Block 6593, lot 043
1410 Dolores St
- City’s use
- Single Family Residential
- Built
- 1957
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 1,697 sq ft
- Lot
- 2,665 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2023 | Completed final sign-off Jul 2023 | 1410 Dolores St | Ly Green Construction Inc | bathroom remodel. all work like for like. tub and shower system. no removal of wallsDetails
bathroom remodel. all work like for like. tub and shower system. no removal of walls | $30,000 |
| Dec 4, 2019 | Completed final sign-off Jul 2021 | 1410 Dolores St | 1)redesign extg front elevation by replacing finishes and windows. 2)install new security gate.Details
1)redesign extg front elevation by replacing finishes and windows. 2)install new security gate. | $28,000 | |
| Sep 24, 2019 | Never finaled issued Sep 2019, no final | 1410 Dolores St | street spaceDetails
street space | ||
| May 30, 2019 | Completed final sign-off Jul 2019 | 1410 Dolores St | Jjj & K Inc./Dba: Alexander Company | replace (2) non-visible door in rear of house w/ wood clad doors. like for like.Details
replace (2) non-visible door in rear of house w/ wood clad doors. like for like. | $6,900 |
| Apr 25, 2013 | Completed final sign-off Oct 2013 | 1410 Dolores St | Boivin Environmental | revision to bpa#2012-0809-6930. adjust 1-hour parapet location away from left side property line. remove stucco from entry hallway and install gyp board.Details
revision to bpa#2012-0809-6930. adjust 1-hour parapet location away from left side property line. remove stucco from entry hallway and install gyp board. | $900 |
| Aug 9, 2012 | Completed final sign-off Oct 2013 | 1410 Dolores St | Boivin Environmental | enclose extg lightwell, provide new skylights, parapet wall and add door to enclose extg breezway. mechanical ventilation @ kitchenDetails
enclose extg lightwell, provide new skylights, parapet wall and add door to enclose extg breezway. mechanical ventilation @ kitchen | $12,000 |
| Feb 8, 2008 | Completed final sign-off Nov 2008 | 1410 Dolores St | revision to permit number 200707116472. install boiler & radient heating. install new garage door.Details
revision to permit number 200707116472. install boiler & radient heating. install new garage door. | $6,000 | |
| Jul 11, 2007 | Completed final sign-off Nov 2008 | 1410 Dolores St | remodel existing habitable spaces at the ground floor: create new master bedroom and bathroom, with new windows and doors at rear. replace furnace and water heater.Details
remodel existing habitable spaces at the ground floor: create new master bedroom and bathroom, with new windows and doors at rear. replace furnace and water heater. | $60,000 | |
| Jan 11, 2006 | Completed final sign-off Feb 2006 | 1410 Dolores St | Ames-Billingsley, Inc. | install 6 replacement windows, 6 windows visible from street. u-value .38-.52Details
install 6 replacement windows, 6 windows visible from street. u-value .38-.52 | $3,991 |
| Nov 8, 2005 | Completed final sign-off Dec 2005 | 1410 Dolores St | replace kitchen cabinets, sink, appliances, countertop. no structural work.Details
replace kitchen cabinets, sink, appliances, countertop. no structural work. | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Boivin Environmental (2), Ames-Billingsley, Inc., Jjj & K Inc./Dba: Alexander Company, Ly Green Construction Inc
- Engineers
- Samuel Kwong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.