Steve Fee
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Fme
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Apr 2023
124 permits since 2000 (architect on 115 permits, authorized agent-others on 12 permits, engineer on 1 permit): 102 completed, 1 in progress, 10 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 124.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 13, 2023 | In progress issued Apr 2024 | 500 Sutter St | this is a revision to pa# 201904198449. revised discharge duct from exhaust fan to run from low roof to street level in lieu of utilizing (e) vertical duct along the side of the bldg. (e) vertical duct to be demolished. exhaust will discharge a min of 10" above grade. revised termination of gas wateDetails
this is a revision to pa# 201904198449. revised discharge duct from exhaust fan to run from low roof to street level in lieu of utilizing (e) vertical duct along the side of the bldg. (e) vertical duct to be demolished. exhaust will discharge a min of 10" above grade. revised termination of gas wate | $25,000 | |
| Aug 2, 2017 | Completed final sign-off Oct 2018 | 235 02nd St | Swinerton Builders | exterior work only limited to painting, installation of eifs based thin-brick system, iefs build base, belt course and cornice, associated demolition- structural metal stud framing deferred. n/a for maher.Details
exterior work only limited to painting, installation of eifs based thin-brick system, iefs build base, belt course and cornice, associated demolition- structural metal stud framing deferred. n/a for maher. | $900,000 |
| May 1, 2014 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | revision to app#201304164667-r2. providing mechanical drawing sheets with revision for fire department approval and mechanical. *** maher: compliance with ordinance no# 155-13 not required ***Details
revision to app#201304164667-r2. providing mechanical drawing sheets with revision for fire department approval and mechanical. *** maher: compliance with ordinance no# 155-13 not required *** | |
| Oct 5, 2012 | Never finaled issued Oct 2012, no final | 259 Post St | R.M.R. Construction Company | demolition of (e) drywall & fixture standards. convert store room to storage room. installation of new drywall. no exterior work on this permit- sprinklers separate-Details
demolition of (e) drywall & fixture standards. convert store room to storage room. installation of new drywall. no exterior work on this permit- sprinklers separate- | $50,750 |
| Jul 3, 2012 | Never finaled issued Dec 2012, no final | 259 Post St | Peacock Construction Inc | exterior demolition of sign band, awnings, related structure.entry door and frame. replacing doors, frame and sign band and column cladding.Details
exterior demolition of sign band, awnings, related structure.entry door and frame. replacing doors, frame and sign band and column cladding. | $15,000 |
| Feb 8, 2012 | Completed final sign-off Jun 2012 | 345 California St | Hathaway Dinwiddie Co. | ste 1600 - proposed ti for an e occupied office space at 16th fl. 1st phase occurs at east side. 2nd at west side. improvements include partial interior demo, proposed wall construction, relocation of e doors, relocation of e lights, ptach e ceiling and finishesDetails
ste 1600 - proposed ti for an e occupied office space at 16th fl. 1st phase occurs at east side. 2nd at west side. improvements include partial interior demo, proposed wall construction, relocation of e doors, relocation of e lights, ptach e ceiling and finishes | $70,000 |
| Oct 26, 2011 | Completed final sign-off Mar 2012 | 600 Montgomery St | Hathaway Dinwiddie Co. | tenant improvement of e office space including changing 4 office fronts from gyp board to frameless glass, relocation of doors and frames, finishes, relocation of elec outlets. mep (including title 24) under separate permit.Details
tenant improvement of e office space including changing 4 office fronts from gyp board to frameless glass, relocation of doors and frames, finishes, relocation of elec outlets. mep (including title 24) under separate permit. | $79,543 |
