2026 | 2800 Turk Bl | Cahill Contractors Llc. | to obtain final insepction for work approved under pa# 201705025403, 201707121634, 201802020272.Details
to obtain final insepction for work approved under pa# 201705025403, 201707121634, 201802020272. | |
| Dec 10, 2025 | In progress issued Dec 2025 | 1111 Gough St | Cahill Contractors Llc. | cahill plans to anchor sculpture on the existing exterior plaza of st. mary's cathedral church at gough and geary streets. sculpture will attach to deck via anchor bolts through existing concrete waffle slab.Details
cahill plans to anchor sculpture on the existing exterior plaza of st. mary's cathedral church at gough and geary streets. sculpture will attach to deck via anchor bolts through existing concrete waffle slab. | $50,000 |
| Dec 8, 2025 | Completed final sign-off Sep 2026 | 838 Pacific Av | Cahill Contractors Llc. | repair of "unsafe conditions" outlined in facade inspection and maintenance, ab-110. the repair will include the repair of exterior concrete wall spalling from eport by rgh, as required by the sf dbi facade ordinance for building facade inspection and maintenance, ab-110.Details
repair of "unsafe conditions" outlined in facade inspection and maintenance, ab-110. the repair will include the repair of exterior concrete wall spalling from eport by rgh, as required by the sf dbi facade ordinance for building facade inspection and maintenance, ab-110. | $200,000 |
| Nov 14, 2025 | Completed final sign-off Jul 2026 | 2350 Turk Bl | Cahill Contractors Llc. | ref 202503041492 and 202510248069 to install production rigging equipment at usf theaterDetails
ref 202503041492 and 202510248069 to install production rigging equipment at usf theater | $200,000 |
| Nov 6, 2025 | Completed final sign-off Nov 2025 | 1025 Masonic Av | Cahill Contractors Llc. | to obtain final inspection for work approved under pa# 202212299416. all work is complete.Details
to obtain final inspection for work approved under pa# 202212299416. all work is complete. | |
| Oct 3, 2025 | Completed final sign-off Nov 2025 | 1760 Waller St | Cahill Contractors Llc. | to obtain final inspection for work approved under pa 202308245178, 202305047099. all work is complete.Details
to obtain final inspection for work approved under pa 202308245178, 202305047099. all work is complete. | |
| Oct 3, 2025 | Completed final sign-off Nov 2025 | 730 Stanyan St | Cahill Contractors Llc. | to obtain final inspection for work approved under pa 202308214844. all work is complete.Details
to obtain final inspection for work approved under pa 202308214844. all work is complete. | |
| Sep 26, 2025 | Completed final sign-off Nov 2025 | 2800 Turk Bl | Cahill Contractors Llc. | to obtain final inspection for work approved under pa# 2016-1220-5404 & 2017-1127-4843. all work is complete.Details
to obtain final inspection for work approved under pa# 2016-1220-5404 & 2017-1127-4843. all work is complete. | |
| Aug 11, 2025 | In progress issued Aug 2025 | 1750 Van Ness Av | Cahill Contractors Llc. | revise approved app 202111232980, change food service equipment in the kitchen area. wok range, electric fyer and hot water dispenseer.Details
revise approved app 202111232980, change food service equipment in the kitchen area. wok range, electric fyer and hot water dispenseer. | |
| Jul 15, 2025 | In progress issued Jul 2026 | 401 California Av | Cahill Contractors Llc. | to erect 6 stories, no basement, type i-a & ii-a, 150 units residential units with child development center (warmshell), (r-2, b,a-3,s-1,s-2,i-4)Details
to erect 6 stories, no basement, type i-a & ii-a, 150 units residential units with child development center (warmshell), (r-2, b,a-3,s-1,s-2,i-4) | $79,391,871 |
| Jun 13, 2025 | Completed final sign-off Jun 2025 | 1801 25th St | Cahill Contractors Llc. | stormwater control pid review ref pa # 2020-0610-8345Details
stormwater control pid review ref pa # 2020-0610-8345 | |
| May 20, 2025 | Completed final sign-off Dec 2025 | 730 Stanyan St | Cahill Contractors Llc. | revision to pa# 202103317637- s3, amendment to reflect actual elevator hoistway dimension a6.03.Details
revision to pa# 202103317637- s3, amendment to reflect actual elevator hoistway dimension a6.03. | |
| Apr 11, 2025 | Completed final sign-off Jul 2026 | 2350 Turk Bl | Cahill Contractors Llc. | renovation of (e) theater includng installation of new cat- walk over (e) stageDetails
renovation of (e) theater includng installation of new cat- walk over (e) stage | $950,000 |
