Block 3616, lot 085
2558 Mission St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2016 | Expired or cancelled withdrawn Oct 2016 | 2558 Mission St | Plant Construction Co, Lp | scope of work for this project is limited kto 5,023 sf of construction fo rone tenant suite. the restrooms are existing & built under separate permit. this permit is for architectural & structural work only. mech, elec & fire/life safety engineering under separate permit.Details
scope of work for this project is limited kto 5,023 sf of construction fo rone tenant suite. the restrooms are existing & built under separate permit. this permit is for architectural & structural work only. mech, elec & fire/life safety engineering under separate permit. | $250,000 |
| Jun 14, 2016 | Completed final sign-off Dec 2016 | 2558 Mission St | Plant Construction Co, Lp | mechanical and electrical work only for one, 5023 sf tenant suite. no change of use. ref. app#2016-04-25-5600Details
mechanical and electrical work only for one, 5023 sf tenant suite. no change of use. ref. app#2016-04-25-5600 | $120,000 |
| May 17, 2016 | Completed final sign-off Jun 2016 | 2558 Mission St | Allied Fire Protection | level 1: fire sprinklers- 8 new sprinkler. 23 relocated sprinklers. total 31. ref pa 2016 0330 3527Details
level 1: fire sprinklers- 8 new sprinkler. 23 relocated sprinklers. total 31. ref pa 2016 0330 3527 | $16,000 |
| Apr 25, 2016 | Completed final sign-off Dec 2016 | 2558 Mission St | Plant Construction Co, Lp | work on 1st floor. change of use from retail to education. t-i includes (7) new classrooms, (2) new private offices, and upgrade school entry. all work on 1st floor. mep, life safety and exit signage under seperate permit.Details
work on 1st floor. change of use from retail to education. t-i includes (7) new classrooms, (2) new private offices, and upgrade school entry. all work on 1st floor. mep, life safety and exit signage under seperate permit. | $750,000 |
| Mar 30, 2016 | Completed final sign-off Dec 2016 | 2558 Mission St | Plant Construction Co, Lp | core work ti includes new restroom, shower room, common stroage room and egress hallway. no structural work. mep/life safety under seperate permit.Details
core work ti includes new restroom, shower room, common stroage room and egress hallway. no structural work. mep/life safety under seperate permit. | $375,000 |
| Oct 28, 2015 | Completed final sign-off Jul 2016 | 2558 Mission St | Build Group Inc. | install seven (7) z-duct locations and install one missed z-duct from original permit 2013-0116-8124.Details
install seven (7) z-duct locations and install one missed z-duct from original permit 2013-0116-8124. | $10,000 |
| Aug 27, 2014 | Expired or cancelled cancelled Jan 2026 | 2558 Mission St | fire evacuation mapsDetails
fire evacuation maps | $39,000 | |
| Jul 9, 2014 | Never finaled issued Jul 2014, no final | 2558 Mission St | street spaceDetails
street space | ||
| Jun 4, 2014 | Completed final sign-off May 2021 | 2558 Mission St | Build Group Inc. | new property line opening in unit 807. ab-009 compliant.Details
new property line opening in unit 807. ab-009 compliant. | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction Co, Lp (4), Build Group Inc. (2), Allied Fire Protection
- Architects
- Dwight Long (2), Denis Henmi
- Engineers
- Dwight Long
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.