83 permits since 2000 (contractor on 83 permits, pmt consultant/expediter on 2 permits): 57 completed, 5 in progress, 18 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Jul 2026 | 2222 Broadway | City Mechanical Inc | steam boiler replacement with new of same capacity. no architectural or building structural work. no change in gas. new concrete pad. ref serial #57439Details
steam boiler replacement with new of same capacity. no architectural or building structural work. no change in gas. new concrete pad. ref serial #57439 | $189,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 564 04th St | City Mechanical Inc | hood flue was damaged due to fire and will be replaced.Details
hood flue was damaged due to fire and will be replaced. | $2,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 1000 Van Ness Av | City Mechanical Inc | replacement of existing garage exhaust and supply air fans with new of same flow. add variable frequency drives to fan motors and replace existing monitoring system.Details
replacement of existing garage exhaust and supply air fans with new of same flow. add variable frequency drives to fan motors and replace existing monitoring system. | $140,000 |
| Feb 5, 2026 | In progress issued Mar 2026 | 50 03rd St | City Mechanical Inc | cooling tower replacement.Details
cooling tower replacement. | $196,000 |
| Oct 9, 2025 | Completed final sign-off Mar 2026 | 4 Embarcadero Center | City Mechanical Inc | air maid system installation. ansul deferred.Details
air maid system installation. ansul deferred. | $196,000 |
| Oct 22, 2024 | Completed final sign-off Jan 2025 | 2575 Marin St | City Mechanical Inc | install new rooftop exhaust fans and pvc ductwork to accomodate customer supplied fume hoods. fume hoods installed to accommodate mechanical requirements from future change of use. note that the space appears to be vacant, formerly used as a vehicle repair facility.Details
install new rooftop exhaust fans and pvc ductwork to accomodate customer supplied fume hoods. fume hoods installed to accommodate mechanical requirements from future change of use. note that the space appears to be vacant, formerly used as a vehicle repair facility. | $55,000 |
| May 1, 2024 | Completed final sign-off Sep 2024 | 2222 Broadway | City Mechanical Inc | restroom exhaust installation. ref permit 202403188062Details
restroom exhaust installation. ref permit 202403188062 | $120,000 |
| Apr 25, 2024 | Completed final sign-off Dec 2024 | 535 Mission St | City Mechanical Inc | revision to pa#202109027705 and 2021706219962 to revise #2 for new duct layout on level 6,9,20,21,& 24.Details
revision to pa#202109027705 and 2021706219962 to revise #2 for new duct layout on level 6,9,20,21,& 24. | |
| Apr 25, 2024 | Completed final sign-off Sep 2024 | 321 07th St | City Mechanical Inc | air flow & zone system improvements. relocate one existing rooftop unit to provide mfgr required clearance.Details
air flow & zone system improvements. relocate one existing rooftop unit to provide mfgr required clearance. | $70,000 |
| Jan 26, 2024 | In progress issued Jan 2024 | 101 Spear St | City Mechanical Inc | installation of water source heat pumps, ductwork and diffusers in the atriumDetails
installation of water source heat pumps, ductwork and diffusers in the atrium | $40,000 |
| Dec 1, 2023 | Completed final sign-off Apr 2024 | 455 Franklin St | City Mechanical Inc | mcquay chiller replacement.Details
mcquay chiller replacement. | $287,000 |
| Feb 17, 2023 | Completed final sign-off Feb 2023 | 240 Dolores St | City Mechanical Inc | ref nov# 202294461: mech permit: pm20230213507: repair malfunctioning ventalation ducts located throughout the parking lot. sections of vent ducts are corroded. repair as needed to original use.Details
ref nov# 202294461: mech permit: pm20230213507: repair malfunctioning ventalation ducts located throughout the parking lot. sections of vent ducts are corroded. repair as needed to original use. | $2,000 |