| Mar 31, 2025 | In progress issued Apr 2025 | 770 Golden Gate Av | Cahill Contractors Llc. | 100% affordable housing revision to pa# 202407307553 for master set of final shoring/ underpinning design and license agreement. reference pa# 202407307553 for 770 golden gate underpinning and pa# 202401083599 s2 and 202401083599 s2 for 750 golden gate main shoring.Details
100% affordable housing revision to pa# 202407307553 for master set of final shoring/ underpinning design and license agreement. reference pa# 202407307553 for 770 golden gate underpinning and pa# 202401083599 s2 and 202401083599 s2 for 750 golden gate main shoring. | |
| Mar 31, 2025 | Completed final sign-off Nov 2025 | 2335 Golden Gate Av | Cahill Contractors Llc. | revision to permit 202306270974 and 202105210845. removal of title 24 special inspection code.Details
revision to permit 202306270974 and 202105210845. removal of title 24 special inspection code. | |
| Mar 17, 2025 | In progress issued Jun 2025 | 150 Oak St | Cahill Contractors Llc., Related California Construction Llc | ab-004 priority:phase 1b: renovate restrooms on floors 1-5.replace (e) toilet partitions w/ proviacy partitions where allwed by (e) fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand (e) egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f.Details
ab-004 priority:phase 1b: renovate restrooms on floors 1-5.replace (e) toilet partitions w/ proviacy partitions where allwed by (e) fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand (e) egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f. | $1,200,000 |
| Mar 13, 2025 | Completed final sign-off May 2026 | 150 Oak St | Cahill Contractors Llc. | ab-004 priority: phase 1a:partial interior non-structural t.i. work on the 4/f & basement. provide make-up air using the (e) mehanical system by rerouting ductwork and air diffusers where applicable. no increase to student population.Details
ab-004 priority: phase 1a:partial interior non-structural t.i. work on the 4/f & basement. provide make-up air using the (e) mehanical system by rerouting ductwork and air diffusers where applicable. no increase to student population. | $350,000 |
| Feb 26, 2025 | In progress issued Mar 2025 | 1151 Fairfax Av | Cahill Contractors Llc. | revision to pa#201909121446 addenda(s-2). revision to level-1 mpoe room walls of hv block 14. the work to be completed is the addition of two layers of gypsum board to mpoe room wall in order to increase fire rating to 2hr from 1hr using wall assembly wgs on a501. the mpoe room door also 90 minutes.Details
revision to pa#201909121446 addenda(s-2). revision to level-1 mpoe room walls of hv block 14. the work to be completed is the addition of two layers of gypsum board to mpoe room wall in order to increase fire rating to 2hr from 1hr using wall assembly wgs on a501. the mpoe room door also 90 minutes. | $4,148 |
| Jan 27, 2025 | Expired or cancelled cancelled Jun 2026 | 1750 Van Ness Av | Cahill Contractors Llc. | revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area.Details
revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area. | |
| Jan 24, 2025 | Completed final sign-off Jun 2026 | 1151 Fairfax Av | Cahill - Nibbi Joint Ventures | development of a park on lot a of final map no.9677 located between hunters view block 14(permit #201909121446) and hunters view block 17 (permit # 201909121448).the park proposes publicly accessible amenities including a play area, learning garden, multi-use lawn,bbq area, and overlook.Details
development of a park on lot a of final map no.9677 located between hunters view block 14(permit #201909121446) and hunters view block 17 (permit # 201909121448).the park proposes publicly accessible amenities including a play area, learning garden, multi-use lawn,bbq area, and overlook. | $4,000,000 |
| Jan 24, 2025 | Completed final sign-off Dec 2025 | 1801 25th St | Cahill Contractors Llc. | priority - sf hope - evac signs for 100% affordable housing. reference site permit 2020.0610.8345. original site permit address is 1801 25th street. reference permit # m1234147 for new addresses 1108 connecticut (bldg a), and 1192 connecticut (bldg b),Details
priority - sf hope - evac signs for 100% affordable housing. reference site permit 2020.0610.8345. original site permit address is 1801 25th street. reference permit # m1234147 for new addresses 1108 connecticut (bldg a), and 1192 connecticut (bldg b), | $5,000 |
| Dec 3, 2024 | In progress issued Apr 2025 | 850 Turk St | Cahill Contractors Llc. | demolish a one story parking garage type ia, associated construction p/a 202212087884 for a replacement apt building, dmj 06/16/2024;Details
