Back to bathroom remodel contractors
Yiu's Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Jul 2026
- Last 24 months
- 8 permits filed
148 permits since 2000: 141 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
85 bathroom remodel permits: 82 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | Completed final sign-off Oct 2026 | 5050 Fulton St | unit #202: remodel kitchen, remove and replace kitchen cabinets, new floor, new countertop, new appliances. replace gfci. replace bathroom vanity faucet. no removal of wallsDetails
unit #202: remodel kitchen, remove and replace kitchen cabinets, new floor, new countertop, new appliances. replace gfci. replace bathroom vanity faucet. no removal of walls | $26,000 |
| May 5, 2026 | Completed final sign-off Aug 2026 | 55 Hermann St | unit 607: remodel kitchen - remove and replace kitchen cabinets, new floor and countertop, new kitchen appliances and faucet. remodel bathroom - replace tile, toilet, sink and faucet. upgrade electrical. all work in kind. no exterior work.Details
unit 607: remodel kitchen - remove and replace kitchen cabinets, new floor and countertop, new kitchen appliances and faucet. remodel bathroom - replace tile, toilet, sink and faucet. upgrade electrical. all work in kind. no exterior work. | $35,000 |
| Jul 29, 2025 | Completed final sign-off Jan 2026 | 3986 23rd St | lower unit- replace shower surround tiles, showerpan and faucet. not a full bathroom remodel.Details
lower unit- replace shower surround tiles, showerpan and faucet. not a full bathroom remodel. | $10,000 |
| May 16, 2025 | Completed final sign-off Aug 2025 | 170 Thrift St | bathroom remodel, replace bathtub, sink, toilet, lights, new floor tiles. install new bathroom in closet area, new shower n, sink and toilet, faucet. replace lightsDetails
bathroom remodel, replace bathtub, sink, toilet, lights, new floor tiles. install new bathroom in closet area, new shower n, sink and toilet, faucet. replace lights | $36,000 |
| Oct 15, 2024 | Completed final sign-off Mar 2025 | 3986 23rd St | middle apartment: remodel (2) bathroom in kind. 1st bathroom - replace tiles, sink, toilet and faucet, showerpan. 2nd bathroom- replace tiles, sink, toilet and faucet. no change to floor layout. no change to wall layout. no structural work.Details
middle apartment: remodel (2) bathroom in kind. 1st bathroom - replace tiles, sink, toilet and faucet, showerpan. 2nd bathroom- replace tiles, sink, toilet and faucet. no change to floor layout. no change to wall layout. no structural work. | $35,000 |
| Sep 13, 2024 | Completed final sign-off Dec 2024 | 2190 Beach St | unit #306: remodel kitchen in kind - remove and replace kitchen cabinet, replace kitchen appliances, new floor and countertop. replace bathroom vanity and faucet in kind. no change to floor layout. no change to wall layout. no structural work.Details
unit #306: remodel kitchen in kind - remove and replace kitchen cabinet, replace kitchen appliances, new floor and countertop. replace bathroom vanity and faucet in kind. no change to floor layout. no change to wall layout. no structural work. | $30,000 |
| Dec 15, 2023 | Completed final sign-off May 2024 | 2201 Pacific Av | unit #601: kitchen remodel: remove and replace kitchen cabinets, replace g.f.c.i, replace all kitchen appliances and new linoleum flr. hallway bathroom: replace sink and faucet, new flr. tiles bedroom bathroom: replace sink and faucet. no moving wallsDetails
unit #601: kitchen remodel: remove and replace kitchen cabinets, replace g.f.c.i, replace all kitchen appliances and new linoleum flr. hallway bathroom: replace sink and faucet, new flr. tiles bedroom bathroom: replace sink and faucet. no moving walls | $40,000 |
| Jul 27, 2023 | Completed final sign-off Feb 2024 | 1950 Jones St | unit 2: kitchen- replace cabinets, sink, faucet, install gfi. bathroom- remove bathtub to shower, replace sink, toilet, and & tiles. upgrade power. replace wall, ceiling finish in kind to maintain fire rating.Details
unit 2: kitchen- replace cabinets, sink, faucet, install gfi. bathroom- remove bathtub to shower, replace sink, toilet, and & tiles. upgrade power. replace wall, ceiling finish in kind to maintain fire rating. | $30,000 |
| Jul 27, 2023 | Completed final sign-off Oct 2023 | 484 Molimo Dr | bathroom- replace shower pan, tiles, sink, toliet and faucet and skylight (same size and location) - replace lights and install gfci. same size and location.Details
bathroom- replace shower pan, tiles, sink, toliet and faucet and skylight (same size and location) - replace lights and install gfci. same size and location. | $16,000 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 1590 Sacramento St | unit 42: remodel kitchen- reove and replace kitchen cabinets, replace kitchen appliances- upgrade power. replace bathroom faucet, sink, and toilet.Details