| Dec 7, 2022 | Completed final sign-off May 2023 | 9 Bernice St | City Mechanical Inc | relocation of existing rooftop ac unit to proper & safe location.Details
relocation of existing rooftop ac unit to proper & safe location. | $60,000 |
| Aug 29, 2022 | Completed final sign-off Jan 2023 | 2424 Mariposa St | City Mechanical Inc | installation of new split heat pump systems serving ballroom and drinking bar, new outside air fan and control dampers.Details
installation of new split heat pump systems serving ballroom and drinking bar, new outside air fan and control dampers. | $189,000 |
| Jul 13, 2022 | Completed final sign-off Sep 2022 | 98 Battery St | City Mechanical Inc | 5/flr - air handler replacementDetails
5/flr - air handler replacement | $150,000 |
| Jul 13, 2022 | Completed final sign-off Sep 2022 | 98 Battery St | City Mechanical Inc | 3/f: air handler replacementDetails
3/f: air handler replacement | $150,000 |
| Jun 16, 2022 | Completed final sign-off Sep 2022 | 444 06th St | City Mechanical Inc | ti hvac front rtu & exhaust air improvement ref 202112214851Details
ti hvac front rtu & exhaust air improvement ref 202112214851 | $180,000 |
| May 18, 2022 | Completed final sign-off Aug 2024 | 2222 Broadway | City Mechanical Inc | gym installation of split system.Details
gym installation of split system. | $30,000 |
| Apr 28, 2022 | Completed final sign-off Jun 2022 | 98 Battery St | City Mechanical Inc | 2nd fl: air handler replacement.Details
2nd fl: air handler replacement. | $145,000 |
| Apr 14, 2022 | Completed final sign-off Jul 2022 | 20 Heron St | City Mechanical Inc | tenant improvement - install new vrf indoor units. ref pa# 202110281420.Details
tenant improvement - install new vrf indoor units. ref pa# 202110281420. | $55,000 |
| Apr 6, 2022 | Completed final sign-off Jul 2022 | 2800 California St | City Mechanical Inc | replace (e) type 1 hood, exhaust fan, greese duct, & makeup air fan with new.Details
replace (e) type 1 hood, exhaust fan, greese duct, & makeup air fan with new. | $110,000 |
| Feb 11, 2022 | Never finaled issued Feb 2022, no final | 98 Battery St | City Mechanical Inc | 6/f: hvac improvements.Details
6/f: hvac improvements. | $130,000 |
| Sep 13, 2021 | Completed final sign-off Oct 2021 | 350 Bush St | City Mechanical Inc | install transfer exhaust fan for it closet. no other changes to building mechanical system.Details
install transfer exhaust fan for it closet. no other changes to building mechanical system. | $10,000 |
| Sep 2, 2021 | Completed final sign-off Dec 2024 | 535 Mission St | City Mechanical Inc | recommencement & completion of work approved under prevous permit application 201706219962.Details
recommencement & completion of work approved under prevous permit application 201706219962. | $10,000 |
| Sep 2, 2021 | Never finaled issued Sep 2021, no final | 2180 Post St | City Mechanical Inc | cooling tower replacement on rooftop, same location and less weight.Details
cooling tower replacement on rooftop, same location and less weight. | $215,000 |
| Aug 12, 2021 | Never finaled issued Sep 2021, no final | 2180 Post St | City Mechanical Inc | replace existing corridor make up air units. (cooling tower sep permit). ref pa 201111219332.Details
replace existing corridor make up air units. (cooling tower sep permit). ref pa 201111219332. | $140,000 |
| Jul 14, 2021 | Completed final sign-off Oct 2021 | 98 Battery St | City Mechanical Inc | 4th floor: hvac improvementsDetails
4th floor: hvac improvements | $195,000 |
| May 21, 2021 | Completed final sign-off Sep 2021 | 220 Bush St | City Mechanical Inc | 1st fl breadk room & scr room mechanical improvement. ref pa# 202103025694.Details
1st fl breadk room & scr room mechanical improvement. ref pa# 202103025694. | $40,000 |