demolish a one story parking garage type ia, associated construction p/a 202212087884 for a replacement apt building, dmj 06/16/2024; | $10,000 |
| Oct 29, 2024 | Completed final sign-off Feb 2025 | 240 Van Ness Av | Cahill Contractors Llc. | rev 202101042034- revise 1st floor cmu wall and add 3 hr concrete ceiling.Details
rev 202101042034- revise 1st floor cmu wall and add 3 hr concrete ceiling. | $15,467 |
| Oct 17, 2024 | In progress filed Oct 2024, not yet issued | 80 Julian Av | Cahill Contractors Llc. | shoring and tiebacks at the subject property associated with improvements under site permit #202212098043.Details
shoring and tiebacks at the subject property associated with improvements under site permit #202212098043. | $25,000 |
| Oct 16, 2024 | In progress issued Feb 2025 | 150 04th Ti St | Cahill Contractors Llc. | mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space.Details
mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space. | $40,000,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 850 Turk St | Cahill Contractors Llc., Bobcomm Llc Dba Pacific Das Llc., Nibbi Bros Assoc Inc. | 100% affordable housing altered site permit for adminstrative construction type change form 1a to 1b. no change in building design as approved under site permit. reference pa# 202212087884.Details
100% affordable housing altered site permit for adminstrative construction type change form 1a to 1b. no change in building design as approved under site permit. reference pa# 202212087884. | |
| Oct 11, 2024 | Completed final sign-off Nov 2024 | 1360 43rd Av | Cahill Contractors Llc. | revision to pa 201912099099 addendum 2 for conversion of mobility and communications units to adaptableDetails
revision to pa 201912099099 addendum 2 for conversion of mobility and communications units to adaptable | |
| Oct 7, 2024 | In progress filed Oct 2024, not yet issued | 80 Julian Av | Cahill Contractors Llc. | excavation and temporary shoring to facilitate the installation and construction of final improvements. the shoring will consist of drilled soldier piles, wood lagging, and tieback anchors.Details
excavation and temporary shoring to facilitate the installation and construction of final improvements. the shoring will consist of drilled soldier piles, wood lagging, and tieback anchors. | $400,000 |
| Oct 1, 2024 | In progress filed Oct 2024, not yet issued | 56 Julian Av | Cahill Contractors Llc. | tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit)Details
tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit) | $25,000 |
| Sep 20, 2024 | In progress issued Oct 2024 | 750 Golden Gate Av | Cahill Contractors Llc. | 100% affordable housing mayor ed 13-01: altered site permit for administrative construction type change from 1a to 1b. no change in building design as approved under site permit reference pa # 202401083599.Details
100% affordable housing mayor ed 13-01: altered site permit for administrative construction type change from 1a to 1b. no change in building design as approved under site permit reference pa # 202401083599. | |
| Sep 6, 2024 | Completed final sign-off Feb 2025 | 240 Van Ness Av | Cahill Contractors Llc. | adding drinking fountain in courtyardDetails
adding drinking fountain in courtyard | $5,000 |
| Aug 30, 2024 | In progress issued Mar 2025 | 1151 Fairfax Av | Cahill Contractors Llc. | rev 201909121448 addenda 2- work to be completed is the addition of 2 layers of gypsum board to the mpoe room wall in order to increase the fire rating from 1 -2 hr. work to be done on lower level floor plan sheets and the wall type being constructed is detailed on plansDetails
rev 201909121448 addenda 2- work to be completed is the addition of 2 layers of gypsum board to the mpoe room wall in order to increase the fire rating from 1 -2 hr. work to be done on lower level floor plan sheets and the wall type being constructed is detailed on plans | $4,148 |
| Aug 16, 2024 | Completed final sign-off Mar 2025 | 1360 43rd Av | Cahill Contractors Llc. | administrative permit to correct the construction type only on 201912099009 to reflect type 5a over the type 1a, 5 story 100% affordable educator building w 135 residential unitsDetails
administrative permit to correct the construction type only on 201912099009 to reflect type 5a over the type 1a, 5 story 100% affordable educator building w 135 residential units | |
| Aug 16, 2024 | Completed final sign-off Mar 2025 | 1360 43rd Av | Cahill Contractors Llc. | revision to 201912099009 addendum 2 for changes to parking layout and additonal signageDetails
revision to 201912099009 addendum 2 for changes to parking layout and additonal signage | |
