Back to bathroom remodel contractors
Ly Green Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Dec 2019 to Sep 2026
- Last 24 months
- 16 permits filed
54 permits since 2000: 44 completed, 9 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 23 completed, 6 in progress. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1889 Church St | revision to 202512051150. new dormer at 3rd fl containing new full bath.Details
revision to 202512051150. new dormer at 3rd fl containing new full bath. | |
| Aug 27, 2026 | In progress issued Oct 2026 | 3065 Clay St | interior remodel of unit #203 existing bath and add new bath. remodel foyer and entry. non-structurl work only. no exterior workDetails
interior remodel of unit #203 existing bath and add new bath. remodel foyer and entry. non-structurl work only. no exterior work | $50,000 |
| Jun 10, 2026 | In progress issued Aug 2026 | 102 Santa Marina St | replace (2) sliding doors at rear facade, not visible from street. remodel primary bath and walk-in closet. remove fireplace inserts, and replace cabinets in living room.Details
replace (2) sliding doors at rear facade, not visible from street. remodel primary bath and walk-in closet. remove fireplace inserts, and replace cabinets in living room. | $50,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 1889 Church St | interior only kitchen and bathroom remodel. demolition of one wall, finishes, and fixtures/lightings. minor mep upgrades. structural upgrades. replacing windows at upper floor.Details
interior only kitchen and bathroom remodel. demolition of one wall, finishes, and fixtures/lightings. minor mep upgrades. structural upgrades. replacing windows at upper floor. | $250,000 |
| Sep 4, 2025 | In progress issued Dec 2025 | 1 Country Club Dr | revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the otherDetails
revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the other | |
| Jun 24, 2025 | Completed final sign-off Jan 2026 | 643 Carolina St | work on 3rd floor. hallway bathroom remodel in kind upgrade water, electrical up to city code. kitchen remodel in kind. upgrade all emp per city code. no wall demolition or construction, no change in plumbing fixture count.Details
work on 3rd floor. hallway bathroom remodel in kind upgrade water, electrical up to city code. kitchen remodel in kind. upgrade all emp per city code. no wall demolition or construction, no change in plumbing fixture count. | $109,700 |
| Apr 8, 2025 | In progress issued Apr 2025 | 1 Country Club Dr | renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings.Details
renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings. | $123,000 |
| Jan 14, 2025 | Completed final sign-off May 2026 | 421 Oak Park Dr | remodel (e) kitchen with vaulted ceiling, new layout, appliances. remodel (e) 1st fl beyond garage w family room, new bedroom, new bath, remodel (e) laundry. remodel in keeping w precedent set by neighboring residences. replace (e) first floor window and door w/ (n) sliding doors.Details
remodel (e) kitchen with vaulted ceiling, new layout, appliances. remodel (e) 1st fl beyond garage w family room, new bedroom, new bath, remodel (e) laundry. remodel in keeping w precedent set by neighboring residences. replace (e) first floor window and door w/ (n) sliding doors. | $250,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 1130 Treat Av | bathroom remodel like for like: no changes to wall layout.Details
bathroom remodel like for like: no changes to wall layout. | $35,000 |
| Oct 25, 2023 | Completed final sign-off Feb 2024 | 643 Carolina St | bathroom remodel like for like, upgrade sub-panel to 200amp.Details
bathroom remodel like for like, upgrade sub-panel to 200amp. | $18,000 |
| Mar 8, 2023 | Completed final sign-off Jul 2023 | 1410 Dolores St | bathroom remodel. all work like for like. tub and shower system. no removal of wallsDetails
bathroom remodel. all work like for like. tub and shower system. no removal of walls | $30,000 |
| Mar 8, 2023 | Completed final sign-off Jul 2023 | 801 Indiana St | unit 560: remodel 1 kitchen, 2 bathrooms and 1 powder room (shower/tub). all work like for like. no changes to layout. no removal of wallsDetails
unit 560: remodel 1 kitchen, 2 bathrooms and 1 powder room (shower/tub). all work like for like. no changes to layout. no removal of walls | $150,000 |
| Aug 11, 2022 | Completed final sign-off Dec 2022 | 1117 Alabama St | unit b: kitchen remodel like for like: bathroom remodel like for like: no change in layout.Details
unit b: kitchen remodel like for like: bathroom remodel like for like: no change in layout. | $80,000 |
| Dec 3, 2021 | Completed final sign-off Apr 2022 | 801 Indiana St | kitchen remodel, like for like. bath remodel, like for like. no structural work. no layout change, no wall removal.Details
kitchen remodel, like for like. bath remodel, like for like. no structural work. no layout change, no wall removal. | $45,000 |