| May 19, 2021 | Completed final sign-off Dec 2021 | 755 Ocean Av | City Mechanical Inc | library mechanical improvements. ref pa# 201912189952.Details
library mechanical improvements. ref pa# 201912189952. | $195,000 |
| Mar 22, 2021 | Completed final sign-off Aug 2021 | 20 Heron St | City Mechanical Inc | vrf equipment and ventilation impovements. ref app#202003036027Details
vrf equipment and ventilation impovements. ref app#202003036027 | $120,000 |
| Dec 21, 2020 | Completed final sign-off May 2021 | 650 Townsend St | City Mechanical Inc | suite 150c: mechanical improvements. (reference) maher n/a.Details
suite 150c: mechanical improvements. (reference) maher n/a. | $190,000 |
| Dec 21, 2020 | Completed final sign-off Jan 2021 | 410 Townsend St | City Mechanical Inc | ventilation improvements for pa202006098271. maher n/a.Details
ventilation improvements for pa202006098271. maher n/a. | $10,000 |
| Dec 14, 2020 | Completed final sign-off Sep 2021 | 121 Spear St | City Mechanical Inc | ste# 250: mechanical improvements. ref pa# 201912200101Details
ste# 250: mechanical improvements. ref pa# 201912200101 | $90,000 |
| Dec 14, 2020 | Completed final sign-off May 2021 | 146 Geary St | City Mechanical Inc | 1st, 3rd & 4th fl mechanical improvements. ref pa# 202001071340, pa#202009013209Details
1st, 3rd & 4th fl mechanical improvements. ref pa# 202001071340, pa#202009013209 | $125,000 |
| May 13, 2020 | Expired or cancelled cancelled Jan 2026 | 450 Shotwell St | City Mechanical Inc | provide supply air distribution for 6-ton vrf fan & coil unit.Details
provide supply air distribution for 6-ton vrf fan & coil unit. | $15,000 |
| Jan 6, 2020 | Completed final sign-off Nov 2020 | 470 Carolina St | City Mechanical Inc | 1st fl - hvac improvments. ref pa #201910295829.Details
1st fl - hvac improvments. ref pa #201910295829. | $96,000 |
| Nov 15, 2019 | Completed final sign-off Dec 2019 | 200 Jackson St | City Mechanical Inc | direct replacement of kef3 with distributionDetails
direct replacement of kef3 with distribution | $30,000 |
| Nov 1, 2019 | Never finaled issued Dec 2019, no final | 1715 Octavia St | City Mechanical Inc | mechanical ventilation improvements - kitchenDetails
mechanical ventilation improvements - kitchen | $180,000 |
| Jul 23, 2019 | Completed final sign-off Jul 2019 | 855 Sacramento St | City Mechanical Inc | 1/f & 2/f: ventilation improvements for boiler room. install new outside air & exhaust fan for mech room ventilation. install new 24hr rated enclosure, duct work, and louver by stairwell.Details
1/f & 2/f: ventilation improvements for boiler room. install new outside air & exhaust fan for mech room ventilation. install new 24hr rated enclosure, duct work, and louver by stairwell. | $10,000 |
| Jun 26, 2019 | Completed final sign-off Dec 2024 | 535 Mission St | City Mechanical Inc | verizon das telecom room hvac. improvements for 2, 3, 4, 5, 7, 8 10, 11, 12, 14, 15, 16, 18, 19, 22, 23, 25 & 26 ventilation system installationfor data closetsDetails
verizon das telecom room hvac. improvements for 2, 3, 4, 5, 7, 8 10, 11, 12, 14, 15, 16, 18, 19, 22, 23, 25 & 26 ventilation system installationfor data closets | $20,000 |
| Mar 26, 2019 | Completed final sign-off Jul 2019 | 170 Maiden Ln | City Mechanical Inc | 5th flr - hvac workDetails
5th flr - hvac work | $125,000 |
| Mar 14, 2019 | Never finaled issued Apr 2019, no final | 101 Henry Adams St | City Mechanical Inc | install supply air ductwork connection to (e) water source heat pumps. ref t.i. 201810304562. maher n/a.Details
install supply air ductwork connection to (e) water source heat pumps. ref t.i. 201810304562. maher n/a. | $20,000 |
| Feb 28, 2019 | Expired or cancelled cancelled Jan 2026 | 444 De Haro St | City Mechanical Inc | hvac ti - straighten duct work for more uniform look. replace register firills. install new duct work for exhaust and restroom area. service and clean (e) heat pump units for proper operations maher naDetails