| Aug 8, 2024 | In progress issued Feb 2025 | 770 Golden Gate Av | Cahill Contractors Llc. | 100% addordable housing. tie backs and underpinning for temporary shoring systems which serve 750 golden gate affordable housing project. reference pa# 202401083599_addendum_2 for main shoring and excavation system permit.Details
100% addordable housing. tie backs and underpinning for temporary shoring systems which serve 750 golden gate affordable housing project. reference pa# 202401083599_addendum_2 for main shoring and excavation system permit. | |
| Jul 24, 2024 | In progress issued Sep 2025 | 1801 25th St | Cahill Contractors Llc. | rev 202006108345- remove (2) exercise bikes and play structures. replace w/alternative play structures and swingset in public play areaDetails
rev 202006108345- remove (2) exercise bikes and play structures. replace w/alternative play structures and swingset in public play area | |
| Jul 16, 2024 | Completed final sign-off Mar 2025 | 1360 43rd Av | Cahill Contractors Llc. | revision to pa # 201912099009-s9: array 3 racking modifications to keep clear of the 2hr separation wall. solar disconnect relocated to be within maint 119. point of connection revised to be a load side connection in panel 4hpa. breaker feeding panel 4hpa downsized from 800a to 600a.Details
revision to pa # 201912099009-s9: array 3 racking modifications to keep clear of the 2hr separation wall. solar disconnect relocated to be within maint 119. point of connection revised to be a load side connection in panel 4hpa. breaker feeding panel 4hpa downsized from 800a to 600a. | |
| Jul 10, 2024 | In progress issued Jul 2024 | 1360 43rd Av | Cahill Contractors Llc. | ref 201912099009 addition of (1) building monument single sided illuminated sign for "scv -shirley chisholm village 1360" facing street with 58 channel letters. shared plans 202406114215Details
ref 201912099009 addition of (1) building monument single sided illuminated sign for "scv -shirley chisholm village 1360" facing street with 58 channel letters. shared plans 202406114215 | $8,000 |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 1670 15th St | Cahill Contractors Llc. | tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit)Details
tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit) | $25,000 |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 391 Valencia St | Cahill Contractors Llc. | tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit)Details
tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit) | $25,000 |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 365 Valencia St | Cahill Contractors Llc. | tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit)Details
tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit) | $25,000 |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 1656 15th St | Cahill Contractors Llc. | tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit)Details
tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit) | $25,000 |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 1672 15th St | Cahill Contractors Llc. | tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit)Details
tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit) | $25,000 |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 375 Valencia St | Cahill Contractors Llc. | tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit)Details
tiebacks at the subject property associated with improvements and shoring at 80 julian (202212098043-priority permit) | $25,000 |
| Jun 28, 2024 | Completed final sign-off Sep 2024 | 3200 California St | Cahill Contractors Llc. | remodel of existing women's steam room. scope includes replacingg the current fixed seating layout and the replacement of the existing ceramic tile, including providing ada access as required for steam rooms.Details
remodel of existing women's steam room. scope includes replacingg the current fixed seating layout and the replacement of the existing ceramic tile, including providing ada access as required for steam rooms. | $110,000 |
| Jun 13, 2024 | Completed final sign-off Nov 2025 | 165 Grove St | Cahill Contractors Llc. | interior construction within a storefront space for a non profit community center, including offices, restroom, kitchenette, and a community space. construction includes partitions, ceilings, and lightingDetails
interior construction within a storefront space for a non profit community center, including offices, restroom, kitchenette, and a community space. construction includes partitions, ceilings, and lighting | $308,000 |