unit 42: remodel kitchen- reove and replace kitchen cabinets, replace kitchen appliances- upgrade power. replace bathroom faucet, sink, and toilet. | $30,000 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 1590 Sacramento St | unit 2: remodel kitchen- remove and replace kitchen cabinets- replace all kitchen appliances, upgrade power. bathroom replace lights and windows.Details
unit 2: remodel kitchen- remove and replace kitchen cabinets- replace all kitchen appliances, upgrade power. bathroom replace lights and windows. | $25,000 |
| May 9, 2023 | Completed final sign-off Sep 2023 | 1590 Sacramento St | unit 16: remodel kitchen- remove and replace cabinets, replace all kitchen appliances, upgrade power. replace bathroom faucet, and windowDetails
unit 16: remodel kitchen- remove and replace cabinets, replace all kitchen appliances, upgrade power. replace bathroom faucet, and window | $30,000 |
| Mar 28, 2023 | Completed final sign-off Oct 2023 | 351 Chestnut St | remodel 1 kitchen: remove cabinet/replace w/new, change 5 windows-not visible from street (same size and location u=.30max), install gfci, replace all appliances; remodel 1 bathroom: replace tiles/sink/toilet/faucet, install shower pan; living room: add outlets all non structuralDetails
remodel 1 kitchen: remove cabinet/replace w/new, change 5 windows-not visible from street (same size and location u=.30max), install gfci, replace all appliances; remodel 1 bathroom: replace tiles/sink/toilet/faucet, install shower pan; living room: add outlets all non structural | $20,000 |
| Feb 16, 2023 | Completed final sign-off May 2023 | 5050 Fulton St | unit 301: remodel kitchen, remove/replace kitchen cabinets. replace bathroom bathtub, sink, toilet, & faucet. kitchen & bathroom remodel.Details
unit 301: remodel kitchen, remove/replace kitchen cabinets. replace bathroom bathtub, sink, toilet, & faucet. kitchen & bathroom remodel. | $25,000 |
| Dec 13, 2022 | Completed final sign-off May 2023 | 540 Ofarrell St | unit 101:remodel kitchen- remove and replace kitchen cabinets, kitchen appliances. replace bath tub, faucet, sink and toilet in bathroom. in kind.Details
unit 101:remodel kitchen- remove and replace kitchen cabinets, kitchen appliances. replace bath tub, faucet, sink and toilet in bathroom. in kind. | $25,000 |
| Sep 26, 2022 | Completed final sign-off Apr 2023 | 3976 23rd St | 3976 a: 1. update whole unit, electrical, replace sheetrock in kind. no layout change. 2. kitchen and bath remodel. no plumbing fixtures layout change. 3. replace bathtub, sink, toilet in bathroom 4. replace kitchen cabinets, floor, and all appliances.Details
3976 a: 1. update whole unit, electrical, replace sheetrock in kind. no layout change. 2. kitchen and bath remodel. no plumbing fixtures layout change. 3. replace bathtub, sink, toilet in bathroom 4. replace kitchen cabinets, floor, and all appliances. | $60,000 |
| Aug 16, 2022 | Completed final sign-off Feb 2023 | 55 Hermann St | unit 603: one kitchen and one bathroom remodel: kitchen- remove and replace kitchen cabinets. install kitchen appliances new gfci. bathroom- replace sink, faucet, toliet and tiles.Details
unit 603: one kitchen and one bathroom remodel: kitchen- remove and replace kitchen cabinets. install kitchen appliances new gfci. bathroom- replace sink, faucet, toliet and tiles. | $20,000 |
| Aug 16, 2022 | Completed final sign-off Feb 2023 | 2190 Beach St | apt 304: one kitchen and one bathroom remodel: kitchen remove and replace kitchen cabinets, install kitchen appliances new gfi. bathroom replace sink, faucet, toilet and tiles.Details
apt 304: one kitchen and one bathroom remodel: kitchen remove and replace kitchen cabinets, install kitchen appliances new gfi. bathroom replace sink, faucet, toilet and tiles. | $20,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 1590 Sacramento St | apt 26: replace sink, faucet and bathtub in bathroom. replace countertop, sink and faucet in kitchen & cabinets. replace g.f.i. in kitchen.Details
apt 26: replace sink, faucet and bathtub in bathroom. replace countertop, sink and faucet in kitchen & cabinets. replace g.f.i. in kitchen. | $16,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 1590 Sacramento St | apt 27: replace lightview window. lights and faucet in bathroom. replace kitchen appliances, new water line, new power in kitchen.Details
