Block 6948, lot 023
755 Ocean Ave
- City’s use
- Commercial Retail
- Built
- 1955
- Stories
- 2
- Units
- 1
- Rooms
- 8 bathrooms
- Building
- 62,167 sq ft
- Lot
- 153,294 sq ft
- Zoning
- RH1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
86 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2026 | In progress issued May 2026 | 755 Ocean Av | Truebeck Construction | new pergola (freestanding) at an existing courtyard space between the (e) classroom building and theatre building.Details
new pergola (freestanding) at an existing courtyard space between the (e) classroom building and theatre building. | $523,000 |
| Jun 21, 2024 | Completed final sign-off Oct 2024 | 755 Ocean Av | Pyro-Comm Systems, Inc. | this is an addition to the existing fire alarm system, we added 2 relay modlues to release hvac shutdownDetails
this is an addition to the existing fire alarm system, we added 2 relay modlues to release hvac shutdown | $10,438 |
| Jun 4, 2024 | Completed final sign-off Oct 2024 | 755 Ocean Av | Truebeck Construction | replacement of e gym floors, 2 telescoping bleachercs, 6 backstops with associated support and powerDetails
replacement of e gym floors, 2 telescoping bleachercs, 6 backstops with associated support and power | $500,000 |
| Feb 27, 2024 | Completed final sign-off Dec 2024 | 755 Ocean Av | Truebeck Construction | all (e) mechanical units and associated duct work are to be removed to allow for support & assembly & upgrades. all (e) roofing and membrane will be removed and replaced with an sbs-modified 2 ply roofing system, along with new drains and overflow systems. new mechanical units and associatedDetails
all (e) mechanical units and associated duct work are to be removed to allow for support & assembly & upgrades. all (e) roofing and membrane will be removed and replaced with an sbs-modified 2 ply roofing system, along with new drains and overflow systems. new mechanical units and associated | $200,000 |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 27 Howth St | The Window Guild Dba Jamz Construction | replace 8 windows back facing with simonton daylight may windows will be same size and style. u=0.30maxDetails
replace 8 windows back facing with simonton daylight may windows will be same size and style. u=0.30max | $10,747 |
| Jun 10, 2022 | Completed final sign-off Sep 2022 | 27 Howth St | Brendan Waters Construction Inc | replace/ rebuild rear deck and stair in kind and same footprint.Details
replace/ rebuild rear deck and stair in kind and same footprint. | $5,000 |
| Jan 31, 2022 | Completed final sign-off Apr 2023 | 755 Ocean Av | Bay Alarm Company | bay alarm to install new supervision decives on new waterflow switches butterfly switches & osy that were installed by others.Details
bay alarm to install new supervision decives on new waterflow switches butterfly switches & osy that were installed by others. | $4,700 |
| May 19, 2021 | Completed final sign-off Dec 2021 | 755 Ocean Av | City Mechanical Inc | library mechanical improvements. ref pa# 201912189952.Details
library mechanical improvements. ref pa# 201912189952. | $195,000 |
| Dec 18, 2019 | Completed final sign-off Nov 2021 | 755 Ocean Av | Saarman Construction,Ltd. | new roof and mech units at library: windows replacement at library window. repairs or replacement at gymDetails
new roof and mech units at library: windows replacement at library window. repairs or replacement at gym | $150,000 |
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 755 Ocean Av | test bldg for emergency responder radio coverage. the bldg passed testing. no physical work done under this permit.Details
test bldg for emergency responder radio coverage. the bldg passed testing. no physical work done under this permit. | ||
| Oct 3, 2018 | Never finaled issued Oct 2018, no final | 755 Ocean Av | street space | ||