| Jun 28, 2011 | Completed final sign-off Sep 2011 | 525 Market St | Hathaway Dinwiddie Co. | 3rd floor-new partitions, ceiling, lighting, power & data & finishesDetails
3rd floor-new partitions, ceiling, lighting, power & data & finishes | $800,000 |
| Jun 15, 2011 | Completed final sign-off Sep 2011 | 2 Bryant St | Field Construction Inc. | 2nd flr: revision to 201105095658. 2 additional hardship forms 1 for restroom door clearance and 1 for building entryDetails
2nd flr: revision to 201105095658. 2 additional hardship forms 1 for restroom door clearance and 1 for building entry | |
| Jun 8, 2011 | Completed final sign-off Nov 2011 | 525 Market St | Hathaway Dinwiddie Co. | 3rd floor demlition of existing offices.Details
3rd floor demlition of existing offices. | $30,000 |
| May 18, 2011 | Completed final sign-off Jan 2012 | 1 Montgomery St | Rossi Builders Inc. | remodel existing conference room into 2 officesDetails
remodel existing conference room into 2 offices | $37,935 |
| Apr 7, 2011 | Completed final sign-off Oct 2011 | 500 Sutter St | Blue Northern Builders Inc | 4th floor ste 430 -demolition of existing offices. build out of new officesDetails
4th floor ste 430 -demolition of existing offices. build out of new offices | $255,000 |
| Mar 28, 2011 | Completed final sign-off May 2011 | 600 Montgomery St | Field Construction Inc. | office ti. install door release from hallway 3704 into office 3706 on the 37th floorDetails
office ti. install door release from hallway 3704 into office 3706 on the 37th floor | $3,000 |
| Mar 15, 2011 | Completed final sign-off Jul 2011 | 601 Montgomery St | Rossi Builders Inc. | office ti on the 7th floor, suite # 777. demolish (e) offices and build out new officesDetails
office ti on the 7th floor, suite # 777. demolish (e) offices and build out new offices | $97,150 |
| Dec 30, 2010 | Completed final sign-off Mar 2011 | 600 Montgomery St | Skyline Construction | build out new conference room and server closet. mep inclued.Details
build out new conference room and server closet. mep inclued. | $155,500 |
| Sep 3, 2010 | Completed final sign-off Nov 2010 | 601 Montgomery St | High Level Construction Co | 17th floor - demolitoin of one restroom & one conference room wall. build server room. upgrade three restrooms.Details
17th floor - demolitoin of one restroom & one conference room wall. build server room. upgrade three restrooms. | $147,400 |
| Apr 30, 2010 | Completed final sign-off Feb 2011 | 201 Filbert St | Peacock Construction Inc | 4th floor #401 - remove one office & build one office. remove ceiling & lighting & install new ceiling with relcoated lights.Details
4th floor #401 - remove one office & build one office. remove ceiling & lighting & install new ceiling with relcoated lights. | $66,675 |
| Oct 23, 2009 | Completed final sign-off Feb 2010 | 601 Montgomery St | High Level Construction Co | 7th floor suite 777 office tennant improvement, remove closet in copy room & install new door, infill existing openign to coffee area. install new section of millwork on coffee area.Details
7th floor suite 777 office tennant improvement, remove closet in copy room & install new door, infill existing openign to coffee area. install new section of millwork on coffee area. | $15,500 |
| Oct 21, 2009 | Completed final sign-off Dec 2009 | 601 Montgomery St | Novo Construction Inc | expansion of suite 700 & build out of spec suite 780.Details
expansion of suite 700 & build out of spec suite 780. | $125,667 |
| Oct 13, 2009 | Completed final sign-off Mar 2010 | 600 Montgomery St | Hathaway Dinwiddie Co. | 45th fl commercial tenant improvement to includes: non structural parition and ceiling, finishes, millwork, electrical and mechanical- sprinklers and fire alarms under separte permit.Details