apt 27: replace lightview window. lights and faucet in bathroom. replace kitchen appliances, new water line, new power in kitchen. | $18,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 1590 Sacramento St | apt 36: replace one window in bathroom lightview. replace faucet and sink in bathroom. remodel kitchen - change water line, new power. replace kitchen cabinet and appliances. new countertop.Details
apt 36: replace one window in bathroom lightview. replace faucet and sink in bathroom. remodel kitchen - change water line, new power. replace kitchen cabinet and appliances. new countertop. | $20,000 |
| Feb 8, 2022 | Completed final sign-off Aug 2022 | 5050 Fulton St | #201: remodel kitchen: remove and replace kitchen cabinets. install kitchen appliances. new g.f.i. replace sink,toilet and faucet in bathroom. non structural.Details
#201: remodel kitchen: remove and replace kitchen cabinets. install kitchen appliances. new g.f.i. replace sink,toilet and faucet in bathroom. non structural. | $18,000 |
| Feb 8, 2022 | Completed final sign-off Jun 2022 | 2325 Jackson St | #201: remodel one kitchen: remove and replace kitchen cabinets. install kitchen appliances. new g.f.i. remodel one bathroom: replace tiles, sink,toilet and faucet in bathroom. non structural.Details
#201: remodel one kitchen: remove and replace kitchen cabinets. install kitchen appliances. new g.f.i. remodel one bathroom: replace tiles, sink,toilet and faucet in bathroom. non structural. | $26,000 |
| Jan 7, 2022 | Completed final sign-off Oct 2022 | 5050 Fulton St | unit 303: convert existing kitchen to bedroom, and existing closet to kitchen. new tile and toilet for the existing bathroom.Details
unit 303: convert existing kitchen to bedroom, and existing closet to kitchen. new tile and toilet for the existing bathroom. | $20,000 |
| Dec 13, 2021 | Completed final sign-off May 2022 | 2190 Beach St | apt 202: (1) remodel kitchen- remove and replace kitchen cabinet. gfci replace all appliances. (1) replace bathroom tiles, sink, toilet, bathtub and faucet.Details
apt 202: (1) remodel kitchen- remove and replace kitchen cabinet. gfci replace all appliances. (1) replace bathroom tiles, sink, toilet, bathtub and faucet. | $15,000 |
| Nov 8, 2021 | Completed final sign-off Jun 2022 | 1620 Jones St | apt #4: remodel kitchen- replace cabinets and appliances. install gfi and install lights remodel bathroom- remove tiles, replace sink and toilet. replace faucet, install new tiles. install gfi and install lights. all replace in kind.Details
apt #4: remodel kitchen- replace cabinets and appliances. install gfi and install lights remodel bathroom- remove tiles, replace sink and toilet. replace faucet, install new tiles. install gfi and install lights. all replace in kind. | $18,000 |
| Jul 12, 2021 | Completed final sign-off Dec 2021 | 180 04th Av | apt 12: remodel kitchen, remove and replace cabinets, new floor, new countertop. replace kitchen appliances, replace toilet, sink, faucet in bathDetails
apt 12: remodel kitchen, remove and replace cabinets, new floor, new countertop. replace kitchen appliances, replace toilet, sink, faucet in bath | $18,000 |
| May 11, 2021 | Completed final sign-off Jun 2024 | 1950 Jones St | unit #6: replace kitchen cabinets. remove bathtub, replace bathroom sink, toilet & tiles. upgrade power.Details
unit #6: replace kitchen cabinets. remove bathtub, replace bathroom sink, toilet & tiles. upgrade power. | $20,000 |
| May 11, 2021 | Completed final sign-off Nov 2021 | 1950 Jones St | unit #5: replace kitchen cabinets. remove bathtub, replace bathroom sink, toilet & tiles. upgrade power.Details
unit #5: replace kitchen cabinets. remove bathtub, replace bathroom sink, toilet & tiles. upgrade power. | $20,000 |
| May 11, 2021 | Completed final sign-off Sep 2021 | 2550 Fulton St | unit #12: replace kitchen cabinets, install gfi. replace sink, faucet, toilet in bathroom.Details
unit #12: replace kitchen cabinets, install gfi. replace sink, faucet, toilet in bathroom. | $18,000 |
| Apr 1, 2021 | Completed final sign-off Dec 2021 | 14 Pleasant St | interior remodel. add 1 bath. remodel existing kitchen and bath.Details
interior remodel. add 1 bath. remodel existing kitchen and bath. | $20,000 |
| Mar 10, 2021 | Completed final sign-off Jun 2021 | 1695 North Point St | #303: remodel kitchen - remove & replace kitchen cabinets, granite countertop, floor linoleum. install g.f.i. replace kitchen appliances. replace one shower faucet in bathroom.Details
#303: remodel kitchen - remove & replace kitchen cabinets, granite countertop, floor linoleum. install g.f.i. replace kitchen appliances. replace one shower faucet in bathroom. | $18,000 |
| Feb 22, 2021 | Completed final sign-off Nov 2021 | 1950 Jones St | unit #4: replace kitchen cabinets. remove bathroom sink, bathtub & sink to replace tiles. upgrade power.Details