hvac ti - straighten duct work for more uniform look. replace register firills. install new duct work for exhaust and restroom area. service and clean (e) heat pump units for proper operations maher na | $120,000 |
| Dec 7, 2018 | Completed final sign-off Jan 2019 | 250 Montgomery St | City Mechanical Inc | reloate (e) ductwork, add new ductwork and air devices as redq to accomodate floor plan changes. ref 201810193686 maher naDetails
reloate (e) ductwork, add new ductwork and air devices as redq to accomodate floor plan changes. ref 201810193686 maher na | $35,000 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 2222 Broadway | City Mechanical Inc | grant hall: bathroomslevel 1-2 , hvac improvements. installation sof new restroom & janitor closet. exhaust grilles, ducts and fans. ref 201803264571Details
grant hall: bathroomslevel 1-2 , hvac improvements. installation sof new restroom & janitor closet. exhaust grilles, ducts and fans. ref 201803264571 | $60,000 |
| May 21, 2018 | Completed final sign-off Nov 2018 | 660 03rd St | City Mechanical Inc | g/f: demo (e) distribution ductwork from (e) hp-102, provide new duct distribution from hp-102 as shown on plan, rebalance airblows from (e) hp-101 as shown on plan, provide new thermostat for hp-102 provide new 1 ton split system ac for server room.Details
g/f: demo (e) distribution ductwork from (e) hp-102, provide new duct distribution from hp-102 as shown on plan, rebalance airblows from (e) hp-101 as shown on plan, provide new thermostat for hp-102 provide new 1 ton split system ac for server room. | $45,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 2801 Leavenworth St | City Mechanical Inc | replace extg chiller with new air-cooled chiller to provided specifications. start up and test for normal operation.Details
replace extg chiller with new air-cooled chiller to provided specifications. start up and test for normal operation. | $98,000 |
| Mar 29, 2018 | Never finaled issued Mar 2018, no final | 83 Mcallister St | City Mechanical Inc | relocation of exhaust fan ef 18 on roof. removal of e fan ef 1 on roof and replacement with new unit inside basement laundry rm not subductedDetails
relocation of exhaust fan ef 18 on roof. removal of e fan ef 1 on roof and replacement with new unit inside basement laundry rm not subducted | $8,000 |
| Feb 23, 2018 | Completed final sign-off May 2018 | 77 Maiden Ln | City Mechanical Inc | 5,6,7 flr -inspect & service (e) mech equip, modify (e) duct work for new floor plan, relocate (e) diffusers & grilles, provide air balance, install new grilles & louvers, install new return sound boots in conf/huddle rms. install new transfer fans in phone rooms, install new exhaust in copy/idf rmDetails
5,6,7 flr -inspect & service (e) mech equip, modify (e) duct work for new floor plan, relocate (e) diffusers & grilles, provide air balance, install new grilles & louvers, install new return sound boots in conf/huddle rms. install new transfer fans in phone rooms, install new exhaust in copy/idf rm | $85,000 |
| Dec 1, 2017 | Completed final sign-off Jun 2018 | 49 Geary St | City Mechanical Inc | 4th fl hvac improvements - install fan coil & heat pump units as located to provide area with cooling & heating. install outside air fan for ventilation ref pa 2017-0919-8939Details
4th fl hvac improvements - install fan coil & heat pump units as located to provide area with cooling & heating. install outside air fan for ventilation ref pa 2017-0919-8939 | $95,000 |
| Nov 6, 2017 | Completed final sign-off Jan 2018 | 560 Mission St | City Mechanical Inc | provide and install new heat pump in ups room, provide and install new circulation pump and consenser water pipingDetails
provide and install new heat pump in ups room, provide and install new circulation pump and consenser water piping | $50,000 |