45th fl commercial tenant improvement to includes: non structural parition and ceiling, finishes, millwork, electrical and mechanical- sprinklers and fire alarms under separte permit. | $350,000 |
| Sep 25, 2009 | Completed final sign-off Mar 2010 | 2 Embarcadero Center | Gci, Inc | chevy's restaurant non-structural demolition of 7974 sq ft primarily interior demolition w/mechancial rooftop units removed. selective demo of exterior glazing w/infill @ exisitng openings per ab-017.Details
chevy's restaurant non-structural demolition of 7974 sq ft primarily interior demolition w/mechancial rooftop units removed. selective demo of exterior glazing w/infill @ exisitng openings per ab-017. | $80,000 |
| Sep 25, 2009 | Completed final sign-off Mar 2010 | 2 Embarcadero Center | Gci, Inc | tony roma's restaurant non-structural demolition of 4793 sq ft primary interior demolition w/mechanical roof top units premoved. selective demo of exterior glazing w/infill @ (e) openings. per ab-017).Details
tony roma's restaurant non-structural demolition of 4793 sq ft primary interior demolition w/mechanical roof top units premoved. selective demo of exterior glazing w/infill @ (e) openings. per ab-017). | $55,000 |
| Sep 21, 2009 | Completed final sign-off Jun 2013 | 601 Montgomery St | 19th floor office tenant improvement: buildout 6 offices, 1 phone closet & 1 coffee room.Details
19th floor office tenant improvement: buildout 6 offices, 1 phone closet & 1 coffee room. | $226,113 | |
| Sep 11, 2009 | Completed final sign-off Nov 2009 | 555 Montgomery St | Hathaway Dinwiddie Co. | 17th floor-barrier removal, provide 60" clearance at accessible stallsDetails
17th floor-barrier removal, provide 60" clearance at accessible stalls | $70,624 |
| Jun 19, 2009 | Completed final sign-off Feb 2010 | 795 Folsom St | Rossi Builders Inc. | demolition of (e) offices, new doors, upgrade restrooms. remove (e) finishes in corridors & restrooms. install new finishes in restrooms & tenant suite. title-24 lighting compliance under separate permit.Details
demolition of (e) offices, new doors, upgrade restrooms. remove (e) finishes in corridors & restrooms. install new finishes in restrooms & tenant suite. title-24 lighting compliance under separate permit. | $214,000 |
| Jun 16, 2009 | Completed final sign-off Jul 2009 | 601 Montgomery St | High Level Construction Co | 18th floor-demise (e) office suite into 2 suites of 3529 sq ft & 1670 sq ft, all work non structural. sprinklers and fire alarm separate permitsDetails
18th floor-demise (e) office suite into 2 suites of 3529 sq ft & 1670 sq ft, all work non structural. sprinklers and fire alarm separate permits | $12,000 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | High Level Construction Co | 7th floor - remodel of restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator, mech and electricalDetails
7th floor - remodel of restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator, mech and electrical | $88,000 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | High Level Construction Co | 11th floor: remodel e restrooms. new fishes at corridors and lobby. smoke guard added at freight elevator-- mech and electrical included....Details
11th floor: remodel e restrooms. new fishes at corridors and lobby. smoke guard added at freight elevator-- mech and electrical included.... | $88,000 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | High Level Construction Co | 8th floor: remodel restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator- mech and electrical...life safety separate permit.......Details
8th floor: remodel restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator- mech and electrical...life safety separate permit....... | $88,000 |
| Feb 20, 2009 | Completed final sign-off Apr 2009 | 909 Montgomery St | Manriquez Construction Inc | at 1st fl: t.i. demolition of wall, door, two low walls, build out of a copy room, new office rm mill work.Details
at 1st fl: t.i. demolition of wall, door, two low walls, build out of a copy room, new office rm mill work. | $68,000 |