unit #4: replace kitchen cabinets. remove bathroom sink, bathtub & sink to replace tiles. upgrade power. | $20,000 |
| Sep 1, 2020 | Completed final sign-off Jan 2021 | 55 Hermann St | unit 204: replace kitchen cabinets & appliances. upgrade power in kitchen. replace bathroom sink, faucet & toilet. all work in kind (kitchen ~8'x10', bathroom ~5'x6').Details
unit 204: replace kitchen cabinets & appliances. upgrade power in kitchen. replace bathroom sink, faucet & toilet. all work in kind (kitchen ~8'x10', bathroom ~5'x6'). | $18,000 |
| Aug 3, 2020 | Completed final sign-off Feb 2021 | 1950 Jones St | unit #3: replace kitchen cabinets, tiles, countertop, sink, electrical outlets and light switches. replace kitchen appliances. kitchen approx 8'x10'. replace bathroom vanity, wall cabinet, toilet and exhaust fan. repair leaking water drain. bathroom approx 8'x8'. all work in kind.Details
unit #3: replace kitchen cabinets, tiles, countertop, sink, electrical outlets and light switches. replace kitchen appliances. kitchen approx 8'x10'. replace bathroom vanity, wall cabinet, toilet and exhaust fan. repair leaking water drain. bathroom approx 8'x8'. all work in kind. | $20,000 |
| Jul 6, 2020 | Completed final sign-off Dec 2020 | 1590 Sacramento St | unit #32: replace kitchen cabinets and appliances. upgrade power. replace sink, faucet and toilet in bathroom. all work in kind. size of kitchen approx 10ft x 12ft. size of bathroom approx 5ft x 5ftDetails
unit #32: replace kitchen cabinets and appliances. upgrade power. replace sink, faucet and toilet in bathroom. all work in kind. size of kitchen approx 10ft x 12ft. size of bathroom approx 5ft x 5ft | $20,000 |
| Jun 11, 2020 | Completed final sign-off Dec 2020 | 2201 Pacific Av | unit #505: replace kitchen cabinet and appliances in kind. upgrade power in kitchen. replace bathroom sink and faucet in kind.Details
unit #505: replace kitchen cabinet and appliances in kind. upgrade power in kitchen. replace bathroom sink and faucet in kind. | $18,000 |
| Jun 11, 2020 | Completed final sign-off Sep 2020 | 2190 Beach St | unit #205: replace kitchen cabinet and appliances in kind. upgrade power in kitchen. replace bathroom sink, toilet and bathtub tiles in kind.Details
unit #205: replace kitchen cabinet and appliances in kind. upgrade power in kitchen. replace bathroom sink, toilet and bathtub tiles in kind. | $20,000 |
| Jun 2, 2020 | Completed final sign-off Aug 2020 | 55 Hermann St | unit# 407: replace kitchen cabinets and appliances in kind. upgrade power in kitchen. replace sink, faucet and toilet in kind. replace bathroom window in kind, not visible from street.Details
unit# 407: replace kitchen cabinets and appliances in kind. upgrade power in kitchen. replace sink, faucet and toilet in kind. replace bathroom window in kind, not visible from street. | $18,000 |
| May 26, 2020 | Completed final sign-off Aug 2020 | 159 19th Av | unit#6. replace kitchen cabinets, appliances, install gfi. replace sink and faucet in bathroom. replace all lights.Details
unit#6. replace kitchen cabinets, appliances, install gfi. replace sink and faucet in bathroom. replace all lights. | $18,000 |
| May 26, 2020 | Completed final sign-off Nov 2020 | 540 Ofarrell St | unit#603. replace kitchen cabinets, appliances, install gfi. replace bathroom faucet. replace all lights.Details
unit#603. replace kitchen cabinets, appliances, install gfi. replace bathroom faucet. replace all lights. | $18,000 |
| Mar 6, 2020 | Completed final sign-off Jul 2020 | 55 Hermann St | unit # 304: remodel kitchen: remove and replace kitchen cabinets, countertop tile, floor lineoleum. replace all kitchen appliances. install gfi replace toilet, sink and faucet in bathroom.Details
unit # 304: remodel kitchen: remove and replace kitchen cabinets, countertop tile, floor lineoleum. replace all kitchen appliances. install gfi replace toilet, sink and faucet in bathroom. | $18,000 |
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 55 Hermann St | unit 604. kitchen and 1 full bath remodeling. install gfi. no change in wall openings layout. replace kitchen cabinets, new appliances, new floor and counterto. replace bathroom fixtures.Details
unit 604. kitchen and 1 full bath remodeling. install gfi. no change in wall openings layout. replace kitchen cabinets, new appliances, new floor and counterto. replace bathroom fixtures. | $20,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 1590 Sacramento St | unit #30: remodel kitchen. replace cabinet and appliances, upgrade power to 60m. replace bathroom sink and faucetDetails
unit #30: remodel kitchen. replace cabinet and appliances, upgrade power to 60m. replace bathroom sink and faucet | $22,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2020 | 2325 Jackson St | kitchen remodel replace cabinets and appliances. bath remodel replce sink toiletDetails