| Oct 13, 2017 | Completed final sign-off Oct 2018 | 1840 Sutter St | City Mechanical Inc | rooftop: total hvac equipment replacement - remove & replace, (3) rooftop package heat pumps. (1) grease exhaust fan, (1) make-up air unit, (1) roof exhaust fan; air distribution system to remain.Details
rooftop: total hvac equipment replacement - remove & replace, (3) rooftop package heat pumps. (1) grease exhaust fan, (1) make-up air unit, (1) roof exhaust fan; air distribution system to remain. | $50,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2018 | 1881 Post St | City Mechanical Inc | rooftop: replace (e) 2 package rooftop air handlingunits with new. reconnect new equipment o(e) ducting system. reconnect new equipment to (e) piping system. maher n/a.Details
rooftop: replace (e) 2 package rooftop air handlingunits with new. reconnect new equipment o(e) ducting system. reconnect new equipment to (e) piping system. maher n/a. | $95,000 |
| Jun 21, 2017 | Completed final sign-off May 2018 | 234 Bush St | City Mechanical Inc | 1/f #132-hvac improvement, install new supply fan with heating coil, install new exhaust fan for studio a, ref. to pa#201703242311. smoke detector shutdown with fire alarm system under separate permit (>2000cfm).Details
1/f #132-hvac improvement, install new supply fan with heating coil, install new exhaust fan for studio a, ref. to pa#201703242311. smoke detector shutdown with fire alarm system under separate permit (>2000cfm). | $20,000 |
| Jun 21, 2017 | Expired or cancelled expired Dec 2024 | 535 Mission St | City Mechanical Inc | floor 6,9,17,20,21,24- hvac improvements, installation of mechanical vantilation system for data closets.Details
floor 6,9,17,20,21,24- hvac improvements, installation of mechanical vantilation system for data closets. | $20,000 |
| Jun 20, 2017 | Completed final sign-off Oct 2017 | 799 Market St | City Mechanical Inc | remove and replace cooling tower on roof. not visible from street. maher n/a.Details
remove and replace cooling tower on roof. not visible from street. maher n/a. | $260,000 |
| Apr 26, 2017 | Completed final sign-off May 2017 | 433 Natoma St | City Mechanical Inc | provide & install new welded grease duct to replace portion of existing. provide access doors. furnish & install shaft around grease duct. maher naDetails
provide & install new welded grease duct to replace portion of existing. provide access doors. furnish & install shaft around grease duct. maher na | $20,000 |
| Feb 8, 2017 | Never finaled issued Feb 2017, no final | 680 Folsom St | City Mechanical Inc | installation of mech ventilation system for data closetDetails
installation of mech ventilation system for data closet | $98,000 |
| Feb 8, 2017 | Completed final sign-off May 2017 | 60 Spear St | City Mechanical Inc | replace existing cooling tower, boiler, and boiler pump with new. reconnect new equipment to existing piping systemDetails
replace existing cooling tower, boiler, and boiler pump with new. reconnect new equipment to existing piping system | $450,000 |
| Dec 28, 2016 | Never finaled issued Jan 2017, no final | 950 Mason St | City Mechanical Inc | active sports club vrf hvac improvements, remove and replace equipment & duct work in mech. area.install new outdoor heat pump. disconnect and reconnect nw equipment in mech area. providie air balance & install nw fan coils & e.f. maher not reqDetails
active sports club vrf hvac improvements, remove and replace equipment & duct work in mech. area.install new outdoor heat pump. disconnect and reconnect nw equipment in mech area. providie air balance & install nw fan coils & e.f. maher not req | $750,000 |
| Nov 22, 2016 | Never finaled issued Dec 2016, no final | 134 Golden Gate Av | City Mechanical Inc | replacement of extg roof top furnace and installation of 2nd room regulating heat pump. replacement furnace will be 100% outdoor air.Details
replacement of extg roof top furnace and installation of 2nd room regulating heat pump. replacement furnace will be 100% outdoor air. | $105,000 |