| Feb 13, 2009 | Completed final sign-off Mar 2009 | 601 Montgomery St | High Level Construction Co | voluntary barrier removal: provide diagonal access to toilets (men's & women's)Details
voluntary barrier removal: provide diagonal access to toilets (men's & women's) | $22,500 |
| Jan 26, 2009 | Completed final sign-off Apr 2009 | 1 California St | 2nd fl: build out 5 private offices in existing office suite. associated hvac and electrical.Details
2nd fl: build out 5 private offices in existing office suite. associated hvac and electrical. | $100,000 | |
| Dec 8, 2008 | Completed final sign-off Mar 2009 | 601 Montgomery St | 20th floor-provide diagonal access to toilet stalls in men's & women's restroomsDetails
20th floor-provide diagonal access to toilet stalls in men's & women's restrooms | $18,000 | |
| Dec 8, 2008 | Completed final sign-off Feb 2009 | 601 Montgomery St | 19th floor-provide diagonal access to toilet stalls in men's & women's restroomsDetails
19th floor-provide diagonal access to toilet stalls in men's & women's restrooms | $18,000 | |
| Nov 18, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | 9th floor - revision to 200806124263: remove (e) drinkling fountain at request of building inspector.Details
9th floor - revision to 200806124263: remove (e) drinkling fountain at request of building inspector. | $375 | |
| Sep 24, 2008 | Completed final sign-off Jan 2009 | 345 California St | Gci, Inc | revision to application 200805212546, to show restrooms changed for ada compliance.Details
revision to application 200805212546, to show restrooms changed for ada compliance. | $100 |
| Sep 15, 2008 | Completed final sign-off Nov 2009 | 601 Montgomery St | divide large office into to 2 offices on the 11th fl. add one office to existing suite. mep under separate permit.Details
divide large office into to 2 offices on the 11th fl. add one office to existing suite. mep under separate permit. | $47,500 | |
| Sep 5, 2008 | Completed final sign-off Oct 2008 | 425 Market St | install (n) ceiling grid & tile, paint & vinyl, flooring, relocate (e) light fixtures info (n) grid, brace ceiling & fixtures per code. life safety, fire sprinklers, fire alarm, electrical, mechanical under separate permit.Details
install (n) ceiling grid & tile, paint & vinyl, flooring, relocate (e) light fixtures info (n) grid, brace ceiling & fixtures per code. life safety, fire sprinklers, fire alarm, electrical, mechanical under separate permit. | $14,000 | |
| Aug 27, 2008 | Never finaled issued Sep 2008, no final | 345 California St | Gci, Inc | 18th floor-tenant improvements which include the following: non-structural partition, ceiling, mechanical, electrical, finishes, millwork & restrooms toilet partitions re-configuration. m.e.p., life safety, fire alarm, sprinklers under seperate permitDetails
18th floor-tenant improvements which include the following: non-structural partition, ceiling, mechanical, electrical, finishes, millwork & restrooms toilet partitions re-configuration. m.e.p., life safety, fire alarm, sprinklers under seperate permit | $19,000 |
| Aug 27, 2008 | Completed final sign-off Jan 2009 | 345 California St | Gci, Inc | revision to 200805212538 to show upgrades to restrooms for ada complianceDetails
revision to 200805212538 to show upgrades to restrooms for ada compliance | $100 |
| Aug 27, 2008 | Completed final sign-off Jan 2009 | 345 California St | Gci, Inc | revision to 200805232812 to show upgrade to restrooms as ada compliantDetails
revision to 200805232812 to show upgrade to restrooms as ada compliant | $100 |
| Aug 25, 2008 | Completed final sign-off Sep 2009 | 345 California St | Gci, Inc | demo of existing doors, walls & partitions under ab-017 to create a vacant space for upcoming ti work.( 19th floor).Details
demo of existing doors, walls & partitions under ab-017 to create a vacant space for upcoming ti work.( 19th floor). | $100,000 |
