Dwight Long
- Listed as
- architect, designer, engineer, lessee
- Firm
- Pfau Architecture
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Jan 2019
33 permits since 2000 (architect on 31 permits, designer on 1 permit, engineer on 1 permit, lessee on 1 permit): 24 completed, 7 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 3, 2019 | Completed final sign-off Sep 2019 | 1563 Page St | Eric F Anderson Incorporated | replacement of all e roof equipment & shall use all e inerior ducts where feasible. at time of hvac replacement, roofing finish replacement will also occur on buildings b,c,& d as well as skylight waterproofing maintenance & repair. building b roof will require structural strengthening to accomodateDetails
replacement of all e roof equipment & shall use all e inerior ducts where feasible. at time of hvac replacement, roofing finish replacement will also occur on buildings b,c,& d as well as skylight waterproofing maintenance & repair. building b roof will require structural strengthening to accomodate | $200,000 |
| May 24, 2018 | Completed final sign-off Aug 2018 | 61 Bluxome St | Tcg Builders Inc Dba The Core Group | revision to 201801188922 new interior window in a non load bearing partition. new furring wall and new non load bearing partition at storage room and it closet maher naDetails
revision to 201801188922 new interior window in a non load bearing partition. new furring wall and new non load bearing partition at storage room and it closet maher na | $5,000 |
| Jan 18, 2018 | Completed final sign-off Aug 2018 | 61 Bluxome St | Tcg Builders Inc Dba The Core Group | ti- will include update of fixtures to the (e) 2 story bld to be used as an exhibition space with an increased occupant load. restrooms and exit passageway and refreshments to be made accessible. mep/fire/life safety under sep permitDetails
ti- will include update of fixtures to the (e) 2 story bld to be used as an exhibition space with an increased occupant load. restrooms and exit passageway and refreshments to be made accessible. mep/fire/life safety under sep permit | $200,000 |
| May 12, 2017 | Completed final sign-off Sep 2017 | 2558 Mission St | Plant Construction Co, Lp | partial change of use from mercantile to educational for 7341 sq.ft. for alta vista school. entire floor space shall be "e" occupancy. 6 classrms, 3 private offices & 1 storage room. includes fit out of entry lobby, 1 classroom, 2 private offices, 1 faculty louge, 1 multi purpose room. mep & lifeDetails
partial change of use from mercantile to educational for 7341 sq.ft. for alta vista school. entire floor space shall be "e" occupancy. 6 classrms, 3 private offices & 1 storage room. includes fit out of entry lobby, 1 classroom, 2 private offices, 1 faculty louge, 1 multi purpose room. mep & life | $930,000 |
| Feb 9, 2017 | Never finaled issued Jul 2017, no final | 250 Valencia St | installation of railing on top of existing roof behind the (e) parapet along east evevation of existing building. no occupancy allowed on roof.Details
installation of railing on top of existing roof behind the (e) parapet along east evevation of existing building. no occupancy allowed on roof. | $10,000 | |
| Nov 1, 2016 | Completed final sign-off Jan 2018 | 1201 Bryant St | exterior renovations for barrier removal - new accessable entrance, removal of steel shed, lighting & exterior door & window repair & replacement. ** maher: n/a **Details
exterior renovations for barrier removal - new accessable entrance, removal of steel shed, lighting & exterior door & window repair & replacement. ** maher: n/a ** | $1,200,000 | |
| Sep 23, 2016 | Completed final sign-off Dec 2017 | 1201 Bryant St | H & M Fire Protection, Inc. | replace sprinkler with new. replace (e) 3/4" pipe with new 1" pipe. add floor control. valves. upgrade seismic sway bracing. ref bldg pa# 2016/06/30/1320. no exterior work. fire sprinkler work only. ** maher: n/a **Details
replace sprinkler with new. replace (e) 3/4" pipe with new 1" pipe. add floor control. valves. upgrade seismic sway bracing. ref bldg pa# 2016/06/30/1320. no exterior work. fire sprinkler work only. ** maher: n/a ** | $126,000 |
| Sep 15, 2016 | Never finaled issued Oct 2016, no final | 3839 Washington St | Johnstone - Mc Auliffe Const. Inc. | revision to pa #201605117189 - revisoin to drainage an sandbox on civil site plan, revision to interior classroom scope. no change to existing gate on site plan.Details
revision to pa #201605117189 - revisoin to drainage an sandbox on civil site plan, revision to interior classroom scope. no change to existing gate on site plan. | |
| Sep 15, 2016 | Never finaled issued Oct 2016, no final | 233 Maple St | Johnstone - Mc Auliffe Const. Inc. | revision to pa #201605238151: revising egress access routes, revising site drainage at sandbox.Details
revision to pa #201605238151: revising egress access routes, revising site drainage at sandbox. | |
| Jun 30, 2016 | Completed final sign-off Jul 2016 | 233 Maple St | Fisher Development Inc | revision to app#2014-0624-9281 s2. this change includes a revision to the egress route from the bldg as discussed with the bldg inspector.Details