| May 9, 2018 | Never finaled issued May 2018, no final | 755 Ocean Av | The Lawson Roofing Co Inc. | reroofing | $53,000 |
| May 3, 2018 | Completed final sign-off Jul 2019 | 755 Ocean Av | Truebeck Construction | civil revisions to the permitted plans associated with pa #2016-0727-3526 s1 & s3. storm drain detention pipe, sand interceptor, new sewer lateral connection & bfp added.Details
civil revisions to the permitted plans associated with pa #2016-0727-3526 s1 & s3. storm drain detention pipe, sand interceptor, new sewer lateral connection & bfp added. | $40,000 |
| Apr 26, 2018 | Never finaled issued May 2018, no final | 755 Ocean Av | street space | ||
| Apr 26, 2018 | Completed final sign-off Jan 2019 | 755 Ocean Av | Sunlogic Inc Dba Solar Technologies | 242.64 kw roof mounted solar installation.Details
242.64 kw roof mounted solar installation. | $665,000 |
| Apr 26, 2018 | Never finaled issued May 2018, no final | 755 Ocean Av | street space | ||
| Apr 24, 2018 | Never finaled filed Apr 2018, never issued | 755 Ocean Av | street space | ||
| Apr 24, 2018 | Never finaled filed Apr 2018, never issued | 755 Ocean Av | street space | ||
| Mar 23, 2018 | Never finaled issued Mar 2018, no final | 755 Ocean Av | H & M Fire Protection, Inc. | installation of underground fire serviceDetails
installation of underground fire service | $25,000 |
| Nov 17, 2017 | Never finaled issued Nov 2017, no final | 755 Ocean Av | street space | ||
| Nov 3, 2017 | Never finaled filed Nov 2017, never issued | 755 Ocean Av | street space | ||
| Oct 31, 2017 | Never finaled issued Nov 2017, no final | 755 Ocean Av | street space | ||
| Jul 19, 2017 | Completed final sign-off Aug 2017 | 755 Ocean Av | H & M Fire Protection, Inc. | resupply existing theater fire sprinkler system. demo existing 4" theater riser. cap 4" main at top of riser. reconnect existing 4" theater main to existing 6" main in wood shop. provide signage at geneva parking fdc. fire alarm work on separate permit. new classroom sprinklers on sepatrate permit.Details
resupply existing theater fire sprinkler system. demo existing 4" theater riser. cap 4" main at top of riser. reconnect existing 4" theater main to existing 6" main in wood shop. provide signage at geneva parking fdc. fire alarm work on separate permit. new classroom sprinklers on sepatrate permit. | $23,500 |
| Jul 19, 2017 | Completed final sign-off Apr 2019 | 755 Ocean Av | H & M Fire Protection, Inc. | replace (e) 4" under ground with new 6" under ground install back flow preventor and new 6" asr. relocate and up size existing sprinkler riser and flow switch. provide signage at fdc for partial gym sprinklers at howth street.Details
replace (e) 4" under ground with new 6" under ground install back flow preventor and new 6" asr. relocate and up size existing sprinkler riser and flow switch. provide signage at fdc for partial gym sprinklers at howth street. | $21,000 |
| Jul 17, 2017 | Completed final sign-off Aug 2017 | 755 Ocean Av | revision to 201705116362, replace sheet t1 due to installation of different temporary modular building office which has different inventory id no 163 commercial coach cc no 115927 and 115928 and serial no 2bb6583 and 2bb6584Details
revision to 201705116362, replace sheet t1 due to installation of different temporary modular building office which has different inventory id no 163 commercial coach cc no 115927 and 115928 and serial no 2bb6583 and 2bb6584 | ||
| Jun 7, 2017 | Completed final sign-off Jan 2019 | 755 Ocean Av | Truebeck Construction | new conduit peneration openings thru an existing concrete terrace wall located in the courtyard & existing concrete basement wall of the cafe. maher na (ref pa# 201607273526s)Details
new conduit peneration openings thru an existing concrete terrace wall located in the courtyard & existing concrete basement wall of the cafe. maher na (ref pa# 201607273526s) | |