kitchen remodel replace cabinets and appliances. bath remodel replce sink toilet | $18,000 |
| Oct 1, 2019 | Completed final sign-off Dec 2019 | 55 Hermann St | apt 305: kitchen remodel - remove and replace kitchen cabinets, counter top, tile, floor lineleum, install gfi, replace all kitchen appliances. replace toilet in bathroom and vanity no other work in bathroom.Details
apt 305: kitchen remodel - remove and replace kitchen cabinets, counter top, tile, floor lineleum, install gfi, replace all kitchen appliances. replace toilet in bathroom and vanity no other work in bathroom. | $18,000 |
| Aug 1, 2019 | Completed final sign-off Jun 2020 | 1423 Mason St | top floor: remodel 8' x 15' kitchen, replace cabinet, install gfi, install appliances. remodel 2 bathroom (5'x7')&(3'x5') replace toilet, bathtub and sink. install gfi into bathroom. install panel. replace lights and install outlets in whole aprartment.Details
top floor: remodel 8' x 15' kitchen, replace cabinet, install gfi, install appliances. remodel 2 bathroom (5'x7')&(3'x5') replace toilet, bathtub and sink. install gfi into bathroom. install panel. replace lights and install outlets in whole aprartment. | $30,000 |
| Jul 10, 2019 | Completed final sign-off Aug 2019 | 1695 North Point St | unit 105: remodel kitchen, remove & replace kitchen cabinet, granite countertop. new floor, install appliances, install gfi. bathroom replace toilet -toilet only (no bathroom remodel)Details
unit 105: remodel kitchen, remove & replace kitchen cabinet, granite countertop. new floor, install appliances, install gfi. bathroom replace toilet -toilet only (no bathroom remodel) | $15,000 |
| May 6, 2019 | Completed final sign-off Jul 2019 | 55 Hermann St | apartment 502: remodel 1 kitchen: remove and replace kitchen cabinet, countertop tile, floor linoleum. install gfi, upgrade power replace all kitchen appliances. remodel 1 bathroom: replace vanity, toilet, faucet and floor tilesDetails
apartment 502: remodel 1 kitchen: remove and replace kitchen cabinet, countertop tile, floor linoleum. install gfi, upgrade power replace all kitchen appliances. remodel 1 bathroom: replace vanity, toilet, faucet and floor tiles | $18,000 |
| Apr 12, 2019 | Completed final sign-off Aug 2019 | 3817 Judah St | remodel (1) kitchen and (1) bathroom. replace cabinet, countertop tiles, floor tiles and install new appliances at kitchen. replace bathtub, tiles, sink, and toilet at bathroom. no change to layout, walls and openings.Details
remodel (1) kitchen and (1) bathroom. replace cabinet, countertop tiles, floor tiles and install new appliances at kitchen. replace bathtub, tiles, sink, and toilet at bathroom. no change to layout, walls and openings. | $30,000 |
| Feb 22, 2019 | Completed final sign-off May 2019 | 55 Hermann St | unit #405: kitchen and bathroom remodel. kitchen--replace cabinets, install counter top tiles, new floor, install aplliances. bathroom--replace tiles, faucet, sink, toilet and litghts.Details
unit #405: kitchen and bathroom remodel. kitchen--replace cabinets, install counter top tiles, new floor, install aplliances. bathroom--replace tiles, faucet, sink, toilet and litghts. | $20,000 |
| Feb 15, 2019 | Completed final sign-off Aug 2019 | 2027 43rd Av | remodel kitchen and bath on 2nd fl. add 2 bedrooms and 1 full bath on 1st fl. relocate furnace and water heaterDetails
remodel kitchen and bath on 2nd fl. add 2 bedrooms and 1 full bath on 1st fl. relocate furnace and water heater | $20,000 |
| Jan 16, 2019 | Completed final sign-off Mar 2019 | 5050 Fulton St | apt 104: remodel kitchen - remove and replace kitchen cabinet, counter top tile, 7x14 floor lineoleum, upgrade power in kitchen. install gfi, replace all kitchen appliances. replace bathtub faucet, toilet and sink in bathroom.Details
apt 104: remodel kitchen - remove and replace kitchen cabinet, counter top tile, 7x14 floor lineoleum, upgrade power in kitchen. install gfi, replace all kitchen appliances. replace bathtub faucet, toilet and sink in bathroom. | $12,000 |
| Dec 7, 2018 | Completed final sign-off Dec 2018 | 55 Hermann St | apt 106: remove existing bathtub surround and replace faucet and install three pieces of granite. for new surround. replace light in bathroom.Details
apt 106: remove existing bathtub surround and replace faucet and install three pieces of granite. for new surround. replace light in bathroom. | $3,500 |
| Nov 29, 2018 | Completed final sign-off Feb 2019 | 2190 Beach St | kitchen remodel - remove and replace kitchen cabinet, ganite counter top, floor lineoleum. install gfi, replace all kitchen appliances. upgrade power. replace sink and faucet in bathroom. apt 207Details