| Aug 20, 2008 | Completed final sign-off Dec 2008 | 600 Montgomery St | Hathaway Dinwiddie Co. | 38/f- revision to appl #2008.0625.5359 - layout changes to south side including mechanical & electrical. differed submittals: life safety, fire sprinklers & fire alarm.Details
38/f- revision to appl #2008.0625.5359 - layout changes to south side including mechanical & electrical. differed submittals: life safety, fire sprinklers & fire alarm. | $55,000 |
| Aug 19, 2008 | Completed final sign-off Mar 2009 | 601 Montgomery St | 20th floor: build out of 3 show suites, including offices, copy rooms, coffee rooms. mep separate permit.Details
20th floor: build out of 3 show suites, including offices, copy rooms, coffee rooms. mep separate permit. | $239,000 | |
| Jul 30, 2008 | Completed final sign-off Aug 2008 | 601 Montgomery St | demolition of new lunch room, millwork, new finishes in existing vacant office space. 6th floor.Details
demolition of new lunch room, millwork, new finishes in existing vacant office space. 6th floor. | $68,000 | |
| Jul 21, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | revise layout of 2nd exit. original pa# 2008-0612-4263Details
revise layout of 2nd exit. original pa# 2008-0612-4263 | ||
| Jul 17, 2008 | Completed final sign-off Sep 2008 | 220 Montgomery St | 6th floor-install onw new wall & door in hall. remove (e) door and infill with drywallDetails
6th floor-install onw new wall & door in hall. remove (e) door and infill with drywall | $8,600 | |
| Jun 25, 2008 | Completed final sign-off Dec 2008 | 600 Montgomery St | Hathaway Dinwiddie Co. | tenant improvement includes non-structural partition and ceiling, mechanical, electrical, finishes and millwork.Details
tenant improvement includes non-structural partition and ceiling, mechanical, electrical, finishes and millwork. | $333,700 |
| Jun 23, 2008 | Completed final sign-off Aug 2008 | 795 Folsom St | 2nd fl: build out of it lab. divide lunch room into bike storage and copy/coffee. mep separate permit.Details
2nd fl: build out of it lab. divide lunch room into bike storage and copy/coffee. mep separate permit. | $29,000 | |
| Jun 19, 2008 | Completed final sign-off Feb 2009 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements. total 23 relocates, 1 removal.Details
relocate fire sprinkler heads per tenant improvements. total 23 relocates, 1 removal. | $4,000 |
| Jun 16, 2008 | Completed final sign-off Mar 2009 | 601 Montgomery St | 20th floor-construction of 5 offices and 1 copy room. mep under separate permit.Details
20th floor-construction of 5 offices and 1 copy room. mep under separate permit. | $117,600 | |
| Jun 12, 2008 | Completed final sign-off Dec 2008 | 417 Montgomery St | 9th floor - tenant improvement, build out of 7 offices, 1 conference rm, 1 it room, 1 coffee rm, 1 copy rm, exit corridor at 9th fl. mechanical under separate permit.Details
9th floor - tenant improvement, build out of 7 offices, 1 conference rm, 1 it room, 1 coffee rm, 1 copy rm, exit corridor at 9th fl. mechanical under separate permit. | $144,000 | |
| May 19, 2008 | Completed final sign-off Aug 2008 | 601 Montgomery St | lighting and hvac work associated with build out of new multi tenant corridor. at 19th fl. (arch 200805192379)Details
lighting and hvac work associated with build out of new multi tenant corridor. at 19th fl. (arch 200805192379) | $15,000 | |
| May 19, 2008 | Completed final sign-off Aug 2008 | 601 Montgomery St | build out of new multi tenant corridor on vacant fl, new corridor and lobby finishes at 19th fl.Details
build out of new multi tenant corridor on vacant fl, new corridor and lobby finishes at 19th fl. | $88,000 | |
| Mar 19, 2008 | Completed final sign-off May 2008 | 1 Embarcadero Center | open passageway between 2 existing suites# 2100.Details
open passageway between 2 existing suites# 2100. | $3,400 | |
| Jan 22, 2008 | Completed final sign-off May 2008 | 600 Montgomery St | Hathaway Dinwiddie Co. | 3rd floor. revision to pa# 2007/10/01/4192 to add new fan coil unit and vfd. revise mechanical and electrical plans to reflect changesDetails