| Nov 8, 2021 | Completed final sign-off Nov 2021 | 868 Minnesota St | unit #411: bathroom remodel like for like, no changes in layout. no structural work. no framing modification.Details
unit #411: bathroom remodel like for like, no changes in layout. no structural work. no framing modification. | $20,000 |
| Nov 2, 2021 | Completed final sign-off Jun 2022 | 867 Indiana St | one bathroom remodel like for like: no changes in layout.Details
one bathroom remodel like for like: no changes in layout. | $25,000 |
| Sep 30, 2021 | Completed final sign-off Mar 2022 | 3622 24th St | 4/f: revision in master bath layout change. remove 4 non loading bearing walls, non structural. ref. no-plan permit 202102124620. no new plumbing fixtures.Details
4/f: revision in master bath layout change. remove 4 non loading bearing walls, non structural. ref. no-plan permit 202102124620. no new plumbing fixtures. | $3,000 |
| Aug 26, 2021 | Completed final sign-off Feb 2022 | 989 20th St | in kind one kitchen remodel- in kind one bathroom remodel no changes in (e) layout.Details
in kind one kitchen remodel- in kind one bathroom remodel no changes in (e) layout. | $80,000 |
| Jul 30, 2021 | Completed final sign-off Jan 2022 | 88 King St | apt 420: remodel 2 bathrooms in-kiknd. no changes in (e) layout. lighting to comply with cec 150(k).Details
apt 420: remodel 2 bathrooms in-kiknd. no changes in (e) layout. lighting to comply with cec 150(k). | $40,000 |
| Jun 2, 2021 | Completed final sign-off Jul 2021 | 25 Camp St | unit 4: add a washer & dryer - laundry closet. modify non-load bearing walls between bedroom/bathroom.Details
unit 4: add a washer & dryer - laundry closet. modify non-load bearing walls between bedroom/bathroom. | $5,000 |
| May 13, 2021 | Completed final sign-off Sep 2021 | 2040 Franklin St | remodel one bathroom and kitchen in-kind. non-structural workDetails
remodel one bathroom and kitchen in-kind. non-structural work | $35,000 |
| Mar 31, 2021 | Completed final sign-off Feb 2023 | 1567 Beach St | remodel the entire house. upgrade main panel from 100 to 200a. relocate kitchen to dinning room area. add master bathroom in (e) kitchen location. convert 523sf part of (e) non habitable area on ground flr to office and laundry room.Details
remodel the entire house. upgrade main panel from 100 to 200a. relocate kitchen to dinning room area. add master bathroom in (e) kitchen location. convert 523sf part of (e) non habitable area on ground flr to office and laundry room. | $250,000 |
| Mar 1, 2021 | Completed final sign-off Apr 2021 | 25 Camp St | bathroom remodel. like for like. no structural work. no framing work.Details
bathroom remodel. like for like. no structural work. no framing work. | $20,000 |
| Feb 19, 2021 | Completed final sign-off Apr 2021 | 850 Minnesota St | bathroom remodeling tub to shower. adding 2 recessed lights. like for like no changes to layout. no walls moving.Details
bathroom remodeling tub to shower. adding 2 recessed lights. like for like no changes to layout. no walls moving. | $24,650 |
| Feb 12, 2021 | Completed final sign-off Mar 2022 | 3622 24th St | kitchen remodel like for like; (2) bathroom remodel like for like; powder room remodel like for like; new flooring, cabinets, countertops, backsplash, sinks and facuets.Details
kitchen remodel like for like; (2) bathroom remodel like for like; powder room remodel like for like; new flooring, cabinets, countertops, backsplash, sinks and facuets. | $140,000 |
| Nov 13, 2020 | Completed final sign-off May 2021 | 356 Roosevelt Wy | kitchen and bathroom remodeling like for like. no change to layout of walls and openingsDetails
kitchen and bathroom remodeling like for like. no change to layout of walls and openings | $25,000 |
| Sep 16, 2020 | Completed final sign-off Dec 2020 | 381 Elizabeth St | lower unit - remodel 1 kitchen and 1 bathroom in-kind. upper unit - remodel 1 kitchen and 2 bathrooms in-kind. replace 7 windows in back of house. non street visible. all work in-kind, no structural workDetails
lower unit - remodel 1 kitchen and 1 bathroom in-kind. upper unit - remodel 1 kitchen and 2 bathrooms in-kind. replace 7 windows in back of house. non street visible. all work in-kind, no structural work | $150,000 |
| Sep 9, 2020 | Completed final sign-off Aug 2021 | 91 Seward St | one kitchen and one bathroom remodeling: kitchen remodeling on 2nd fl like for like. bathroom remodeling on 1st fl like for like. nw lighting shall comply with cec 150.0 (k) 3 & k(5). no walls alterations. no nw wall & no extg wall relocations. all new plumbing fixtures retain in same location.Details
one kitchen and one bathroom remodeling: kitchen remodeling on 2nd fl like for like. bathroom remodeling on 1st fl like for like. nw lighting shall comply with cec 150.0 (k) 3 & k(5). no walls alterations. no nw wall & no extg wall relocations. all new plumbing fixtures retain in same location. | $80,000 |
| Dec 4, 2019 | Completed final sign-off Jun 2020 | 701 Minnesota St | 1 bathroom remodel like for like.Details
1 bathroom remodel like for like. | $12,000 |