kitchen remodel - remove and replace kitchen cabinet, ganite counter top, floor lineoleum. install gfi, replace all kitchen appliances. upgrade power. replace sink and faucet in bathroom. apt 207 | $16,000 |
| Nov 15, 2018 | Completed final sign-off Jan 2019 | 2550 Fulton St | remodel kitchen - remove and replace kitchen cabinets. countertops tiles, floor lineoleum, install gfi, replace all kitchen appliances. upgrade power in kitchen. replace toilet, sink and faucet in bathroom.Details
remodel kitchen - remove and replace kitchen cabinets. countertops tiles, floor lineoleum, install gfi, replace all kitchen appliances. upgrade power in kitchen. replace toilet, sink and faucet in bathroom. | $16,000 |
| Aug 7, 2018 | Completed final sign-off Oct 2018 | 55 Hermann St | remove and replace kithcen cabinet, countertop, tile, floor linoleum. install gfi. replace all kitchen appliance. replace bathtub, toilet, sink, faucet in bathroom. replace light view window in bathroom.Details
remove and replace kithcen cabinet, countertop, tile, floor linoleum. install gfi. replace all kitchen appliance. replace bathtub, toilet, sink, faucet in bathroom. replace light view window in bathroom. | $15,000 |
| Jul 27, 2018 | Completed final sign-off Nov 2018 | 1950 Jones St | unit 1: replace kitchen cabinets, tiles, countertop, sink, faucent, electrical, upgrade circuit breaker, replace kitchen appliances, bathroom vanity, wll cabinet, toilet, exhaust fan, repair drainDetails
unit 1: replace kitchen cabinets, tiles, countertop, sink, faucent, electrical, upgrade circuit breaker, replace kitchen appliances, bathroom vanity, wll cabinet, toilet, exhaust fan, repair drain | $20,000 |
| Jun 8, 2018 | Completed final sign-off Sep 2018 | 2151 Filbert St | all work is in unit #2153 filbert street: remodel kitchen & remove (e) wall, remodel (e) bathroom, and add (n) bathroom. new footings at ground level. replace exterior french doors in kind. n/a maherDetails
all work is in unit #2153 filbert street: remodel kitchen & remove (e) wall, remodel (e) bathroom, and add (n) bathroom. new footings at ground level. replace exterior french doors in kind. n/a maher | $55,000 |
| Mar 27, 2018 | Completed final sign-off May 2018 | 2355 Polk St | unit 404: kitchen remodel, replace cabinets, countertop, tiles, linoleum floor, appliances; bathroom, replace tiles, vanity, toilet, install gfiDetails
unit 404: kitchen remodel, replace cabinets, countertop, tiles, linoleum floor, appliances; bathroom, replace tiles, vanity, toilet, install gfi | $43,000 |
| Jan 16, 2018 | Completed final sign-off Mar 2018 | 2201 Pacific Av | unit # 406 kitchen remodel, replace cabinets, instlal appliances, install tiles, install gfi bathroom remodel, replace bathrub, faucet, replace sink, no rough framing or change of (e) layoutDetails
unit # 406 kitchen remodel, replace cabinets, instlal appliances, install tiles, install gfi bathroom remodel, replace bathrub, faucet, replace sink, no rough framing or change of (e) layout | $33,000 |
| Jan 9, 2018 | Completed final sign-off Mar 2018 | 2190 Beach St | apt 102: remodel kitchen - replace kitchen cabinets. install gfi. install floor linoleum. replace counter top tile, install new appliances. replace bath tub faucet, sink and window in bathroom. maher naDetails
apt 102: remodel kitchen - replace kitchen cabinets. install gfi. install floor linoleum. replace counter top tile, install new appliances. replace bath tub faucet, sink and window in bathroom. maher na | $12,000 |
| Oct 25, 2017 | Completed final sign-off Dec 2017 | 3423 Fillmore St | apt 110: kitchen remodel: replace cabinets, appliances, 2 windows at light wells. replace 1 bathroom window. maher n/a.Details
apt 110: kitchen remodel: replace cabinets, appliances, 2 windows at light wells. replace 1 bathroom window. maher n/a. | $12,000 |
| Aug 10, 2017 | Completed final sign-off Oct 2017 | 1590 Sacramento St | unit 12: kitchen remodel, replace cabinets, replace appliances, install tiles, gfi; bathroom remodel, replace tub, sink, toilet, window; no structural work, same configurationDetails
unit 12: kitchen remodel, replace cabinets, replace appliances, install tiles, gfi; bathroom remodel, replace tub, sink, toilet, window; no structural work, same configuration | $20,000 |
| Jun 29, 2017 | Completed final sign-off Aug 2017 | 1590 Sacramento St | unit #40: kitchen remodel - replace cabinets, replace appliances, relocate water & gas lines. bathroom remodel - replace bath tub, faucet, replace sink and vanityDetails
unit #40: kitchen remodel - replace cabinets, replace appliances, relocate water & gas lines. bathroom remodel - replace bath tub, faucet, replace sink and vanity | $15,000 |