| Jun 11, 2024 | Completed final sign-off Mar 2025 | 1360 43rd Av | Cahill Contractors Llc. | addition of one building monument sign, which is to be illuminated, and has its own self standing footing/foundation which is independant of the adjacent building structure.Details
addition of one building monument sign, which is to be illuminated, and has its own self standing footing/foundation which is independant of the adjacent building structure. | $2,000 |
| Apr 1, 2024 | Completed final sign-off Jun 2024 | 180 Jones St | Cahill Contractors Llc. | revision to pa 202004307276: work consists of adding a 7'-6" wall & door around lift between a 3' floor level (interior)Details
revision to pa 202004307276: work consists of adding a 7'-6" wall & door around lift between a 3' floor level (interior) | $6,000 |
| Mar 8, 2024 | In progress issued Jul 2024 | 750 Golden Gate Av | Cahill Contractors Llc. | 100% affordable housing. erect 8 story type 1a, residential 75 units, parking, office assembly (r-2,s-1,s-2,b,a-3). mayor ed 13-01Details
100% affordable housing. erect 8 story type 1a, residential 75 units, parking, office assembly (r-2,s-1,s-2,b,a-3). mayor ed 13-01 | $37,100,000 |
| Feb 1, 2024 | In progress issued Feb 2024 | 1530 Page St | Cahill Contractors Llc. | removal of glazing & damaged intermediate mullions & damaged perimeter framing (as required) of 6 (e) non-fire-rated steel windows on e+w sides of bldg. installation of new non-fire rated steel frame windows with new insulated glazing lites to meet current energy code. lites window 10 vert of egressDetails
removal of glazing & damaged intermediate mullions & damaged perimeter framing (as required) of 6 (e) non-fire-rated steel windows on e+w sides of bldg. installation of new non-fire rated steel frame windows with new insulated glazing lites to meet current energy code. lites window 10 vert of egress | $150,000 |
| Jan 22, 2024 | In progress issued May 2025 | 939 Eddy St | Cahill Contractors Llc. | *** priority project *** for 100% affordable housing. soilder piles, wood lagging and tie backs for temporary shoring systems serving 850 turk affordable housing project. reference pa# 202212087884_addendum_2 for main shoring and excavation system permit.Details
*** priority project *** for 100% affordable housing. soilder piles, wood lagging and tie backs for temporary shoring systems serving 850 turk affordable housing project. reference pa# 202212087884_addendum_2 for main shoring and excavation system permit. | |
| Jan 22, 2024 | In progress issued May 2025 | 951 Eddy St | Cahill Contractors Llc. | ***priority project*** for 100% affordable housing. soilder piles, wood lagging and tie backs for temporary shoring systems serving 850 turk affordable housing project. reference pa# 202212087884_addendum_2 for main shoring and excavation system permit.Details
***priority project*** for 100% affordable housing. soilder piles, wood lagging and tie backs for temporary shoring systems serving 850 turk affordable housing project. reference pa# 202212087884_addendum_2 for main shoring and excavation system permit. | |
| Sep 29, 2023 | Expired or cancelled cancelled Feb 2024 | 1801 25th St | Cahill Contractors Llc. | 100% affordable housing. revision to 202209132381, revision to temp shoring systems. additional wall due to unforseen site conditionsDetails
100% affordable housing. revision to 202209132381, revision to temp shoring systems. additional wall due to unforseen site conditions | $90,000 |
| Sep 29, 2023 | Completed final sign-off Jun 2024 | 1801 25th St | Cahill Contractors Llc. | 100% affordable housing. revision to permanent soil wall for addition of micropiles pa 2022-1115-6521/ the purpose of these microplies is to mitigate footing surcharge at building a mciropile details and elevations are included in the design package (see sheets mp-1 through mp-3)Details
100% affordable housing. revision to permanent soil wall for addition of micropiles pa 2022-1115-6521/ the purpose of these microplies is to mitigate footing surcharge at building a mciropile details and elevations are included in the design package (see sheets mp-1 through mp-3) | $42,000 |
| Sep 22, 2023 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal, shop drawings, aac glass guardrails for the annex level and main lobby, ref pa# 202105210845Details
deferred submittal, shop drawings, aac glass guardrails for the annex level and main lobby, ref pa# 202105210845 | |
| Aug 31, 2023 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal, shop drawings, olson steel handrails for the interior stairs and retaining wall. ref 202105210845Details
