Contractors with bathroom remodel permits
Ranked across every bathroom remodel permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Showing contractors with a bathroom remodel permit in the last 5 years. Include inactive contractors
CompletedIn progressNever finaledExpired or cancelled
- 1Brady ConstructionLicense 539362 86 permits: 86 completed. Last filed May 2026. Typically 78 days from permit to final inspection.
- 2Camp Roofing Ltd Dba Camp ConstructionLicense 1088923 415 permits: 353 completed, 56 in progress, 4 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 70 days from permit to final inspection.
- 3Chl Construction CompanyLicense 960561 52 permits: 49 completed, 3 in progress. Last filed Jun 2026. Typically 249 days from permit to final inspection.
- 4William Gregory ClauseLicense 831583 109 permits: 107 completed, 2 expired or cancelled. Last filed Jul 2024. Typically 181 days from permit to final inspection.
- 5Jason Liu Construction CompanyLicense 662067 41 permits: 40 completed, 1 in progress. Last filed Aug 2026. Typically 243 days from permit to final inspection.
- 6Dunros ConstructionLicense 977841 42 permits: 39 completed, 3 in progress. Last filed May 2026. Typically 158 days from permit to final inspection.
- 7Chongson Construction Co.License 642065 39 permits: 39 completed. Last filed Mar 2025. Typically 125 days from permit to final inspection.
- 8Mr UngerLicense 982722 41 permits: 38 completed, 3 in progress. Last filed Aug 2026. Typically 58 days from permit to final inspection.
- 9Valex ConstructionLicense 809059 65 permits: 62 completed, 2 in progress, 1 never finaled. Last filed Jul 2026. Typically 82 days from permit to final inspection.
- 10Be Home Remodeling IncLicense 1115373 49 permits: 36 completed, 13 in progress. Last filed Aug 2026. Typically 63 days from permit to final inspection.
- 11Hang C Construction IncLicense 760153 36 permits: 35 completed, 1 in progress. Last filed May 2025. Typically 180 days from permit to final inspection.
- 12Steven Liao Construction CompanyLicense 690964 38 permits: 35 completed, 3 in progress. Last filed Sep 2026. Typically 189 days from permit to final inspection.
- 13Patrick Coakley ConstructionLicense 819320 35 permits: 34 completed, 1 in progress. Last filed Jul 2024. Typically 153 days from permit to final inspection.
- 14We Do Construction Inc.License 1096552 95 permits: 74 completed, 19 in progress, 2 expired or cancelled. Last filed Aug 2026. Typically 98 days from permit to final inspection.
- 15Sure, Inc.License 561658 727 permits: 673 completed, 11 in progress, 25 never finaled, 18 expired or cancelled. Last filed Aug 2026. Typically 92 days from permit to final inspection.
- 16Hong Shink ConstructionLicense 758888 57 permits: 54 completed, 2 in progress, 1 never finaled. Last filed Jun 2026. Typically 142 days from permit to final inspection.
- 17B R S ConstructionLicense 896799 32 permits: 32 completed. Last filed Dec 2025. Typically 102 days from permit to final inspection.
- 18Sean M O'reillyLicense 812877 34 permits: 32 completed, 2 in progress. Last filed May 2026. Typically 77 days from permit to final inspection.
- 19Bay Metro CorporationLicense 850352 54 permits: 52 completed, 1 in progress, 1 never finaled. Last filed Apr 2026. Typically 119 days from permit to final inspection.
- 20S H C ILicense 887172 30 permits: 30 completed. Last filed Sep 2023. Typically 129 days from permit to final inspection.
- 217 Hills ConstructionLicense 1064265 36 permits: 30 completed, 6 in progress. Last filed Sep 2026. Typically 122 days from permit to final inspection.
- 22Jin Qing Construction Corp.License 1030182 30 permits: 29 completed, 1 in progress. Last filed Aug 2026. Typically 275 days from permit to final inspection.
- 23Yefa Construction IncLicense 1047719 31 permits: 29 completed, 2 in progress. Last filed Nov 2025. Typically 310 days from permit to final inspection.
- 24Yiu's Construction CoLicense 802681 85 permits: 81 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Last filed Jul 2026. Typically 105 days from permit to final inspection.
- 25Toni's Construction IncLicense 551504 67 permits: 65 completed, 2 expired or cancelled. Last filed Apr 2025. Typically 141 days from permit to final inspection.
- 26Great Ocean Construction Inc.License 1103304 32 permits: 28 completed, 4 in progress. Last filed Jul 2026. Typically 138 days from permit to final inspection.