| Apr 14, 2017 | Completed final sign-off Jun 2017 | 1590 Sacramento St | kitchen remodel, replace cabinets, install new appliances , bathroom remodel replace faucet ,tiles & sink i add window & bathtub in unit # 28Details
kitchen remodel, replace cabinets, install new appliances , bathroom remodel replace faucet ,tiles & sink i add window & bathtub in unit # 28 | $15,000 |
| Apr 14, 2017 | Completed final sign-off Jul 2017 | 2190 Beach St | kitchen remodel, replace cabinets & tiles, install gfi, install appliances , bathroom remodel replace faucet & sink , replace bathroom window, in unit # 106Details
kitchen remodel, replace cabinets & tiles, install gfi, install appliances , bathroom remodel replace faucet & sink , replace bathroom window, in unit # 106 | $12,000 |
| Sep 2, 2016 | Completed final sign-off Oct 2016 | 1590 Sacramento St | unit #17 - bathroom remodel: bathtub, faucet, sink, vanity, install gfi. high efficacy lighting or controlled by manual on sensor and high efficacy main light. replace window at same opening.Details
unit #17 - bathroom remodel: bathtub, faucet, sink, vanity, install gfi. high efficacy lighting or controlled by manual on sensor and high efficacy main light. replace window at same opening. | $2,500 |
| Sep 2, 2016 | Completed final sign-off Nov 2016 | 2249 33rd Av | bathroom remodel - replace tiles, bathtub, toilet, sink, high efficacy lighting or controlled by manual on sensor and high efficacy main light. kitchen remodel - replace countertop, main water line, upgrade power line. no change in cabinet. kitchen lighting 50% wattage high efficacy.Details
bathroom remodel - replace tiles, bathtub, toilet, sink, high efficacy lighting or controlled by manual on sensor and high efficacy main light. kitchen remodel - replace countertop, main water line, upgrade power line. no change in cabinet. kitchen lighting 50% wattage high efficacy. | $18,000 |
| Jul 29, 2016 | Completed final sign-off Jan 2017 | 215 El Camino Del Mar | kitchen and bathroom remodel in-kind; no new wall & no existing wall relocation. lighting in kitchen and bathroom remodel shall comply w/ cec 150.0(k) 3 & 5. repair dry rot wood at rear deck less than 50% in-kind not visible from street.Details
kitchen and bathroom remodel in-kind; no new wall & no existing wall relocation. lighting in kitchen and bathroom remodel shall comply w/ cec 150.0(k) 3 & 5. repair dry rot wood at rear deck less than 50% in-kind not visible from street. | $23,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 1590 Sacramento St | unit 14: kitchen remodel: remove/replace cabinets, floor tiles, sink, faucet & vent; replace lights (min50%) (e) hood remain; bathroom remodel: remove/replace bathtub, sink, faucet, floor tiles, replace (e) opaque window, replace lights (min 1 light), toilets, (e) fan remains.Details
unit 14: kitchen remodel: remove/replace cabinets, floor tiles, sink, faucet & vent; replace lights (min50%) (e) hood remain; bathroom remodel: remove/replace bathtub, sink, faucet, floor tiles, replace (e) opaque window, replace lights (min 1 light), toilets, (e) fan remains. | $15,000 |
| May 27, 2016 | Completed final sign-off Sep 2016 | 1590 Sacramento St | unit 5: kitchen remodel - replace cabinetes, install tiles, dishwasher, garbage disposal, vent, faucet, lights; bathroom remodel - install sink, faucet, bathtub, lights, gfi, replace window.Details
unit 5: kitchen remodel - replace cabinetes, install tiles, dishwasher, garbage disposal, vent, faucet, lights; bathroom remodel - install sink, faucet, bathtub, lights, gfi, replace window. | $15,000 |
| Nov 5, 2015 | Completed final sign-off Dec 2015 | 815 Fell St | to comply with complaint 201575581. 3rd floor: kitchen and bathroom remodel. 4th floor(attic): powder room remodel, water heater and space heaterDetails
to comply with complaint 201575581. 3rd floor: kitchen and bathroom remodel. 4th floor(attic): powder room remodel, water heater and space heater | $20,000 |
| Jul 16, 2015 | Completed final sign-off Sep 2015 | 2325 Jackson St | apt 102: kitchen - remove cabinets and install new, put linoleum on floors, put tiles on couter top, install dishwahser, faucet, stove top, and refig. bathroom - remove tiles, replace faucet, replace toilet, sink, faucet, install tiles.Details
apt 102: kitchen - remove cabinets and install new, put linoleum on floors, put tiles on couter top, install dishwahser, faucet, stove top, and refig. bathroom - remove tiles, replace faucet, replace toilet, sink, faucet, install tiles. | $15,000 |