revision to app#2014-0624-9281 s2. this change includes a revision to the egress route from the bldg as discussed with the bldg inspector. | |
| Jun 30, 2016 | Completed final sign-off Dec 2017 | 1201 Bryant St | Fisher Development Inc | building interior alterations. work includes (n) bathrooms, elevator & core build-out. no change in area, use or occupancy classification. exterior work & barrier removal under separate permit. mep deferred.Details
building interior alterations. work includes (n) bathrooms, elevator & core build-out. no change in area, use or occupancy classification. exterior work & barrier removal under separate permit. mep deferred. | $3,200,000 |
| Jun 15, 2016 | Expired or cancelled withdrawn Oct 2016 | 2558 Mission St | Plant Construction Co, Lp | scope of work for this project is limited kto 5,023 sf of construction fo rone tenant suite. the restrooms are existing & built under separate permit. this permit is for architectural & structural work only. mech, elec & fire/life safety engineering under separate permit.Details
scope of work for this project is limited kto 5,023 sf of construction fo rone tenant suite. the restrooms are existing & built under separate permit. this permit is for architectural & structural work only. mech, elec & fire/life safety engineering under separate permit. | $250,000 |
| May 6, 2016 | Completed final sign-off Apr 2017 | 1639 Oak St | Plant Construction Co, Lp | revision to app#201501266630 s4. correction t0 door schedule only. sheet a10.02. door 201,202,203,204,205, & 206 are incorrectly marked on door schedule as rated. per pre-app and plan check a rating is not required in the locations.Details
revision to app#201501266630 s4. correction t0 door schedule only. sheet a10.02. door 201,202,203,204,205, & 206 are incorrectly marked on door schedule as rated. per pre-app and plan check a rating is not required in the locations. | |
| Apr 25, 2016 | Completed final sign-off Dec 2016 | 2558 Mission St | Plant Construction Co, Lp | work on 1st floor. change of use from retail to education. t-i includes (7) new classrooms, (2) new private offices, and upgrade school entry. all work on 1st floor. mep, life safety and exit signage under seperate permit.Details
work on 1st floor. change of use from retail to education. t-i includes (7) new classrooms, (2) new private offices, and upgrade school entry. all work on 1st floor. mep, life safety and exit signage under seperate permit. | $750,000 |
| Apr 11, 2016 | Completed final sign-off Jul 2016 | 233 Maple St | Fisher Development Inc | revision to appl #201406249281-s2: revision involves a change in rhe accessible route to the bldg & removal of the requirement for fire alarm tie-in to 3839 washington st per discussion during fire alarm plan check.Details
revision to appl #201406249281-s2: revision involves a change in rhe accessible route to the bldg & removal of the requirement for fire alarm tie-in to 3839 washington st per discussion during fire alarm plan check. | |
| Apr 7, 2016 | Completed final sign-off Aug 2017 | 1201 Bryant St | interior non structural demo, flooring and walls, mep systems, manufactory equipment. building to remain vacant and comply with ab-0b17Details
interior non structural demo, flooring and walls, mep systems, manufactory equipment. building to remain vacant and comply with ab-0b17 | $450,000 | |
| Apr 5, 2016 | Expired or cancelled withdrawn Jul 2016 | 1639 Oak St | revision to arch/mep 2015 0126 6630 s4. remove mid/intermdiate rail between stair at 1st & 2nd floor. requested by fire inspectionDetails
revision to arch/mep 2015 0126 6630 s4. remove mid/intermdiate rail between stair at 1st & 2nd floor. requested by fire inspection | ||
| Mar 30, 2016 | Completed final sign-off Dec 2016 | 2558 Mission St | Plant Construction Co, Lp | core work ti includes new restroom, shower room, common stroage room and egress hallway. no structural work. mep/life safety under seperate permit.Details
core work ti includes new restroom, shower room, common stroage room and egress hallway. no structural work. mep/life safety under seperate permit. | $375,000 |
| Feb 24, 2016 | Completed final sign-off Apr 2017 | 1639 Oak St | Plant Construction Co, Lp | revision to arch/mep addendum 201501266630-s4, health dept review of proposed kitchen located on 1st flDetails
revision to arch/mep addendum 201501266630-s4, health dept review of proposed kitchen located on 1st fl | |
| Feb 18, 2016 | Completed final sign-off Mar 2016 | 233 Maple St | Fisher Development Inc | revision to previously issued permit 201406249281(s2); this revision involves the removal of a glass draft stop at the 2nd level of the building's open stair.Details
revision to previously issued permit 201406249281(s2); this revision involves the removal of a glass draft stop at the 2nd level of the building's open stair. | |
| Oct 8, 2015 | Never finaled issued Nov 2015, no final | 3839 Washington St | Fisher Development Inc | new exterior stair with one hour property line wall for comletion at egress path for the 233 maple street shcool building as required under p#201406249281Details