3rd floor. revision to pa# 2007/10/01/4192 to add new fan coil unit and vfd. revise mechanical and electrical plans to reflect changes | $45,000 |
| Dec 28, 2007 | Completed final sign-off Feb 2008 | 601 Montgomery St | add clerestory glass wall to reception area. build out meeting room. add power and signal outlets. existing ceiling and lighting to remain.Details
add clerestory glass wall to reception area. build out meeting room. add power and signal outlets. existing ceiling and lighting to remain. | $78,000 | |
| Dec 28, 2007 | Completed final sign-off Jun 2008 | 601 Montgomery St | remodel ex. restrooms on the 6th floor. new finishes in lobby and corridors.Details
remodel ex. restrooms on the 6th floor. new finishes in lobby and corridors. | $88,000 | |
| Dec 5, 2007 | Completed final sign-off Feb 2008 | 450 Sutter St | 9th floor-revision to pa# 200706285388-change door swing at hall 905 and back door hall 917Details
9th floor-revision to pa# 200706285388-change door swing at hall 905 and back door hall 917 | ||
| Nov 9, 2007 | Completed final sign-off May 2008 | 600 Montgomery St | Hathaway Dinwiddie Co. | new life safety devisces to tenant space on 3rd floor. ref. appl. #2007-10-01-4192.Details
new life safety devisces to tenant space on 3rd floor. ref. appl. #2007-10-01-4192. | $20,000 |
| Oct 19, 2007 | Completed final sign-off Jan 2008 | 500 Howard St | Cannon Constructors North Inc | upgrade security desk and addition of optic turnstiles. to include demo of old deskDetails
upgrade security desk and addition of optic turnstiles. to include demo of old desk | $155,000 |
| Oct 12, 2007 | Completed final sign-off Jan 2008 | 795 Folsom St | t/i 2nd floor, to provide new office,conference room,ante-room,closets and meeting room.Details
t/i 2nd floor, to provide new office,conference room,ante-room,closets and meeting room. | $250,000 | |
| Oct 1, 2007 | Completed final sign-off May 2008 | 600 Montgomery St | Hathaway Dinwiddie Co. | commecial ti includes non-structural partition and ceiling, mechanical, electrical, finishes and millwork. life safety, fire sprinklers and fire alarm, if required will be under separate permit.Details
commecial ti includes non-structural partition and ceiling, mechanical, electrical, finishes and millwork. life safety, fire sprinklers and fire alarm, if required will be under separate permit. | $901,880 |
| Sep 28, 2007 | Expired or cancelled expired Dec 2009 | 601 Montgomery St | remodel of (e) office suite on 3rd fl including demo of low wall, build out of (n) lunch room and store room. no exterior work. mep under separate permit.no exterior workDetails
remodel of (e) office suite on 3rd fl including demo of low wall, build out of (n) lunch room and store room. no exterior work. mep under separate permit.no exterior work | $189,000 | |
| Sep 26, 2007 | Completed final sign-off Feb 2008 | 3 Embarcadero Center | selective demolition of (e) non-structural partitions, door & frame construction of (n) non-structural interior partitions, doors & frames. plumbing,electrical & mechanicl under separate permitDetails
selective demolition of (e) non-structural partitions, door & frame construction of (n) non-structural interior partitions, doors & frames. plumbing,electrical & mechanicl under separate permit | $48,500 | |
| Jul 13, 2007 | Never finaled issued Feb 2008, no final | 191 Sutter St | ground level facade improvements including: awnings, replace stone cladding, painting structure fronts and demolition of canopy. all work is design/build. awning under seperate permitDetails
ground level facade improvements including: awnings, replace stone cladding, painting structure fronts and demolition of canopy. all work is design/build. awning under seperate permit | $64,598 | |
| Jul 6, 2007 | Completed final sign-off Nov 2007 | 601 Montgomery St | t.i. on 5/f only.remodel of existing office suite including buildout of 1 new office, break room, store room, work room. sprinkler, life safety, mech, elec. under seperate permit.Details