| Jun 9, 2016 | Never finaled issued Aug 2016, no final | 444 De Haro St | City Mechanical Inc | provide & install (1) a/c system with condensate line in the 2nd floor server room. maher naDetails
provide & install (1) a/c system with condensate line in the 2nd floor server room. maher na | $4,000 |
| May 19, 2016 | Completed final sign-off Aug 2016 | 300 Montgomery St | City Mechanical Inc | #350- hvac t.i. per scope, existing supply air from central fan system will be ducted to new vav boxes to provide cooling, existing building heating will feed reheat coils at vav boxes, new split heat pump, new restroom exhaist fans. n/a ordinance #155-13Details
#350- hvac t.i. per scope, existing supply air from central fan system will be ducted to new vav boxes to provide cooling, existing building heating will feed reheat coils at vav boxes, new split heat pump, new restroom exhaist fans. n/a ordinance #155-13 | $100,000 |
| Mar 24, 2016 | Completed final sign-off Jun 2016 | 731 Market St | City Mechanical Inc | 4th floor hvac, ti: provide & install nine fan coils, condensate piping, supply & return air duct work, two new transfer exahust systems, one outside air fan system. ref pa 2016-0217-9764Details
4th floor hvac, ti: provide & install nine fan coils, condensate piping, supply & return air duct work, two new transfer exahust systems, one outside air fan system. ref pa 2016-0217-9764 | $230,000 |
| Oct 20, 2015 | Never finaled issued Nov 2015, no final | 700 Velasco Av | City Mechanical Inc | hvac tenant improvements - remove & replace three (3) rooftop units, test & balance system.Details
hvac tenant improvements - remove & replace three (3) rooftop units, test & balance system. | $40,000 |
| Jun 9, 2015 | Completed final sign-off Nov 2015 | 550 Montgomery St | City Mechanical Inc | 2nd floor: perform mechanical heating improvements per plans and specs dated 6/2/15 by mhc engineers job #15-122. n/a for maherDetails
2nd floor: perform mechanical heating improvements per plans and specs dated 6/2/15 by mhc engineers job #15-122. n/a for maher | $90,000 |
| Jun 9, 2015 | Completed final sign-off Mar 2016 | 550 Montgomery St | City Mechanical Inc | 4th floor: perform mechanical heating improvements per plans and specs dated 5/28/15 by mhc engineers job #15-122Details
4th floor: perform mechanical heating improvements per plans and specs dated 5/28/15 by mhc engineers job #15-122 | $130,000 |
| Dec 30, 2013 | Completed final sign-off Jan 2014 | 88 Kearny St | City Mechanical Inc | reconfigure ducting after the new walls are built for proper air distribution and air flows as shown on the new drawings. install server room exhaust as shown on the new drawings.Details
reconfigure ducting after the new walls are built for proper air distribution and air flows as shown on the new drawings. install server room exhaust as shown on the new drawings. | $10,000 |
| Sep 11, 2013 | Completed final sign-off Oct 2013 | 3450 03rd St | City Mechanical Inc | unit #2b - distribution for existing ac 1-8, new ef for restroom, new cu#1-2 add new fsd. ref #2012.11.21.4668Details
unit #2b - distribution for existing ac 1-8, new ef for restroom, new cu#1-2 add new fsd. ref #2012.11.21.4668 | $97,898 |
| Sep 11, 2013 | Completed final sign-off Oct 2013 | 3450 03rd St | City Mechanical Inc | unit #2a - distribution for existing rtu 1-8, new ef for restroom, new cu#1-2, add new fsd. ref pa #2012.11.21.4666Details
unit #2a - distribution for existing rtu 1-8, new ef for restroom, new cu#1-2, add new fsd. ref pa #2012.11.21.4666 | $97,898 |
| Sep 11, 2013 | Never finaled issued Sep 2013, no final | 550 Montgomery St | City Mechanical Inc | 10th floor:reconfigure 2 vav boxes & installation of split system. ref pa #2012.10.17.2221Details
10th floor:reconfigure 2 vav boxes & installation of split system. ref pa #2012.10.17.2221 | $68,717 |