- 27Darc Ventures Inc Dba Spl Construction SLicense 938513 80 permits: 74 completed, 3 in progress, 3 expired or cancelled. Last filed Aug 2026. Typically 178 days from permit to final inspection.
- 28Landmark Construction Inc.License 907832 45 permits: 44 completed, 1 never finaled. Last filed Apr 2023. Typically 148 days from permit to final inspection.
- 29Nelson T Lewis Const Co Inc.License 195866 94 permits: 87 completed, 3 in progress, 4 expired or cancelled. Last filed Sep 2026. Typically 88 days from permit to final inspection.
- 30At6 Design BuildLicense 283485 45 permits: 43 completed, 1 in progress, 1 never finaled. Last filed Apr 2026. Typically 288 days from permit to final inspection.
- 31T T General ConstructionLicense 927524 26 permits: 25 completed, 1 in progress. Last filed Feb 2026. Typically 184 days from permit to final inspection.
- 32Kenneth ChiuLicense 817869 26 permits: 25 completed, 1 in progress. Last filed Jul 2026. Typically 93 days from permit to final inspection.
- 33J. Ho Construction IncLicense 680425 142 permits: 133 completed, 1 in progress, 4 never finaled, 4 expired or cancelled. Last filed Apr 2026. Typically 89 days from permit to final inspection.
- 34Bai Yuan LiLicense 923824 42 permits: 41 completed, 1 never finaled. Last filed Dec 2025. Typically 147 days from permit to final inspection.
- 35Lee And Son Construction Inc.License 961053 64 permits: 55 completed, 7 in progress, 1 never finaled, 1 expired or cancelled. Last filed Jun 2026. Typically 200 days from permit to final inspection.
- 36Winder Construction Inc.License 1033654 28 permits: 24 completed, 4 in progress. Last filed Jun 2026. Typically 350 days from permit to final inspection.
- 37Elisha MayostLicense 881789 41 permits: 39 completed, 1 in progress, 1 expired or cancelled. Last filed Apr 2025. Typically 128 days from permit to final inspection.
- 38Ly Green Construction IncLicense 1056878 29 permits: 23 completed, 6 in progress. Last filed Sep 2026. Typically 127 days from permit to final inspection.
- 39C & L Builders Inc.License 860328 25 permits: 23 completed, 2 in progress. Last filed Sep 2026. Typically 206 days from permit to final inspection.
- 40Freemodel Inc.License 1066986 25 permits: 23 completed, 2 in progress. Last filed Sep 2026. Typically 117 days from permit to final inspection.
Most recent bathroom remodel permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress | 745 Lakeview Av | addition & alterations to (e) one story, sfd. new basement. great room addition at 1st floor & kitchen remodel. 2nd floor addition with new bedroom & bathrooms. approximatly 80 cu. ft. to be excavated for new basement below proposed addition. | $199,000 | |
| Oct 1, 2026 | In progress | 465 Harkness Av | fill in side yard for new baths & closet @ ground floor.new perimiter footings,new roof deck over to be incombustible material.open wall to expand media room,add beam cols,ftgs as needed.enclosed(e)garage.general mech,elec, & plumb upgrades. | $80,000 | |
| Oct 1, 2026 | In progress | 148 Caine Av | to comply with nov# 202657051. 1/f: add media room, 2 bedroom and 1 full bath. 2/f: remodel kitchen and bathroom. add new exterior stair at rear, replace garage door with in kind (w00d) replace front windows with kind (vinyl). | $180,000 | |
| Oct 1, 2026 | In progress | 1447 Palou Av | removal of unpermitted oven/stove and replacement with two-burner stovetop. legalize full bathroom including addition of shower. | $1,000 | |
| Oct 1, 2026 | In progress | 36 College Av | 1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs. | $80,000 | |
| Oct 1, 2026 | In progress | 1620 Jones St | units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family area | $90,000 | |
| Oct 1, 2026 | In progress | 1972 Green St | add adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic. | $85,000 | |
| Oct 1, 2026 | In progress | 2072 Ellis St | 1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit. | $550,000 | |
| Oct 1, 2026 | In progress | 55 Balceta Av | Modl Construction | remove bathtub & plumbing connections, remove bathroom finishes, fixtures accessaries & trims. demo wall, install new shower compartment, shower pan, shower plumbing, valve, shower head & drain. replace water closet, vanity. new electrical-receptacles, lights,switches, and exhaust fan. switches | $20,000 |