t.i. on 5/f only.remodel of existing office suite including buildout of 1 new office, break room, store room, work room. sprinkler, life safety, mech, elec. under seperate permit. | $120,000 | |
| Jul 6, 2007 | Never finaled issued Jul 2007, no final | 1489 Webster St | Peacock Construction Inc | install atm in existing storefront. remove existing glazing. install new glazing, hardie board wall and vent and duct extension.1Details
install atm in existing storefront. remove existing glazing. install new glazing, hardie board wall and vent and duct extension.1 | $2,700 |
| Jun 28, 2007 | Completed final sign-off Feb 2008 | 450 Sutter St | 9th floor-remodel of (e) medical office. build out new exam rooms, reception area, break room, store room. no hvac work. no exterior work. electrical permit seperate.Details
9th floor-remodel of (e) medical office. build out new exam rooms, reception area, break room, store room. no hvac work. no exterior work. electrical permit seperate. | $150,000 | |
| Jun 18, 2007 | Expired or cancelled expired Jul 2009 | 1489 Webster St | Peacock Construction Inc | 0ti-4, sprinkler-relocate 32, remove 6. ground floor only.Details
0ti-4, sprinkler-relocate 32, remove 6. ground floor only. | $6,500 |
| Jun 18, 2007 | Never finaled issued Jul 2007, no final | 1489 Webster St | Peacock Construction Inc | oti#2 mepDetails
oti#2 mep | $8,500 |
| May 25, 2007 | Expired or cancelled expired Nov 2009 | 601 Montgomery St | oti-1 18th floor el me ls spDetails
oti-1 18th floor el me ls sp | $128,000 | |
| May 10, 2007 | Expired or cancelled expired Apr 2009 | 220 Montgomery St | Ayoob & Peery Plumbing Co Inc | 9th floor-relocate and removed fire sprinkler heads per tenant improvements. 4 relocates & 1 removedDetails
9th floor-relocate and removed fire sprinkler heads per tenant improvements. 4 relocates & 1 removed | $1,100 |
| May 1, 2007 | Completed final sign-off Oct 2007 | 425 Market St | Hathaway Dinwiddie Co. | oti-2, sephora usa, 3rd floor, el, me.Details
oti-2, sephora usa, 3rd floor, el, me. | $180,000 |
| Apr 11, 2007 | Completed final sign-off Jun 2007 | 1 Market St | oti-1, 25th floor, el, ls, spDetails
oti-1, 25th floor, el, ls, sp | $45,000 | |
| Apr 4, 2007 | Completed final sign-off Dec 2007 | 600 Montgomery St | 4th floor - revision to to include more demo to create (1) more office. mep is deferred submittal. no structural work.Details
4th floor - revision to to include more demo to create (1) more office. mep is deferred submittal. no structural work. | $58,000 | |
| Apr 3, 2007 | Completed final sign-off Jun 2007 | 2 Embarcadero Center | Dpr Construction Inc | oti-2, 10th floor, le, me.Details
oti-2, 10th floor, le, me. | $75,000 |
| Mar 12, 2007 | Never finaled issued Mar 2007, no final | 505 Sansome St | demo of non-structural walls. electrical deffered- separate permit.Details
demo of non-structural walls. electrical deffered- separate permit. | $16,000 | |
| Feb 12, 2007 | Completed final sign-off Jul 2007 | 505 Sansome St | cushman & wakefield- oti-1 3rd floor el, me, ls, spDetails
cushman & wakefield- oti-1 3rd floor el, me, ls, sp | $68,000 | |
| Jan 17, 2007 | Completed final sign-off Jul 2007 | 1 Market St | oti-2, ironwood capital, 25/fl, steuart tower, el, me.Details
oti-2, ironwood capital, 25/fl, steuart tower, el, me. | $185,000 | |
| Jan 16, 2007 | Completed final sign-off Jul 2007 | 1 Market St | oti-1 25th floor, el, me, ls, spDetails
oti-1 25th floor, el, me, ls, sp | $1,400,000 | |
| Dec 28, 2006 | Completed final sign-off Dec 2007 | 600 Montgomery St | Hathaway Dinwiddie Co. | mechanical, electrical & plumbing for tenant improvement on 4th floor.Details
mechanical, electrical & plumbing for tenant improvement on 4th floor. | $220,500 |
| Dec 22, 2006 | Completed final sign-off Dec 2007 | 600 Montgomery St | minor non structural demo, new partitions partial new ceiling all new finishes mechanical and electrical under separate permit project construction under asbestos containmentDetails