| Jun 7, 2017 | Completed final sign-off Jul 2017 | 755 Ocean Av | The Lawson Roofing Co Inc. | re-roofingDetails
re-roofing | $245,000 |
| May 11, 2017 | Completed final sign-off Aug 2017 | 755 Ocean Av | Truebeck Construction | parking lot- install 14 temporary 1 story pre-manufactured portable classrooms in 7 hcd-approved bldgs & 1 temp. office bldg for 11 months, enlarge north gate & drive for sffd access. n/a ordinance #155-13Details
parking lot- install 14 temporary 1 story pre-manufactured portable classrooms in 7 hcd-approved bldgs & 1 temp. office bldg for 11 months, enlarge north gate & drive for sffd access. n/a ordinance #155-13 | $50,000 |
| May 4, 2017 | Completed final sign-off Sep 2017 | 755 Ocean Av | Pyro-Comm Systems, Inc. | replace & relocate (e) fire alarm control unit. reconnect (e) slc loops to facu. all (e) devices are backward compatible. provide new devices in temp portables. connect to facu pa 2016-0727-3526 maher naDetails
replace & relocate (e) fire alarm control unit. reconnect (e) slc loops to facu. all (e) devices are backward compatible. provide new devices in temp portables. connect to facu pa 2016-0727-3526 maher na | $15,000 |
| Apr 20, 2017 | Never finaled issued Apr 2017, no final | 755 Ocean Av | street space | ||
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 755 Ocean Av | street space | ||
| Mar 23, 2017 | Completed final sign-off Jan 2019 | 755 Ocean Av | Truebeck Construction | temporary installation of heating hot water and domestic hot water systems to maintain uninterrupted service to the school campus during construction (ref. #201607273526s)maher ordinance - extended orinance no.155-13 n/a.Details
temporary installation of heating hot water and domestic hot water systems to maintain uninterrupted service to the school campus during construction (ref. #201607273526s)maher ordinance - extended orinance no.155-13 n/a. | $30,000 |
| Mar 21, 2017 | Completed final sign-off Jan 2019 | 755 Ocean Av | Truebeck Construction | exterior sound wall located at the east edge of the extg campus parking lot adjacent to interstate 280, proposed under pa# 201607273526s, 201607273527s & 201607273528sDetails
exterior sound wall located at the east edge of the extg campus parking lot adjacent to interstate 280, proposed under pa# 201607273526s, 201607273527s & 201607273528s | |
| Jul 27, 2016 | Completed final sign-off Jul 2019 | 755 Ocean Av | Pyro-Comm Systems, Inc., Truebeck Construction, H & M Fire Protection, Inc. | selective demo & full renovation of (e) 2 story bldg with historic facade & 3rd story addition to classroom bldg. selective demo & partial renovation of (e) science classroom & addition of restrooms @ theatre bldg. addition of newly enclosed alley space between classrm & theatre blg ** maher: n/a **Details
selective demo & full renovation of (e) 2 story bldg with historic facade & 3rd story addition to classroom bldg. selective demo & partial renovation of (e) science classroom & addition of restrooms @ theatre bldg. addition of newly enclosed alley space between classrm & theatre blg ** maher: n/a ** | $15,000,000 |
| Jul 27, 2016 | Completed final sign-off Jan 2019 | 755 Ocean Av | Truebeck Construction | shop renovation. partial renovation of 1 room in (e) shop building to convert use of room from a computer lab to a shop space with minor equipment. ** maher: n/a **Details
shop renovation. partial renovation of 1 room in (e) shop building to convert use of room from a computer lab to a shop space with minor equipment. ** maher: n/a ** | $55,000 |
| Jul 27, 2016 | Completed final sign-off Aug 2017 | 755 Ocean Av | Truebeck Construction | gym renovation. minor renovation of exit path consisting of infilling (e) exiting doors through the classroom building & providing a new direct exit path to exterior. ** maher: n/a **Details