| Oct 1, 2026 | In progress | 250 King St | Brenes Construction | remodel 2 existing bathrooms in kind. replace tile finishes and vanities. kitchen: replace countertops in kind. no change to existing layout. no structural work, no wall removed or relocated. plumb, elec remain. all existing accessible features to be maintained | $9,000 |
| Oct 1, 2026 | In progress | 2412 22nd Av | Kearney Construction Llc | demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodel | $120,000 |
| Sep 30, 2026 | In progress | 267 Bright St | new adu per ca govt code. at 1/f: modify (e) floor space with 1 new bedroom and bathroom, kitchen and laundry. | $85,000 | |
| Sep 30, 2026 | In progress | 1519 28th Av | revision to pa#202508122788: 1) reduce the width of new door 1 in bedroom #1. 2)relocate the sink in new bath #2. 3) window 3 like for like replacement on the 2nd floor livingroom. | ||
| Sep 30, 2026 | In progress | 1736 Larkin St | vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access... | $500,000 | |
| Sep 30, 2026 | In progress | 2450 Van Ness Av | construction of a 2-unit detached adu building, type v-b, 2 story, with 1 bedroom and 1 bathroom per unit per the state program | $225,000 | |
| Sep 30, 2026 | In progress | 341 Avila St | expansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance. | $744,000 | |
| Sep 30, 2026 | In progress | 480 Mission Bay Blvd North Bl | Velocity Remediation Llc | replace drywall that was removed due to water damage 100 sq ft in ceiling @ bathroom & in closet. replace tile @ tub wall. new sheet rock shall be 5/8" type x gyp board and to match existing. no wall relocation, no structural work. | $10,000 |
| Sep 30, 2026 | In progress | 461 02nd St | Level Edge Construction Llc | apt c123 - bathroom remodeling take out the tub make a shower pan, plumbing valve change and angle stop. electrical will be the same. no layout change. | $15,000 |
| Sep 30, 2026 | In progress | 3232 Buchanan St | Yellow Zone Construction | to comply with nov#202652319 (item 9) & 202657825, kitchen & bath remodel like kind, unit #3, install disconnect for sub-panel; install water heater; install drain and trap vent in tradesman corridor and legalize unpermitted laundry area in garage. to comply with nov #202652063 | $10,000 |
| Sep 30, 2026 | In progress | 1849 Church St | Hrvc Construction Inc | kitchen, bathroom and laundry-elec room remodel. (apartments 1 & 3) all work in-kind, no layout changes and replace all plumbing fixtures. no removal of walls. | $120,240 |
| Sep 29, 2026 | In progress | 663 09th Av | new plan configuration: move existing kitchen and 2 bathrooms for the new layout and remodel them. remove load bearing wall in the kitchen. replace the existing fire egress stair ladder with new stairs and landing in the rear. | $160,000 | |
| Sep 29, 2026 | In progress | 1240 Valencia St | convert (e) storage into accessible bathroom. install new range & new hand sink to (e) food prep room. | $60,000 | |
| Sep 29, 2026 | In progress | 615 Hayes St | addition of one bathroom at garage. | $15,000 | |
| Sep 29, 2026 | In progress | 114 Jasper Pl | new adu on 1/f including kitchen, 1 media room, sleeping area, & 1 3-fixture bathroom. | $50,000 | |
| Sep 29, 2026 | In progress | 665 09th Av | remodel existing master bedroom and bathroom. | $25,000 | |
| Sep 29, 2026 | In progress | 1034 Noe St | level 1 - demo full bath, pantry, kitchen & laundry for (n) powder room, laundry and room & kitchen, demo 2 window for (n) window; level 2 - demo bath for (n) full bath w/shower, demo primary bath for new full bath w/2 sink vanity, shower & toilet. family room: new door & (n) millwork | $175,000 | |
| Sep 29, 2026 | In progress | 1269 Silver Av | interior remodel: 1) 2nd floor add new bath, bedroom, and laundry room. 2) 1st floor to add new bathroom, new bedroom and new entertainment room. | $200,000 | |
| Sep 29, 2026 | In progress | 2843 Webster St | unit 205: to reconfigure central hallway and bathroom layout, construct a new dedicated laundry closet with washer/ dryer hookups. convert (e) single bathroom into 1 full bathroom and 1 primary en suite bathroom. remodel kitchen with new cabinets, countertops and appliances. relocate interior non-be | $50,000 | |
| Sep 29, 2026 | In progress | 1363 45th Av | convert (e) storage & office into 2 bedroom, new media room & 1 (n) full bath at basement level. replace (e) furnace & water heater. approximately 513sf | $15,000 | |
| Sep 29, 2026 | In progress | 217 Kearny St | C.B Pro, Inc. | cosmetic tenat replacement. bathroom replace cashier counter top @ bar location, paint | $78,000 |