| Aug 10, 2011 | Never finaled filed Aug 2011, never issued | 466 Townsend St | City Mechanical Inc | furnish & install heat pump split system, condensor & air handler, ductwork. air distribution & condensate drain as per drawingsDetails
furnish & install heat pump split system, condensor & air handler, ductwork. air distribution & condensate drain as per drawings | $23,000 |
| Jun 1, 2011 | Completed final sign-off Mar 2012 | 77 Maiden Ln | City Mechanical Inc | furnish & install 4 water service heat pumps, ducting & plumbingDetails
furnish & install 4 water service heat pumps, ducting & plumbing | $68,000 |
| Sep 3, 2010 | Completed final sign-off Jul 2011 | 77 Maiden Ln | City Mechanical Inc | hvac tenant improvment on floors 5-6-7 per plansDetails
hvac tenant improvment on floors 5-6-7 per plans | $150,000 |
| Jul 20, 2010 | Completed final sign-off Sep 2010 | 1 South Van Ness Av | City Mechanical Inc | install water source heat pump for supplemental cooling for after hours cooling in an existing bldg.Details
install water source heat pump for supplemental cooling for after hours cooling in an existing bldg. | $19,000 |
| Dec 5, 2008 | Never finaled issued Dec 2008, no final | 100 Spear St | City Mechanical Inc | fire smoke damper replacement floors 18-22. as-built drawings ref#:200804220297Details
fire smoke damper replacement floors 18-22. as-built drawings ref#:200804220297 | |
| Oct 10, 2008 | Never finaled issued Oct 2008, no final | 90 New Montgomery St | City Mechanical Inc | install 24000 btu ac unit in computer room with ductwork and thermostat, install condenser water supply and return lines, install condensate line and ejectionDetails
install 24000 btu ac unit in computer room with ductwork and thermostat, install condenser water supply and return lines, install condensate line and ejection | $16,000 |
| Oct 10, 2008 | Completed final sign-off Apr 2009 | 1 Nob Hill Cr | City Mechanical Inc | hotel kitchen: remove and replace existing type 1 pastry kitchen hood. all welded exhaust ducting with cleanout access. install exhaust and makeup fans. controls and elec by electricianDetails
hotel kitchen: remove and replace existing type 1 pastry kitchen hood. all welded exhaust ducting with cleanout access. install exhaust and makeup fans. controls and elec by electrician | $28,000 |
| May 13, 2008 | Completed final sign-off Jun 2008 | 865 Market St | City Mechanical Inc | mezzanine: comply w/ n.o.v. 200839013 - recover refrigerant change from condemsing unit. repipe to new condeming unit at new location-mezzanine.Details
mezzanine: comply w/ n.o.v. 200839013 - recover refrigerant change from condemsing unit. repipe to new condeming unit at new location-mezzanine. | $8,000 |
| Apr 22, 2008 | Never finaled issued Apr 2008, no final | 100 Spear St | City Mechanical Inc | floor 18, 19, 20 & 21 - remove & replace (20) line dampers from 18th to 21st floors. replacement shall not infringe on any extiging mechanical system ac as well as any (e) smoke control system.Details
floor 18, 19, 20 & 21 - remove & replace (20) line dampers from 18th to 21st floors. replacement shall not infringe on any extiging mechanical system ac as well as any (e) smoke control system. | $9,000 |
| Mar 27, 2008 | Completed final sign-off Apr 2008 | 100 Spear St | City Mechanical Inc | furnish and install variable air volume terminal with (2) supply air ducts - reheat coil, piping and controls.Details
furnish and install variable air volume terminal with (2) supply air ducts - reheat coil, piping and controls. | $14,700 |
| Mar 27, 2008 | Completed final sign-off Jun 2008 | 150 Stockton St | City Mechanical Inc | remove and replace (4) existing a/c units on the roof.Details
remove and replace (4) existing a/c units on the roof. | $500,000 |
| May 3, 2000 | Completed final sign-off May 2000 | 39 Stockton St | City Mechanical Inc | replace condensor's (tye-ea) ac #2 - #3 located on roofDetails