gym renovation. minor renovation of exit path consisting of infilling (e) exiting doors through the classroom building & providing a new direct exit path to exterior. ** maher: n/a ** | $45,000 |
| Apr 26, 2016 | Completed final sign-off Nov 2016 | 755 Ocean Av | Saarman Construction,Ltd. | repair to l.w.h.s library building caused by water intrusion - remove & replace stucco & windows on south elevationDetails
repair to l.w.h.s library building caused by water intrusion - remove & replace stucco & windows on south elevation | $250,000 |
| Jan 30, 2015 | Completed final sign-off Oct 2015 | 755 Ocean Av | voluntary seismic upgrade to classroom roof and wall connection. n/a ordinance #155-13Details
voluntary seismic upgrade to classroom roof and wall connection. n/a ordinance #155-13 | $295,000 | |
| Dec 5, 2014 | Never finaled issued Dec 2014, no final | 755 Ocean Av | Bay Alarm Company | fire alarm----provide voluntary facu motherboard replacement of nfs-640 facu model notifier cpu2-640. ul certification number on panel is fc13699011. testing of panel to be 100 percent and 10 percent of exisiting devices.Details
fire alarm----provide voluntary facu motherboard replacement of nfs-640 facu model notifier cpu2-640. ul certification number on panel is fc13699011. testing of panel to be 100 percent and 10 percent of exisiting devices. | $1,500 |
| Jul 6, 2012 | Completed final sign-off Aug 2012 | 755 Ocean Av | Bayside Heating & A/C Inc | replace 7 fan coils, 7 condensing units, like for like. no change in capacityDetails
replace 7 fan coils, 7 condensing units, like for like. no change in capacity | $51,000 |
| Jun 22, 2012 | Completed final sign-off Jul 2012 | 755 Ocean Av | Plant Construction Company Lp | new full height partition wall in existing shop room with new door and window. mechanical on separate permit gr floorDetails
new full height partition wall in existing shop room with new door and window. mechanical on separate permit gr floor | $30,000 |
| Sep 13, 2011 | Expired or cancelled withdrawn Jun 2014 | 755 Ocean Av | replace two rooftop package units a/c units; replace with like equipmentDetails
replace two rooftop package units a/c units; replace with like equipment | ||
| Sep 2, 2011 | Never finaled issued Sep 2011, no final | 755 Ocean Av | Bay Alarm Company | fire alarm system. add one horn/strobe in new closet room on the 1st fl of the admin bldgDetails
fire alarm system. add one horn/strobe in new closet room on the 1st fl of the admin bldg | $1,495 |
| Jun 14, 2011 | Completed final sign-off Aug 2011 | 755 Ocean Av | Plant Construction Company Lp | convert boy's shower room into an officeDetails
convert boy's shower room into an office | $20,000 |
| Apr 12, 2011 | Never finaled issued Apr 2011, no final | 755 Ocean Av | street space permit | ||
| Mar 30, 2011 | Completed final sign-off Aug 2011 | 755 Ocean Av | Plant Construction Company Lp | voluntary structural strengthening to gym roof & wall structure. upgrade (e) disabled access restrooms on main levelDetails
voluntary structural strengthening to gym roof & wall structure. upgrade (e) disabled access restrooms on main level | $290,000 |
| Jun 3, 2010 | Completed final sign-off Jul 2010 | 755 Ocean Av | Plant Construction Company Lp | install door at bio prep areaDetails
install door at bio prep area | $9,700 |
| Aug 6, 2009 | Completed final sign-off Aug 2009 | 755 Ocean Av | Plant Construction Company Lp | revision to approved pa#2009/0611/0274. new lighting in bathroom only.Details
revision to approved pa#2009/0611/0274. new lighting in bathroom only. | $7,000 |
| Jun 11, 2009 | Completed final sign-off Aug 2009 | 755 Ocean Av | Plant Construction Company Lp | modification of existing mens and womens restrooms. installation of new plumbing fixtures, new toilet accessories. demo existing wall & construction of new wall between womens restroom and existing office. lighting under seperate permit.Details