new exterior stair with one hour property line wall for comletion at egress path for the 233 maple street shcool building as required under p#201406249281 | $50,000 |
| Feb 23, 2015 | Never finaled issued Jun 2015, no final | 1625 Oak St | Plant Construction Co, Lp | erect/move building from blk 1223, lot 023, type v two story single family dwelling. garage level to be sprinklered to nfpa 13r (under separate permit)Details
erect/move building from blk 1223, lot 023, type v two story single family dwelling. garage level to be sprinklered to nfpa 13r (under separate permit) | $225,000 |
| Feb 11, 2015 | Never finaled issued Jun 2015, no final | 1637 Oak St | Plant Construction Co, Lp | move house from lot 023 to lot 3 address 1625 oak street. maintain (e) conditions as discribed in drawing. foundation to remain. garage level to be sprinklered to nfpa 13r (under separate permit)Details
move house from lot 023 to lot 3 address 1625 oak street. maintain (e) conditions as discribed in drawing. foundation to remain. garage level to be sprinklered to nfpa 13r (under separate permit) | $25,000 |
| Feb 9, 2015 | Completed final sign-off Aug 2017 | 1400 16th St | Charles Pankow Builders Ltd | architectural and mep upgrades to building (maher ordinance - extended ordinance $155-13 not required) related planning case: 2014-003102env. sprinklers and fire alarm under separate permit.Details
architectural and mep upgrades to building (maher ordinance - extended ordinance $155-13 not required) related planning case: 2014-003102env. sprinklers and fire alarm under separate permit. | $3,900,000 |
| Jan 30, 2015 | Completed final sign-off Oct 2015 | 755 Ocean Av | voluntary seismic upgrade to classroom roof and wall connection. n/a ordinance #155-13Details
voluntary seismic upgrade to classroom roof and wall connection. n/a ordinance #155-13 | $295,000 | |
| Jan 26, 2015 | Completed final sign-off Apr 2017 | 1639 Oak St | Plant Construction Co, Lp | erect a three story type iia commercial building. building address should be 1639 oak street.Details
erect a three story type iia commercial building. building address should be 1639 oak street. | $15,000,000 |
| Dec 24, 2014 | Completed final sign-off Aug 2017 | 1400 16th St | Charles Pankow Builders Ltd | seismic strengthening of building and addition of new skylight.Details
seismic strengthening of building and addition of new skylight. | $1,100,000 |
| Apr 3, 2013 | Completed final sign-off Oct 2016 | 2059 Golden Gate Av | Ampex Engineering & Co | add new s-car parking area below 1/f residential occupancy incl new exterior opening for garage door, new auto runway & curb cut, new street tree & landscaping, relocation of (e) wd post & beamws, demo (e) basementDetails
add new s-car parking area below 1/f residential occupancy incl new exterior opening for garage door, new auto runway & curb cut, new street tree & landscaping, relocation of (e) wd post & beamws, demo (e) basement | $60,000 |
| Mar 6, 2013 | Completed final sign-off Oct 2013 | 250 Valencia St | demolition of interior door opening at library and demolition of bathroom at gym.Details
demolition of interior door opening at library and demolition of bathroom at gym. | $7,500 | |
| Nov 15, 2012 | Completed final sign-off Dec 2015 | 8 Farnum St | 2nd flr:interior bathroom and kitchen renovation,new bathroom fixture, new kitchen cabinates,fixtures and appliances,new kitchen and bath plumbing,lighting ad electrical, new wall and adjoring space 1st:coverting exisiting storage area to den using adjoing spa roof:3 new skylightsDetails
2nd flr:interior bathroom and kitchen renovation,new bathroom fixture, new kitchen cabinates,fixtures and appliances,new kitchen and bath plumbing,lighting ad electrical, new wall and adjoring space 1st:coverting exisiting storage area to den using adjoing spa roof:3 new skylights | $35,000 | |
| Dec 22, 2008 | Completed final sign-off Jan 2009 | 2750 Jackson St | replacement of existing 14 ft. fence on lower rooftop playfield.Details
replacement of existing 14 ft. fence on lower rooftop playfield. | $20,000 | |
| Mar 20, 2008 | Never finaled issued Mar 2008, no final | 350 Brannan St | change ground floor suite main entry designation from (e) brannan entry to (e) jack london alley entry. entry from brannan st. is not ada accessible & is the back door in relation to the tenant build-out. entry from jack london allen is accessible and is the front entry to tenant space on grd flr.Details
change ground floor suite main entry designation from (e) brannan entry to (e) jack london alley entry. entry from brannan st. is not ada accessible & is the back door in relation to the tenant build-out. entry from jack london allen is accessible and is the front entry to tenant space on grd flr. | ||
| Oct 1, 2007 | Completed final sign-off Jun 2008 | 8 Farnum St | add walls and door at garage to create study and storage. change exiting window to door for study room.Details
add walls and door at garage to create study and storage. change exiting window to door for study room. | $3,000 |