deferred submittal, shop drawings, olson steel handrails for the interior stairs and retaining wall. ref 202105210845 | |
| Aug 31, 2023 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal-shop drawings-draper inc. gym equipment. install 4 ceiling-suspended, side-folding basketball backstops model tbs-26-b. ref pa 202105210845.Details
deferred submittal-shop drawings-draper inc. gym equipment. install 4 ceiling-suspended, side-folding basketball backstops model tbs-26-b. ref pa 202105210845. | |
| Aug 8, 2023 | Completed final sign-off Sep 2024 | 1360 43rd Av | Cahill Contractors Llc., Rcm Fire Protection Inc. | revision to pa# 201912099009/s-5: includes updated fire sprinkler required flow, removal of sprinkler heads from elevator shafts and elevator machine rooms & updated hanger information.Details
revision to pa# 201912099009/s-5: includes updated fire sprinkler required flow, removal of sprinkler heads from elevator shafts and elevator machine rooms & updated hanger information. | |
| Jul 11, 2023 | Completed final sign-off Mar 2024 | 425 California St | Cahill Contractors Llc. | interior tentant improvement demolition of non-structural partitions, new partitons finishes and restroom accessibilty upgradesDetails
interior tentant improvement demolition of non-structural partitions, new partitons finishes and restroom accessibilty upgrades | $1,000,000 |
| Jun 29, 2023 | Never finaled issued Jul 2023, no final | 111 Taylor St | Cahill Contractors Llc. | saw cut and demo a portion of street side basement wall for permanent power to the project located at 180 jones street.Details
saw cut and demo a portion of street side basement wall for permanent power to the project located at 180 jones street. | $50,000 |
| Jun 27, 2023 | Completed final sign-off Nov 2025 | 2335 Golden Gate Av | Cahill Contractors Llc. | revision to approved hvac system under issued pa#202105210845. separate units & associated controls relocated to the rear of the property on the lower annex roof.Details
revision to approved hvac system under issued pa#202105210845. separate units & associated controls relocated to the rear of the property on the lower annex roof. | $191,880 |
| Apr 24, 2023 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal - shop drawings for bendheim channel glass panel system - stair enclosure. ref pa 202105210845Details
deferred submittal - shop drawings for bendheim channel glass panel system - stair enclosure. ref pa 202105210845 | |
| Apr 24, 2023 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845)Details
deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845) | |
| Apr 17, 2023 | Completed final sign-off Jun 2024 | 1801 25th St | Cahill Contractors Llc. | revision to 202006108345-s1 per field conditions and soil improvementsDetails
revision to 202006108345-s1 per field conditions and soil improvements | $50,000 |
| Mar 21, 2023 | Completed final sign-off Jun 2023 | 55 Cravath St | Cahill Contractors Llc., J. Flores Construction Company Inc | install approximtely 20 linear feet of 6" ductile iron pipe from point of connection at curb to fire sprinkler lateral at 5 feet from face of building, installed by others also installing 6' flextendDetails
install approximtely 20 linear feet of 6" ductile iron pipe from point of connection at curb to fire sprinkler lateral at 5 feet from face of building, installed by others also installing 6' flextend | $238,425 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 404 Geneva Av | Cahill Contractors Llc. | bike shop, shared bathroom w/402 geneva ave, ref arch bpa#202211146440. mechanical, electrical, plumbing. ref bpa#201807033677Details
bike shop, shared bathroom w/402 geneva ave, ref arch bpa#202211146440. mechanical, electrical, plumbing. ref bpa#201807033677 | $69,750 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 400 Geneva Av | Cahill Contractors Llc. | art studio/instruction space for youth art exchange, (1) ada bathroom, same size, lighting, electrical, mechanical, f/s. ref arch bpa#202211146434. mechanical, electrical, plumbing. ref bpa#201807033677Details
art studio/instruction space for youth art exchange, (1) ada bathroom, same size, lighting, electrical, mechanical, f/s. ref arch bpa#202211146434. mechanical, electrical, plumbing. ref bpa#201807033677 | $87,250 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 402 Geneva Av | Cahill Contractors Llc. | mercantile shop for future t.i., shared bathroom w/404 geneva ave. ref arch bpa#202211146438. mechanical, electrical, plumbing. ref bpa#201807033677Details