modification of existing mens and womens restrooms. installation of new plumbing fixtures, new toilet accessories. demo existing wall & construction of new wall between womens restroom and existing office. lighting under seperate permit. | $65,000 |
| Aug 19, 2008 | Completed final sign-off Apr 2009 | 755 Ocean Av | Bayside Heating & A/C Inc | modify below roof duct system to serve reconfigured office layout. ref pa #200806265476.Details
modify below roof duct system to serve reconfigured office layout. ref pa #200806265476. | $13,000 |
| Aug 18, 2008 | Completed final sign-off Apr 2009 | 755 Ocean Av | Bay Alarm Company | 2nd floor-revision, relocate 3 (e) horn/strobes on 2nd floor in the theatre and administration building due to tenant improvement. as builts for application #200603318036Details
2nd floor-revision, relocate 3 (e) horn/strobes on 2nd floor in the theatre and administration building due to tenant improvement. as builts for application #200603318036 | |
| Jul 22, 2008 | Completed final sign-off Apr 2009 | 755 Ocean Av | Plant Construction Company Lp | change location & detail for previously approved drinking fountain installation. ref. appl. 200806265476Details
change location & detail for previously approved drinking fountain installation. ref. appl. 200806265476 | |
| Jul 21, 2008 | Completed final sign-off Nov 2008 | 27 Howth St | The Lawson Roofing Co Inc. | reroofing.Details
reroofing. | $21,184 |
| Jul 10, 2008 | Completed final sign-off Apr 2009 | 755 Ocean Av | Plant Construction Company Lp | revision to application 200806265476r-1, remove bearing wall, replace it with new manufactured beam.Details
revision to application 200806265476r-1, remove bearing wall, replace it with new manufactured beam. | $4,000 |
| Jun 26, 2008 | Completed final sign-off Apr 2009 | 755 Ocean Av | Plant Construction Company Lp | conversion of (1) existing classroom into (4) private offices & (1) office suite on 2nd floor. mech & elec work under separate permit.Details
conversion of (1) existing classroom into (4) private offices & (1) office suite on 2nd floor. mech & elec work under separate permit. | $125,000 |
| Dec 14, 2007 | Never finaled issued Dec 2007, no final | 755 Ocean Av | street space & sidewalk | ||
| Jun 18, 2007 | Completed final sign-off Aug 2007 | 755 Ocean Av | remodel existing adminssions office. new office entry door. infill old entry door with new parition. mep, fire alarm and sprinkers under separate permit.Details
remodel existing adminssions office. new office entry door. infill old entry door with new parition. mep, fire alarm and sprinkers under separate permit. | $50,000 | |
| Jun 13, 2007 | Completed final sign-off Sep 2007 | 755 Ocean Av | Slayton Construction | science lab remodel projects consists remodel (e)casework & countertops.install a new fumehood blower & ducting.isntall new casework,counter tops & sinks incl an ada accessible work station.new plumbing tiled into(e) plumbing,rewire electrical circuits to new locations in laboratory.Details
science lab remodel projects consists remodel (e)casework & countertops.install a new fumehood blower & ducting.isntall new casework,counter tops & sinks incl an ada accessible work station.new plumbing tiled into(e) plumbing,rewire electrical circuits to new locations in laboratory. | $80,000 |
| Mar 31, 2006 | Expired or cancelled expired Feb 2009 | 755 Ocean Av | Bay Alarm Company | scope of work repair the existing administration bldng; fire alarm system and to interconnect all existing campus facu's into one systemDetails
scope of work repair the existing administration bldng; fire alarm system and to interconnect all existing campus facu's into one system | $59,700 |
| Jan 31, 2006 | Completed final sign-off May 2006 | 755 Ocean Av | costruct indoor climbing wall. ref appl 200504291232.Details