minor non structural demo, new partitions partial new ceiling all new finishes mechanical and electrical under separate permit project construction under asbestos containment | $220,500 | |
| Dec 20, 2006 | Completed final sign-off May 2007 | 601 Montgomery St | revidion to 200611026761 instal smokeguard in place of won doorDetails
revidion to 200611026761 instal smokeguard in place of won door | $2,200 | |
| Dec 20, 2006 | Completed final sign-off May 2007 | 601 Montgomery St | oti-2, montgomery bldg, 3/fl, el, me.Details
oti-2, montgomery bldg, 3/fl, el, me. | $45,000 | |
| Dec 20, 2006 | Completed final sign-off May 2007 | 601 Montgomery St | revidion to 200611026756 instal smokeguard in place of won doorDetails
revidion to 200611026756 instal smokeguard in place of won door | $2,200 | |
| Dec 20, 2006 | Completed final sign-off May 2007 | 601 Montgomery St | oti-2 (4th fl) el, me: mechanical and electrical work associated with lobby and restoom remodel.Details
oti-2 (4th fl) el, me: mechanical and electrical work associated with lobby and restoom remodel. | $45,000 | |
| Nov 20, 2006 | Completed final sign-off Mar 2007 | 601 Montgomery St | oti-1 3rd fl-elDetails
oti-1 3rd fl-el | $74,000 | |
| Nov 20, 2006 | Completed final sign-off Mar 2007 | 601 Montgomery St | michanical and electical work associated ith remodel of office suite. oti-2, 3rd floor, el, meDetails
michanical and electical work associated ith remodel of office suite. oti-2, 3rd floor, el, me | $54,000 | |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 475 Sansome St | Swinerton Builders | renew pa# 200506034175, 200510044750 for final.Details
renew pa# 200506034175, 200510044750 for final. | |
| Nov 15, 2006 | Expired or cancelled expired Sep 2010 | 500 Howard St | Cannon Constructors North Inc | oti-1, 4th floor, el, me, ls, sp.Details
oti-1, 4th floor, el, me, ls, sp. | $700,000 |
| Aug 1, 2006 | Completed final sign-off Oct 2006 | 345 California St | Peacock Construction Inc | oti-1, 35th floor, el, me, ls, sp.Details
oti-1, 35th floor, el, me, ls, sp. | $202,000 |
| Jul 27, 2006 | Completed final sign-off Apr 2007 | 49 Stevenson St | oti-1 3/f el, me, ls, sp. demolition of 3 rooms. construction of 6 offices and a training room.Details
oti-1 3/f el, me, ls, sp. demolition of 3 rooms. construction of 6 offices and a training room. | $102,000 | |
| Jul 18, 2006 | Completed final sign-off Sep 2007 | 475 Sansome St | Morrow-Meadows Corp Dba: Arc Electric Co | renew pa# 200511158172 for final inspection.Details
renew pa# 200511158172 for final inspection. | |
| Jun 14, 2006 | Completed final sign-off Jan 2007 | 2343 Fillmore St | oti-1 elme, ls sp 'b' floorDetails
oti-1 elme, ls sp 'b' floor | $81,000 | |
| Jun 5, 2006 | Completed final sign-off Sep 2006 | 601 Montgomery St | oti-1 12th floor, el, me, ls, sp demolition of existing partitions, build out of new offices & a copy room.Details
oti-1 12th floor, el, me, ls, sp demolition of existing partitions, build out of new offices & a copy room. | $60,000 | |
| Apr 26, 2006 | Completed final sign-off Sep 2006 | 795 Folsom St | Bcci Construction Company | oti-1 2nd floor, improvement includes demoliton, construction of partitions, millwork, ceiling work & finishes.Details
oti-1 2nd floor, improvement includes demoliton, construction of partitions, millwork, ceiling work & finishes. | $170,000 |
| Mar 13, 2006 | Completed final sign-off Dec 2006 | 1 Embarcadero Center | oti-1 26th floor el me ls spDetails
oti-1 26th floor el me ls sp | $110,000 | |
| Feb 27, 2006 | Completed final sign-off Apr 2006 | 1596 Howard St | oti-1 3rd floor, el, ls, sp create demissed office space, add coffee bar.Details
oti-1 3rd floor, el, ls, sp create demissed office space, add coffee bar. | $72,000 | |
| Jan 5, 2006 | Completed final sign-off Mar 2006 | 601 Montgomery St | oti-2, 18th floor, el, me.Details
oti-2, 18th floor, el, me. | $8,000 |