mercantile shop for future t.i., shared bathroom w/404 geneva ave. ref arch bpa#202211146438. mechanical, electrical, plumbing. ref bpa#201807033677 | $69,250 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 2330 San Jose Av | Cahill Contractors Llc. | t.i., office/meeting space for community org, (2) ada bathrooms, lighting, electrical, mecahnical. ref arch bpa#202211146441. mech/elec/plumb. ref bpa#201807033677Details
t.i., office/meeting space for community org, (2) ada bathrooms, lighting, electrical, mecahnical. ref arch bpa#202211146441. mech/elec/plumb. ref bpa#201807033677 | $76,450 |
| Feb 27, 2023 | Expired or cancelled expired Mar 2026 | 1360 43rd Av | Cahill Contractors Llc. | priority 13-01: revision to pa# 201912099009/s-1 & s-2. structural reductioon to the slab thickness over stall #4. provide 18" draft stop over ev stalls. revised mechanical and electrical related to changes.Details
priority 13-01: revision to pa# 201912099009/s-1 & s-2. structural reductioon to the slab thickness over stall #4. provide 18" draft stop over ev stalls. revised mechanical and electrical related to changes. | |
| Feb 6, 2023 | Completed final sign-off Dec 2024 | 1801 25th St | Cahill Contractors Llc. | sf hope - fire service underground. reference site permit 2020.0610.8345 & addendum #4 (fire sprinkler addendum).Details
sf hope - fire service underground. reference site permit 2020.0610.8345 & addendum #4 (fire sprinkler addendum). | $50,000 |
| Jan 17, 2023 | Completed final sign-off Jan 2024 | 55 Cravath St | Cahill Contractors Llc. | revision for exterior bldg maintenance ref pa# 2018-1022-3762 s2Details
revision for exterior bldg maintenance ref pa# 2018-1022-3762 s2 | |
| Dec 29, 2022 | In progress issued Feb 2026 | 730 Stanyan St | Cahill Contractors Llc. | ground flr: ti for use of early childcare & education center. consists of non-structural partitions & finishes, exterior courtyard imrpovements, mep low voltage & fire protection systems will be design build and submitted under separate permits. fixtures & plumbing are shown on plans for ref only.Details
ground flr: ti for use of early childcare & education center. consists of non-structural partitions & finishes, exterior courtyard imrpovements, mep low voltage & fire protection systems will be design build and submitted under separate permits. fixtures & plumbing are shown on plans for ref only. | $481,612 |
| Dec 29, 2022 | Expired or cancelled expired Nov 2025 | 1025 Masonic Av | Cahill Contractors Llc. | new slope of the walkway shared with church and the urban school of sf. alterations to existing basement windows,new stairs up to the church sacristy,and(n) stairs down to its basement boiler room.school renovation permit(2021-1229-5177)includes alterations to the walkway,gym/multipurpose bldg.Details
new slope of the walkway shared with church and the urban school of sf. alterations to existing basement windows,new stairs up to the church sacristy,and(n) stairs down to its basement boiler room.school renovation permit(2021-1229-5177)includes alterations to the walkway,gym/multipurpose bldg. | $50,000 |
| Dec 23, 2022 | Completed final sign-off Dec 2023 | 55 Cravath St | Cahill Contractors Llc. | revision to permit # 202203150047: change address from 1 ave of the palms to 55 cravath st.Details
revision to permit # 202203150047: change address from 1 ave of the palms to 55 cravath st. | |
| Dec 23, 2022 | Completed final sign-off Dec 2023 | 55 Cravath St | Cahill Contractors Llc. | revision to permit #202106303523: to change addres from 1 ave of the palms to 55 cravath st.Details
revision to permit #202106303523: to change addres from 1 ave of the palms to 55 cravath st. | |
| Dec 23, 2022 | Completed final sign-off May 2025 | 1639 Oak St | Cahill Contractors Llc. | scope of work includes alterations to the ext plaza occupying the southeast corner of the property at 1639 oak st., including alterations to an ext stair leading to the parking garage, a new ramped approach to the ext plaza and a reshaped flow-thru planterDetails
scope of work includes alterations to the ext plaza occupying the southeast corner of the property at 1639 oak st., including alterations to an ext stair leading to the parking garage, a new ramped approach to the ext plaza and a reshaped flow-thru planter | $75,000 |
| Dec 15, 2022 | Completed final sign-off Jan 2024 | 1633 Valencia St | Cahill Contractors Llc. | demolition of a type 5b 1 story b/m social care facilityDetails
demolition of a type 5b 1 story b/m social care facility | $150,000 |
| Dec 15, 2022 | Completed final sign-off Jan 2024 | 1633 Valencia St | Cahill Contractors Llc. | demolition of a type 5b 1 story m retailDetails