costruct indoor climbing wall. ref appl 200504291232. | $10,000 | |
| Dec 29, 2005 | Completed final sign-off Apr 2006 | 755 Ocean Av | Bayside Heating & A/C Inc | rev to 200504291232 hvac mech work only addition of a 5 ton heat pump to heat and cool a new weight lifting room at lick-wilmerding high school.Details
rev to 200504291232 hvac mech work only addition of a 5 ton heat pump to heat and cool a new weight lifting room at lick-wilmerding high school. | $13,500 |
| Sep 19, 2005 | Expired or cancelled expired Feb 2010 | 755 Ocean Av | Cosco Fire Protection Inc. | add 8 fire sprinklers & relocate 16 to accomodate ti changes. ref 200504291232. pipe schedule.Details
add 8 fire sprinklers & relocate 16 to accomodate ti changes. ref 200504291232. pipe schedule. | $7,300 |
| Apr 29, 2005 | Completed final sign-off Apr 2006 | 755 Ocean Av | const enclosed mezzanie above for storage, remove a raised fl and replace with new floor.Details
const enclosed mezzanie above for storage, remove a raised fl and replace with new floor. | $90,000 | |
| May 24, 2004 | Expired or cancelled expired Feb 2010 | 755 Ocean Av | removal non-structural partitions & replace with new partitions for new office in administrative areDetails
removal non-structural partitions & replace with new partitions for new office in administrative are | $25,000 | |
| Sep 26, 2003 | Completed final sign-off Oct 2003 | 755 Ocean Av | Plant Construction Co, Lp | renew app #200206189345/200301215537Details
renew app #200206189345/200301215537 | |
| Aug 11, 2003 | Never finaled issued Aug 2003, no final | 755 Ocean Av | exit plan for record proposed #200202149284 for records keeping onlyDetails
exit plan for record proposed #200202149284 for records keeping only | ||
| Jun 20, 2003 | Never finaled issued Jun 2003, no final | 755 Ocean Av | Allied Fire Protection | underground fire sprinkler system supply-as builts, evision to 200301215537Details
underground fire sprinkler system supply-as builts, evision to 200301215537 | |
| Jun 11, 2003 | Never finaled issued Jun 2003, no final | 755 Ocean Av | H 2 Fire Protection | install resturant (ansul) fire system in kitchen according to nfpa (relocation)Details
install resturant (ansul) fire system in kitchen according to nfpa (relocation) | $4,000 |
| Jun 10, 2003 | Expired or cancelled expired Feb 2018 | 755 Ocean Av | adding 3 hornstrobes & two pull station to existing panel for lobby upgradeDetails
adding 3 hornstrobes & two pull station to existing panel for lobby upgrade | $4,665 | |
| Apr 9, 2003 | Never finaled issued May 2003, no final | 755 Ocean Av | Air Exhange, Inc. | furnish and insall dust collection system system including ductworkDetails
furnish and insall dust collection system system including ductwork | $34,304 |
| Apr 4, 2003 | Never finaled issued Apr 2003, no final | 755 Ocean Av | south building - revision to 2002/02/14/9290 per updated drawing 3/19/03 for wall types.Details
south building - revision to 2002/02/14/9290 per updated drawing 3/19/03 for wall types. | $10,000 | |
| Apr 4, 2003 | Never finaled issued Apr 2003, no final | 755 Ocean Av | north building - revision to 2002/02/14/9284 per updated drawing 3/19/03 for wall types andDetails
north building - revision to 2002/02/14/9284 per updated drawing 3/19/03 for wall types and | $10,000 | |
| Mar 18, 2003 | Completed final sign-off May 2003 | 755 Ocean Av | Ecoenergies Construction | install pv solar panel systemDetails
install pv solar panel system | $43,818 |
| Feb 5, 2003 | Never finaled issued Feb 2003, no final | 755 Ocean Av | revision to app 200202149284-north & south elimination of low-e glazing & reduction of insulation onDetails
revision to app 200202149284-north & south elimination of low-e glazing & reduction of insulation on | ||
