Karen Murray
- Listed as
- architect
- Firm
- Van Meter Williams Pollack Llp
- Based in
- San Francisco
- On San Francisco permits
- Apr 2020 to Oct 2026
7 permits since 2000 (architect on 7 permits): 3 completed, 3 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 505 Mayor Edwin M. Lee Av | application for crane permit to perform hoisting of pre-fabricated wall and floor panels, and bundles of ply, and framing materials.Details
application for crane permit to perform hoisting of pre-fabricated wall and floor panels, and bundles of ply, and framing materials. | $519,209 | |
| May 15, 2025 | Completed final sign-off Oct 2025 | 1539 23rd Av | Dcs Plumbing Llc | remodel e) kitchen at 2nd fl including removal of walls, remodel e) bedroom closet at 2nd flDetails
remodel e) kitchen at 2nd fl including removal of walls, remodel e) bedroom closet at 2nd fl | $62,000 |
| Apr 1, 2024 | Completed final sign-off Jun 2024 | 180 Jones St | Cahill Contractors Llc. | revision to pa 202004307276: work consists of adding a 7'-6" wall & door around lift between a 3' floor level (interior)Details
revision to pa 202004307276: work consists of adding a 7'-6" wall & door around lift between a 3' floor level (interior) | $6,000 |
| Jun 29, 2023 | Never finaled issued Jul 2023, no final | 111 Taylor St | Cahill Contractors Llc. | saw cut and demo a portion of street side basement wall for permanent power to the project located at 180 jones street.Details
saw cut and demo a portion of street side basement wall for permanent power to the project located at 180 jones street. | $50,000 |
| Nov 14, 2022 | In progress issued Aug 2024 | 1652 Sunnydale Av | Cahill Guzman Construction Group Jv | mayor dir 17-02 priority project - erect a 4-story, type 5a/type 1a, apartment building with 95 units and one basement level.Details
mayor dir 17-02 priority project - erect a 4-story, type 5a/type 1a, apartment building with 95 units and one basement level. | $69,971,776 |
| Jul 28, 2022 | In progress issued Jan 2025 | 11 Frida Kahlo Wy | Nibbi Bros Assoc Inc. | bldg e - mayor's ed# 17-02. erect a 7-story, type 3a over type 1a construction, with 128 residential units & community facility.Details
bldg e - mayor's ed# 17-02. erect a 7-story, type 3a over type 1a construction, with 128 residential units & community facility. | $72,464,450 |
| Apr 30, 2020 | Completed final sign-off Sep 2024 | 180 Jones St | Cahill Contractors Llc., Brayer Electric Company, Siemens Industry, Inc. | to erect a type-1b, 9-story, 70-dwelling unit bldg with zero basements.Details
to erect a type-1b, 9-story, 70-dwelling unit bldg with zero basements. | $30,000,000 |