| Jul 8, 2015 | Completed final sign-off Sep 2015 | 180 04th Av | unit #6: remodel kitchen - replace cabinets, install countertop, tiles, linoleum on floors, install dishwasher , garbage disposal, faucet, microwave hood & stove top, replace lights, gfi.- bathroom remodel-replace vanity top and faucet.Details
unit #6: remodel kitchen - replace cabinets, install countertop, tiles, linoleum on floors, install dishwasher , garbage disposal, faucet, microwave hood & stove top, replace lights, gfi.- bathroom remodel-replace vanity top and faucet. | $9,000 |
| Jun 18, 2015 | Completed final sign-off Oct 2015 | 2190 Beach St | apt #301: kitchen remodel: remove and replace cabinets, sink, countertop tiles, faucet, dishwasher, garbage disposal, microwave. move gs vault inside cabinet. bathroom remodel: remove tiles from bathtub section, replace faucet, new sink, new water closet. n/a for maher.relocate bedroom wall.Details
apt #301: kitchen remodel: remove and replace cabinets, sink, countertop tiles, faucet, dishwasher, garbage disposal, microwave. move gs vault inside cabinet. bathroom remodel: remove tiles from bathtub section, replace faucet, new sink, new water closet. n/a for maher.relocate bedroom wall. | $35,000 |
| Feb 13, 2015 | Completed final sign-off Apr 2015 | 55 Hermann St | apt # 307: kitchen remodel: remove and replace kitchen cabinet,tile, countertop, new stove top, sink, faucet, microwave, and new refriderator. bathroom: change toilet and replace window.(light-well) n/a for the maher.Details
apt # 307: kitchen remodel: remove and replace kitchen cabinet,tile, countertop, new stove top, sink, faucet, microwave, and new refriderator. bathroom: change toilet and replace window.(light-well) n/a for the maher. | $16,000 |
| Dec 12, 2014 | Completed final sign-off Feb 2015 | 55 Hermann St | unit 606 - kitchen remodel - remove and replace kitchen cabinet, tile countertop and stovetop sink, faucet; bathroom remodel - remove and rep;lace tiles, sink, cabinet, tilet and faucetDetails
unit 606 - kitchen remodel - remove and replace kitchen cabinet, tile countertop and stovetop sink, faucet; bathroom remodel - remove and rep;lace tiles, sink, cabinet, tilet and faucet | $16,000 |
| Nov 21, 2014 | Completed final sign-off Jan 2015 | 55 Hermann St | remove kitchen cabinet, replace w/ (n) cabinet, tile, counter top, hood, stove top, faucet & dishwasher. remove & replace window. remodel bathroom.Details
remove kitchen cabinet, replace w/ (n) cabinet, tile, counter top, hood, stove top, faucet & dishwasher. remove & replace window. remodel bathroom. | $25,000 |
| Oct 23, 2014 | Expired or cancelled expired May 2025 | 2586 47th Av | add 1 family room and 1 bath on 1st fl (401 sq ft) relocate water heater and furnaceDetails
add 1 family room and 1 bath on 1st fl (401 sq ft) relocate water heater and furnace | $20,000 |
| Aug 29, 2014 | Completed final sign-off Nov 2014 | 2190 Beach St | apt#105- kitchen and bath remodel - to comply with cec150.0(k)3 & 5Details
apt#105- kitchen and bath remodel - to comply with cec150.0(k)3 & 5 | $17,000 |
| Jul 30, 2014 | Completed final sign-off Oct 2014 | 540 Ofarrell St | kitchen remodel. remove & replace cabinets. counter tops. bathroom. remodel, remove & replace sink, faucet, toilet, bathtubs, tiles. replace 1 window in bathroom in kind. no structural work.Details
kitchen remodel. remove & replace cabinets. counter tops. bathroom. remodel, remove & replace sink, faucet, toilet, bathtubs, tiles. replace 1 window in bathroom in kind. no structural work. | $21,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 2190 Beach St | unit 201. kitchen remodel - remove and replace cabinets, counter tops. bathroom remodel - remove and replace sink, faucet, toilet, bath tub, tiles.Details
unit 201. kitchen remodel - remove and replace cabinets, counter tops. bathroom remodel - remove and replace sink, faucet, toilet, bath tub, tiles. | $12,000 |
| Apr 25, 2014 | Completed final sign-off Jun 2014 | 55 Hermann St | kitchen remodel - remove & replace cabinets & appliances, bathroom remodel- remove & replace toilet, sink & tiles, replace drywall (multiple areas) unit 206Details
kitchen remodel - remove & replace cabinets & appliances, bathroom remodel- remove & replace toilet, sink & tiles, replace drywall (multiple areas) unit 206 | $10,000 |
| Feb 10, 2014 | Completed final sign-off May 2014 | 540 Ofarrell St | unit #405: kitchen remodel_ remove & replace cabinets and appliances; bathroom remodel- remove & replace toilet, sink and tiles, replace drywall (multiple areas); compliance with ord 155-13 not requiredDetails
unit #405: kitchen remodel_ remove & replace cabinets and appliances; bathroom remodel- remove & replace toilet, sink and tiles, replace drywall (multiple areas); compliance with ord 155-13 not required | $23,000 |