| Jan 21, 2003 | Expired or cancelled expired Sep 2003 | 755 Ocean Av | Allied Fire Protection | underground fire line #fp-ug, rev. to appl#200211262365Details
underground fire line #fp-ug, rev. to appl#200211262365 | $10,000 |
| Nov 26, 2002 | Completed final sign-off Oct 2003 | 755 Ocean Av | Allied Fire Protection | new fire sprinkler sys include standpipe to new educational structure/tdc tech ctr tot sp heads 372.Details
new fire sprinkler sys include standpipe to new educational structure/tdc tech ctr tot sp heads 372. | $60,400 |
| Oct 11, 2002 | Completed final sign-off Oct 2003 | 755 Ocean Av | new fire alarm system for new building at (e)high schoolDetails
new fire alarm system for new building at (e)high school | $52,000 | |
| Jun 18, 2002 | Expired or cancelled expired Sep 2003 | 755 Ocean Av | excavation & shoring : relate to #200202149284 &200202149290Details
excavation & shoring : relate to #200202149284 &200202149290 | $25,000 | |
| Jun 3, 2002 | Expired or cancelled expired Sep 2003 | 755 Ocean Av | Allied Fire Protection | add additional sprinklers to existing system to provide fire protection to theater seating areasDetails
add additional sprinklers to existing system to provide fire protection to theater seating areas | $13,500 |
| May 8, 2002 | Expired or cancelled expired Sep 2003 | 755 Ocean Av | upgrade of existing fire alarm system addition of smoke detection and horn/strobe unitDetails
upgrade of existing fire alarm system addition of smoke detection and horn/strobe unit | $6,720 | |
| Mar 22, 2002 | Expired or cancelled expired Sep 2003 | 755 Ocean Av | interior non structural soft demoDetails
interior non structural soft demo | $25,000 | |
| Feb 14, 2002 | Completed final sign-off Oct 2003 | 755 Ocean Av | new horizontal extension to existing bldg to provide new lab class roomsDetails
new horizontal extension to existing bldg to provide new lab class rooms | $1,900,000 | |
| Feb 14, 2002 | Completed final sign-off Oct 2003 | 755 Ocean Av | horizontal of existing bldg to new classrooms at 1st fl level, southDetails
horizontal of existing bldg to new classrooms at 1st fl level, south | $1,141,000 | |
| Jan 8, 2002 | Completed final sign-off Oct 2002 | 755 Ocean Av | renovation of an (e) school teater on the 2nd floor- new seating for a total of 411 seatsDetails
renovation of an (e) school teater on the 2nd floor- new seating for a total of 411 seats | $500,000 | |
| Aug 4, 2000 | Expired or cancelled expired Sep 2003 | 755 Ocean Av | wood and duct fire supression systemDetails
wood and duct fire supression system | $2,500 | |
| Jul 14, 2000 | Expired or cancelled expired Feb 2001 | 755 Ocean Av | istall owners u/l listed hood suppllied berlin food equip. ins. #16 guageDetails
istall owners u/l listed hood suppllied berlin food equip. ins. #16 guage | $13,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Truebeck Construction (11), Plant Construction Company Lp (9), Allied Fire Protection (4), H & M Fire Protection, Inc. (4), Bay Alarm Company (3), Bayside Heating & A/C Inc (3), Pyro-Comm Systems, Inc. (3), The Lawson Roofing Co Inc. (3), Saarman Construction,Ltd. (2), Air Exhange, Inc., Bay Alarm Company, Bay Alarm Company, Brendan Waters Construction Inc, City Mechanical Inc, Cosco Fire Protection Inc., Ecoenergies Construction, H 2 Fire Protection, Plant Construction Co, Lp, Slayton Construction, Sunlogic Inc Dba Solar Technologies, The Window Guild Dba Jamz Construction
- Architects
- Stephen Marnold (3), Thurston Shell (3), Jennifer Devlin (2), Chad Hamilton, Dwight Alan Long, Kevin Hart Architecture, Michael Jake
- Engineers
- Robert Espinoza (2), Andy Forrest, Don David, Eric Soladay, Jared Barrilleaux, Jason White, Jingbo Yang, John Knox, Kevin Day, Meng Hsiu Chen, Ramez Sayed, Steven Tipping, Theodore Charles Grabowsky, Tunde Munz
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.