demolition of a type 5b 1 story m retail | $50,000 |
| Dec 15, 2022 | Completed final sign-off May 2026 | 1633 Valencia St | Cahill Contractors Llc. | mayor directive 13-01: to erect 6 stories, type 1a ground flr residential service & common spaces, type 3a upper flr residential unitsDetails
mayor directive 13-01: to erect 6 stories, type 1a ground flr residential service & common spaces, type 3a upper flr residential units | $53,000,000 |
| Dec 13, 2022 | Completed final sign-off Dec 2023 | 55 Cravath St | Cahill Contractors Llc. | document change of address on pa #201810223762 from 1 avenue of the palms to 55 cravath st.Details
document change of address on pa #201810223762 from 1 avenue of the palms to 55 cravath st. | |
| Dec 12, 2022 | Completed final sign-off Aug 2023 | 2340 San Jose Av | Cahill Contractors Llc. | installation of a new exterior aluminum sculpture at west side of existing 9-story concrete building.Details
installation of a new exterior aluminum sculpture at west side of existing 9-story concrete building. | $10,000 |
| Dec 9, 2022 | In progress issued Sep 2024 | 80 Julian Av | Cahill Contractors Llc. | priority process per ab-004: to erect a 6-story & 2 basements, type iv-c, mixed used building.Details
priority process per ab-004: to erect a 6-story & 2 basements, type iv-c, mixed used building. | $27,000,000 |
| Dec 8, 2022 | In progress issued Dec 2023 | 850 Turk St | Cahill Contractors Llc., Bobcomm Llc Dba Pacific Das Llc. | priority processing - 100% affordable housing. to erect a 8-story, 92-dwelling units, type 1a mixed-used building.Details
priority processing - 100% affordable housing. to erect a 8-story, 92-dwelling units, type 1a mixed-used building. | $39,000,000 |
| Nov 15, 2022 | Completed final sign-off May 2024 | 1801 25th St | Cahill Contractors Llc. | sf hope.soil nail shoring for future 100% affordable housing.reference site permit #2020/0610/8345.Details
sf hope.soil nail shoring for future 100% affordable housing.reference site permit #2020/0610/8345. | $50,000 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 2330 San Jose Av | Cahill Contractors Llc. | office/meeting space for community organization. first t.i. permit for commercial space of ground floor affordable housing project bpa#201807033677. (2)a.d.a. bathrooms. lighting, electrical, mechanical to be submitted under separate permitDetails
office/meeting space for community organization. first t.i. permit for commercial space of ground floor affordable housing project bpa#201807033677. (2)a.d.a. bathrooms. lighting, electrical, mechanical to be submitted under separate permit | $623,200 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 400 Geneva Av | Cahill Contractors Llc. | art studio/instruction space for youth art exchange. first-time t.i. use permit. basebuilding permit 201807033677. (1)a.d.a. bathroom, (1) service sink. lighting, electrical, mechanical to be submitted under separate permit.Details
art studio/instruction space for youth art exchange. first-time t.i. use permit. basebuilding permit 201807033677. (1)a.d.a. bathroom, (1) service sink. lighting, electrical, mechanical to be submitted under separate permit. | $262,840 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 404 Geneva Av | Cahill Contractors Llc. | bike shop. first-time t.i. use permit. base building permit 201807033677. (1) service sink. lighting, electrical, mechanical to be submitted under separate permit. bathroom is shared w/neighboring tenant (402 geneva)Details
bike shop. first-time t.i. use permit. base building permit 201807033677. (1) service sink. lighting, electrical, mechanical to be submitted under separate permit. bathroom is shared w/neighboring tenant (402 geneva) | $178,290 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 402 Geneva Av | Cahill Contractors Llc. | mercantile shop for future tenant. first-time t.i. use permit. base building permit 201807033677. (1)new shared a.d.a. bathroom with 404 geneva, (1) service sink. lighting, electrical, mechanical to be submitted under separate permit.Details
mercantile shop for future tenant. first-time t.i. use permit. base building permit 201807033677. (1)new shared a.d.a. bathroom with 404 geneva, (1) service sink. lighting, electrical, mechanical to be submitted under separate permit. | $232,790 |
| Sep 29, 2022 | Never finaled issued Oct 2022, no final | 1064 Mission St | Cahill Contractors Llc. | name change from reception to open office. no change in use or occupancy. ref 201910094014.Details
name change from reception to open office. no change in use or occupancy. ref 201910094014. |